CN111021607B - Curtain wall mounting part - Google Patents

Curtain wall mounting part Download PDF

Info

Publication number
CN111021607B
CN111021607B CN201911363881.2A CN201911363881A CN111021607B CN 111021607 B CN111021607 B CN 111021607B CN 201911363881 A CN201911363881 A CN 201911363881A CN 111021607 B CN111021607 B CN 111021607B
Authority
CN
China
Prior art keywords
connecting rod
installation
mounting
pressing plate
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911363881.2A
Other languages
Chinese (zh)
Other versions
CN111021607A (en
Inventor
郭志勇
潘金勇
张彦辉
辛秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Decoration Curtain Wall Co Ltd
Original Assignee
China Construction Fifth Bureau Decoration Curtain Wall Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Decoration Curtain Wall Co Ltd filed Critical China Construction Fifth Bureau Decoration Curtain Wall Co Ltd
Priority to CN201911363881.2A priority Critical patent/CN111021607B/en
Publication of CN111021607A publication Critical patent/CN111021607A/en
Application granted granted Critical
Publication of CN111021607B publication Critical patent/CN111021607B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/90Curtain walls comprising panels directly attached to the structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention provides a curtain wall mounting piece which comprises a front pressing plate, a rear connecting rod, a mounting head and a pull ring. A plurality of installation parts of the front pressure plate. The rear pressing plates are a plurality of and are respectively installed on the edge of the rear end face of the front pressing plate. One end of the rear connecting rod is a ball head, the ball head is clamped between the front pressing plate and the rear pressing plate, and the other end of the rear connecting rod penetrates through the rear pressing plate. Each front connecting rod is of a U-shaped bending structure, one end of each front connecting rod is installed on the installation portion, and the installation portion is installed at the other end of each front connecting rod in a threaded mode. One end of each pull ring is hinged with a screw; the two pull rings are respectively sleeved on two sections which are oppositely arranged after the front connecting rod is bent. The invention has the advantages of convenient installation and adjustment, convenient adjustment of the installation angle and the installation position of each wallboard in the installation process of the curtain wall, improvement of the integral installation efficiency of the curtain wall, simple structure of parts, easy assembly and disassembly and convenient processing and production.

Description

Curtain wall mounting part
Technical Field
The invention relates to the field of architectural decoration, in particular to a curtain wall mounting piece.
Background
Curtain wall gradually becomes the sign of modern building, has the pleasing to the eye atmospheric advantage of appearance to glass curtain wall has good daylighting nature, adopts on public building generally. The curtain comprises the concatenation of polylith wallboard, during the installation, couples together every curtain wallboard through the connecting piece, and for the convenience of installation and regulation, the corner at the wallboard is installed to the connecting piece usually. Because the whole size of the wall body is large, errors can be generated during building construction and part processing, and the sealing property and the aesthetic property of the wall body can be ensured only by mutually compensating and adjusting each wallboard during installation. Accordingly, in view of the above, a curtain wall mount is designed to address the above deficiencies.
Disclosure of Invention
The technical problem to be solved by the invention is as follows: in the curtain wall installation process, the installation angle and the installation position of each curtain wall plate can be conveniently adjusted, and then the installation efficiency and the installation quality of the curtain wall are improved.
The technical scheme adopted by the invention for solving the technical problems is as follows:
the curtain wall mounting piece comprises a front pressing plate, a rear connecting rod, a mounting head and a pull ring. The side end of the front pressure plate is provided with a plurality of installation parts. The rear pressing plates are a plurality of and are respectively installed on the edge of the rear end face of the front pressing plate through bolts. One end of the rear connecting rod is a ball head, the ball head is clamped between the front pressing plate and the rear pressing plate, and the other end of the rear connecting rod penetrates through the rear pressing plate. The front connecting rods are a plurality of and are each of a U-shaped bending structure, one end of each front connecting rod is installed on the installation portion, and the installation portion is installed at the other end of each front connecting rod in a threaded mode. The mounting head faces the front end face of the front pressing plate. The pull rod comprises two pull rings, one end of each pull ring is hinged with a screw, and the two screws are connected through a first nut; the two pull rings are respectively sleeved on two sections which are oppositely arranged after the front connecting rod is bent.
Preferably, the end face of the front pressure plate is provided with a through middle hole, and the middle hole is arranged corresponding to the mounting head.
Preferably, the mounting portion is a through hole penetrating from a side end of the front platen to the center hole; the connecting end of the front connecting rod and the mounting part is provided with threads, the connecting end is arranged in the through hole, and the front connecting rod is fixed with the front pressure plate through a second nut arranged in an opposite manner.
Preferably, the mounting part is two press plates which are buckled with each other, and the two press plates are connected through bolts and clamp the end part of the front connecting rod between the two press plates.
Preferably, the mounting head is a polygonal column, and a notch is formed on a side surface of the column.
The invention has the advantages that the installation and adjustment are convenient, the adjustment of the installation angle and the installation position of each wallboard can be convenient in the installation process of the curtain wall, the integral installation efficiency of the curtain wall is improved, and the installation gap and the installation stress between the wallboards are reduced; the parts of the invention have simple structure, are beneficial to assembly and disassembly, and are convenient to process and produce.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic view of an overall mounting arrangement provided by an embodiment of the present invention;
FIG. 2 is a schematic view of the exploded structure of FIG. 1;
FIG. 3 is a schematic diagram of a front platen configuration provided by an embodiment of the present invention;
FIG. 4 is a schematic view of a drawbar configuration according to an embodiment of the present invention;
in the figure: 100-front pressing plate, 101-mounting part, 102-middle hole, 200-rear pressing plate, 300-rear connecting rod, 400-front connecting rod, 500-pull rod, 501-pull ring, 502-screw rod, 503-first nut, 600-mounting head, 601-notch and 700-second nut.
Detailed Description
The above-described scheme is further illustrated below with reference to specific examples. It is to be understood that these examples are for the purpose of illustrating the invention and are not to be construed as limiting the scope of the invention. The conditions used in the examples may be further adjusted according to the conditions of the particular manufacturer, and the conditions not specified are generally the conditions in routine experiments.
In a specific embodiment, a curtain wall mounting member is provided, which comprises a front pressing plate 100, wherein the front pressing plate 100 is a circular or polygonal plate-shaped structure, and a plurality of mounting parts 101 are arranged at the side ends of the front pressing plate 100. The specific number of mounting portions 101 may be determined according to the number of wall panels to be connected to a curtain wall mounting member, and if 4 wall panels are connected to one mounting member, the number of mounting portions 101 is at least 4. The curtain wall mounting part also comprises a plurality of rear pressing plates 200, the number of the rear pressing plates 200 is a plurality, the specific number can be determined according to the number of the wall plates required to be connected by one curtain wall mounting part, namely, when the number of the wall plates is more, the number of the rear pressing plates 200 is increased along with the wall plates in order to improve the mounting strength, and the rear pressing plates 200 are mounted at the rear end face edge of the front pressing plate 100 through bolts in order to facilitate adjustment and mounting. The back press plate 200 is mainly used for installing the back connecting rod 300 in cooperation with the front press plate 100, and the back connecting rod 300 can fixedly install the curtain wall installation part and the connected back wall plate on the structure of the building steel. The front end of the rear connecting rod 300 is a ball head, the ball head is clamped between the front pressing plate 100 and the rear pressing plate 200, the rear end of the rear connecting rod 300 penetrates through the rear pressing plate 200, and the rear end of the rear connecting rod 300 can swing. When the ball head clamping device is installed, the clamping force of the front pressing plate 100 and the rear pressing plate 200 to the ball head can be adjusted through bolts. The swing of the rear end of the rear connecting rod 300 when the clamping pressure is reduced is beneficial to the connection and adjustment of the rear connecting rod 300 and the building steel structure, and the position compensation is realized. The installation position is determined and then the clamping pressure is adjusted to be increased so that the rear link 300 is fixed. And then can improve the installation and the regulation efficiency of curtain. The curtain wall mounting part further comprises a front connecting rod 400, the front connecting rod 400 is used for mounting curtain wall boards, the number of the front connecting rod 400 is a plurality of, the specific number of the front connecting rod 400 can be determined according to the number of the wall boards, under the general condition, the number of the front connecting rod 400 is equal to the number of the connected wall boards, and each wall board is mounted with the corresponding front connecting rod 400. Each front connecting rod 400 is a U-shaped bending structure, and two sections oppositely arranged after being bent into a U shape have certain elasticity, but the elasticity is enough to support the wall board, so that the installation strength of the wall board is ensured. One end of the front link 400 is mounted on the mounting part 101, and the other end is threadedly mounted with a mounting head 600; wherein the mounting head 600 after mounting is disposed toward the front end surface of the front platen 100 and can be connected with a wall board. When the wall plate is mounted with the mounting head 600, the mounting position of the mounting head 600 can be adjusted by screw threads, i.e., the mounting head 600 moves along the axis of the front link 400. During installation, when the wallboard installation position deviates from the implementation position, compensation and adjustment can be performed through the movement of the installation head 600, so that the installation and adjustment of the installation head 600 and the wallboard are facilitated. In use, the tie bar 500 is mounted on the front link 400 in order to stabilize the elasticity of the front link 400 and further enhance the strength of the front link 400, and to change the mounting position of the mounting head 600 by using the characteristic of the elasticity of the front link 400. The pull rod 500 comprises two pull rings 501, one end of each pull ring 501 is hinged with a screw 502, and the two screws 502 are connected through a first nut 503; two pull rings 501 are respectively sleeved on two sections of the front connecting rod 400 which are oppositely arranged after being bent, namely two vertical edges of the U-shaped structure, when the position of the mounting head 600 is adjusted, the front connecting rod 400 of the U-shaped structure is deformed by screwing the first nut 503, namely the opening of the U-shaped structure is increased or reduced, at the moment, the mounting head 600 can swing, and therefore the angle and the gap between the mounting head 600 and a wallboard can be conveniently adjusted.
During installation, the rear connecting rod 300 is firstly connected with a building steel structure preliminarily; then, the hoisted wall boards are respectively and primarily connected with the mounting heads 600 corresponding to the front connecting rods 400; when the accurate adjustment is carried out after the aforesaid is connected, connecting rod 400 and installation head 600 can be convenient for be connected between curtain installed part and the wallboard before adjusting, connecting rod 300 can be convenient for be connected between curtain installed part and the building steel construction through adjusting.
According to the above, in order to further facilitate the installation of the curtain wall panel, the partial structure of the curtain wall panel is further limited, and the specific scheme is as follows:
in order to facilitate the installation and adjustment between the mounting head 600 and the wall plate, a through middle hole 102 is formed in the end surface of the front pressing plate 100, the middle hole 102 is arranged corresponding to the mounting head 600, and when the mounting head 600 is installed with the wall plate, the middle hole 102 can facilitate the screwing of the mounting head 600 and the checking of the position of the mounting head 600. On the basis of the installation and adjustment of the front connecting rod 400 and the front pressure plate 100, the installation part 101 is a through hole penetrating from the side end of the front pressure plate 100 to the middle hole 102; the connecting end of the front connecting rod 400 and the mounting part 101 is provided with threads, the end is arranged in the through hole, the front connecting rod 400 is fixed with the front pressing plate 100 through second nuts 700 arranged in an opposite mode, the two second nuts 700 are respectively arranged on the outer side wall of the front pressing plate 100 and the inner wall of the through hole 102, the mounting position of the front connecting rod 400 can be locked through screwing the two second nuts 700, and the front connecting rod 400 and the front pressing plate 100 are fixed; after the two second nuts 700 are unscrewed, the threaded end of the front connecting rod 400 can move along the through hole, so that the mounting position of the mounting head 600 can be adjusted, and the mounting head 600 can be conveniently connected with the wall board.
Similarly, in order to facilitate the mounting and adjustment of the front link 400 and the front pressure plate 100, the mounting portion 101 may be provided as two pressure plates that are engaged with each other and are connected by bolts to sandwich the end portion of the front link 400 therebetween. The front connecting rod 400 is pressed by the two pressing plates to fix the front connecting rod 400 and the front pressing plate 100; after the two pressing plates are loosened, the mounting position of the mounting head 600 can be adjusted, and the connection between the mounting head 600 and the wall board is further facilitated.
During the installation, in order to facilitate the installation of installation head 600 and wallboard and improve the installation intensity of the two, will install head 600 for the polygon cylinder, seted up notch 601 on the cylinder side, can install connecting fastener such as bolt or screw in the mounting groove.
In light of the foregoing description of the preferred embodiment of the present invention, many modifications and variations will be apparent to those skilled in the art without departing from the spirit and scope of the invention. The technical scope of the present invention is not limited to the content of the specification, and must be determined according to the scope of the claims.

Claims (4)

1. A curtain wall mount, comprising:
the side end of the front pressure plate (100) is provided with a plurality of mounting parts (101);
the rear pressing plates (200) are arranged at the edge of the rear end face of the front pressing plate (100) through bolts;
one end of the rear connecting rod (300) is a ball head, the ball head is clamped between the front pressing plate (100) and the rear pressing plate (200), and the other end of the rear connecting rod (300) penetrates through the rear pressing plate (200);
the number of the front connecting rods (400) is multiple, each front connecting rod (400) is of a U-shaped bending structure, one end of each front connecting rod is installed on the installation part (101), and the other end of each front connecting rod is installed with an installation head (600) in a threaded mode; wherein the mounting head (600) is arranged towards the front end surface of the front pressure plate (100);
the pull rod (500) comprises two pull rings (501), one end of each pull ring (501) is hinged with a screw (502), and the two screws (502) are connected through first nuts (503); the two pull rings (501) are respectively sleeved on two sections which are oppositely arranged after the front connecting rod (400) is bent.
2. The curtain wall mounting piece as claimed in claim 1, wherein the front pressure plate (100) has a through central hole (102) formed in an end surface thereof, and the central hole (102) is disposed corresponding to the mounting head (600).
3. The curtain wall mounting as claimed in claim 2, wherein the mounting portion (101) is a through hole passing through from a side end of the front press plate (100) to the central hole (102); and a thread is arranged at the connecting end of the front connecting rod (400) and the mounting part (101), the connecting end is arranged in the through hole, and the front connecting rod (400) is fixed with the front pressure plate (100) through a second nut (700) arranged in an opposite manner.
4. A curtain wall mounting as claimed in any one of claims 1 to 3, wherein the mounting head (600) is a polygonal cylinder with notches (601) in the sides of the cylinder.
CN201911363881.2A 2019-12-26 2019-12-26 Curtain wall mounting part Active CN111021607B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911363881.2A CN111021607B (en) 2019-12-26 2019-12-26 Curtain wall mounting part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911363881.2A CN111021607B (en) 2019-12-26 2019-12-26 Curtain wall mounting part

Publications (2)

Publication Number Publication Date
CN111021607A CN111021607A (en) 2020-04-17
CN111021607B true CN111021607B (en) 2021-06-22

Family

ID=70214514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911363881.2A Active CN111021607B (en) 2019-12-26 2019-12-26 Curtain wall mounting part

Country Status (1)

Country Link
CN (1) CN111021607B (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203654534U (en) * 2013-12-05 2014-06-18 英利集团有限公司 Photovoltaic module fixing device for curtain wall
CN206829449U (en) * 2017-06-19 2018-01-02 浙江云兴建设有限公司 A kind of cell curtain wall conveniently rotated
CN108360717B (en) * 2018-03-27 2020-04-10 江苏和源兴建设股份有限公司 Curtain wall connecting piece convenient to install and adjust
CN208803607U (en) * 2018-06-20 2019-04-30 广东昕泰建材有限公司 A kind of simple curtain wall installing structure

Also Published As

Publication number Publication date
CN111021607A (en) 2020-04-17

Similar Documents

Publication Publication Date Title
CN108360717B (en) Curtain wall connecting piece convenient to install and adjust
CN111021607B (en) Curtain wall mounting part
CN106194948B (en) Flexible connector and the section bar shelf made using the flexible connector
CN204691158U (en) Decorative panel Components installation syndeton
CN107420732B (en) Splicing structure of aluminum profile
CN210650724U (en) Quick-change type sucker base
CN212225714U (en) Aluminum alloy connecting piece for plates
CN210152026U (en) Adjustable solderless switching system of assembled curtain
CN209855599U (en) Club connection structure in aluminum alloy window
CN207676569U (en) A kind of novel, practical overhead transmission line sign board mounting bracket
CN219175594U (en) Assembled aluminum plate curtain wall
CN219037050U (en) Frameless cabinet machine
CN219175573U (en) Aluminum alloy curtain wall
CN218714189U (en) Waterproof type curtain plastic-aluminum board
CN218233931U (en) Indoor dry-hanging stone curtain wall mounting structure
CN216042376U (en) Regulation formula dado suspended structure
CN218437954U (en) Aluminum veneer mounting structure for decoration engineering
CN215907190U (en) Lotus leaf column cylinder node mounting structure
CN210052986U (en) Power cabinet connecting piece and power cabinet connecting structure
CN211286221U (en) Connection structure of adjustable angle mounting panel
CN213978016U (en) Novel reed claw
CN220492888U (en) Photovoltaic board fixed knot constructs based on anticreep plate nut
CN220266327U (en) Saving type assembled flat die template with quickly adjustable flatness
CN216405863U (en) Ornamental strip mounting structure for curtain
CN212271422U (en) Tower roof lantern steel frame mounting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Guo Zhiyong

Inventor after: Pan Jinyong

Inventor after: Zhang Yanhui

Inventor after: Xin Xiu

Inventor before: Xin Xiu

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210602

Address after: 410000 room 1201, block B, international phase II building, CCB Hecheng headquarters, 69 zhengtangpo Road, Yuhua District, Changsha City, Hunan Province

Applicant after: CHINA CONSTRUCTION FIFTH ENGINEERING DIVISION WALL & DECORATION Co.,Ltd.

Address before: 125001 unit 1, building 2-11, LVYE villa, No.2, Lianyang Road, Lianshan District, Huludao City, Liaoning Province

Applicant before: Xin Xiu

GR01 Patent grant
GR01 Patent grant