CN111021882B - Assembled bay window and installation process thereof - Google Patents

Assembled bay window and installation process thereof Download PDF

Info

Publication number
CN111021882B
CN111021882B CN201911311084.XA CN201911311084A CN111021882B CN 111021882 B CN111021882 B CN 111021882B CN 201911311084 A CN201911311084 A CN 201911311084A CN 111021882 B CN111021882 B CN 111021882B
Authority
CN
China
Prior art keywords
mounting
hole
beams
vertical beams
cross beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911311084.XA
Other languages
Chinese (zh)
Other versions
CN111021882A (en
Inventor
范旭
任国俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Huiya Building Materials Technology Co ltd
Original Assignee
Nantong Huiya Building Materials Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Huiya Building Materials Technology Co ltd filed Critical Nantong Huiya Building Materials Technology Co ltd
Priority to CN201911311084.XA priority Critical patent/CN111021882B/en
Publication of CN111021882A publication Critical patent/CN111021882A/en
Application granted granted Critical
Publication of CN111021882B publication Critical patent/CN111021882B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/02Base frames, i.e. template frames for openings in walls or the like, provided with means for securing a further rigidly-mounted frame; Special adaptations of frames to be fixed therein
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/0007Implements for finishing work on buildings for mounting doors, windows or frames; their fitting
    • E04F21/0015Implements for finishing work on buildings for mounting doors, windows or frames; their fitting for mounting frames
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/56Fastening frames to the border of openings or to similar contiguous frames
    • E06B1/58Fastening frames to the border of openings or to similar contiguous frames by filling up the joints, e.g. by cementing
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/56Fastening frames to the border of openings or to similar contiguous frames
    • E06B1/60Fastening frames to the border of openings or to similar contiguous frames by mechanical means, e.g. anchoring means

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an assembled bay window and an installation process thereof, relates to the technical field of prefabricated parts, and aims to solve the technical problems of large integral dead weight and difficult transportation and installation of the whole bay window. In addition, the cross beams and the vertical beams can be stacked respectively during transportation, so that the stacking state of the cross beams and the vertical beams can be more compact, and the transportation is facilitated.

Description

Assembled bay window and installation process thereof
Technical Field
The invention relates to the technical field of prefabricated parts, in particular to an assembled bay window and an installation process thereof.
Background
The bay window is an external window which protrudes out of the wall surface of the building, can expand the indoor space, has wide visual field and enriches the vertical surface of the building.
The existing Chinese patent with the publication number of CN206418914U discloses a prefabricated bay window, which comprises a window frame and a window body arranged around the window frame, wherein the window body comprises an upper eave, a lower eave, a left vertical surface and a right vertical surface which are integrally arranged. The upper eave, the lower eave, the left vertical surface and the right vertical surface are integrally formed.
However, the whole bay window is poured, so that the whole bay window has large self weight and is difficult to transport and install, and improvement is needed.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide the assembled bay window which has the advantages that the whole body is divided into a plurality of blocks, the assembly can be carried out on a construction site, and the transportation and the installation are more convenient.
In order to achieve the purpose, the invention provides the following technical scheme:
the utility model provides a pin-connected panel window that wafts, includes the crossbeam and the perpendicular roof beam of a pair of vertical setting that a pair of level set up, two it is located between two crossbeams to erect the roof beam, two the crossbeam and two erect the roof beam and enclose into frame type structure, two the surface of crossbeam is located it and erects the fixed installation piece that is provided with of roof beam department of linking to each other, the roof and the diapire of erecting the roof beam all are equipped with and supply corresponding installation piece to insert the mounting hole of establishing, installation piece and mounting hole clearance fit, the fixed concrete layer that is provided with between installation piece outer wall and the mounting hole inner wall.
By adopting the technical scheme, the integral bay window is divided into the pair of cross beams and the pair of vertical beams, so that during hoisting, the weight of a single block is reduced, the hoisting is convenient, the specification requirement on hoisting equipment is low, and the installation is facilitated. In addition, the cross beams and the vertical beams can be stacked respectively during transportation, so that the stacking state of the cross beams and the vertical beams can be more compact, and the transportation is facilitated.
During the assembly, all insert a plurality of installation pieces and establish to the mounting hole to fill the concrete in the clearance department of installation piece and mounting hole, treat after concrete curing accomplishes, can make the joint strength of installation piece and mounting hole higher, simple to operate promptly.
Furthermore, the side wall of the mounting block and the side wall of the mounting hole are both provided with a filling groove along the horizontal direction.
Through adopting above-mentioned technical scheme, when filling the retardation soil, the concrete can stretch into and fill the inslot, can make the lateral wall integrated into one piece of the concrete layer of final formation have with the sand grip of filling groove looks adaptation, can make after the concrete layer maintenance, the joint strength of installation piece and mounting hole is higher.
Furthermore, the bottoms of the filling grooves are obliquely arranged towards the corresponding openings of the mounting holes.
Through adopting above-mentioned technical scheme, when the installation piece has the trend of slipping away from the mounting hole, the concrete layer that is located the filling inslot can be better the restriction installation piece slip away from the mounting hole, further promotes the installation piece and inserts the state stability of establishing to the mounting hole after.
Furthermore, the mounting hole lateral wall runs through along the horizontal direction and is equipped with the slide opening, the adaptation is inserted and is equipped with the slide bar in the slide opening, the installation piece lateral wall runs through along the horizontal direction and is equipped with the jack that supplies the slide bar middle part adaptation to insert to establish.
Through adopting above-mentioned technical scheme, insert when the installation piece and establish to the mounting hole in the back, wear to establish slide opening and jack with the slide bar, can further promote the joint strength of installation piece and mounting hole for the installation piece is further difficult for taking out from the mounting hole.
Furthermore, both ends of the sliding rod extend out of the sliding hole and are sleeved with limit nuts, and the diameters of the outer edges of the limit nuts are larger than those of the inner edges of the sliding hole.
Through adopting above-mentioned technical scheme, insert the slide bar and establish back in slide opening and the jack, establish limit nut with the both ends screw thread cover of slide bar, support the outside of tight slide opening part respectively through the limit nut at both ends, can make the slide bar more stable for the position state of slide opening and jack for the slide bar is difficult for taking place axial and slides, and stability is higher.
Furthermore, both ends of the sliding hole are provided with operation holes, the diameter of each operation hole is larger than that of the sliding hole, the limiting nut is located in each operation hole, and the limiting nut is in clearance fit with the operation holes.
Through adopting above-mentioned technical scheme, arrange stop nut in the handle hole, can be so that stop nut is not outstanding to erect the roof beam lateral wall, avoid carrying out the mistake to stop nut in the follow-up work progress and touch, promoted stop nut's disguise.
Furthermore, a waterproof plug is inserted into the end part of the operation hole, which faces away from the sliding hole in a matching manner.
Through adopting above-mentioned technical scheme, after stop nut finishes installing, insert waterproof end cap and establish to the handle hole in to the realization is to the closing cap of handle hole opening part, thereby reducible outside rainwater gets into the handle hole, can prolong stop nut's life.
Furthermore, the waterproof plug is in threaded connection with the operation hole, and a pull ring is fixedly connected to the end wall of the waterproof plug, which is back to the sliding hole.
Through adopting above-mentioned technical scheme, when needs rotate waterproof end cap, can insert rod-like object and establish to the pull ring in, the rotation operation of the waterproof end cap of realization that afterwards can be more convenient laborsaving has promoted the convenience that waterproof end cap rotated the in-process, and compares in directly rotating waterproof end cap through the hand, more difficult emergence slippage, stability is higher promptly.
Furthermore, a horizontally arranged connecting rope is connected between two pull rings at the same horizontal height, a sun-shading curtain is arranged between every two adjacent connecting ropes, a plurality of connecting rings are uniformly distributed at the top and the bottom of the sun-shading curtain along the length direction of the sun-shading curtain, and the connecting rings are slidably sleeved on the outer sides of the corresponding connecting ropes.
Through adopting above-mentioned technical scheme, during user's later stage in-service use, the accessible slides the sunshade screen and jets into the control of indoor degree in order to realize sunshine, and two pull rings all link to each other with waterproof end cap, waterproof end cap and handle hole threaded connection, waterproof end cap's state stability is higher promptly, can be so that the support intensity of connecting the rope also higher for stability in the sunshade screen use is higher, has effectively utilized the pull ring, need not additionally to install the relevant installation component of sunshade screen.
In view of the defects in the prior art, another object of the present invention is to provide an assembling type bay window installation process, which has the advantage of convenient assembling.
In order to achieve the purpose, the invention provides the following technical scheme:
an installation process of an assembled bay window comprises the following steps:
s1, firstly installing the cross beam at the bottom through a crane, and then hoisting the vertical beams at two sides to the upper parts of the two installation blocks of the cross beam at the bottom through the crane;
s2, coating concrete layers on the surfaces of the two mounting blocks of the cross beam at the bottom, and lowering the vertical beams to enable the mounting blocks to be inserted into the mounting holes, so that the mounting of the vertical beams at the two sides can be completed;
s3, hoisting the cross beam at the top to the positions above the vertical beams at the two sides through a crane, coating concrete on the surfaces of the two mounting blocks of the cross beam at the top, and lowering the cross beam at the top to enable the mounting blocks to be inserted into the mounting holes, so that the mounting of the cross beam at the top can be completed;
and S4, naturally curing for 21 days.
Through adopting above-mentioned technical scheme, can assemble two crossbeams and two perpendicular roof beams, and assemble the completion back, its holistic structural strength is higher, convenient operation.
In conclusion, the invention has the following beneficial effects:
1. the surface that has adopted two crossbeams is located its and erects the fixed installation piece that is provided with of roof and diapire that the roof of roof beam all is equipped with and supplies corresponding installation piece to insert the mounting hole of establishing, installation piece and mounting hole clearance fit, the fixed concrete layer that is provided with between installation piece outer wall and the mounting hole inner wall. The integral bay window is divided into a pair of cross beams and a pair of vertical beams, so that during hoisting, the weight of a single block is reduced, the hoisting is convenient, the specification requirement on hoisting equipment is low, and the installation is facilitated. In addition, the cross beams and the vertical beams can be stacked respectively during transportation, so that the stacking state of the cross beams and the vertical beams can be more compact, and the transportation is facilitated. During the assembly, all insert a plurality of installation pieces and establish to the mounting hole to fill the concrete in the clearance department of installation piece and mounting hole, treat after concrete curing accomplishes, can make the joint strength of installation piece and mounting hole higher, simple to operate promptly.
2. The side wall of the mounting block and the side wall of the mounting hole are both provided with filling grooves along the horizontal direction. When filling the slow setting soil, the concrete can stretch into and fill the inslot, can make the lateral wall integrated into one piece of the concrete layer of final stroke have with the sand grip of filling groove looks adaptation, can make after the concrete layer maintenance, the joint strength of installation piece and mounting hole is higher.
3. The following steps are adopted for installation: s1, firstly installing the cross beam at the bottom through a crane, and then hoisting the vertical beams at two sides to the upper parts of the two installation blocks of the cross beam at the bottom through the crane; s2, coating concrete layers on the surfaces of the two mounting blocks of the cross beam at the bottom, and lowering the vertical beams to enable the mounting blocks to be inserted into the mounting holes, so that the mounting of the vertical beams at the two sides can be completed; s3, hoisting the cross beam at the top to the positions above the vertical beams at the two sides through a crane, coating concrete on the surfaces of the two mounting blocks of the cross beam at the top, and lowering the cross beam at the top to enable the mounting blocks to be inserted into the mounting holes, so that the mounting of the cross beam at the top can be completed; and S4, naturally curing for 21 days. Can assemble two crossbeams and two perpendicular roof beams, and assemble the back of accomplishing, its holistic structural strength is higher, convenient operation.
Drawings
FIG. 1 is a schematic structural diagram of this embodiment 1;
FIG. 2 is an enlarged view taken at A in FIG. 1;
fig. 3 is a sectional view showing the connection relationship between the mounting block and the mounting hole in embodiment 1.
In the figure: 11. a cross beam; 12. erecting a beam; 2. mounting blocks; 20. mounting holes; 21. a concrete layer; 22. filling the groove; 3. a slide bar; 30. a slide hole; 300. a jack; 31. an operation hole; 32. a limit nut; 33. a waterproof plug; 34. a pull ring; 4. connecting ropes; 41. a sun screen; 42. and (7) connecting rings.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Example 1:
a split mounting type bay window, refer to fig. 1, comprises a pair of horizontally arranged cross beams 11 and a pair of vertically arranged vertical beams 12, wherein the two vertical beams 12 are positioned between the two cross beams 11, and the two cross beams 11 and the two vertical beams 12 form a frame structure.
Referring to fig. 2, the surface of the two cross beams 11 is integrally formed with a mounting block 2 at the connection part with the vertical beam 12, and the top wall and the bottom wall of the vertical beam 12 are provided with mounting holes 20. The mounting blocks 2 are inserted into the corresponding mounting holes 20 in a clearance fit manner. And a concrete layer 21 is poured and filled between the outer wall of the mounting block 2 and the inner wall of the mounting hole 20. The side wall of the mounting block 2 and the side wall of the mounting hole 20 are both provided with filling grooves 22 along the horizontal direction, and the bottoms of the plurality of filling grooves 22 are inclined towards the corresponding opening of the mounting hole 20.
Referring to fig. 3, a sliding hole 30 penetrates through the side wall of the mounting hole 20 along the horizontal direction, and a sliding rod 3 is inserted into the sliding hole 30. The side wall of the mounting block 2 is provided with a jack 300 along the horizontal direction in a penetrating way, and the middle part of the sliding rod 3 is inserted into the jack 300 in a matching way so as to connect the mounting block 2 and the mounting hole 20. Both ends of the slide hole 30 are provided with operation holes 31, and the diameter of the operation holes 31 is larger than that of the slide hole 30. The two ends of the sliding rod 3 extend out of the sliding hole 30 and are located in the operation hole 31, the outer wall of the sliding rod is sleeved with a limiting nut 32 in a threaded mode, and the limiting nut 32 is in clearance fit with the operation hole 31. The diameter of the outer edge of the limit nut 32 is larger than that of the inner edge of the slide hole 30, and the end wall of the limit nut 32 abuts against the bottom of the operation hole 31.
Referring to fig. 3, a waterproof plug 33 is inserted into the end of the operation hole 31 opposite to the slide hole 30, and the waterproof plug 33 is preferably made of rubber. The end wall of the waterproof plug 33 facing away from the slide hole 30 is adhesively fixed with a pull ring 34.
Referring to fig. 2, a connecting rope 4 is detachably connected between two pull rings 34 at the same horizontal height through a lock catch, and the connecting rope 4 is horizontally arranged. A sun-shading curtain 41 is arranged between the adjacent connecting ropes 4, a plurality of connecting rings 42 are sewn and fixed at the top and the bottom of the sun-shading curtain 41 along the length direction of the sun-shading curtain, and the connecting rings 42 are slidably sleeved on the outer sides of the corresponding connecting ropes 4.
The working principle is as follows: by dividing the integral bay window into the pair of cross beams 11 and the pair of vertical beams 12, during hoisting, the weight of a single block is reduced, the hoisting is convenient, the specification requirement on hoisting equipment is low, and the installation is convenient. In addition, the cross members 11 and the vertical members 12 can be stacked separately during transportation, so that they can be more compact in a stacked state, thereby facilitating transportation.
During installation, each installation block 2 is inserted into the installation hole 20, the slide rod 3 is inserted into the slide hole 30 and the jack 300, the limit nuts 32 are sleeved at two ends of the slide rod 3, the two limit nuts 32 are respectively abutted to the bottoms of the corresponding operation holes 31, the waterproof plugs 33 are screwed into the operation holes 31, the opening of the operation holes 31 can be sealed, the slide rod 3 can enable the connection strength of the installation blocks 2 and the installation hole 20 to be higher, when the installation is needed, the slide rod 3 is firstly pulled out of the slide hole 30 and the jack 300, the installation blocks 2 and the installation hole 20 can be conveniently separated, and even the cross beam 11 and the vertical beam 12 are disassembled and utilized.
Example 2:
an installation process of an assembled bay window comprises the following steps:
s1, firstly installing the bottom cross beam 11 through a crane, and then hoisting the vertical beams 12 on the two sides to the upper parts of the two installation blocks 2 of the bottom cross beam 11 through the crane;
s2, coating concrete layers 21 on the surfaces of the two mounting blocks 2 of the cross beam 11 at the bottom, preferably, the thickness of the concrete layers 21 is 7mm, lowering the vertical beams 12 to enable the mounting blocks 2 to be inserted into the mounting holes 20, and then filling concrete in the gaps between the mounting blocks 2 and the mounting holes 20 until the gaps are filled, so that the mounting of the vertical beams 12 at the two sides can be completed;
s3, hoisting the cross beam 11 at the top to be above the vertical beams 12 at two sides by a crane, painting concrete on the surfaces of the two mounting blocks 2 of the cross beam 11 at the top, preferably, the thickness of the concrete layer 21 is 7mm, lowering the cross beam 11 at the top to ensure that the mounting blocks 2 are inserted into the mounting holes 20, and filling the gaps between the mounting blocks 2 and the mounting holes 20 with the concrete until the gaps are filled, thereby completing the mounting of the cross beam 11 at the top;
and S4, naturally curing for 21 days.
The working principle is as follows: through adopting above-mentioned technical scheme can assemble two crossbeams 11 and two perpendicular roof beams 12, and assemble the completion back, its holistic structural strength is higher, convenient operation.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications of the present embodiment without inventive contribution as needed after reading the present specification, but all of them are protected by patent law within the scope of the claims of the present invention.

Claims (4)

1. The utility model provides a window is wafted to pin-connected panel which characterized in that: the concrete beam is characterized by comprising a pair of horizontally arranged cross beams (11) and a pair of vertically arranged vertical beams (12), wherein the two vertical beams (12) are positioned between the two cross beams (11), the two cross beams (11) and the two vertical beams (12) form a frame structure in a surrounding mode, mounting blocks (2) are fixedly arranged on the surfaces of the two cross beams (11) at the positions where the cross beams are connected with the vertical beams (12), mounting holes (20) for inserting the corresponding mounting blocks (2) are formed in the top wall and the bottom wall of each vertical beam (12), the mounting blocks (2) are in clearance fit with the mounting holes (20), and a concrete layer (21) is fixedly arranged between the outer wall of each mounting block (2) and the inner wall of each mounting hole (20); a sliding hole (30) penetrates through the side wall of the mounting hole (20) along the horizontal direction, a sliding rod (3) is inserted into the sliding hole (30) in a matching manner, and an insertion hole (300) for inserting the middle part of the sliding rod (3) in a matching manner is formed through the side wall of the mounting block (2) along the horizontal direction; the two ends of the sliding rod (3) extend out of the sliding hole (30) and are sleeved with limit nuts (32), and the diameter of the outer edge of each limit nut (32) is larger than that of the inner edge of the corresponding sliding hole (30); both ends of the sliding hole (30) are provided with operation holes (31), the diameter of each operation hole (31) is larger than that of the sliding hole (30), the limiting nut (32) is positioned in each operation hole (31), and the limiting nut (32) is in clearance fit with the operation holes (31); a waterproof plug (33) is inserted into the end part of the operating hole (31) back to the sliding hole (30) in a matching way; the waterproof plug (33) is in threaded connection with the operation hole (31), and a pull ring (34) is fixedly connected to the end wall of the waterproof plug (33) back to the sliding hole (30); be connected with the connection rope (4) that the level set up between two pull rings (34) that are located same level, it is adjacent connect and be provided with sunshade screen (41) between rope (4), sunshade screen (41)'s top and bottom all have a plurality of go-between (42) along its length direction equipartition, and are a plurality of go-between (42) slidable cover is established in corresponding connection rope (4) outside.
2. A built-up type bay window as claimed in claim 1, wherein: and filling grooves (22) are formed in the side wall of the mounting block (2) and the side wall of the mounting hole (20) along the horizontal direction.
3. A built-up type bay window as claimed in claim 2, wherein: the bottoms of the filling grooves (22) are obliquely arranged towards the opening of the corresponding mounting hole (20).
4. A process of installing a sectional bay window as claimed in any one of claims 1 to 3, comprising the steps of:
s1, firstly installing the cross beam (11) at the bottom through a crane, and then hoisting the vertical beams (12) at two sides to the upper parts of the two installation blocks (2) of the cross beam (11) at the bottom through the crane;
s2, coating concrete layers (21) on the surfaces of two mounting blocks (2) of a cross beam (11) at the bottom, and lowering vertical beams (12) to enable the mounting blocks (2) to be inserted into the mounting holes (20), so that the mounting of the vertical beams (12) at two sides can be completed;
s3, hoisting the cross beam (11) at the top to the positions above the vertical beams (12) at the two sides by a crane, painting concrete on the surfaces of the two mounting blocks (2) of the cross beam (11) at the top, and lowering the cross beam (11) at the top to enable the mounting blocks (2) to be inserted into the mounting holes (20), so that the mounting of the cross beam (11) at the top can be completed;
and S4, naturally curing for 21 days.
CN201911311084.XA 2019-12-18 2019-12-18 Assembled bay window and installation process thereof Active CN111021882B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911311084.XA CN111021882B (en) 2019-12-18 2019-12-18 Assembled bay window and installation process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911311084.XA CN111021882B (en) 2019-12-18 2019-12-18 Assembled bay window and installation process thereof

Publications (2)

Publication Number Publication Date
CN111021882A CN111021882A (en) 2020-04-17
CN111021882B true CN111021882B (en) 2021-08-17

Family

ID=70209875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911311084.XA Active CN111021882B (en) 2019-12-18 2019-12-18 Assembled bay window and installation process thereof

Country Status (1)

Country Link
CN (1) CN111021882B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07286478A (en) * 1994-04-18 1995-10-31 Sekisui Chem Co Ltd Lintel
CN206418914U (en) * 2017-01-07 2017-08-18 五洋建设集团股份有限公司 The prefabricated window that floats
CN107806174A (en) * 2017-11-30 2018-03-16 中建钢构有限公司 A kind of window that floats applied in assembling type steel structure building
CN108252614A (en) * 2018-03-21 2018-07-06 中国建筑第七工程局有限公司 A kind of mounting structure and installation method of the prefabricated window that floats
CN109236113A (en) * 2018-10-24 2019-01-18 长沙远大住宅工业集团股份有限公司 Assembled floats window, assembled floating window structure system and its construction method
CN110195560A (en) * 2019-07-01 2019-09-03 衡阳市金铭环境科技有限公司 A kind of assembled floating window structure
CN110499897A (en) * 2019-08-16 2019-11-26 深圳市天地成幕墙门窗科技有限公司 A kind of door and its mounting process of install convenient

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101538982B (en) * 2009-04-27 2011-06-08 尤建霞 Detachable floating window structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07286478A (en) * 1994-04-18 1995-10-31 Sekisui Chem Co Ltd Lintel
CN206418914U (en) * 2017-01-07 2017-08-18 五洋建设集团股份有限公司 The prefabricated window that floats
CN107806174A (en) * 2017-11-30 2018-03-16 中建钢构有限公司 A kind of window that floats applied in assembling type steel structure building
CN108252614A (en) * 2018-03-21 2018-07-06 中国建筑第七工程局有限公司 A kind of mounting structure and installation method of the prefabricated window that floats
CN109236113A (en) * 2018-10-24 2019-01-18 长沙远大住宅工业集团股份有限公司 Assembled floats window, assembled floating window structure system and its construction method
CN110195560A (en) * 2019-07-01 2019-09-03 衡阳市金铭环境科技有限公司 A kind of assembled floating window structure
CN110499897A (en) * 2019-08-16 2019-11-26 深圳市天地成幕墙门窗科技有限公司 A kind of door and its mounting process of install convenient

Also Published As

Publication number Publication date
CN111021882A (en) 2020-04-17

Similar Documents

Publication Publication Date Title
CN110984388B (en) Assembled building supporting seat
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN208668908U (en) Movable Scaffold for construction
CN111021882B (en) Assembled bay window and installation process thereof
CN104975812A (en) Rotary drilling rig
CN111927249B (en) Integral prefabricated embedded bay window, connecting node and manufacturing method
CN210439704U (en) Building telescopic platform with adjustable
CN207160274U (en) A kind of simple plugging device in pump line hole and unwrapping wire hole
CN216340631U (en) Modular passing-through stone structure
CN111636553B (en) Assembled balcony structure and construction process
CN205348720U (en) Take hoisting device's removal scaffold
EP0568165B1 (en) Method of integrating construction and building block for its implementation
CN102296594A (en) Multifunctional remote control pile driver of motor-driven caterpillar band
CN216552053U (en) Steel structure foundation pillar structure for civil engineering
CN105019456A (en) Pile driving frame of comprehensive pile driver
CN205558328U (en) Prefabricated assembly type structure skirt protection network
CN107761982A (en) A kind of construction method of the external series connection buckling-resistant support structure of assembled
CN219220271U (en) Foundation pit hanging ladder
CN218324244U (en) Portable security fence that construction was used is built in room
CN214462390U (en) Collect slope grooving width control in workman construction operation platform of an organic whole
CN204060041U (en) Kiosk type combination body-building device
CN216142628U (en) Assembled bay window structure
CN113026955B (en) Assembly type building structure with stable structure and construction method thereof
CN217949551U (en) Architectural decoration's roofing insulating layer integral structure
CN218748610U (en) Drilling tool for concrete floor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant