CN111005431B - Municipal pipeline mounting structure and construction method thereof - Google Patents

Municipal pipeline mounting structure and construction method thereof Download PDF

Info

Publication number
CN111005431B
CN111005431B CN201911358307.8A CN201911358307A CN111005431B CN 111005431 B CN111005431 B CN 111005431B CN 201911358307 A CN201911358307 A CN 201911358307A CN 111005431 B CN111005431 B CN 111005431B
Authority
CN
China
Prior art keywords
pipeline
base
clamping
template
pipelines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201911358307.8A
Other languages
Chinese (zh)
Other versions
CN111005431A (en
Inventor
翁浩
吴荣华
林泽如
金伟煌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Xinye Construction Engineering Co ltd
Original Assignee
Huizhou Xinye Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Xinye Construction Engineering Co ltd filed Critical Huizhou Xinye Construction Engineering Co ltd
Priority to CN201911358307.8A priority Critical patent/CN111005431B/en
Publication of CN111005431A publication Critical patent/CN111005431A/en
Application granted granted Critical
Publication of CN111005431B publication Critical patent/CN111005431B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention relates to the technical field of pipeline structures, in particular to a municipal pipeline mounting structure and a construction method thereof, and the technical scheme is as follows: the pipeline fixing device comprises a plurality of pipelines which are sequentially spliced and a plurality of pipeline bases which are arranged in grooves and used for supporting the pipelines, wherein two opposite sides of the upper surface of each pipeline base are respectively provided with a template groove, the template grooves are connected with templates in a clamping manner, the pipelines are positioned between the two templates, the inner side of one template is hinged with a fastening rope used for fixing the pipelines, the other template is provided with a through hole for the free end of the fastening rope to pass through, two adjacent pipelines are respectively a first pipeline and a second pipeline, one end of the first pipeline, which is close to the second pipeline, is provided with an external thread, one end of the second pipeline, which is close to the first pipeline, is provided with an internal thread, and the first pipeline is; the pipeline base is provided with a positioning assembly for tightly winding the fixing rope. The pipeline structure facilitates the disassembly and assembly between the pipeline and the base, and further improves the efficiency of pipeline rush repair.

Description

Municipal pipeline mounting structure and construction method thereof
Technical Field
The invention relates to the technical field of pipeline structures, in particular to a municipal pipeline mounting structure and a construction method thereof.
Background
The pipeline refers to a system consisting of a pipe duct for collecting and discharging sewage, wastewater and rainwater and auxiliary devices thereof. Along with the gradual increase of urbanization construction strength, the construction requirement on urban pipelines is higher and higher.
The existing municipal pipeline mainly adopts a PE pipeline, and the PE pipeline is a polyethylene plastic sleeve which is extruded and molded and has the excellent characteristics of corrosion resistance, wear resistance, aging resistance and the like. During installation, the ends of the two pipes are usually spliced together, and then the two pipes are connected to each other by hot-melt connection.
The above prior art solutions have the following drawbacks: in the long-term use process of the pipeline, the situation that the pipeline is blocked by solid garbage often occurs. At this moment, need open the pipeline through the manual work and salvage, because all be the butt fusion between the pipeline together, the installation is inconvenient with the dismantlement, consumes a large amount of efforts of mediation personnel and time, influences the efficiency of salvageing, so need improve.
Disclosure of Invention
Aiming at the defects of the prior art, the first purpose of the invention is to provide a municipal pipeline mounting structure, which facilitates the disassembly and assembly between a pipeline and a base, and further improves the efficiency of pipeline rush repair.
The technical purpose of the invention is realized by the following technical scheme: a municipal pipeline mounting structure comprises a plurality of pipelines which are sequentially spliced and a plurality of pipeline bases which are arranged in grooves and used for supporting the pipelines, wherein the pipeline bases are linearly arranged, two opposite sides of the upper surface of each pipeline base are respectively provided with a template groove, the template grooves are clamped with templates, the pipelines are positioned between two templates, the inner side of one template is hinged with a fastening rope used for fixing the pipelines, the other template is provided with a through hole for the free end of the fastening rope to pass through, two adjacent pipelines are respectively a first pipeline and a second pipeline, the first pipeline is provided with an external thread close to the second pipeline, the second pipeline is provided with an internal thread close to the first pipeline, and the first pipeline is connected with the second pipeline through a thread; and a positioning assembly for tightly winding the fixing rope is arranged on the pipeline base.
Through adopting above-mentioned technical scheme, threaded connection makes first pipeline and second pipeline realize tentatively fixing, tightens up the fastening rope through locating component, and then realizes being fixed in the pipeline base with the pipeline of different specifications on.
As a further improvement of the invention, the outer side walls of the first pipeline and the second pipeline, which are close to each other, are circumferentially and correspondingly provided with a first clamping groove and a second clamping groove, and the surface of one side of the fastening rope, which faces the pipelines, is fixedly provided with a first clamping strip in clamping fit with the first clamping groove and a second clamping strip in clamping fit with the second clamping groove.
Through adopting above-mentioned technical scheme, utilize the joint cooperation in first card strip and first screens groove and second card strip and second screens groove, transversely fix a position adjacent pipeline for the pipeline can be more stable be fixed in on the pipeline base.
As a further improvement of the invention, the positioning assembly comprises a screw rod rotatably carried on the upper surface of every adjacent four pipeline bases along the length direction of the pipeline, a wire sleeve fixedly arranged on the screw rod at intervals, and a connector connected between the wire sleeve and a fastening rope, wherein the fastening rope can be wound on the wire sleeve through the connector.
Through adopting above-mentioned technical scheme, the connector can be fixed in the fastening rope and sheathe in the line, and utilizes the auto-lock principle of lead screw to realize tightening up the operation of fastening rope, and simple structure is practical, and is applicable to and carries out fixed operation to different specification and dimension's pipeline.
As a further improvement of the invention, the connector comprises a mounting box which is respectively arranged on the side wall of the wire wheel and corresponds to the plug block arranged at the free end of the fastening rope, two clamping holes arranged on the mounting box, two elastic positioning blocks arranged at the end parts of the plug block and a clamping hook arranged at the end parts of the elastic positioning blocks, wherein the clamping hook is clamped and matched with the clamping holes, and the plug block is in inserted and matched with the mounting box; two the elastic locating piece is located the both sides of inserted block respectively, the elastic locating piece is under natural state, just when inserted block and elastic locating piece are located the installation box, pothook and card hole joint just run through the card hole.
By adopting the technical scheme, the elastic positioning block and the inserting block are inserted into the mounting box, and the clamping hook is clamped with the clamping hole, so that the fastening rope is connected to the wire sleeve, and the wire rod drives the wire sleeve to rotate to wind the fastening rope on the wire sleeve in the later period; the clamping hook is pressed, the clamping hook is separated from the clamping hole, the insertion block and the elastic positioning block are separated from the mounting box conveniently, and the pipeline base are convenient to disassemble and maintain in the later period.
As a further improvement of the invention, the inserting block is provided with a reinforcing block which is positioned between the two elastic positioning blocks and can be abutted against the clamping hook.
Through adopting above-mentioned technical scheme, when pressing the pothook, the deformation volume of reinforcing block restriction elastically positioned piece has protected elastically positioned piece well, greatly reduced because of pressing the too big possibility that leads to elastically positioned piece to damage of power of pothook.
As a further improvement of the invention, one end of the screw rod is fixedly provided with a rotary handle.
Through adopting above-mentioned technical scheme, the setting up of swing handle makes things convenient for the staff to rotate the lead screw.
As a further improvement of the invention, the upper surface of the pipeline base is provided with a containing groove for clamping the pipeline.
Through adopting above-mentioned technical scheme, the screens is advanced to the pipeline in the setting of storage tank, and then reduces the condition emergence that the in-process pipeline that is fixed in the pipeline base at the pipeline removed at will.
As a further development of the invention, the end face of the first tube facing the second tube is tapered.
Through adopting above-mentioned technical scheme, the tip of the first pipeline of being convenient for is inserted in the second pipeline and is rotated the installation in the setting of conical surface.
As a further improvement of the invention, the inner side wall of the second pipeline is provided with a step surface, the step surface is provided with a sealing gasket, and the end part of the first pipeline inserted into the second pipeline is in butt fit with the sealing gasket.
Through adopting above-mentioned technical scheme, when first pipeline installation was in the second pipeline, first pipeline was inserted the tip of inserting in the second pipeline and is cooperated to seal ring butt to seal ring produces elastic extrusion, makes first pipeline installation ground more firm, but also the leakproofness between first pipeline and the second pipeline that has increased.
The second purpose of the invention is to provide a municipal pipeline construction method, which can facilitate the installation and connection between the pipeline base and the pipeline.
In order to achieve the purpose, the invention specifically comprises the following steps:
(1) prefabricating a pipeline base, designing a mould according to the standard size of the pipeline base, and manufacturing the pipeline base in a processing plant according to the designed standard size and the mould;
(2) transporting the manufactured pipeline base to a construction site;
(3) the method comprises the following steps of (1) defining a pipeline to be installed, excavating a pipeline groove section by section from the downstream to the upstream of the pipeline to be installed along the defined pipeline by using an excavator, and flattening and compacting the bottom of the constructed pipeline groove;
(4) hoisting the pipeline base, namely paving the pipeline base at uniform intervals in the longitudinal direction by adopting a hoisting device, wherein the pipeline base is linearly arranged, and when the pipeline base is in a symmetrical double-division type, the pipeline base is symmetrically arranged according to the position of a pipeline, and connecting templates are timely and respectively installed on two sides of the upper surface of the pipeline base;
(5) the method comprises the following steps that (1) pipelines are connected and placed, and the pipelines are sequentially spliced according to design requirements and then stably installed on a pipeline base and located between two templates by adopting a manual matching mechanical pipe lowering mode;
(6) the pipeline is fixed, the upper surfaces of every four adjacent pipeline bases rotate along the arrangement direction of the pipeline bases to bear a lead screw, a wire sleeve is correspondingly arranged on the lead screw, the inner side of one template is hinged with a fastening rope, the free end of the fastening rope is fixed on the wire sleeve through a connector, the lead screw is rotated to order the fastening rope to be wound on the wire sleeve, and the pipeline is tightened and fixed.
Through adopting above-mentioned technical scheme, be convenient for lay of pipeline base and to the dismouting between the pipeline of different specifications and the pipeline base, the work progress is simple.
In conclusion, the invention has the following beneficial effects:
1. the first pipeline and the second pipeline are preliminarily fixed through threaded connection, and the fastening rope is tightened through the positioning assembly, so that pipelines with different specifications are fixed on the pipeline base;
2. the elastic positioning block and the plug block are inserted into the mounting box, and the clamping hook is clamped with the clamping hole, so that the fastening rope is connected onto the wire sleeve, the wire sleeve is driven by the lead screw to rotate in the later period, the fastening rope can be wound on the wire sleeve, the clamping hook is pressed, the clamping hook is separated from the clamping hole, the plug block and the elastic positioning block can be conveniently separated from the mounting box, and the later period of disassembly and maintenance between the pipeline and the pipeline base are facilitated;
3. utilize the joint cooperation in first card strip and first screens groove and second card strip and second screens groove, transversely fix a position adjacent pipeline for the pipeline can be more stable be fixed in on the pipeline base.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is a schematic view showing an assembled relationship of a first pipe and a second pipe in an embodiment of the present invention;
FIG. 3 is a schematic diagram of a portion of a pipe base and a pipe connection according to an embodiment of the present invention;
FIG. 4 is an enlarged view of portion A of FIG. 3;
FIG. 5 is a schematic view of the assembled relationship of the fastening cord, connector and cable cover in an embodiment of the invention;
fig. 6 is an enlarged view of a portion B in fig. 5.
In the figure: 1. a pipe base; 101. a template slot; 2. a template; 3. a pipeline; 31. a first conduit; 32. a second conduit; 4. a containing groove; 5. fastening the rope; 51. a first clip strip; 52. a second card strip; 61. a first clamping groove; 62. a second clamping groove; 7. perforating; 8. a reinforcing bar; 9. a screw rod; 10. a wire sleeve; 11. inserting a block; 12. an elastic positioning block; 13. a hook; 14. mounting a box; 15. a box opening; 16. a clamping hole; 17. a reinforcing block; 18. and (5) screwing a handle.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
A municipal pipeline mounting structure, referring to fig. 1 and 2, comprises a plurality of pipelines 3 and a plurality of cuboid-shaped pipeline bases 1 which are arranged in a groove (not shown in the figure) and used for supporting the pipelines 3, wherein the number of the pipeline bases 1 can be adjusted according to the actual length of the groove, and the pipeline bases 1 are distributed along the length direction of the groove.
Referring to fig. 2 and 3, a containing groove 4 for containing the clamping position of the pipeline 3 is formed in the upper surface of the pipeline base 1, specifically, two adjacent pipelines 3 are a first pipeline 31 and a second pipeline 32 respectively, an external thread is arranged at one end of the first pipeline 31 close to the second pipeline 32, an internal thread is arranged at one end of the second pipeline 32 close to the first pipeline 31, the first pipeline 31 is connected with the second pipeline 32 through a thread, and when the first pipeline 31 and the second pipeline 32 are placed on the pipeline base 1 in a butt joint manner, the joint of the first pipeline 31 and the second pipeline 32 is located on the upper surface of the pipeline base 1. Meanwhile, the end surface of the first pipe 31 facing the second pipe 32 is conical; the inside wall of second pipeline 32 is equipped with the ladder face, install seal ring (not shown in the figure) on the ladder face, the tip and the seal ring butt cooperation in first pipeline 31 inserts second pipeline 32, when first pipeline 31 is installed in second pipeline 32, the tip that first pipeline 31 pegged graft in second pipeline 32 is to seal ring butt cooperation, and produce elastic extrusion to seal ring, make first pipeline 31 install more firmly, and the leakproofness between first pipeline 31 that has still increased and the second pipeline 32.
Simultaneously, the opposite both sides of upper surface of pipeline base 1 have seted up template groove 101 respectively, and the joint cooperation has rectangular platelike template 2 in template groove 101, and the length direction interval welding of template 2 is followed to the lateral surface of template 2 has stiffener 8, and in this embodiment, the mode that stiffener 8 kept away from template 2's one end accessible bolted connection corresponds fixed connection on pipeline base 1. In addition, the inside of one of them template 2 articulates there is the fastening rope 5 that is used for fixed pipeline 3, sets up the perforation 7 that supplies fastening rope 5 free end to pass on another template 2, installs the locating component who is used for receiving tightly fastening rope 5 on the pipeline base 1.
Referring to fig. 4 and 5, specifically, the positioning assembly includes a screw rod 9 rotatably supported on the upper surfaces of every adjacent four pipeline bases 1 along the length direction of the pipeline 3, wire sleeves 10 fixedly mounted on the screw rod 9 at intervals, and connectors connected between the wire sleeves 10 and the fastening ropes 5, in this embodiment, the number of the wire sleeves 10 is the same as that of the pipeline bases 1 and is located right above the pipeline bases 1, a rotating handle 18 is welded at one end of the screw rod 9, and the fastening ropes 5 can be wound on the wire sleeves 10 through the connectors. The staff utilizes the connector can be fixed in the line cover 10 with fastening rope 5 on, and utilizes the auto-lock principle of lead screw 9 to realize tightening up the operation of fastening rope 5, and simple structure is practical, and is applicable to and carries out fixed operation to different specification and dimension's pipeline 3.
Referring to fig. 5 and 6, specifically, the connector includes an insertion block 11 fixedly connected to the free end of the fastening rope 5 and a mounting box 14 on the side wall of the reel, a clamping hole 16 formed in two opposite side walls of the mounting box 14, two elastic positioning blocks 12 integrally formed at the end of the insertion block 11, and a hook 13 integrally formed at the end of the elastic positioning blocks 12, the hook 13 is in clamping fit with the clamping hole 16, the insertion block 11 is in splicing fit with the mounting box 14, and the two elastic positioning blocks 12 are respectively located at two sides of the insertion block 11. When the elastic positioning block 12 is in a natural state and the insertion block 11 and the elastic positioning block 12 are located in the mounting box 14, the hook 13 is clamped with the clamping hole 16 and penetrates through the clamping hole 16. Meanwhile, the insert 11 is further integrally formed with a reinforcing block 17 which is located between the two elastic positioning blocks 12 and can be abutted against the hook 13. A worker inserts the elastic positioning block 12 and the insertion block 11 into the mounting box 14, and the clamping hook 13 is clamped with the clamping hole 16, so that the fastening rope 5 is connected to the wire sleeve 10, and then the lead screw 9 drives the wire sleeve 10 to rotate and the fastening rope 5 can be wound on the wire sleeve 10 in the later period; the clamping hook 13 is pressed, the clamping hook 13 is separated from the clamping hole 16, the insertion block 11 and the elastic positioning block 12 are conveniently separated from the mounting box 14, and the disassembly and maintenance between the pipeline 3 and the pipeline base 1 in the later period are facilitated.
Referring back to fig. 3 and 4, in order to reduce the occurrence of lateral movement of the adjacent pipelines 3, so that the pipelines 3 can be more stably fixed on the pipeline base 1, a first clamping groove 61 and a second clamping groove 62 are respectively and correspondingly formed in the circumferential direction of the outer side wall of the first pipeline 31 and the outer side wall of the second pipeline 32, which are close to each other, and a first clamping strip 51 clamped and matched with the first clamping groove 61 and a second clamping strip 52 clamped and matched with the second clamping groove 62 are respectively and fixedly arranged on the side surface of the fastening rope 5 facing the pipelines 3.
The general working principle is as follows: when the pipeline 3 needs to be fixed on the pipeline base 1, a worker enables the fastening rope 5, the elastic positioning block 12 and the insertion rod to penetrate through the through hole 7 together, the elastic positioning block 12 and the insertion block 11 are inserted into the mounting box 14, and the clamping hook 13 is clamped with the clamping hole 16, so that the fastening rope 5 is connected onto the wire sleeve 10, and then the wire sleeve 10 is driven by the lead screw 9 to rotate the fastening rope 5 to be wound on the wire sleeve 10; when the pipeline 3 needs to be detached from the pipeline base 1, the hook 13 is pressed, the hook 13 is separated from the clamping hole 16, the insertion block 11 and the elastic positioning block 12 are conveniently separated from the mounting box 14, and the fastening rope 5, the elastic positioning block 12 and the insertion rod are reversely drawn out of the through hole 7.
A construction method of municipal pipelines comprises the following steps:
(1) prefabricating a pipeline base 1, designing a mould according to the standard size of the pipeline base 1, and manufacturing the pipeline base 1 in a processing plant according to the designed standard size and the mould;
(2) transporting the manufactured pipeline base 1 to a construction site;
(3) the method comprises the following steps of (1) defining a line of a pipeline 3 to be installed, excavating a pipeline groove section by section from the downstream to the upstream of the pipeline 3 to be installed along the defined line by using an excavator, and flattening and compacting the bottom of the constructed pipeline groove;
(4) hoisting the pipeline base 1, paving the pipeline base 1 at uniform intervals along the longitudinal direction by adopting a hoisting device, and arranging the pipeline base 1 in a straight line, when the pipeline base 1 is in a symmetrical double-division type, symmetrically arranging the pipeline base 1 according to the position of a pipeline 3, and timely installing connecting templates 2 on two sides of the upper surface of the pipeline base 1 respectively;
(5) the pipelines 3 are connected and placed, the pipes are sequentially spliced according to the design requirement by adopting a manual matching machine to lower the pipes, and then are stably installed on the pipeline base 1 and positioned between the two templates 2;
(6) the pipeline 3 is fixed, the upper surfaces of every four adjacent pipeline bases 1 rotate along the arrangement direction of the pipeline bases 1 to bear the lead screw 9, the lead screw 9 is correspondingly provided with a wire sleeve 10, the inner side of one template 2 is hinged with the fastening rope 5, the free end of the fastening rope 5 is fixed on the wire sleeve 10 through a connector, and the lead screw 9 is rotated to drive the fastening rope 5 to be wound on the wire sleeve 10 to tighten and fix the pipeline 3.
The construction method is convenient for laying the pipeline base 1 and dismounting the pipelines 3 and the pipeline base 1 in different specifications, and the construction process is simple.
The above-mentioned embodiments are merely illustrative and not restrictive, and those skilled in the art can make modifications to the embodiments without inventive contribution as required after reading the present specification, but only protected by the patent laws within the scope of the claims.

Claims (7)

1. The utility model provides a municipal administration pipeline mounting structure, includes many pipeline (3) of concatenation in proper order and lay a plurality of pipeline base (1) that are used for supporting pipeline (3) in the slot, characterized by, a plurality of pipeline base (1) are the straight line and arrange, the both sides that the upper surface is relative on pipeline base (1) are provided with template groove (101) respectively, template groove (101) joint has template (2), pipeline (3) are located between two template (2), wherein the inboard of one template (2) articulates has fastening rope (5) that are used for fixed pipeline (3), sets up on another template (2) and supplies perforation (7) that the free end of fastening rope (5) passed, and adjacent two pipeline (3) are first pipeline (31) and second pipeline (32) respectively, first pipeline (31) are close to second pipeline (32) and are equipped with the external screw thread, the second pipeline (32) is provided with internal threads close to the first pipeline (31), and the first pipeline (31) is in threaded connection with the second pipeline (32); the pipeline base (1) is provided with a positioning component for tightly winding the fixed rope (5); a first clamping groove (61) and a second clamping groove (62) are respectively and correspondingly arranged on the circumferential direction of the outer side wall of the first pipeline (31) close to the outer side wall of the second pipeline (32), and a first clamping strip (51) in clamping fit with the first clamping groove (61) and a second clamping strip (52) in clamping fit with the second clamping groove (62) are respectively and fixedly arranged on the surface of one side, facing the pipeline (3), of the fastening rope (5); the positioning assembly comprises a screw rod (9) rotatably borne on the upper surfaces of every two adjacent pipeline bases (1) along the length direction of the pipeline (3), wire sleeves (10) fixedly arranged on the screw rod (9) at intervals and connectors connected between the wire sleeves (10) and fastening ropes (5), and the fastening ropes (5) can be wound on the wire sleeves (10) through the connectors; the connector comprises an inserting block (11) which is arranged at the free end of the fastening rope (5) and a mounting box (14) of the side wall of the wire wheel, two clamping holes (16) which are arranged on the mounting box (14), two elastic positioning blocks (12) which are arranged at the end part of the inserting block (11) and a clamping hook (13) which is arranged at the end part of the elastic positioning blocks (12), wherein the clamping hook (13) is clamped and matched with the clamping holes (16), and the inserting block (11) is in inserting fit with the mounting box (14); two elastically positioned piece (12) are located the both sides of inserted block (11) respectively, elastically positioned piece (12) are under natural state, just when inserted block (11) and elastically positioned piece (12) are located mounting box (14), pothook (13) and card hole (16) joint just run through card hole (16).
2. The municipal pipe installation structure according to claim 1, wherein the insert (11) is provided with a reinforcement (17) between the two resilient locating blocks (12) and against which the hook (13) abuts.
3. The municipal pipe mounting structure according to claim 2, wherein a knob (18) is fixedly provided at one end of the screw (9).
4. The municipal pipe mounting structure according to claim 1, wherein the upper surface of the pipe base (1) is provided with a receiving groove (4) for the pipe (3) to be caught.
5. The municipal pipe mounting structure according to claim 1, wherein the end surface of the first pipe (31) facing the second pipe (32) is tapered.
6. The municipal pipe mounting structure according to claim 1, wherein the inner side wall of the second pipe (32) is provided with a stepped surface on which a sealing gasket is provided, and the end of the first pipe (31) inserted into the second pipe (32) is in abutting fit with the sealing gasket.
7. The method for constructing a municipal pipe installation according to any one of claims 1 to 6, comprising the steps of:
(1) prefabricating a pipeline base (1), designing a mould according to the standard size of the pipeline base (1), and manufacturing the pipeline base (1) in a processing plant according to the designed standard size and the mould;
(2) transporting the manufactured pipeline base (1) to a construction site;
(3) the method comprises the following steps of (1) defining a line of a pipeline (3) to be installed, excavating a pipeline groove section by section from the downstream to the upstream of the pipeline (3) to be installed along the defined line by using an excavator, and flattening and compacting the bottom of the constructed pipeline groove;
(4) hoisting the pipeline base (1), paving the pipeline base (1) at uniform intervals in the longitudinal direction by adopting a hoisting device, and arranging the pipeline base (1) in a straight line, when the pipeline base (1) is in a symmetrical double-division type, symmetrically arranging the pipeline base (1) according to the position of a pipeline (3), and timely installing connecting templates (2) on two sides of the upper surface of the pipeline base (1) respectively;
(5) the pipelines (3) are placed in a connected mode, the pipelines are sequentially spliced according to design requirements by adopting a manual matching machine to lower the pipelines, and then the pipelines are stably installed on the pipeline base (1) and located between the two templates (2);
(6) pipeline (3) are fixed, the upper surface of every adjacent four pipeline bases (1) rotates along the arrangement direction of pipeline base (1) and bears lead screw (9), corresponding set up wire sleeve (10) on lead screw (9), wherein inboard articulated fastening rope (5) of a template (2), the free end of fastening rope (5) is fixed in wire sleeve (10) through the connector, it orders about fastening rope (5) and convolutes on wire sleeve (10) to rotate lead screw (9), tighten fixedly pipeline (3).
CN201911358307.8A 2019-12-25 2019-12-25 Municipal pipeline mounting structure and construction method thereof Expired - Fee Related CN111005431B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911358307.8A CN111005431B (en) 2019-12-25 2019-12-25 Municipal pipeline mounting structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911358307.8A CN111005431B (en) 2019-12-25 2019-12-25 Municipal pipeline mounting structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN111005431A CN111005431A (en) 2020-04-14
CN111005431B true CN111005431B (en) 2021-06-04

Family

ID=70118530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911358307.8A Expired - Fee Related CN111005431B (en) 2019-12-25 2019-12-25 Municipal pipeline mounting structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN111005431B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111485615B (en) * 2020-04-22 2021-02-26 广东中帆建设有限公司 Construction method of municipal rainwater and sewage diversion pipeline
CN112013165B (en) * 2020-07-24 2021-12-21 浙江广盛环境建设集团有限公司 Municipal pipeline construction structure and method thereof
CN112610753A (en) * 2020-12-04 2021-04-06 北京京润园林绿化工程有限公司 Connection structure between pipelines for gardens
CN113443569A (en) * 2021-05-27 2021-09-28 中国华冶科工集团有限公司 Method for installing pipeline in workshop

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203828199U (en) * 2014-04-29 2014-09-17 力顿钮扣配件(深圳)有限公司 Double-locking buckle tool
JP2016153655A (en) * 2013-06-24 2016-08-25 株式会社岡田建工 Pipe retainer
CN206111112U (en) * 2016-10-28 2017-04-19 中国石油化工股份有限公司 Bank of tubes fixer
CN108204030A (en) * 2017-12-13 2018-06-26 苍南县交通建设工程有限公司 Sewage conduct mounting structure and its construction method
CN209653078U (en) * 2019-01-02 2019-11-19 北京京水建设集团有限公司 A kind of Pipe installing anti-floating system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016153655A (en) * 2013-06-24 2016-08-25 株式会社岡田建工 Pipe retainer
CN203828199U (en) * 2014-04-29 2014-09-17 力顿钮扣配件(深圳)有限公司 Double-locking buckle tool
CN206111112U (en) * 2016-10-28 2017-04-19 中国石油化工股份有限公司 Bank of tubes fixer
CN108204030A (en) * 2017-12-13 2018-06-26 苍南县交通建设工程有限公司 Sewage conduct mounting structure and its construction method
CN209653078U (en) * 2019-01-02 2019-11-19 北京京水建设集团有限公司 A kind of Pipe installing anti-floating system

Also Published As

Publication number Publication date
CN111005431A (en) 2020-04-14

Similar Documents

Publication Publication Date Title
CN111005431B (en) Municipal pipeline mounting structure and construction method thereof
CN212317492U (en) Vertical pre-buried threading pipe structure in roof beam of conveniently taking over
CN207229922U (en) Adjustable upper and lower conduit channel fixing device
CN211629839U (en) Cable pipe mouth sealing and plugging device
CN202899626U (en) Outer hoop type inhaul cable stretch-draw tool device
CN218236612U (en) Reinforced concrete pipeline repairing device
CN108118716B (en) Anti-blocking structure for power pipeline and construction method of anti-blocking structure
CN214500496U (en) Pipeline non-excavation lining pipe compound circle aerifys clamping type sealing device
CN214460620U (en) Integrated inspection well for continuously winding glass fiber reinforced plastic
CN111711155A (en) Cable pipe orifice sealing and plugging device and using method thereof
CN210530501U (en) Ecological enclosure wall for building site
CN219102243U (en) Building pipeline lays fixing device
CN220908615U (en) Municipal rainwater pipeline assembly module
CN215452393U (en) Template pipeline positioning device
CN215009420U (en) Fixing device of electric power communication calandria
CN214368375U (en) Concrete drain pipe convenient to installation
CN212107451U (en) Continuous water seal blocking device for large box culvert
KR100735063B1 (en) Method of repairing pipe and material for repairing
CN220566711U (en) Traction tube cracking device with replaceable cutter for short tube replacement
CN218094909U (en) Lining pipe for pipeline repair
CN211010259U (en) Connecting structure of pipeline
CN218152788U (en) Anticorrosion polymer drain pipe
CN218385810U (en) Saddle-shaped wire clamp
CN216789404U (en) Reinforced structure is used in installation of rectangle push pipe end
CN218976239U (en) Spliced PVC power cable protection tube

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210604

Termination date: 20211225

CF01 Termination of patent right due to non-payment of annual fee