CN111021704A - Intelligent climbing frame system for construction site - Google Patents

Intelligent climbing frame system for construction site Download PDF

Info

Publication number
CN111021704A
CN111021704A CN202010083057.8A CN202010083057A CN111021704A CN 111021704 A CN111021704 A CN 111021704A CN 202010083057 A CN202010083057 A CN 202010083057A CN 111021704 A CN111021704 A CN 111021704A
Authority
CN
China
Prior art keywords
lifting
climbing
intelligent
bolt
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010083057.8A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wudi Guoliang Anti Corrosion And Thermal Insulation Engineering Co Ltd
Original Assignee
Wudi Guoliang Anti Corrosion And Thermal Insulation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wudi Guoliang Anti Corrosion And Thermal Insulation Engineering Co Ltd filed Critical Wudi Guoliang Anti Corrosion And Thermal Insulation Engineering Co Ltd
Priority to CN202010083057.8A priority Critical patent/CN111021704A/en
Publication of CN111021704A publication Critical patent/CN111021704A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Abstract

The invention provides an intelligent climbing frame system for a construction site, which comprises a climbing frame upper cross beam, a first upright post, a second upright post, a climbing frame lower cross beam, a foot stool, a climbing moving table, a protective guard, a holding rod, a fixing bolt and a limit switch. The position switch, the rope lifting frame, the connecting rod, the movable sleeve, the movable nut, the lifting screw and the lifting speed reduction motor are arranged, intelligent lifting and climbing work is facilitated, the lifting speed reduction motors on the left side and the right side drive the lifting screw to rotate, the movable nut moves upwards at the moment, the movable sleeve moves upwards on the outer walls of the first upright post and the second upright post, the connecting rod drives the rope lifting frame to move at the moment, building personnel can stand on the upper portion of the climbing moving platform to perform intelligent climbing work, the position switch can play a limiting protection role during descending, and an automatic intelligent climbing lifting function is achieved.

Description

Intelligent climbing frame system for construction site
Technical Field
The invention belongs to the technical field of building construction equipment, and particularly relates to an intelligent climbing frame system for a building site.
Background
In the building construction process, a climbing frame is usually built outside a wall of a building to assist workers in working, conveying building materials and the like, and the height of the climbing frame is increased along with the gradual rise of the building height.
At present, a climbing frame device can be used when a worker in a construction site climbs.
But current climb a device and still have unable automatic intelligence climbing promotion, do not possess the supplementary building appliances function that promotes, the safety protection effect is poor, the unable night warning operation with the unable problem of intelligent control operation.
Therefore, the intelligent climbing frame system for the construction site is very necessary to be invented.
Disclosure of Invention
In order to solve the technical problem, the invention provides an intelligent climbing frame system for a construction site, which aims to solve the problems that the existing climbing frame device cannot automatically and intelligently climb and lift, does not have the function of assisting in lifting construction tools, has poor safety protection effect, cannot warn at night and cannot intelligently control operation. The intelligent climbing frame system for the building site comprises a climbing frame upper cross beam, a first stand column, a second stand column, a climbing frame lower cross beam, a foot base, a climbing moving platform, a protective guard, a holding rod, a fixing bolt and a limit switch, and can intelligently lift and lift a climbing machine structure, assist a building tool to lift a hook structure, an adjustable night warning lighting lamp bank structure, a rotatable and retractable safety protection belt structure and a multi-position adjustable type rotating intelligent control host structure, wherein one transverse end of the climbing frame upper cross beam is connected with the upper right side of the first stand column through a bolt, and the other transverse end of the climbing frame upper cross beam is connected with the upper left side of the second stand column through a bolt; one transverse end of the lower cross beam of the climbing frame is connected with the right lower side of the first upright post through a bolt, and the other transverse end of the lower cross beam of the climbing frame is connected with the left lower side of the second upright post through a bolt; the lower ends of the first upright post and the second upright post are respectively connected with foot seats through bolts; one longitudinal end of the guard rail is respectively bolted on the left side and the right side of the lower part of the holding rod, and the other end of the guard rail is respectively installed on the left side and the right side of the front part of the climbing mobile station and the left side and the right side of the rear part of the climbing mobile station through fixing bolts; the limit switches are respectively bolted on the middle upper part of the inner side of the first upright post and the middle upper part of the inner side of the second upright post; the intelligent lifting climbing machine structure is connected with the climbing mobile station; the auxiliary construction tool lifting hook structure is connected with the holding rod; the adjustable night warning lighting lamp bank structure is connected with the upper cross beam of the climbing frame; the rotatable storage type safety protection belt structure is connected with the intelligent lifting climbing machine structure; the multi-position adjustable rotary intelligent control host structure is connected with the holding rod; the intelligent lifting climbing machine structure comprises a position switch, a rope lifting frame, a connecting rod, a movable sleeve, a movable nut, a lifting screw rod and a lifting speed reduction motor, wherein the position switch is respectively connected to the lower end of the rope lifting frame through bolts; one end of each connecting rod is connected to the middle position of the inner side of the movable sleeve through a bolt, and the other end of each connecting rod is connected to the middle position of the outer side of the rope lifting frame through a bolt; the movable nuts are respectively and longitudinally welded on the outer wall of the movable sleeve; the movable nuts are respectively in threaded connection with the outer wall of the lifting screw; the lifting screw rods are respectively connected with the lower end of the output shaft of the lifting speed reduction motor at the upper end in the longitudinal direction through a coupler.
Preferably, the structure capable of assisting the lifting hook of the construction tool comprises a lifting rope, the lifting hook of the construction tool, a rotating wheel, a worm gear speed reducer, a lifting motor and a protective cover, wherein one end of the lifting rope is tied to the upper end of the lifting hook of the construction tool, and the other end of the lifting rope is wound on the outer surface of the rotating wheel; the rotating wheel key is connected to the front end of an output shaft of the worm gear speed reducer; the right end of the worm gear speed reducer is connected with a lifting motor through a bolt; the protective cover covers the upper side of the outer part of the rotating wheel.
Preferably, the adjustable night warning and lighting lamp bank structure comprises a solar charging panel, adjusting bolts and nuts, a connecting seat, a lampshade, a storage battery, a warning lamp bank and an aluminum alloy rod, wherein the upper ends of the solar charging panel are respectively installed inside the connecting seat through the adjusting bolts and nuts; the connecting seats are respectively connected to the left side and the right side of the upper part of the lampshade through screws; the front wall of the bottom of the inner side of the lampshade is connected with a storage battery through a screw; the left wall and the right wall inside the lampshade are respectively connected with a warning lamp row by longitudinal screws; the upper end of the aluminum alloy rod extends to the inside of the lampshade and is in screw connection with the top of the inner side of the lampshade.
Preferably, the rotatable retractable safety protection belt structure comprises a safety protection belt, a sub-magic tape fastener, a main magic tape fastener, a safety rope, a retractable wheel, a wheel seat and a wing screw, wherein the left end of the safety protection belt is sewn and connected with the right end of the safety rope; the sub magic tape buckle and the female magic tape buckle are respectively sewn at the right ends of the safety protection belts arranged at the front part and the rear part; the left end of the safety rope is wound on the outer wall of the storage wheel, and the left end of the safety rope and the storage wheel are connected through a bolt; the containing wheel is connected to the middle position in the wheel seat through a wing-shaped screw in a fastening and connecting mode.
Preferably, the multi-position adjustable type rotary intelligent control host structure comprises an intelligent control host, a U-shaped adjusting seat, movable bolts and nuts, a flat-head cross rod, a rotary rod and a fixed sleeve, wherein the intelligent control host is respectively connected to the outer end of the U-shaped adjusting seat through longitudinal inner side bolts; the U-shaped adjusting seats are respectively arranged at the left end and the right end of the flat head cross rod through movable bolts and nuts; the transverse middle position of the flat-head cross rod is connected with the upper end of the rotating rod through a bolt; the rotating rod is movably inserted in the fixed sleeve in the longitudinal direction.
Preferably, the movable sleeve is respectively sleeved on the outer wall of the first upright post and the outer wall of the second upright post in a sliding manner.
Preferably, the climbing mobile station is transversely bolted on the inner middle lower part between the rope lifting frames.
Preferably, the lifting speed reduction motor is respectively bolted to the upper end of the first upright column and the upper end of the second upright column.
Preferably, the rope lifting frame is an aluminum alloy frame.
Preferably, the intelligent lifting climbing machine structure is provided with two structures and is arranged oppositely.
Preferably, the input shaft of the worm gear speed reducer is coupled with the output shaft of the lifting motor.
Preferably, the rear end of the protective cover is in screw connection with the middle position of the front end of the upper part of the worm gear speed reducer.
Preferably, the lifting hook of the construction tool is a stainless steel hook.
Preferably, the worm gear reducer is bolted to the middle position in the front of the handrail arranged in the front.
Preferably, the rotating wheel is an I-shaped stainless steel wheel.
Preferably, the protective cover is a semicircular stainless steel cover.
Preferably, the solar charging panel adopts two monocrystalline silicon solar panels.
Preferably, the warning light bank adopts one or a combination of a plurality of red LED lamps, yellow LED lamps and blue LED lamps.
Preferably, the solar charging panel, the storage battery and the warning light bar are connected in series through wires.
Preferably, the lampshade is a transparent glass fiber reinforced plastic cover.
Preferably, the lower end of the aluminum alloy rod in the longitudinal direction is in bolted connection with the middle position of the upper part of the upper cross beam of the climbing frame.
Preferably, the safety protection belt adopts two nylon pull belts.
Preferably, the sub-magic tape and the female magic tape are buckled with each other.
Preferably, the safety rope is a nylon rope.
Preferably, the wheel seats arranged on the left side and the right side are respectively connected with the upper ends of the rope lifting frames arranged on the left end and the right end in a longitudinal lower end bolt mode.
Preferably, the longitudinal lower end of the fixing sleeve is in bolted connection with the middle position of the upper part of the holding rod arranged at the front part.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the intelligent climbing device, the position switch, the rope lifting frame, the connecting rod, the movable sleeve, the movable nut, the lifting screw and the lifting speed reduction motor are arranged, intelligent lifting and climbing work is facilitated, the lifting speed reduction motors on the left side and the right side drive the lifting screw to rotate, the movable nut moves upwards at the moment, the movable sleeve moves upwards on the outer walls of the first stand column and the second stand column, the connecting rod drives the rope lifting frame to move at the moment, building personnel can stand on the upper portion of the climbing moving platform and can perform intelligent climbing work, a limiting protection effect can be achieved when the building personnel descend through the position switch, and the automatic intelligent climbing lifting function is achieved.
2. According to the invention, the arrangement of the lifting rope, the lifting hook of the construction tool, the rotating wheel, the worm and gear speed reducer and the lifting motor is beneficial to assisting in lifting the construction tool, the lifting motor drives the worm and gear speed reducer to rotate anticlockwise, so that the worm and gear speed reducer drives the rotating wheel to rotate, the lifting rope is loosened, the lifting hook of the construction tool starts to move downwards until the lifting hook is separated from ground personnel, the construction tool can be hung at the moment, and the lifting operation can be carried out by the action of the lifting motor again.
3. According to the invention, the arrangement of the protective cover is beneficial to protecting the rotating wheel, so that accidents are avoided.
4. According to the solar energy power supply device, the solar charging panel, the adjusting bolt nut, the connecting seat, the lampshade, the storage battery, the warning lamp bank and the aluminum alloy rod are arranged, night warning prompt work is facilitated, meanwhile, auxiliary warning work can be carried out in the daytime, light energy is converted into electric energy through the solar charging panel to continuously supply power to the storage battery in the daytime, the warning lamp bank can continuously carry out warning work to ensure that the warning work is smoothly carried out, the position of the solar charging panel inside the connecting seat can be adjusted in an auxiliary mode through the adjusting bolt nut by loosening the adjusting bolt nut, the sunlight can be received better, and the power supply efficiency is ensured.
5. In the invention, the arrangement of the lampshade is beneficial to playing a role of protection and ensuring the working efficiency of the warning lamp bank.
6. According to the invention, the aluminum alloy rods are arranged, so that the aluminum alloy rods are favorable for connection, fixation and support.
7. According to the safety protection belt, the sub-magic tape buckle, the female magic tape buckle, the safety rope, the storage wheel, the wheel seat and the wing screw are arranged, so that safety protection operation is facilitated, building personnel can pull out the safety rope by loosening the wing screw, the safety protection belt is wrapped on the waist of the building personnel, the sub-magic tape buckle and the female magic tape buckle are mutually pasted, safety auxiliary protection operation can be performed, if the safety protection belt is used, the storage wheel can be rotated to pack the safety rope, the wing screw can be locked, and safety protection capacity is guaranteed.
8. In the invention, the intelligent control host, the U-shaped adjusting seat, the movable bolt and nut, the flat head cross rod, the rotating rod and the fixed sleeve are arranged, thus being beneficial to intelligent control, the climbing labor force of building personnel can be reduced, the use space is improved, the intelligent control host arranged on the left side and the right side can carry out multi-position intelligent operation work, the movable bolts and nuts are loosened, the positions of the U-shaped adjusting seats at the left end and the right end of the flat head cross rod can be adjusted, the inclination angle of the intelligent control host can be changed conveniently, the operation is convenient, by rotating the position of the rotating rod in the fixed sleeve, the position of the intelligent control host can be changed to facilitate the operation, the lifting speed reducing motor and the lifting motor can be controlled to act in real time through the intelligent control host, meanwhile, safety limiting operation can be performed through the limit switch and the position switch, so that the working stability and safety of the system are guaranteed.
9. According to the invention, the arrangement of the upper cross beam of the climbing frame, the first stand column, the second stand column, the lower cross beam of the climbing frame and the foot seats is favorable for achieving good stable supporting performance, and the upper cross beam of the climbing frame, the lower cross beam of the climbing frame and the building outer wall can be fixed through bolts so as to ensure the climbing and lifting stability.
10. According to the invention, the arrangement of the climbing mobile station, the guard rail, the holding rod and the fixing bolt is beneficial to ensuring the operation safety of building personnel.
Drawings
Fig. 1 is a schematic structural view of the present invention.
Fig. 2 is a schematic structural diagram of the intelligent lifting climbing machine structure.
Fig. 3 is a schematic structural view of the construction assisting construction tool lifting hook structure of the present invention.
Fig. 4 is a schematic structural view of an adjustable night warning lighting lamp bank structure according to the present invention.
FIG. 5 is a schematic structural diagram of a rotatably retractable safety belt structure according to the present invention.
Fig. 6 is a schematic structural diagram of a multi-position adjustable rotary intelligent control host structure according to the present invention.
Fig. 7 is a schematic electrical wiring diagram of the present invention.
In the figure:
1. climbing a frame upper beam; 2. a first upright post; 3. a second upright post; 4. a lower cross beam of the climbing frame; 5. a foot seat; 6. climbing a mobile station; 7. protecting the fence; 8. a support rod; 9. fixing the bolt; 10. a limit switch; 11. the climbing machine structure can be lifted intelligently; 111. a position switch; 112. a rope lifting frame; 113. a connecting rod; 114. an active cannula; 115. moving the nut; 116. lifting the screw; 117. lifting the speed reducing motor; 12. the lifting hook structure of the construction tool can be assisted; 121. lifting a rope; 122. a construction tool lifting hook; 123. a rotating wheel; 124. a worm gear reducer; 125. a hoisting motor; 126. a protective cover; 13. an adjustable night warning lighting lamp bank structure; 131. a solar charging panel; 132. adjusting the bolt and the nut; 133. a linking seat; 134. a lamp shade; 135. a storage battery; 136. a warning light bar; 137. an aluminum alloy rod; 14. a rotatable retractable safety protection belt structure; 141. a safety guard band; 142. a sub-magic tape buckle; 143. the female magic tape is buckled; 144. a safety cord; 145. a storage wheel; 146. a wheel seat; 147. a thumb screw; 15. the host structure can be adjusted in multiple positions and can be rotated intelligently controlled; 151. intelligently controlling the host; 152. a U-shaped adjusting seat; 153. a movable bolt and a nut; 154. a flat-head cross bar; 155. rotating the rod; 156. and (5) fixing the sleeve.
Detailed Description
The invention is described in detail with reference to the accompanying drawings, as shown in fig. 1 and fig. 2, the intelligent climbing frame system for the construction site comprises a climbing frame upper beam 1, a first upright post 2, a second upright post 3, a climbing frame lower beam 4, a foot base 5, a climbing moving platform 6, a protective guard 7, a holding rod 8, a fixing bolt 9, a limit switch 10, an intelligent lifting climbing machine structure 11, an auxiliary construction tool lifting hook structure 12, an adjustable night warning lighting lamp row structure 13, a rotatable retractable safety protection belt structure 14 and a multi-position adjustable rotatable intelligent control host structure 15, wherein one transverse end of the climbing frame upper beam 1 is bolted on the upper right side of the first upright post 2, and the other transverse end of the climbing frame upper beam is bolted on the upper left side of the second upright post 3; one transverse end of the lower cross beam 4 of the climbing frame is connected with the right lower side of the first upright post 2 through a bolt, and the other transverse end of the lower cross beam is connected with the left lower side of the second upright post 3 through a bolt; the lower ends of the first upright post 2 and the second upright post 3 are respectively connected with a foot seat 5 through bolts; one longitudinal end of the guard rail 7 is respectively in bolted connection with the left side and the right side of the lower part of the handrail 8, and the other end of the guard rail is respectively installed on the left side and the right side of the front part of the climbing mobile station 6 and the left side and the right side of the rear part of the climbing mobile station 6 through fixing bolts 9; the limit switch 10 is respectively bolted on the middle upper part of the inner side of the first upright post 2 and the middle upper part of the inner side of the second upright post 3; the intelligent lifting climbing machine structure 11 is connected with the climbing mobile station 6; the auxiliary construction tool lifting hook structure 12 is connected with the holding rod 8; the adjustable night warning lighting lamp bank structure 13 is connected with the climbing frame upper beam 1; the rotatable storage type safety protection belt structure 14 is connected with the intelligent lifting climbing machine structure 11; the multi-position adjustable rotary intelligent control host machine structure 15 is connected with the handrail 8; the intelligent lifting climbing machine structure 11 comprises a position switch 111, a rope lifting frame 112, a connecting rod 113, a movable sleeve 114, a movable nut 115, a lifting screw 116 and a lifting speed reduction motor 117, wherein the position switch 111 is respectively bolted at the lower end of the rope lifting frame 112; one end of each connecting rod 113 is connected with the middle position of the inner side of the movable sleeve 114 through a bolt, and the other end of each connecting rod is connected with the middle position of the outer side of the rope lifting frame 112 through a bolt; the movable nuts 115 are respectively welded on the outer wall of the movable sleeve 114 longitudinally; the movable nuts 115 are respectively in threaded connection with the outer wall of the lifting screw 116; lifting screw 116 vertical upper end and lifting gear motor 117's output shaft lower extreme coupling joint setting respectively, carry out intelligence promotion climbing during operation, lifting gear motor 117 through the left and right sides drives lifting screw 116 rotatory, it moves up to remove nut 115 this moment, and move work on the outer wall of first stand 2 and second stand 3 through movable sleeve 114, connecting rod 113 drives lifting rope frame 112 and removes this moment, the construction personnel can stand on climbing mobile station 6 upper portion, can carry out intelligence climbing work, can play spacing guard action when descending through position switch 111, realize automatic intelligent climbing lifting function.
In this embodiment, referring to fig. 3, the structure 12 of the auxiliary lifting hook for construction tool includes a lifting rope 121, a lifting hook for construction tool 122, a rotating wheel 123, a worm gear reducer 124, a lifting motor 125 and a protective cover 126, wherein one end of the lifting rope 121 is tied to the upper end of the lifting hook for construction tool 122, and the other end is wound around the outer surface of the rotating wheel 123; the rotating wheel 123 is connected with the front end of an output shaft of the worm gear reducer 124 in a key mode; the right end of the worm gear reducer 124 is connected with a lifting motor 125 through a bolt; protective cover 126 cover connect in the outside upside of swiveling wheel 123, carry out the auxiliary lifting construction tool during operation, drive worm gear speed reducer 124 anticlockwise rotation through promoting motor 125 for worm gear speed reducer 124 drives the swiveling wheel 123 rotation, and will carry rope 121 and relax, construction tool lifting hook 122 begins to move down this moment, until keeping away from with ground personnel, can hang construction tool this moment, accessible promotes motor 125 and moves once more, can promote the operation.
In this embodiment, referring to fig. 4, the adjustable night warning lighting lamp bank structure 13 includes a solar charging panel 131, an adjusting bolt and nut 132, a connecting seat 133, a lampshade 134, a storage battery 135, a warning lamp bank 136 and an aluminum alloy rod 137, wherein the upper ends of the solar charging panel 131 are respectively installed inside the connecting seat 133 through the adjusting bolt and nut 132; the connecting seats 133 are respectively screwed at the left and right sides of the upper part of the lampshade 134; the front wall of the inner bottom of the lampshade 134 is connected with a storage battery 135 through screws; the left wall and the right wall inside the lampshade 134 are respectively connected with a warning lamp row 136 in a longitudinal screw mode; vertical upper end of aluminum alloy pole 137 extend to the inside of lamp shade 134, and set up with the inboard top screw connection of lamp shade 134, carry out the suggestion during operation of warning night, also can assist warning work daytime simultaneously, turn into the electric energy with light energy through solar charging panel 131 constantly for battery 135 supplies power daytime, can make warning lamp row 136 constantly warn work, go on smoothly with the assurance warning work, through loosening adjusting bolt nut 132, can assist regulation solar charging panel 131 through adjusting bolt nut 132 in the inside position of linking up seat 133, so that better accept sunshine, guarantee power supply efficiency.
In this embodiment, as shown in fig. 5, the rotatable retractable safety protection belt structure 14 includes a safety protection belt 141, a sub-magic tape 142, a female magic tape 143, a safety rope 144, a retractable wheel 145, a wheel seat 146 and a wing screw 147, wherein the left end of the safety protection belt 141 is sewn and connected, and the safety protection belt is tied and connected with the right end of the safety rope 144; the sub hook and loop fastener 142 and the female hook and loop fastener 143 are respectively sewn to the right end of the safety protection belt 141 arranged at the front and rear parts; the left end of the safety rope 144 is wound on the outer wall of the receiving wheel 145, and the left end of the safety rope 144 is connected with the receiving wheel 145 through a bolt; accomodate wheel 145 coupling in the inside intermediate position of wheel seat 146, and set up through thumb screw 147 fastening connection, when carrying out the safety protection operation, construction personnel can pull out safety rope 144 through relaxing thumb screw 147, wrap up safety protection area 141 at construction personnel waist this moment, and paste sub-magic subsides button 142 and female magic subsides button 143 each other, can carry out safe auxiliary protection operation, if the use is ended, wheel 145 is accomodate in the accessible rotation, pack up safety rope 144, can lock thumb screw 147, guarantee the safety protection ability.
In this embodiment, referring to fig. 6, the multi-position adjustable rotary intelligent control host structure 15 includes an intelligent control host 151, a U-shaped adjusting seat 152, a movable bolt and nut 153, a flat cross bar 154, a rotary rod 155 and a fixed sleeve 156, wherein the intelligent control host 151 is respectively bolted to the outer end of the U-shaped adjusting seat 152 on the inner longitudinal side; the U-shaped adjusting seats 152 are respectively installed at the left end and the right end of the flat-head cross rod 154 through movable bolts and nuts 153; the flat head cross rod 154 is bolted at the upper end of the rotating rod 155 at the transverse middle position; vertical activity of rotary rod 155 peg graft in the inside of fixed sleeving 156, through intelligent control, reducible construction personnel climbing labour, promote the usage space, the accuse host computer 151 of intelligence through the left and right sides setting can carry out multiposition intelligence operation work, through relaxing movable bolt nut 153, can adjust the position at both ends about flat head horizontal pole 154 of U type regulation seat 152, be convenient for change the inclination of the accuse host computer 151 of intelligence, convenient operation, through rotatory rotary rod 155 in the inside position of fixed sleeving 156, can change the position of the accuse host computer 151 of intelligence, so as to operate, can control in real time through the accuse host computer 151 and promote gear motor 117 and promote motor 125 and move, can carry out safety limit operation through limit switch 10 and position switch 111 simultaneously, with assurance system job stabilization nature and security.
In this embodiment, specifically, the movable sleeve 114 is slidably sleeved on the outer wall of the first upright 2 and the outer wall of the second upright 3, respectively.
In this embodiment, specifically, the climbing mobile station 6 is horizontally bolted to the inner middle-lower part between the rope lifting frames 112.
In this embodiment, specifically, the lifting gear motor 117 is respectively bolted to the upper end of the first upright 2 and the upper end of the second upright 3.
In this embodiment, specifically, the rope lifting frame 112 specifically adopts an aluminum alloy frame.
In this embodiment, specifically, the intelligent lifting climbing machine structure 11 is provided with two and is arranged oppositely.
In this embodiment, specifically, the input shaft of the worm gear reducer 124 and the output shaft of the lifting motor 125 are coupled.
In this embodiment, specifically, the rear end of the protective cover 126 is screwed to the middle position of the upper front end of the worm gear reducer 124.
In this embodiment, the lifting hook 122 of the construction tool is a stainless steel hook.
In this embodiment, specifically, the worm gear reducer 124 is bolted to the middle position in the front of the handrail 8.
In this embodiment, specifically, the rotating wheel 123 specifically adopts an i-shaped stainless steel wheel.
In this embodiment, the protection cover 126 is a semicircular stainless steel cover.
In this embodiment, specifically, the solar charging panel 131 adopts two monocrystalline silicon solar panels.
In this embodiment, specifically, the warning light bank 136 is a light bank formed by one or a combination of a red LED lamp, a yellow LED lamp, and a blue LED lamp.
In this embodiment, specifically, the solar charging panel 131, the storage battery 135 and the warning light bank 136 are connected in series through wires.
In this embodiment, specifically, the lampshade 134 is specifically a transparent glass fiber reinforced plastic cover.
In this embodiment, specifically, the lower end of the aluminum alloy rod 137 in the longitudinal direction is bolted to the middle position of the upper part of the upper cross beam 1 of the climbing frame.
In this embodiment, specifically, the safety protection belt 141 employs two nylon pulling belts.
In this embodiment, specifically, the sub hook and loop fastener 142 and the female hook and loop fastener 143 are fastened to each other.
In this embodiment, the safety rope 144 is specifically a nylon rope.
In this embodiment, specifically, the wheel bases 146 disposed on the left and right sides are respectively bolted to the upper ends of the rope lifting frames 112 disposed on the left and right sides.
In this embodiment, specifically, the lower longitudinal end of the fixing sleeve 156 is bolted to the middle position of the upper part of the front-arranged handrail 8.
In this embodiment, specifically, the limit switch 10, the position switch 111, the lifting speed reduction motor 117 and the lifting motor 125 are respectively connected to the intelligent control host 151 through wires.
In this embodiment, specifically, the battery 135 is a battery in which a plurality of 18650 type cells are combined.
In this embodiment, specifically, the limit switch 10 and the position switch 111 are respectively LXW5-11D1 type travel switches.
In this embodiment, specifically, the lifting deceleration motor 117 specifically employs a58SW-31ZY worm gear deceleration motor, the lifting motor 125 specifically employs a 775 motor, and the intelligent control main machine 151 specifically employs a 4.3-inch EX3G-43HB all-in-one machine.
Principle of operation
In the invention, the climbing frame upper crossbeam 1 and the climbing frame lower crossbeam 4 are fixed with the outer wall of a building through bolts to ensure climbing lifting stability, when intelligent lifting and climbing work is carried out, the lifting speed reducing motors 117 at the left and right sides drive the lifting screw rods 116 to rotate, at the same time, the movable nuts 115 move upwards and move upwards on the outer walls of the first upright post 2 and the second upright post 3 through the movable sleeves 114, at the same time, the connecting rods 113 drive the rope lifting frames 112 to move, a building worker can stand on the upper part of the climbing moving platform 6 to carry out intelligent climbing work, the position switch 111 can play a role of limiting and protecting when descending to realize automatic intelligent climbing lifting function, when the auxiliary lifting building tool works, the lifting motor 125 drives the worm gear reducer 124 to rotate anticlockwise, so that the worm gear 124 drives the rotating wheel 123 to rotate and the lifting rope 121 to be loosened, at this moment, the lifting hook 122 of the construction tool starts to move downwards until the lifting hook is separated from ground personnel, the construction tool can be hung, the lifting motor 125 can be used for moving again, the lifting operation can be carried out, when the night warning prompt work is carried out, the auxiliary warning work can be carried out in the daytime, the solar charging panel 131 can convert the light energy into the electric energy to continuously supply power for the storage battery 135 in the daytime, the warning lamp bank 136 can continuously carry out the warning work to ensure that the warning work is carried out smoothly, the position of the solar charging panel 131 inside the connecting seat 133 can be adjusted in an auxiliary way by loosening the adjusting bolt and nut 132, so that the sunlight can be better received, the power supply efficiency is ensured, when the safety protection operation is carried out, the construction personnel can pull out the safety rope 144 by loosening the wing-shaped screw 147, at this moment, the safety protection belt 141 is wrapped on the waist of, the sub magic tape 142 and the female magic tape 143 are adhered to each other to perform safety auxiliary protection operation, if the use is finished, the safety rope 144 can be retracted by rotating the storage wheel 145 to lock the thumb screw 147, thereby ensuring safety protection performance, the climbing labor force of the construction personnel can be reduced by intelligent control, the use space can be improved, the multi-position intelligent operation work can be performed by the intelligent control host 151 arranged at the left and right sides, the positions of the U-shaped adjusting seat 152 at the left and right ends of the flat head cross bar 154 can be adjusted by loosening the movable bolt and nut 153, the inclination angle of the intelligent control host 151 can be conveniently changed, the operation is convenient, the position of the intelligent control host 151 can be changed by rotating the rotating rod 155 inside the fixed sleeve 156, so that the operation is convenient, the lifting speed reduction motor 117 and the lifting motor 125 can be controlled to act in real time by the intelligent control host 151, meanwhile, the safety limit operation can be performed through the limit switch 10 and the position switch 111 to ensure the working stability and safety of the system.
The technical solutions of the present invention or similar technical solutions designed by those skilled in the art based on the teachings of the technical solutions of the present invention are all within the scope of the present invention.

Claims (10)

1. The intelligent climbing system for the building site is characterized by comprising a climbing frame upper beam (1), a first stand column (2), a second stand column (3), a climbing frame lower beam (4), a foot base (5), a climbing moving platform (6), a protective guard (7), a holding rod (8), a fixing bolt (9), a limit switch (10), an intelligent lifting climbing machine structure (11), an auxiliary building tool lifting hook structure (12), an adjustable night warning lighting lamp row structure (13), a rotatable storage type safety protection belt structure (14) and a multi-position adjustable type rotating intelligent control host machine structure (15), wherein one transverse end of the climbing frame upper beam (1) is connected to the upper right side of the first stand column (2) through a bolt, and the other transverse end of the climbing frame upper beam is connected to the upper left side of the second stand column (3) through a bolt; one transverse end of the lower cross beam (4) of the climbing frame is connected with the right lower side of the first upright post (2) through a bolt, and the other transverse end of the lower cross beam is connected with the left lower side of the second upright post (3) through a bolt; the lower ends of the first upright post (2) and the second upright post (3) are respectively connected with a foot seat (5) through bolts; one longitudinal end of the guard rail (7) is respectively in bolted connection with the left side and the right side of the lower part of the holding rod (8), and the other end of the guard rail is respectively installed on the left side and the right side of the front part of the climbing mobile station (6) and the left side and the right side of the rear part of the climbing mobile station (6) through fixing bolts (9); the limit switch (10) is respectively connected to the middle upper part of the inner side of the first upright post (2) and the middle upper part of the inner side of the second upright post (3) through bolts; the intelligent lifting climbing machine structure (11) is connected with the climbing mobile station (6); the auxiliary construction tool lifting hook structure (12) is connected with the holding rod (8); the adjustable night warning lighting lamp bank structure (13) is connected with the climbing frame upper beam (1); the rotatable storage type safety protection belt structure (14) is connected with the intelligent lifting climbing machine structure (11); the multi-position adjustable rotary intelligent control host structure (15) is connected with the handrail (8); the intelligent lifting climbing machine structure (11) comprises a position switch (111), a rope lifting frame (112), a connecting rod (113), a movable sleeve (114), a movable nut (115), a lifting screw rod (116) and a lifting speed reduction motor (117), wherein the position switch (111) is respectively bolted at the lower end of the rope lifting frame (112); one end of each connecting rod (113) is connected with the middle position of the inner side of the movable sleeve (114) through a bolt, and the other end of each connecting rod is connected with the middle position of the outer side of the rope lifting frame (112) through a bolt; the movable nuts (115) are respectively longitudinally welded on the outer wall of the movable sleeve (114); the movable nuts (115) are respectively in threaded connection with the outer wall of the lifting screw (116); the lifting screw rods (116) are respectively connected with the lower end of the output shaft of the lifting speed reduction motor (117) through a coupler at the longitudinal upper end.
2. The intelligent climbing frame system for construction sites as claimed in claim 1, wherein the auxiliary construction tool lifting hook structure (12) comprises a lifting rope (121), a construction tool lifting hook (122), a rotating wheel (123), a worm gear speed reducer (124), a lifting motor (125) and a protective cover (126), one end of the lifting rope (121) is tied to the upper end of the construction tool lifting hook (122), and the other end is wound on the outer surface of the rotating wheel (123); the rotating wheel (123) is connected with the front end of an output shaft of the worm gear speed reducer (124) in a key mode; the right end of the worm gear speed reducer (124) is connected with a lifting motor (125) through a bolt; the protective cover (126) is covered on the outer upper side of the rotating wheel (123).
3. The intelligent climbing frame system for the construction site according to claim 1, wherein the adjustable night warning lighting lamp bank structure (13) comprises a solar charging panel (131), an adjusting bolt and nut (132), a connecting seat (133), a lamp shade (134), a storage battery (135), a warning lamp bank (136) and an aluminum alloy rod (137), wherein the upper ends of the solar charging panel (131) are respectively installed inside the connecting seat (133) through the adjusting bolt and nut (132); the connecting seats (133) are respectively connected to the left side and the right side of the upper part of the lampshade (134) through screws; the front wall of the bottom of the inner side of the lampshade (134) is connected with a storage battery (135) through a screw; the left wall and the right wall inside the lampshade (134) are respectively connected with a warning lamp row (136) by longitudinal screws; the longitudinal upper end of the aluminum alloy rod (137) extends to the inside of the lampshade (134) and is in screw connection with the top of the inner side of the lampshade (134).
4. The intelligent climbing frame system for construction sites according to claim 1, wherein the rotatable retractable safety belt structure (14) comprises a safety belt (141), a sub magic tape fastener (142), a female magic tape fastener (143), a safety rope (144), a retractable wheel (145), a wheel seat (146) and a thumb screw (147), the left ends of the safety belt (141) are sewn and tied with the right ends of the safety rope (144); the sub magic tape button (142) and the female magic tape button (143) are respectively sewn at the right ends of the safety protection belts (141) arranged at the front part and the rear part; the left end of the safety rope (144) is wound on the outer wall of the storage wheel (145), and the left end of the safety rope (144) is connected with the storage wheel (145) through a bolt; the receiving wheel (145) is coupled to the middle position inside the wheel seat (146) in a shaft mode and is fastened and connected through a wing-shaped screw (147).
5. The intelligent climbing frame system for construction sites according to claim 1, wherein the multi-position adjustable rotary intelligent control host machine structure (15) comprises an intelligent control host machine (151), a U-shaped adjusting seat (152), a movable bolt and nut (153), a flat head cross rod (154), a rotary rod (155) and a fixed sleeve (156), wherein the intelligent control host machine (151) is respectively bolted at the outer end of the U-shaped adjusting seat (152) along the longitudinal inner side; the U-shaped adjusting seats (152) are respectively installed at the left end and the right end of the flat head cross rod (154) through movable bolts and nuts (153); the transverse middle position of the flat head cross rod (154) is connected with the upper end of the rotating rod (155) through a bolt; the rotating rod (155) is movably inserted in the fixed sleeve (156) in the longitudinal direction.
6. The intelligent climbing frame system for construction sites according to claim 1, wherein the movable sleeve (114) is respectively sleeved on the outer wall of the first upright post (2) and the outer wall of the second upright post (3) in a sliding manner.
7. The intelligent climbing frame system for construction sites according to claim 1, wherein the climbing mobile station (6) is transversely bolted to the inner middle lower part between the lifting rope frames (112).
8. The intelligent climbing frame system for construction sites according to claim 1, wherein the lifting gear motor (117) is bolted to the upper end of the first upright (2) and the upper end of the second upright (3), respectively.
9. The intelligent climbing frame system for the construction site as claimed in claim 1, wherein the lifting rope frame (112) is an aluminum alloy frame.
10. The intelligent climbing frame system for construction sites according to claim 1, wherein the worm gear reducer (124) is bolted to the middle position in the front of the handrail (8) arranged in the front.
CN202010083057.8A 2020-02-07 2020-02-07 Intelligent climbing frame system for construction site Pending CN111021704A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010083057.8A CN111021704A (en) 2020-02-07 2020-02-07 Intelligent climbing frame system for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010083057.8A CN111021704A (en) 2020-02-07 2020-02-07 Intelligent climbing frame system for construction site

Publications (1)

Publication Number Publication Date
CN111021704A true CN111021704A (en) 2020-04-17

Family

ID=70203399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010083057.8A Pending CN111021704A (en) 2020-02-07 2020-02-07 Intelligent climbing frame system for construction site

Country Status (1)

Country Link
CN (1) CN111021704A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764626A (en) * 2020-06-05 2020-10-13 中船澄西船舶修造有限公司 Cantilever type scaffold
CN113089992A (en) * 2021-03-26 2021-07-09 苏州眠饰界贸易有限公司 Building outer wall glass matched with staff to maintain and prolong service life
CN114382274A (en) * 2022-01-25 2022-04-22 段艳红 Intelligent climbing frame system for construction site
CN114572893A (en) * 2022-03-07 2022-06-03 中交一公局集团有限公司 Adjustable vertical transportation equipment for prefabricated building

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001107552A (en) * 1999-10-08 2001-04-17 Yurtec Corp Temporary scaffold with safety handrail, and safety handrail provided on temporary scaffold
CN201255292Y (en) * 2008-09-09 2009-06-10 谭迎建 Flat-plate TV and display view angle adjustment device
JP5513049B2 (en) * 2009-09-24 2014-06-04 アルインコ株式会社 Scaffolding board
CN205215840U (en) * 2015-10-26 2016-05-11 中国人民解放军第四军医大学 Many joints of operating room lift pipe fixation fram
CN207177256U (en) * 2017-06-30 2018-04-03 云南建投第四建设有限公司 A kind of safe and intelligent is encorbelmented external rendering scaffold
CN209442550U (en) * 2018-11-01 2019-09-27 李洪盛 A kind of engineering construction lifting device with top protection function
CN110700553A (en) * 2019-11-14 2020-01-17 陕西开友实业有限公司 Attached lifting operation safety protection platform for building construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001107552A (en) * 1999-10-08 2001-04-17 Yurtec Corp Temporary scaffold with safety handrail, and safety handrail provided on temporary scaffold
CN201255292Y (en) * 2008-09-09 2009-06-10 谭迎建 Flat-plate TV and display view angle adjustment device
JP5513049B2 (en) * 2009-09-24 2014-06-04 アルインコ株式会社 Scaffolding board
CN205215840U (en) * 2015-10-26 2016-05-11 中国人民解放军第四军医大学 Many joints of operating room lift pipe fixation fram
CN207177256U (en) * 2017-06-30 2018-04-03 云南建投第四建设有限公司 A kind of safe and intelligent is encorbelmented external rendering scaffold
CN209442550U (en) * 2018-11-01 2019-09-27 李洪盛 A kind of engineering construction lifting device with top protection function
CN110700553A (en) * 2019-11-14 2020-01-17 陕西开友实业有限公司 Attached lifting operation safety protection platform for building construction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
广东省建筑安全协会: "《附着升降脚手架架子工》", 30 September 2016, 华中科技大学出版社 *
曲德仁: "《架子工操作技能(初、中级)》", 30 September 2010, 金盾出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764626A (en) * 2020-06-05 2020-10-13 中船澄西船舶修造有限公司 Cantilever type scaffold
CN113089992A (en) * 2021-03-26 2021-07-09 苏州眠饰界贸易有限公司 Building outer wall glass matched with staff to maintain and prolong service life
CN113089992B (en) * 2021-03-26 2023-01-20 天立建设有限公司 Building outer wall glass matched with workers to maintain and prolong service life
CN114382274A (en) * 2022-01-25 2022-04-22 段艳红 Intelligent climbing frame system for construction site
CN114572893A (en) * 2022-03-07 2022-06-03 中交一公局集团有限公司 Adjustable vertical transportation equipment for prefabricated building

Similar Documents

Publication Publication Date Title
CN111021704A (en) Intelligent climbing frame system for construction site
CN212359051U (en) Electric power high altitude construction auxiliary device
CN107724660A (en) A kind of multi-functional power equipment maintaining operating platform
CN208633472U (en) A kind of civil engineering work construction bracket
CN114017272A (en) Suspended ceiling extension type multifunctional wind turbine cabin cover and working method thereof
CN211341793U (en) Draw gear is stabilized to building templates
CN217600284U (en) Electric installation elevating gear that construction used
CN115811272A (en) Splicing type photovoltaic panel convenient for adjusting supporting angle
CN217091989U (en) Manned pole climbing device
CN210239556U (en) Electric power engineering is with field work ladder of being convenient for remove
CN211974246U (en) Hydraulic engineering construction auxiliary assembly that ascends a height
CN213267534U (en) Civil engineering two-way unloading formula height-regulating frame that falls
CN113120821B (en) Construction comprehensive equipment for electric power engineering
CN206144452U (en) Novel supplementary ladder
CN218406368U (en) Electric power construction equipment with safety protective guard
CN106611938B (en) A kind of power coaster
CN219991094U (en) Efficient electric power internet of things circuit rescue maintenance frame
CN210219665U (en) Combined lamp bracket convenient to mount and dismount
CN218406379U (en) Bridge construction support
CN218597907U (en) Retractable safety fence for electric power construction
CN105217537B (en) A kind of climbing system
CN211397419U (en) Maintenance ladder frame convenient to move
CN216381738U (en) Suspended ceiling extension type multifunctional wind power generator cabin cover
CN215291324U (en) High altitude construction is with slowly falling equipment
CN217106042U (en) Building construction platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200417