CN111006637B - 沉陷区地表沉降监测设备 - Google Patents
沉陷区地表沉降监测设备 Download PDFInfo
- Publication number
- CN111006637B CN111006637B CN201911139662.6A CN201911139662A CN111006637B CN 111006637 B CN111006637 B CN 111006637B CN 201911139662 A CN201911139662 A CN 201911139662A CN 111006637 B CN111006637 B CN 111006637B
- Authority
- CN
- China
- Prior art keywords
- pipe
- plate
- top cover
- plates
- assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C5/00—Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Force Measurement Appropriate To Specific Purposes (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明涉及对采空区检测技术领域,具体涉及一种沉陷区地表沉降监测设备,其包括:顶盖、固定组件、管一、管二;所述固定组件包括:装配板、挤压板、橡胶层、压力传感器;固定组件套设在管一、管二外,多个固定组件间隔排列在检测孔洞内,与被检测孔洞壁面抵接;当某一组固定组件所对应的岩层出现沉陷时,由于固定组件与岩壁抵接,所以对应的固定组件会跟着岩层一起下沉,激光尺感应到反射板的变化将下沉深度显示在显示屏上。
Description
技术领域
本发明涉及对采空区检测技术领域,具体涉及沉陷区地表沉降监测设备。
背景技术
煤炭在我国能源结构中约占75%,在国民经济和社会发展中具有重要的地位,但也产生了一系列的问题,如环境污染、山体滑坡、地表沉降变形等,其中,以地表沉降变形问题最为突出,部分矿区甚至出现了塌陷现象,这给矿区当地人民的生命财产和生态环境等带来了巨大的威胁。
现阶段的制定治理方案,所用的地面形变监测方法大多采用水准测量或者GPS等点测量方法,采用全站仪、水准仪等设备进行检测,但对于岩体发生沉降导致的地表沉降,这种传统的监测方式并不适用。
发明内容
因此,本发明正是鉴于上述问题而做出的,本发明的目的在于提供一种沉陷区地表沉降监测设备,该设备插入地下,通过与岩壁的抵合,与岩壁共同下沉,从而测量出地面下方的下沉情况。
沉陷区地表沉降监测设备,包括:顶盖、固定组件、上管、下管;所述固定组件、上管、下管有多组,每组放置在检测孔洞不同深度位置,用于测量对应位置的沉陷情况;
所述固定组件包括装配板、挤压板、橡胶层、压力传感器,所述装配板套在上管和下管外,两个装配板之间连接有所述挤压板,挤压板外侧连有所述橡胶层,所述压力传感器位于橡胶层内;
根据检测孔洞深度及沉陷层数量需要,组装多组固定组件、管一、管二,组装完成后插入检测孔洞中,固定组件上挤压板的外层橡胶层抵接在检测孔洞的岩壁上;
所述顶盖上设置有激光尺和显示屏,每个激光尺对应每组固定组件;
所述激光尺及压力传感器的读书显示在顶盖的显示屏上。
有益效果:
1、当某一组固定组件所对应的岩层出现沉陷时,由于固定组件与岩壁抵接,所以对应的固定组件会跟着岩层一起下沉,激光尺感应到反射板的变化将下沉深度显示在显示屏上;
2、本发明固定组件及管一、管二的数量可根据沉陷区的不同沉陷层数情况进行设置;
3、岩层在下陷时会对检测孔洞产生挤压,与检测孔洞岩壁抵接的压力传感器能测出压力变化,从而对某一岩层的下陷进行预测。
附图说明
图1为本发明整体结构示意图。
图2为本发明固定组件结构示意图。
图3为本发明装配板与挤压板连接轴的横截面图。
图4为本发明管一、管二结构示意图。
图5为本发明管下压固定组件运动示意图。
如图中所示:1-检测孔洞、2-顶盖、3-固定组件、4-管一、5-管二、31-装配板、32-挤压板、33-橡胶层、34-压力传感器、41-下压板、42-卡块、51-卡槽。
具体实施方式
下面结合具体实施例和附图对本发明作进一步说明,在以下的描述中阐述了更多的细节以便于充分理解本发明,但是本发明显然能够以多种不同于此描述的其他方式来实施,本领域技术人员可以在不违背本发明内涵的情况下根据实际应用情况作出类似推广、演绎,因此不应以此具体实施例的内容限制本发明的保护范围。
如图1所示,沉陷区地表沉降监测设备,包括:顶盖2、固定组件3、管一4、管二5;
所述顶盖2直径大于检测孔洞1,且覆盖检测孔洞1,其中顶盖2底面安装有三个激光尺,顶面设有两个显示屏,其中一个显示屏显示激光尺所反馈的数据;
所述固定组件3数量为多个,间隔排列在检测孔洞1内,其中多个固定组件3分为三组,每一组对应不同深度的地层;
如图2所示,所述固定组件3包括:装配板31、挤压板32、橡胶层33、压力传感器34;
所述装配板31数量为多个,装配板31两两上下相对设置,每个装配板31的中心处开设有贯通口;
所述挤压板32由三块板顺序轴连组成,四个为一组,每组挤压板32对应一组装配板31,每个挤压板32两端通过轴连的方式与上下两个装配板31轴连接,如图3所示,所述装配板31上的轴套横截面为四分之三圆形,挤压板32上的轴横截面为半圆形,其目的在于使挤压板32在有限的范围内沿轴转动;
所述橡胶层数量与挤压板32数量一致,每个橡胶层33分别固定在挤压板32的中间板上,与检测孔洞1壁面抵接,所述橡胶层33有一定厚度,且中心部位设有凹槽;
所述压力传感器34数量与橡胶层33相同,分别设置在橡胶层33的中心凹槽内,其中顶盖2的另一显示屏用于显现压力传感器34反馈的数据;
所述管一4数量为多个,分别沿每组固定组件3的上装配板31的贯通口向下插入;
如图4所示,所述管一4中部外侧设有环形下压板41,所述管一4下部的外侧壁面设有卡块42;
所述管二5分为上下两部分,下部的横截面直径大于上部,所述管二5数量为多个,分别沿每组固定组件3的下装配板31的贯通口向上插入,每个管二5内水平设有一条反射板,且每个反射板沿垂直方向上相互无遮挡,并一一对应顶盖2底面的激光尺,上、下部的交接处支撑装配板31,其中管二5上端的一侧壁面设有“L”形卡槽51,卡槽51的垂直槽向上延伸出管二5,形成开口,且卡槽51的开口与卡块42对应;
单个管一4与管二5为一组连接一个固定组件3,再通过管二5直径较大的下端与另一固定组件3中的管一4相套接,最上方管一4连接顶盖2,且容纳激光尺,最下方的管二5底面为封闭状。
本发明工作原理:
首先通过机械力下压顶盖2,顶盖2挤压管一4向下移动,管一4的下压板41下压装配板31,挤压板32逐渐被压缩,其中板向外伸出,接着管一4下压管二5,管一4的卡块42插入管二5的卡槽51内,管二5继续下压下方的管一4,依次让多个挤压板32逐渐被压缩,此时各橡胶层33与检测孔洞1岩壁相抵合,机械力旋转顶盖2,多个卡块42进入多个卡槽51的水平槽内,从而对多个挤压板32进行定型,一方面挤压板32支撑检测孔洞1,另一方面挤压板32跟随检测孔洞1下沉部位移动,当检测孔洞1下端下沉时,下方的挤压板32跟随检测孔洞1下沉部位移动,管二5与上方管一4相反端逐渐远离,此时激光尺通过最下方管二5底面测量下陷距离,再通过一显示器进行显示,由于下沉时检测孔洞1为空心,检测孔洞1岩壁会向轴心挤压,从而进一步挤压橡胶层33,岩壁挤压到压力传感器34时,通过压力传感器34受到岩壁传来的压力大。
Claims (3)
1.沉陷区地表沉降监测设备,包括:顶盖(2)、固定组件(3)、管一(4)、管二(5);所述顶盖(2)覆盖检测孔洞洞口,其中顶盖(2)底面安装有激光尺,顶盖(2)顶面设有两个显示屏,其中一个显示屏显示激光尺所反馈的数据;
其特征在于:
所述固定组件(3)数量为多个,间隔排列在检测孔洞内,所述固定组件(3)包括:装配板(31)、挤压板(32)、橡胶层(33)、压力传感器(34);
所述装配板(31)数量为多个,装配板(31)两两上下相对设置,每个装配板(31)的中心处开设有贯通口;
所述挤压板(32)由三块板顺序轴连组成,四个为一组,每组挤压板(32)对应一组装配板(31),每个挤压板(32)两端通过轴连的方式与上下两个装配板(31)轴连接;
所述橡胶层数量与挤压板(32)数量一致,每个橡胶层(33)分别固定在挤压板(32)的中间板上,与检测孔洞壁面抵接,且中心部位设有凹槽;
所述压力传感器(34)数量与橡胶层(33)相同,分别设置在橡胶层(33)的中心凹槽内,其中顶盖(2)的另一显示屏显现压力传感器(34)反馈的数据;
所述管一(4)中部外侧设有环形下压板(41),管一(4)下部的外侧壁面设有卡块(42),所述管一(4)沿固定组件(3)的上装配板(31)的贯通口向下插入;
所述管二(5)分为上、下两部分,下部的横截面直径大于上部,沿固定组件(3)的下装配板(31)的贯通口向上插入,管二(5)内水平设有反射板,对应顶盖(2)底面的激光尺,所述上、下部的交接处支撑装配板(31),其中管二(5)上端的一侧壁面设有“L”形卡槽(51),卡槽(51)的垂直槽向上延伸出管二(5),形成开口,且卡槽(51)的开口与卡块(42)对应。
2.根据权利要求1所述的沉陷区地表沉降监测设备,其特征在于:所述管一(4)与管二(5)为一组连接一个固定组件(3),再通过管二(5)直径较大的下端与另一固定组件(3)中的管一(4)相套接,最上方管一(4)连接顶盖(2),最下方的管二(5)底面为封闭状。
3.根据权利要求1所述的沉陷区地表沉降监测设备,其特征在于:所述装配板(31)上的轴套横截面为四分之三圆形,挤压板(32)上的轴横截面为半圆形。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911139662.6A CN111006637B (zh) | 2019-11-21 | 2019-11-21 | 沉陷区地表沉降监测设备 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911139662.6A CN111006637B (zh) | 2019-11-21 | 2019-11-21 | 沉陷区地表沉降监测设备 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111006637A CN111006637A (zh) | 2020-04-14 |
CN111006637B true CN111006637B (zh) | 2021-12-07 |
Family
ID=70113072
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911139662.6A Active CN111006637B (zh) | 2019-11-21 | 2019-11-21 | 沉陷区地表沉降监测设备 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111006637B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111928816B (zh) * | 2020-09-01 | 2021-08-20 | 河南省建筑科学研究院有限公司 | 一种地下工程运行安全性的监控方法和监控系统 |
CN112747793B (zh) * | 2021-01-05 | 2022-08-26 | 房小夏 | 一种矿山地表沉陷岩移观测装置 |
CN115248027B (zh) * | 2021-04-28 | 2023-07-21 | 深圳大学 | 一种土体沉降光纤感应监测装置及沉降量测量方法 |
CN118009976A (zh) * | 2024-04-10 | 2024-05-10 | 山东省国土空间生态修复中心(山东省地质灾害防治技术指导中心、山东省土地储备中心) | 一种地面沉降监测用基岩标扶正器 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012219487A (ja) * | 2011-04-07 | 2012-11-12 | Maruyama Kogyo Kk | 沈下量測定装置、それを用いた軟弱地盤の改良工法、盛土構造物が造成される地盤の動態把握方法、及び地下埋設物が埋設される地盤の動態把握方法 |
CN207672634U (zh) * | 2017-12-01 | 2018-07-31 | 米永超 | 一种岩土工程施工土层沉降用监测装置 |
CN208254457U (zh) * | 2018-05-31 | 2018-12-18 | 陕西省地质环境监测总站 | 一种适用于地层沉降远程监测的相位式激光监测仪 |
CN109084727A (zh) * | 2018-10-12 | 2018-12-25 | 河北稳控科技有限公司 | 一种多维监测装置 |
CN209559187U (zh) * | 2019-03-06 | 2019-10-29 | 杭州辉厚科技有限公司 | 管道沉降监测预警系统 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8826553B2 (en) * | 2012-04-20 | 2014-09-09 | Trimble Navigation Limited | Layout equipment and layout method |
-
2019
- 2019-11-21 CN CN201911139662.6A patent/CN111006637B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012219487A (ja) * | 2011-04-07 | 2012-11-12 | Maruyama Kogyo Kk | 沈下量測定装置、それを用いた軟弱地盤の改良工法、盛土構造物が造成される地盤の動態把握方法、及び地下埋設物が埋設される地盤の動態把握方法 |
CN207672634U (zh) * | 2017-12-01 | 2018-07-31 | 米永超 | 一种岩土工程施工土层沉降用监测装置 |
CN208254457U (zh) * | 2018-05-31 | 2018-12-18 | 陕西省地质环境监测总站 | 一种适用于地层沉降远程监测的相位式激光监测仪 |
CN109084727A (zh) * | 2018-10-12 | 2018-12-25 | 河北稳控科技有限公司 | 一种多维监测装置 |
CN209559187U (zh) * | 2019-03-06 | 2019-10-29 | 杭州辉厚科技有限公司 | 管道沉降监测预警系统 |
Also Published As
Publication number | Publication date |
---|---|
CN111006637A (zh) | 2020-04-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111006637B (zh) | 沉陷区地表沉降监测设备 | |
CN106546366B (zh) | 一种伞型深孔三向应力及位移综合测试装置 | |
CN113865551B (zh) | 适用于高边坡与河道双台阶的空地结合基坑开挖监测预警系统及其操作方法 | |
CN104090086B (zh) | 地下承压水位动态变化作用下土结构性测试装置及方法 | |
CN204177381U (zh) | 一种光纤光栅测斜仪器 | |
CN105300343A (zh) | 串联式序列节段变形监测传感装置 | |
CN102359982A (zh) | 一种地下气体探测的多功能探头 | |
CN102979071B (zh) | 深基坑受力稳定性远程智能监测及三维预警方法与系统 | |
CN210154614U (zh) | 一种基于bim的基坑及其周边地层的沉降监测装置 | |
CN101629799A (zh) | 无通视高陡边坡变形监测方法及其装置 | |
CN205209475U (zh) | 串联式序列节段变形监测传感装置 | |
CN103061322B (zh) | 深基坑稳定性远程智能监测三维数字综合预警方法与系统 | |
CN106884441B (zh) | 一种可视化敞口双壁模型管桩试验装置 | |
CN113187471B (zh) | 页岩气开采过程中跨断层界面牛顿力主动测量装置及方法 | |
CN203034434U (zh) | 深基坑稳定性远程智能监测三维数字综合预警系统 | |
CN109488331A (zh) | 成型盾构隧道管片及其受力测试方法 | |
CN211291851U (zh) | 一种盾构隧道土体地震液化实时监测系统 | |
CN105043611A (zh) | 一种膨胀土侧向膨胀力原位测试装置 | |
CN209430206U (zh) | 成型盾构隧道管片 | |
CN204882545U (zh) | 顺层岩质边坡滑移试验系统 | |
CN202208911U (zh) | 一种地下气体探测的多功能探头 | |
CN218293533U (zh) | 一种岩土工程勘察钻探用防跑偏支座 | |
CN106092050A (zh) | 一种分布式光纤测斜装置及测斜方法 | |
CN201635066U (zh) | 用于污染地基土的环境静力触探探头 | |
CN112539734A (zh) | 一种融合北斗技术地面沉降监测分层标 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |