CN110958695A - Resource processing method, device and system, and resource receiving method and device - Google Patents
Resource processing method, device and system, and resource receiving method and device Download PDFInfo
- Publication number
- CN110958695A CN110958695A CN201811132721.2A CN201811132721A CN110958695A CN 110958695 A CN110958695 A CN 110958695A CN 201811132721 A CN201811132721 A CN 201811132721A CN 110958695 A CN110958695 A CN 110958695A
- Authority
- CN
- China
- Prior art keywords
- resource
- time domain
- information
- repetition
- resources
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/0446—Resources in time domain, e.g. slots or frames
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/0453—Resources in frequency domain, e.g. a carrier in FDMA
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1263—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
- H04W72/1268—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The invention provides a resource processing method, a resource processing device and a resource processing system, and a resource receiving method and a resource receiving device. Specifically, the resource processing method includes: configuring uplink Scheduling Request (SR) resources for User Equipment (UE), wherein the SR resources are used for the UE to send an SR; sending a first message to the UE, wherein the first message carries configuration information of the SR resource, and the configuration information at least includes: time domain location information and frequency domain location information. The invention solves the problems that the utilization efficiency of SR resources is low and the resource requirement of a system cannot be met in the related technology, thereby achieving the effects of improving the utilization efficiency of the SR resources, meeting the requirement of more user side equipment on the SR resources and reducing the system overhead.
Description
Technical Field
The present invention relates to the field of communications, and in particular, to a method, an apparatus, and a system for processing a resource, and a method and an apparatus for receiving a resource.
Background
In the NB-IoT Rel-15 standard protocol, if the terminal does not have downlink scheduling, the terminal can report the uplink data transmission requirement through a dedicated uplink Scheduling Request (SR) resource, and the dedicated SR resource is a non-competitive PRACH resource. And the terminal sends a random access signal in the configured special SR non-contention PRACH to indicate that uplink data needs to be transmitted. The assignment of dedicated PRACH on NB-IoT Rel-15 standard is exclusive to the assigned PRACH at all times during the terminal's access to the system. The time allocation density of the PRACH is generally higher than the reporting granularity of uplink data transmission that the terminal needs to indicate through the SR, so this method may cause a low utilization rate of dedicated SR resources. In order to support more users to configure dedicated SR resources, the system needs to configure many PRACH resources, which results in a large system overhead and even fails to meet the requirements of dedicated SR resources.
Disclosure of Invention
The embodiment of the invention provides a resource processing method, a resource processing device and a resource receiving method and a resource receiving device, which are used for at least solving the problems that the utilization efficiency of SR resources in the related technology is low and the resource requirements of a system cannot be met.
According to an embodiment of the present invention, there is provided a resource processing method, including: configuring uplink Scheduling Request (SR) resources for User Equipment (UE), wherein the SR resources are used for the UE to send an SR; sending a first message to the UE, wherein the first message carries configuration information of the SR resource, and the configuration information at least includes: time domain location information and frequency domain location information.
Optionally, the configuration information further includes: a coverage level of the SR resource.
Optionally, the frequency domain location information at least includes: a carrier index of the SR resource, a subcarrier index of the SR resource.
Optionally, sending a system broadcast message to the UE; wherein the resource information of the SR resource is carried in the SIB2 in the system broadcast message.
Optionally, the resource information of the SR resource at least includes: a time domain period corresponding to the coverage grade, a starting time corresponding to the coverage grade, and a subcarrier corresponding to the coverage grade.
Optionally, the time domain location information includes: a time domain offset index of the SR resource.
Optionally, a time domain offset index of the SR resource and a time domain configuration index table of the SR resource for determining a time domain period of the SR resource corresponding to the time domain offset index of the SR resource are configured in advance for the UE; and/or, the first message carries the time domain offset index of the SR resource and the configuration information of the time domain configuration index table of the SR resource.
Optionally, the time domain location information further includes a periodicity factor of the SR resource.
Optionally, a time domain offset index of the SR resource and a periodicity factor of the SR resource are preconfigured for the UE; and/or, the first message carries the time domain offset index of the SR resource and the configuration information of the periodicity factor of the SR resource.
Optionally, the resource information of the SR resource at least includes: a time domain period corresponding to the coverage level, a start time corresponding to the coverage level, a subcarrier corresponding to the coverage level, and a repetition number corresponding to the coverage level.
Optionally, the time domain location information at least includes: a repetition number coefficient of the SR resource and a time domain repetition offset of the SR resource.
Optionally, a repetition number coefficient of the SR resource and a time domain repetition offset of the SR resource are preconfigured for the UE; and/or, the first message carries the repetition frequency coefficient of the SR resource and the configuration information of the time domain repetition offset of the SR resource.
Optionally, second information sent by the UE is received on an SR resource determined by the UE according to the configuration information, where the second information is used to indicate a data transmission requirement.
Optionally, configuring the SR resource for the UE includes: the time domain positions of the SR resources configured for different UEs are different.
Optionally, the resource comprises: the SR dedicated PRACH resource.
According to an embodiment of the present invention, there is provided a resource receiving method, including: user Equipment (UE) receives a first message sent by a base station, wherein the first message is carried in configuration information of an uplink Scheduling Request (SR) resource, and the configuration information at least comprises: time domain position information and frequency domain position information; and according to the configuration information, the UE determines the position of the SR resource for triggering SR in uplink data transmission.
Optionally, the configuration information further includes: a coverage level of the SR resource.
Optionally, the frequency domain location information at least includes: a carrier index of the SR resource, a subcarrier index of the SR resource.
Optionally, the method further comprises: receiving a system broadcast message sent by the base station; wherein the resource information of the SR resource is carried in the SIB2 in the system broadcast message.
Optionally, the resource information of the SR resource at least includes: a time domain period corresponding to the coverage grade, a starting time corresponding to the coverage grade, and a subcarrier corresponding to the coverage grade.
Optionally, the time domain location information includes: a time domain offset index of the SR resource.
Optionally, the method further comprises: acquiring a time domain offset index of the SR resource pre-configured by the base station and a time domain configuration index table of the SR resource for determining a time domain period of the SR resource corresponding to the time domain offset index of the SR resource; and/or receiving the time domain offset index of the SR resource and the configuration information of the time domain configuration index table of the SR resource, which are carried in the first message.
Optionally, the method further comprises: determining a time domain period of the SR resource according to the time domain offset index of the SR resource and a time domain configuration index table of the SR resource; calculating a time domain offset value of the SR resource and a starting time of the SR resource, wherein the time domain offset value of the SR resource is equal to a time domain period corresponding to the coverage level multiplied by a time domain offset index of the SR resource; the starting time of the SR resource is equal to the sum of the starting time corresponding to the coverage grade and the time domain offset value.
Optionally, the time domain location information further includes a periodicity factor of the SR resource.
Optionally, a time domain offset index of the SR resource and a periodicity factor of the SR resource pre-configured by the base station are obtained; and/or receiving the time domain offset index of the SR resource and the configuration information of the periodicity factor of the SR resource, which are carried in the first message.
Optionally, calculating a time domain cycle of the SR resource, a time domain offset value of the SR resource, and a start time of the SR resource; wherein the time domain period of the SR resource is equal to the time domain period corresponding to the coverage level multiplied by the period factor of the SR resource; the time domain offset value is equal to a time domain period corresponding to the coverage level multiplied by a time domain offset index of the SR resource; the starting time of the SR resource is equal to the sum of the starting time corresponding to the coverage grade and the time domain offset value.
Optionally, the resource information of the SR resource at least includes: a time domain period corresponding to the coverage level, a start time corresponding to the coverage level, a subcarrier corresponding to the coverage level, and a repetition number corresponding to the coverage level.
Optionally, the time domain location information at least includes: a repetition number coefficient of the SR resource and a time domain repetition offset of the SR resource.
Optionally, a repetition frequency coefficient of the SR resource and a time domain repetition offset of the SR resource, which are configured in advance by the base station, are obtained; and/or receiving the repetition frequency coefficient of the SR resource and the configuration information of the time domain repetition offset of the SR resource, which are carried in the first message.
Optionally, calculating a time domain repetition number of the SR resource and a time domain repetition part of the SR resource; wherein the time domain repetition number of the SR resource is equal to the resource repetition number corresponding to the coverage level multiplied by the repetition number coefficient of the SR resource; the time domain repetition portion of the SR resource comprises: and subtracting 1 from the sum of the time domain repetition offset of the SR resource and the time domain repetition times of the SR resource.
Optionally, the UE sends second information to the base station on the determined SR resource, where the second information is used to indicate a data transmission requirement.
Optionally, the method further comprises: and the time domain positions of the SR resources configured by the base station for different UEs are different.
Optionally, the resource comprises: and the Physical Random Access Channel (PRACH) resource special for the SR.
According to another embodiment of the present invention, there is provided a resource processing apparatus, located in a base station, including: a configuration module, configured to configure an uplink scheduling request, SR, resource for user equipment, UE, where the SR resource is used for the UE to send an SR; a sending module, configured to send a first message to the UE, where the first message carries configuration information of the SR resource, and the configuration information at least includes: time domain location information and frequency domain location information.
According to another embodiment of the present invention, an apparatus for receiving a resource is provided, where the apparatus is located in a user equipment UE, and the apparatus includes: a receiving module, configured to receive a first message sent by a base station, where the first message is carried in configuration information of an uplink scheduling request, SR, resource, and the configuration information at least includes: time domain position information and frequency domain position information; and the triggering module is used for determining the position of the SR resource for triggering the SR in the uplink data transmission process according to the configuration information.
According to another embodiment of the present invention, there is provided a processing system of a resource, including: the base station is configured to configure an uplink Scheduling Request (SR) resource for the UE and send a first message to the UE, where the first message carries configuration information of the SR resource, and the configuration information at least includes: time domain position information and frequency domain position information; and the UE is used for determining the position of the SR resource for triggering the SR in uplink data transmission according to the configuration information.
According to a further embodiment of the present invention, there is also provided a storage medium having a computer program stored therein, wherein the computer program is arranged to perform the steps of any of the above method embodiments when executed.
According to yet another embodiment of the present invention, there is also provided an electronic device, including a memory in which a computer program is stored and a processor configured to execute the computer program to perform the steps in any of the above method embodiments.
According to the invention, the base station configures the SR resources for each UE at both the time domain position and the frequency domain position, so that the dedicated SR resources are configured for the UE. Therefore, the problems that the utilization efficiency of the SR resources is low and the resource requirements of the system cannot be met in the related technology can be solved, and the effects of improving the service efficiency of the SR resources, meeting the requirements of more user side devices on the SR resources and reducing the system overhead are achieved.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the invention without limiting the invention. In the drawings:
fig. 1 is a block diagram of a hardware configuration of a mobile terminal according to a resource processing method of an embodiment of the present invention;
FIG. 2 is a flow diagram of a method of processing a resource according to an embodiment of the invention;
fig. 3 is a flow chart of a method of receiving a resource according to an embodiment of the present invention;
FIG. 4 is a block diagram of a resource processing apparatus according to an embodiment of the present invention;
fig. 5 is a block diagram of a receiving apparatus of a resource according to an embodiment of the present invention;
FIG. 6 is a block diagram of a processing system for a resource according to an embodiment of the invention.
Detailed Description
The invention will be described in detail hereinafter with reference to the accompanying drawings in conjunction with embodiments. It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict.
It should be noted that the terms "first," "second," and the like in the description and claims of the present invention and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order.
Example 1
The method provided by the first embodiment of the present application may be executed in a mobile terminal, a computer terminal, or a similar computing device. Taking the example of being operated on a mobile terminal, fig. 1 is a hardware structure block diagram of the mobile terminal of a resource processing method according to an embodiment of the present invention. As shown in fig. 1, the mobile terminal 10 may include one or more (only one shown in fig. 1) processors 102 (the processor 102 may include, but is not limited to, a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, and optionally may also include a transmission device 106 for communication functions and an input-output device 108. It will be understood by those skilled in the art that the structure shown in fig. 1 is only an illustration, and does not limit the structure of the mobile terminal. For example, the mobile terminal 10 may also include more or fewer components than shown in FIG. 1, or have a different configuration than shown in FIG. 1.
The memory 104 may be used to store computer programs, for example, software programs and modules of application software, such as computer programs corresponding to the resource processing method in the embodiment of the present invention, and the processor 102 executes various functional applications and data processing by running the computer programs stored in the memory 104, so as to implement the above-mentioned method. The memory 104 may include high speed random access memory, and may also include non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some instances, the memory 104 may further include memory located remotely from the processor 102, which may be connected to the mobile terminal 10 via a network. Examples of such networks include, but are not limited to, the internet, intranets, local area networks, mobile communication networks, and combinations thereof.
The transmission device 106 is used for receiving or transmitting data via a network. Specific examples of the network described above may include a wireless network provided by a communication provider of the mobile terminal 10. In one example, the transmission device 106 includes a Network adapter (NIC), which can be connected to other Network devices through a base station so as to communicate with the internet. In one example, the transmission device 106 may be a Radio Frequency (RF) module, which is used for communicating with the internet in a wireless manner.
In this embodiment, a method for processing resources running on the mobile terminal is provided, and fig. 2 is a flowchart of a method for processing resources according to an embodiment of the present invention, as shown in fig. 2, the flowchart includes the following steps:
step S202, configuring an uplink Scheduling Request (SR) resource for User Equipment (UE), wherein the SR resource is used for the UE to send an SR;
step S204, sending a first message to the UE, where the first message carries configuration information of the SR resource, and the configuration information at least includes: time domain location information and frequency domain location information.
Optionally, the resource comprises: the SR dedicated PRACH resource.
Specifically, the present embodiment is mainly applied to SR resources of non-contention PRACH resources. It should be noted that, for convenience of illustration, the contents described in the following embodiments all depend on a scenario in which PRACH resources are used as SR resources. Of course, other resource types capable of serving as SR resources are also within the scope of the present embodiment. And will not be described herein in more detail.
Optionally, the configuration information further includes: a coverage level of the SR resource.
Specifically, the coverage level of the SR resource refers to a coverage level of a cell in which the UE is located.
Optionally, the frequency domain location information at least includes: a carrier index of the SR resource, a subcarrier index of the SR resource.
Specifically, the carrier index of the SR resource and the subcarrier index of the SR resource are used to indicate the position of the carrier and the subcarrier acquired by the UE. For example, if the value in the carrier index of the SR resource is 0 and the value in the subcarrier index of the SR resource is 2, it indicates that the UE acquires the 2 nd subcarrier of the carrier 0. Accordingly, the UE can determine location information of resources on the frequency domain.
Optionally, sending a system broadcast message to the UE; wherein the resource information of the SR resource is carried in the SIB2 in the system broadcast message.
Optionally, the resource information of the SR resource at least includes: a time domain period corresponding to the coverage grade, a starting time corresponding to the coverage grade, and a subcarrier corresponding to the coverage grade.
Specifically, the resource information of the SR resource is used to indicate location information of a frequency domain and a time domain for each coverage level. For example, the resource information of the SR resource corresponds to a coverage level 0, a time domain period is 40s, a start time is 8ms, and corresponding subcarriers are 0 to 11. Therefore, when the period and the starting time of the SR resource are calculated subsequently, the calculation can be performed based on the resource information.
In addition, since the resource information of the SR resource is common information, it is not specific information transmitted for a specific UE. Meanwhile, the mode of broadcasting the message by the broadcasting system cannot ensure that each UE can successfully receive the resource information of the SR resource at one time. Therefore, in order to prevent some UEs from failing to receive the resource information of the SR resource, on one hand, it is ensured that each UE can receive the resource information of the SR resource by the base station periodically transmitting the resource information of the SR resource for multiple times. On the other hand, in order to save resources, the UE may transmit a response to the base station, after receiving the resource information of the SR resource. If the base station does not receive the response of the UE within the predetermined time threshold, the base station sends the response again to the non-responding UE through separate information.
Optionally, the time domain location information includes: a time domain offset index of the SR resource.
Optionally, a time domain offset index of the SR resource and a time domain configuration index table of the SR resource for determining a time domain period of the SR resource corresponding to the time domain offset index of the SR resource are configured in advance for the UE; and/or, the first message carries the time domain offset index of the SR resource and the configuration information of the time domain configuration index table of the SR resource.
Specifically, the time domain configuration index table of the SR resource refers to time domain periods of different SR resources corresponding to time domain offset indexes of the different SR resources. For example, when the time domain offset index of the SR resource is 0, the time domain period of the SR resource is 40ms, and when the time domain offset index of the SR resource is 1, the time domain period of the SR resource is 80 ms. After receiving the time domain configuration index table, the subsequent UE can determine the time domain period of the corresponding SR resource according to the value of the time domain offset index of the SR resource.
Optionally, the time domain location information further includes a periodicity factor of the SR resource.
Specifically, the period factor of the SR resource is a multiple of the time domain period of the SR with respect to the time domain period corresponding to the coverage level. In addition, for convenience of management, the period factor of the SR resource takes an integer of 2 to 64.
Optionally, a time domain offset index of the SR resource and a periodicity factor of the SR resource are preconfigured for the UE; and/or, the first message carries the time domain offset index of the SR resource and the configuration information of the periodicity factor of the SR resource.
Optionally, the resource information of the SR resource at least includes: a time domain period corresponding to the coverage level, a start time corresponding to the coverage level, a subcarrier corresponding to the coverage level, and a repetition number corresponding to the coverage level.
Specifically, the resource information of the SR resource is also used to indicate location information of a frequency domain, a time domain, and a repetition number for each coverage level. For example, the resource information of the SR resource corresponds to a coverage level 0, a time domain period is 40s, a start time is 8ms, corresponding subcarriers are 0 to 11, and the number of repetitions is 2. Therefore, in the subsequent calculation, the calculation can be performed based on the resource information.
Optionally, the time domain location information at least includes: a repetition number coefficient of the SR resource and a time domain repetition offset of the SR resource.
Specifically, although multiple resources of a coverage level may be repeatedly time division multiplexed to multiple users, each UE uses only a portion of the resource repetition of the coverage level. Specifically, the number of repetitions of the SR resource coefficient includes at least: 1,1/2,1/4,1/8,1/16,1/32,1/64,1/128. The time domain repetition offset of the SR resource is an nth repetition of the resource repetition corresponding to the coverage level, and is used to determine the repetition part actually used by the user. The time domain repetition offset is an integer from 0 to 128. For example, if the value of the time domain repetition offset is 5, it means that the 5 th repetition in the resource repetition corresponding to the coverage level is used to determine the repetition part actually used by the user.
Optionally, a repetition number coefficient of the SR resource and a time domain repetition offset of the SR resource are preconfigured for the UE; and/or, the first message carries the repetition frequency coefficient of the SR resource and the configuration information of the time domain repetition offset of the SR resource.
Optionally, second information sent by the UE is received on an SR resource determined by the UE according to the configuration information, where the second information is used to indicate a data transmission requirement.
Specifically, the second information includes at least a preamble code.
Optionally, configuring the SR resource for the UE includes: the time domain positions of the SR resources configured for different UEs are different.
It should be noted that the frequency domain positions of the SR resources allocated by the base station to the UE may be the same carrier and subcarrier, or may be different carriers and subcarriers. Therefore, through the configuration information, the base station can configure multiple user time domains for the UE on SR resources at the same or different frequency domain positions. Therefore, the utilization efficiency of the special SR PRACH resource can be improved, the requirements of more terminal SR PRACH resources are met, and the system overhead is reduced.
Through the steps, the problems that the utilization efficiency of SR resources is low and the resource requirements of a system cannot be met in the related technology are solved, and the effects of improving the service efficiency of the SR resources, meeting the requirements of more user side equipment on the SR resources and reducing the system overhead are achieved.
Through the above description of the embodiments, those skilled in the art can clearly understand that the method according to the above embodiments can be implemented by software plus a necessary general hardware platform, and certainly can also be implemented by hardware, but the former is a better implementation mode in many cases. Based on such understanding, the technical solutions of the present invention may be embodied in the form of a software product, which is stored in a storage medium (e.g., ROM/RAM, magnetic disk, optical disk) and includes instructions for enabling a terminal device (e.g., a mobile phone, a computer, a server, or a network device) to execute the method according to the embodiments of the present invention.
Example 2
In this embodiment, a method for processing resources running on the mobile terminal is provided, and fig. 3 is a flowchart of a method for receiving resources according to an embodiment of the present invention, which has been described and is not described again. As shown in fig. 3, the process includes the following steps:
step S302, after accessing a network side device, a user side device receives a resource configured by the network side device and used for performing an uplink scheduling request SR; wherein, the configuration mode comprises: configuring a time domain position of the resource;
step S304, according to the configuration information, the UE determines the position of the SR resource for triggering SR in uplink data transmission.
Optionally, the configuration information further includes: a coverage level of the SR resource.
Specifically, the coverage level of the SR resource refers to a coverage level of a cell in which the UE is located.
Optionally, the frequency domain location information at least includes: a carrier index of the SR resource, a subcarrier index of the SR resource.
Specifically, the carrier index of the SR resource and the subcarrier index of the SR resource are used to indicate the position of the carrier and the subcarrier acquired by the UE. For example, if the value in the carrier index of the SR resource is 0 and the value in the subcarrier index of the SR resource is 2, it indicates that the UE acquires the 2 nd subcarrier of the carrier 0. Accordingly, the UE can determine location information of resources on the frequency domain.
Optionally, the method further comprises: receiving a system broadcast message sent by the base station; wherein the resource information of the SR resource is carried in the SIB2 in the system broadcast message.
Optionally, the resource information of the SR resource at least includes: a time domain period corresponding to the coverage grade, a starting time corresponding to the coverage grade, and a subcarrier corresponding to the coverage grade.
Specifically, the resource information of the SR resource is used to indicate location information of a frequency domain and a time domain for each coverage level. For example, the resource information of the SR resource corresponds to a coverage level 0, a time domain period is 40s, a start time is 8ms, and corresponding subcarriers are 0 to 11. Therefore, when the period and the starting time of the SR resource are calculated subsequently, the calculation can be performed based on the resource information.
In addition, since the resource information of the SR resource is common information, it is not specific information transmitted for a specific UE. Meanwhile, the mode of broadcasting the message by the broadcasting system cannot ensure that each UE can successfully receive the resource information of the SR resource at one time. Therefore, in order to prevent some UEs from failing to receive the resource information of the SR resource, on one hand, it is ensured that each UE can receive the resource information of the SR resource by the base station periodically transmitting the resource information of the SR resource for multiple times. On the other hand, in order to save resources, the UE may transmit a response to the base station, after receiving the resource information of the SR resource. And if the base station does not receive the response of the UE within the preset time threshold, the base station sends the response to the non-responded UE again through separate information.
Optionally, the time domain location information includes: a time domain offset index of the SR resource.
Optionally, the method further comprises: acquiring a time domain offset index of the SR resource pre-configured by the base station and a time domain configuration index table of the SR resource for determining a time domain period of the SR resource corresponding to the time domain offset index of the SR resource; and/or receiving the time domain offset index of the SR resource and the configuration information of the time domain configuration index table of the SR resource, which are carried in the first message.
Specifically, the time domain configuration index table of the SR resource refers to time domain periods of different SR resources corresponding to time domain offset indexes of the different SR resources. For example, when the time domain offset index of the SR resource is 0, the time domain period of the SR resource is 40ms, and when the time domain offset index of the SR resource is 1, the time domain period of the SR resource is 80 ms. After receiving the time domain configuration index table, the subsequent UE can determine the time domain period of the corresponding SR resource according to the value of the time domain offset index of the SR resource.
Optionally, the method further comprises: determining a time domain period of the SR resource according to the time domain offset index of the SR resource and a time domain configuration index table of the SR resource; calculating a time domain offset value of the SR resource and a starting time of the SR resource, wherein the time domain offset value of the SR resource is equal to a time domain period corresponding to the coverage level multiplied by a time domain offset index of the SR resource; the starting time of the SR resource is equal to the sum of the starting time corresponding to the coverage grade and the time domain offset value.
Specifically, the time domain offset index of the SR resource includes a plurality of different time domain offset values corresponding to different coverage levels. If the time domain offset value of the SR resource required by the current UE needs to be determined, the time domain offset value needs to be obtained by multiplying the time domain period corresponding to the coverage level by the index value corresponding to the time domain period corresponding to the coverage level in the time domain offset index of the SR resource. For example, if the time domain period corresponding to the coverage level of level 0 is 40ms and the time domain offset index of the SR resource corresponding thereto takes a value of 10, the time domain offset value of the SR resource is 400 ms. In addition, for convenience of management, the period factor of the SR resource is an integer from 0 to 64.
Optionally, the time domain location information further includes a periodicity factor of the SR resource.
Optionally, a time domain offset index of the SR resource and a periodicity factor of the SR resource pre-configured by the base station are obtained; and/or receiving the time domain offset index of the SR resource and the configuration information of the periodicity factor of the SR resource, which are carried in the first message.
Optionally, calculating a time domain cycle of the SR resource, a time domain offset value of the SR resource, and a start time of the SR resource; wherein the time domain period of the SR resource is equal to the time domain period corresponding to the coverage level multiplied by the period factor of the SR resource; the time domain offset value is equal to a time domain period corresponding to the coverage level multiplied by a time domain offset index of the SR resource; the starting time of the SR resource is equal to the sum of the starting time corresponding to the coverage grade and the time domain offset value.
Specifically, the period factor of the SR resource is a multiple of the time domain period of the SR with respect to the time domain period corresponding to the coverage level. For example, if the coverage level of level 0 corresponds to a time domain period of 40ms and the period factor of the SR resource is 5, then the time domain period of the SR resource can be calculated to be 200 ms. In addition, for convenience of management, the period factor of the SR resource takes an integer of 2 to 64.
Optionally, the resource information of the SR resource at least includes: a time domain period corresponding to the coverage level, a start time corresponding to the coverage level, a subcarrier corresponding to the coverage level, and a repetition number corresponding to the coverage level.
Specifically, the resource information of the SR resource is also used to indicate location information of a frequency domain, a time domain, and a repetition number for each coverage level. For example, the resource information of the SR resource corresponds to a coverage level 0, a time domain period is 40s, a start time is 8ms, corresponding subcarriers are 0 to 11, and the number of repetitions is 2. Therefore, in the subsequent calculation, the calculation can be performed based on the resource information.
Optionally, the time domain location information at least includes: a repetition number coefficient of the SR resource and a time domain repetition offset of the SR resource.
Specifically, although multiple resources of a coverage level may be repeatedly time division multiplexed to multiple users, each UE uses only a portion of the resource repetition of the coverage level. Specifically, the number of repetitions of the SR resource coefficient includes at least: 1,1/2,1/4,1/8,1/16,1/32,1/64,1/128. The time domain repetition offset of the SR resource is an nth repetition of the resource repetition corresponding to the coverage level, and is used to determine the repetition part actually used by the user. The time domain repetition offset is an integer from 0 to 128. For example, if the value of the time domain repetition offset is 5, it means that the 5 th repetition in the resource repetition corresponding to the coverage level is used to determine the repetition part actually used by the user.
Optionally, a repetition frequency coefficient of the SR resource and a time domain repetition offset of the SR resource, which are configured in advance by the base station, are obtained; and/or receiving the repetition frequency coefficient of the SR resource and the configuration information of the time domain repetition offset of the SR resource, which are carried in the first message.
Optionally, calculating a time domain repetition number of the SR resource and a time domain repetition part of the SR resource; wherein the time domain repetition number of the SR resource is equal to the resource repetition number corresponding to the coverage level multiplied by the repetition number coefficient of the SR resource; the time domain repetition portion of the SR resource comprises: and subtracting 1 from the sum of the time domain repetition offset of the SR resource and the time domain repetition times of the SR resource.
Specifically, the time domain repetition number of the SR resource can be calculated by a multiplication result of the resource repetition number of the coverage level and the repetition number coefficient of the SR resource, for example, if the resource repetition number of the coverage level 0 is 160 and the repetition number coefficient of the SR resource is 1/32, the time domain repetition number of the SR resource is 5.
Specifically, the time domain repetition part of the SR resource may also be determined according to the time domain repetition offset of the SR resource and the time domain repetition number of the SR resource, for example, if the time domain repetition offset is 1, the results are 1 and 5. From this result, the 1 st repetition and the 5 th repetition of the coverage level 0 repetition were used.
Optionally, the method further comprises: and the UE sends second information to the base station on the determined SR resource, wherein the second information is used for indicating the data transmission requirement.
Specifically, the second information includes at least a preamble code.
Optionally, the method further comprises: and the time domain positions of SR resources configured for different UEs by the base station are different.
It should be noted that the frequency domain positions of the SR resources allocated by the base station to the UE may be the same carrier and subcarrier, or may be different carriers and subcarriers. Therefore, through the configuration information, the base station can configure multiple user time domains for the UE on SR resources at the same or different frequency domain positions. Therefore, the utilization efficiency of the special SR PRACH resource can be improved, the requirements of more terminal SR PRACH resources are met, and the system overhead is reduced.
It should be noted that, according to the above embodiment, the following scenarios are also provided to facilitate understanding of the technical solutions:
scene 1:
1. the base station configures cell PRACH resources in SIB2, where an indicated PRACH resource information table is shown in table 1:
TABLE 1
Coverage grade | PRACH period (ms) | PRACH start time (ms) | Subcarrier of PRACH |
0 | 40 | 8 | 0~11 |
1 | 80 | 64 | 12~23 |
2 | 640 | 256 | 24~35 |
After the UE1 accesses, the base station issues dedicated SR PRACH configuration information as shown in table 2:
TABLE 2
After the UE2 accesses, the base station issues dedicated SR PRACH configuration information as shown in table 3:
TABLE 3
After the UE3 accesses, the base station issues dedicated SR PRACH configuration information as shown in table 4:
TABLE 4
5. As can be seen from tables 1 and 2, the UE1 acquires the 2 nd subcarrier with the frequency domain configuration as carrier 0.
The time domain period of the PRACH resource of the SR corresponding to the UE is the PRACH period of coverage level 0, 40ms multiplied by the PRACH period factor 2 and equal to 80 ms.
Since the PRACH time domain offset index is 0, the time domain offset value corresponding to the PRACH resource of the SR of the UE1 is also 0, and therefore the starting time of the PRACH resource of the SR is 8 ms.
The UE1 sends a preamble on the configured time-frequency domain SR PRACH resource (the 2 nd subcarrier of the carrier 0, the time domain cycle of the PRACH resource is 80ms, and the start time is 8ms), indicating the data transmission requirement.
6. As can be seen from tables 1 and 3, the UE2 also acquires the 2 nd subcarrier with the frequency domain configuration as carrier 0.
Meanwhile, the time domain period of the PRACH resource of the SR corresponding to the UE2 is the PRACH period of coverage level 0, 40ms multiplied by the PRACH period factor 2 and equal to 80 ms.
However, since the PRACH time domain offset index is 1, the time domain offset value corresponding to the PRACH resource of the SR of the UE2 is different from the time domain offset value corresponding to the PRACH resource of the SR of the UE1, that is, 40ms, and the starting time of the PRACH resource of the final SR is 48 ms.
The UE2 sends a preamble on the configured time-frequency domain SR PRACH resource (the 2 nd subcarrier of the carrier 0, the time domain cycle of the PRACH resource is 80ms, and the start time is 48ms), indicating the data transmission requirement.
7. As can be seen from tables 1 and 4, the UE1 acquires the 2 nd subcarrier with the frequency domain configuration as carrier 0.
Since the PRACH time domain offset index is 0, the time domain offset value corresponding to the PRACH resource of the SR of the UE1 is also 0, and therefore the starting time of the PRACH resource of the SR is 8 ms.
However, since the PRACH period factor is 1, the time domain period of the PRACH resource of the SR corresponding to the UE3 is 40ms multiplied by 1 to be equal to 40 ms.
The UE1 sends a preamble on the configured time-frequency domain SR PRACH resource (2 nd subcarrier of carrier 0, time domain cycle of PRACH resource is 40ms, start time is 8ms), indicating a data transmission requirement.
Therefore, it can be seen that the base station can configure the same frequency domain (i.e., the 2 nd subcarrier of the carrier 0), and can ensure different configurations in the time domain by adjusting the PRACH period factor and the PRACH time domain offset index, so that the dedicated SR PRACH resource at the same frequency domain position can be configured for time domain orthogonal multiplexing of multiple users, thereby improving the utilization efficiency of the dedicated SRPRACH resource, satisfying the demands of SR PRACH resources of more terminals, and reducing the system overhead.
Scene 2:
1. the base station configures cell PRACH resources in SIB2, where the indicated PRACH resource information still follows the PRACH resource information table in table 1 for convenience of example. Of course, other PRACH resource information tables are also within the protection scope of the present scenario, and are not described herein in detail.
2. The base station defines a time domain configuration index table of SR PRACH resources, as shown in table 5.
TABLE 5
Index value Isr | Time domain period of PRACH resource | PRACH TIME-Domain OFFSET INDEX |
0 | 40 | Isr |
1~2 | 80 | Isr-1 |
3~6 | 160 | Isr-3 |
7~12 | 240 | Isr-7 |
13~20 | 320 | Isr-13 |
21~36 | 640 | Isr-21 |
37~68 | 1280 | Isr-37 |
69~132 | 2560 | Isr-69 |
After the UE1 accesses, the base station issues dedicated SR PRACH configuration information as shown in table 6:
TABLE 6
After the UE2 accesses, the base station issues dedicated SR PRACH configuration information as shown in table 7:
TABLE 7
4. As can be seen from table 1, table 5 and table 6, the UE1 acquires the 2 nd subcarrier with the frequency domain configuration as carrier 0.
The time domain cycle of the PRACH resource of the SR corresponding to the UE1 is known from the look-up table 6, and the time domain cycle of the PRACH resource corresponding to the time domain offset index 1 is 80 ms.
Since the PRACH time domain offset index is 1, the time domain offset value corresponding to the PRACH resource of the SR of the UE1 is 40ms, and therefore the starting time of the PRACH resource of the SR is 48 ms.
The UE1 sends a preamble on the configured time-frequency domain SR PRACH resource (the 2 nd subcarrier of the carrier 0, the time domain cycle of the PRACH resource is 80ms, and the start time is 8ms), indicating the data transmission requirement.
5. As can be seen from table 1, table 5 and table 7, the UE1 acquires the 2 nd subcarrier with the frequency domain configuration as carrier 0.
The time domain period of the PRACH resource of the SR corresponding to the UE1 is known from the look-up table 6, and the time domain period of the PRACH resource corresponding to the time domain offset so 3 is 160 ms.
Since the PRACH time domain offset index is 3, the time domain offset value corresponding to the PRACH resource of the SR of the UE1 is also 120ms, and therefore the starting time of the PRACH resource of the SR is 128 ms.
The UE1 sends a preamble on the configured time-frequency domain SR PRACH resource (2 nd subcarrier of carrier 0, time domain period of PRACH resource is 160ms, start time is 128ms), indicating a data transmission requirement.
Therefore, it can be seen that the base station can configure the same frequency domain (i.e., the 2 nd subcarrier of the carrier 0) and can ensure different configurations in the time domain by adjusting the PRACH time domain offset index, so that the dedicated SR PRACH resource in the same frequency domain position can be configured for time domain orthogonal multiplexing of multiple users, thereby improving the utilization efficiency of the dedicated SR PRACH resource, satisfying the demands of SR PRACH resources of more terminals, and reducing the system overhead.
Scene 3:
1. the base station configures the PRACH resource of the cell in the SIB2, where the indicated PRACH resource information table is as shown in table 8: .
TABLE 8
After the UE1 accesses, the base station issues dedicated SR PRACH configuration information as shown in table 9:
TABLE 9
After the UE2 accesses, the base station issues dedicated SR PRACH configuration information as shown in table 10:
watch 10
After the UE3 accesses, the base station issues dedicated SR PRACH configuration information as shown in table 11:
TABLE 11
5. As can be seen from tables 1 and 9, the UE1 acquires the 2 nd subcarrier with the frequency domain configuration as carrier 0.
The time domain repetition number of the user SR PRACH resource corresponding to the UE1 is the PRACH repetition number 4 corresponding to the coverage level 1 multiplied by the SR PRACH repetition number coefficient 1/2 equal to 2.
While the SR PRACH resource time domain repetition part is 0 and 1, using the 0 th and 1 st repetition in the coverage level 1 repetition.
The UE1 sends a preamble on the configured time-frequency domain SR PRACH resource (the 2 nd subcarrier of carrier 0, the SR PRACH resource time domain repetition number is 2, and the 0 th and 1 st repetitions in the coverage level 1 repetition) to indicate the data transmission requirement.
6. As can be seen from tables 1 and 10, the UE2 acquires the 2 nd subcarrier with the frequency domain configuration as carrier 0.
The time domain repetition times of the user SR PRACH resource corresponding to the UE2 are the same as those of the UE1, i.e. 2.
However, since the SR PRACH time domain repetition offsets are different, the SR PRACH resource time domain repetition portions of the UE2 are 1 and 2, using the 1 st and 2 nd repetitions in the coverage level 1 repetition.
The UE1 sends a preamble on the configured time-frequency domain SR PRACH resource (2 nd subcarrier of carrier 0, SR PRACH resource time domain repetition number is 2,1 st and 2 nd repetition in coverage level 1 repetition) to indicate a data transmission requirement.
7. As can be seen from tables 1 and 11, the UE3 acquires the 2 nd subcarrier with the frequency domain configuration as carrier 0.
However, the time domain repetition number of the user SR PRACH resource corresponding to the UE3 is different from that of the UE1, and the time domain repetition number of the user SR PRACH resource corresponding to the UE1 is equal to the PRACH repetition number 4 corresponding to the coverage level 1 multiplied by the SR PRACH repetition number coefficient 1/4.
Therefore, the time domain repetition part of the user SR PRACH resource corresponding to the UE3 is also different from that of the UE1, i.e. 0, i.e. the 0 th repetition of the coverage level 1 repetition is used.
The UE1 sends a preamble on the configured time-frequency domain SR PRACH resource (the 2 nd subcarrier of carrier 0, the SR PRACH resource time domain repetition number is 1, the 0 th repetition in the coverage level 1 repetition) to indicate the data transmission requirement.
Therefore, it can be seen that the base station can configure the same frequency domain (i.e., the 2 nd subcarrier of the carrier 0), and can ensure different configurations in the time domain by adjusting the SR PRACH repetition number coefficient and the SR PRACH time domain repetition offset, so that the dedicated SR PRACH resources in the same frequency domain position can be configured for time domain orthogonal multiplexing of multiple users, thereby improving the utilization efficiency of the dedicated SR PRACH resources, satisfying the demands of more terminal SR PRACH resources, and reducing the system overhead.
It should be noted that the distances of the above scenarios are only an example, and are not exhaustive, and any examples based on the above scenarios of the present invention are within the protection scope of the present embodiment. E.g., different frequency domain configuration information.
Example 3
In this embodiment, a resource processing apparatus is further provided, and the apparatus is used to implement the foregoing embodiments and preferred embodiments, and details of which have been already described are omitted. As used below, the term "module" may be a combination of software and/or hardware that implements a predetermined function. Although the means described in the embodiments below are preferably implemented in software, an implementation in hardware, or a combination of software and hardware is also possible and contemplated.
Fig. 4 is a block diagram of a resource processing apparatus according to an embodiment of the present invention, and as shown in fig. 4, the apparatus includes: a configuration module 42 and a sending module 44.
A configuration module 42, configured to configure an uplink scheduling request, SR, resource for a user equipment, UE, where the SR resource is used for the UE to send an SR;
a sending module 44, configured to send a first message to the UE, where the first message carries configuration information of the SR resource, and the configuration information at least includes: time domain location information and frequency domain location information.
Example 4
In this embodiment, a resource processing apparatus is further provided, and the apparatus is used to implement the foregoing embodiments and preferred embodiments, and details of which have been already described are omitted. As used below, the term "module" may be a combination of software and/or hardware that implements a predetermined function. Although the means described in the embodiments below are preferably implemented in software, an implementation in hardware, or a combination of software and hardware is also possible and contemplated.
Fig. 5 is a block diagram of a receiving apparatus of a resource according to an embodiment of the present invention, and as shown in fig. 5, the apparatus includes: a receiving module 52 and a triggering module 54.
A receiving module 52, configured to receive a first message sent by a base station, where the first message is carried in configuration information of an uplink scheduling request, SR, resource, and the configuration information at least includes: time domain position information and frequency domain position information;
and the triggering module 54 determines, according to the configuration information, a location of the SR resource for triggering SR in uplink data transmission.
Example 5
In this embodiment, a resource processing system is further provided, and the apparatus is used to implement the foregoing embodiments and preferred embodiments, and details of which have been already described are omitted.
Fig. 6 is a block diagram of a resource processing system according to an embodiment of the present invention, as shown in fig. 6, including a base station 62 and a UE64,
the base station 62 is configured to configure an uplink scheduling request SR resource for the UE64, and send a first message to the UE64, where the first message carries configuration information of the SR resource, and the configuration information at least includes: time domain position information and frequency domain position information;
and the UE64 is configured to determine, according to the configuration information, a location of the SR resource for triggering SR in uplink data transmission.
Example 6
Embodiments of the present invention also provide a storage medium having a computer program stored therein, wherein the computer program is arranged to perform the steps of any of the above method embodiments when executed.
Alternatively, in the present embodiment, the storage medium may be configured to store a computer program for executing the steps of:
s1, configuring an uplink Scheduling Request (SR) resource for User Equipment (UE), wherein the SR resource is used for the UE to send an SR;
s2, sending a first message to the UE, where the first message carries configuration information of the SR resource, and the configuration information at least includes: time domain location information and frequency domain location information.
Alternatively, in the present embodiment, the storage medium may be configured to store a computer program for executing the steps of:
s1: user Equipment (UE) receives a first message sent by a base station, wherein the first message is carried in configuration information of an uplink Scheduling Request (SR) resource, and the configuration information at least comprises: time domain position information and frequency domain position information;
s2: and according to the configuration information, the UE determines the position of the SR resource for triggering SR in uplink data transmission.
Optionally, in this embodiment, the storage medium may include, but is not limited to: various media capable of storing computer programs, such as a usb disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a removable hard disk, a magnetic disk, or an optical disk.
Embodiments of the present invention also provide an electronic device comprising a memory having a computer program stored therein and a processor arranged to run the computer program to perform the steps of any of the above method embodiments.
Optionally, the electronic apparatus may further include a transmission device and an input/output device, wherein the transmission device is connected to the processor, and the input/output device is connected to the processor.
Alternatively, in this embodiment, the processor may be configured to store a computer program for executing the following steps:
s1, configuring an uplink Scheduling Request (SR) resource for User Equipment (UE), wherein the SR resource is used for the UE to send an SR;
s2, sending a first message to the UE, where the first message carries configuration information of the SR resource, and the configuration information at least includes: time domain location information and frequency domain location information.
Alternatively, in this embodiment, the processor may be configured to store a computer program for executing the following steps:
s1: user Equipment (UE) receives a first message sent by a base station, wherein the first message is carried in configuration information of an uplink Scheduling Request (SR) resource, and the configuration information at least comprises: time domain position information and frequency domain position information;
s2: and according to the configuration information, the UE determines the position of the SR resource for triggering SR in uplink data transmission.
Optionally, the specific examples in this embodiment may refer to the examples described in the above embodiments and optional implementation manners, and this embodiment is not described herein again.
It will be apparent to those skilled in the art that the modules or steps of the present invention described above may be implemented by a general purpose computing device, they may be centralized on a single computing device or distributed across a network of multiple computing devices, and alternatively, they may be implemented by program code executable by a computing device, such that they may be stored in a storage device and executed by a computing device, and in some cases, the steps shown or described may be performed in an order different than that described herein, or they may be separately fabricated into individual integrated circuit modules, or multiple ones of them may be fabricated into a single integrated circuit module. Thus, the present invention is not limited to any specific combination of hardware and software.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the principle of the present invention should be included in the protection scope of the present invention.
Claims (38)
1. A method for processing resources, comprising:
configuring uplink Scheduling Request (SR) resources for User Equipment (UE), wherein the SR resources are used for the UE to send an SR;
sending a first message to the UE, wherein the first message carries configuration information of the SR resource, and the configuration information at least includes: time domain location information and frequency domain location information.
2. The method of claim 1, wherein the configuration information further comprises: a coverage level of the SR resource.
3. The method of claim 2, wherein the frequency domain location information comprises at least: a carrier index of the SR resource, a subcarrier index of the SR resource.
4. The method of claim 3, further comprising:
sending a system broadcast message to the UE; wherein the resource information of the SR resource is carried in the SIB2 in the system broadcast message.
5. The method of claim 4, wherein the resource information of the SR resources comprises at least: a time domain period corresponding to the coverage grade, a starting time corresponding to the coverage grade, and a subcarrier corresponding to the coverage grade.
6. The method of claim 5, wherein the time domain location information comprises: a time domain offset index of the SR resource.
7. The method of claim 6, further comprising:
pre-configuring a time domain offset index of the SR resource and a time domain configuration index table of the SR resource for determining a time domain period of the SR resource corresponding to the time domain offset index of the SR resource for the UE; and/or the presence of a gas in the gas,
and the first message carries the time domain offset index of the SR resource and the configuration information of the time domain configuration index table of the SR resource.
8. The method of claim 6, wherein the time domain location information further comprises a periodicity factor of the SR resources.
9. The method of claim 8, further comprising:
pre-configuring a time domain offset index of the SR resource and a periodicity factor of the SR resource for the UE; and/or the presence of a gas in the gas,
and carrying the time domain offset index of the SR resource and the configuration information of the periodicity factor of the SR resource in the first message.
10. The method of claim 4, wherein the resource information of the SR resources comprises at least: a time domain period corresponding to the coverage level, a start time corresponding to the coverage level, a subcarrier corresponding to the coverage level, and a repetition number corresponding to the coverage level.
11. The method of claim 10, wherein the time domain location information comprises at least: a repetition number coefficient of the SR resource and a time domain repetition offset of the SR resource.
12. The method of claim 11, further comprising:
pre-configuring a repetition number coefficient of the SR resource and a time domain repetition offset of the SR resource for the UE; and/or the presence of a gas in the gas,
and carrying the repetition frequency coefficient of the SR resource and the configuration information of the time domain repetition offset of the SR resource in the first message.
13. The method according to any one of claims 1-12, further comprising:
and receiving second information sent by the UE on the SR resource determined by the UE according to the configuration information, wherein the second information is used for indicating the data transmission requirement.
14. The method according to any of claims 1-12, wherein configuring the SR resources for the UE comprises: the time domain positions of the SR resources configured for different UEs are different.
15. The method according to any of claims 1-12, wherein the resources comprise: and the Physical Random Access Channel (PRACH) resource special for the SR.
16. A method for receiving a resource, comprising:
user Equipment (UE) receives a first message sent by a base station, wherein the first message is carried in configuration information of an uplink Scheduling Request (SR) resource, and the configuration information at least comprises: time domain position information and frequency domain position information;
and according to the configuration information, the UE determines the position of the SR resource for triggering SR in uplink data transmission.
17. The method of claim 16, wherein the configuration information further comprises: a coverage level of the SR resource.
18. The method of claim 17, wherein the frequency domain location information comprises at least: a carrier index of the SR resource, a subcarrier index of the SR resource.
19. The method of claim 18, further comprising:
receiving a system broadcast message sent by the base station; wherein the resource information of the SR resource is carried in the SIB2 in the system broadcast message.
20. The method of claim 19, wherein the resource information of the SR resources comprises at least: a time domain period corresponding to the coverage grade, a starting time corresponding to the coverage grade, and a subcarrier corresponding to the coverage grade.
21. The method of claim 20, wherein the time domain location information comprises: a time domain offset index of the SR resource.
22. The method of claim 21, further comprising:
acquiring a time domain offset index of the SR resource pre-configured by the base station and a time domain configuration index table of the SR resource for determining a time domain period of the SR resource corresponding to the time domain offset index of the SR resource; and/or the presence of a gas in the gas,
receiving the time domain offset index of the SR resource and the configuration information of the time domain configuration index table of the SR resource, which are carried in the first message.
23. The method of claim 22, further comprising:
determining a time domain period of the SR resource according to the time domain offset index of the SR resource and a time domain configuration index table of the SR resource; and the number of the first and second groups,
calculating a time domain offset value of the SR resource and a starting time of the SR resource, wherein the time domain offset value of the SR resource is equal to a time domain period corresponding to the coverage level multiplied by a time domain offset index of the SR resource; the starting time of the SR resource is equal to the sum of the starting time corresponding to the coverage grade and the time domain offset value.
24. The method of claim 21, wherein the time domain location information further comprises a periodicity factor of the SR resource.
25. The method of claim 24, further comprising:
acquiring a time domain offset index of the SR resource and a periodic factor of the SR resource, which are configured in advance by the base station; and/or the presence of a gas in the gas,
receiving the time domain offset index of the SR resource and the configuration information of the periodicity factor of the SR resource, which are carried in the first message.
26. The method of claim 25, further comprising:
calculating a time domain period of the SR resource, a time domain offset value of the SR resource and a starting time of the SR resource; wherein the time domain period of the SR resource is equal to the time domain period corresponding to the coverage level multiplied by the period factor of the SR resource; the time domain offset value is equal to a time domain period corresponding to the coverage level multiplied by a time domain offset index of the SR resource; the starting time of the SR resource is equal to the sum of the starting time corresponding to the coverage grade and the time domain offset value.
27. The method of claim 19, wherein the resource information of the SR resources comprises at least: a time domain period corresponding to the coverage level, a start time corresponding to the coverage level, a subcarrier corresponding to the coverage level, and a repetition number corresponding to the coverage level.
28. The method of claim 27, wherein the time domain location information comprises at least: a repetition number coefficient of the SR resource and a time domain repetition offset of the SR resource.
29. The method of claim 28, further comprising: acquiring a repetition frequency coefficient of the SR resource and a time domain repetition offset of the SR resource, which are configured in advance by the base station; and/or the presence of a gas in the gas,
and receiving the repetition frequency coefficient of the SR resource and the configuration information of the time domain repetition offset of the SR resource, which are carried in the first message.
30. The method of claim 29, further comprising:
calculating the time domain repetition times of the SR resources and the time domain repetition part of the SR resources; wherein the time domain repetition number of the SR resource is equal to the resource repetition number corresponding to the coverage level multiplied by the repetition number coefficient of the SR resource; the time domain repetition portion of the SR resource comprises: and subtracting 1 from the sum of the time domain repetition offset of the SR resource and the time domain repetition times of the SR resource.
31. The method according to any one of claims 16-30, further comprising:
and the UE sends second information to the base station on the determined SR resource, wherein the second information is used for indicating data transmission requirements.
32. The method according to any one of claims 16-30, further comprising: and the time domain positions of the SR resources configured by the base station for different UEs are different.
33. The method according to any of claims 16-30, wherein the resources comprise: and the Physical Random Access Channel (PRACH) resource special for the SR.
34. An apparatus for processing resources at a base station, comprising:
a configuration module, configured to configure an uplink scheduling request, SR, resource for user equipment, UE, where the SR resource is used for the UE to send an SR;
a sending module, configured to send a first message to the UE, where the first message carries configuration information of the SR resource, and the configuration information at least includes: time domain location information and frequency domain location information.
35. An apparatus for receiving resources, located in a User Equipment (UE), comprising:
a receiving module, configured to receive a first message sent by a base station, where the first message is carried in configuration information of an uplink scheduling request, SR, resource, and the configuration information at least includes: time domain position information and frequency domain position information;
and the determining module is used for determining the position of the SR resource for triggering the SR in the uplink data transmission process according to the configuration information.
36. A system for processing resources, comprising a base station and a User Equipment (UE),
the base station is configured to configure an uplink scheduling request, SR, resource for the UE, and send a first message to the UE, where the first message carries configuration information of the SR resource, and the configuration information at least includes: time domain position information and frequency domain position information;
and the UE is used for determining the position of the SR resource for triggering the SR in uplink data transmission according to the configuration information.
37. A storage medium having a computer program stored thereon, wherein the computer program is arranged to perform the method of any of claims 1-15,16-33 when executed.
38. An electronic device comprising a memory and a processor, wherein the memory has stored therein a computer program, and wherein the processor is configured to execute the computer program to perform the method of any of claims 1-15, 16-33.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811132721.2A CN110958695A (en) | 2018-09-27 | 2018-09-27 | Resource processing method, device and system, and resource receiving method and device |
PCT/CN2019/107651 WO2020063610A1 (en) | 2018-09-27 | 2019-09-25 | Resource processing method, device and system, and resource receiving method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811132721.2A CN110958695A (en) | 2018-09-27 | 2018-09-27 | Resource processing method, device and system, and resource receiving method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110958695A true CN110958695A (en) | 2020-04-03 |
Family
ID=69953333
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811132721.2A Pending CN110958695A (en) | 2018-09-27 | 2018-09-27 | Resource processing method, device and system, and resource receiving method and device |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN110958695A (en) |
WO (1) | WO2020063610A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021212315A1 (en) * | 2020-04-21 | 2021-10-28 | Qualcomm Incorporated | Physical uplink control channel enhancement for indoor coverage holes |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104301928B (en) * | 2013-07-19 | 2018-10-02 | 中兴通讯股份有限公司 | Data transmission restoration methods, terminal and system in LTE network |
US10531493B2 (en) * | 2015-04-22 | 2020-01-07 | Intel IP Corporation | Low latency contention based scheduling request |
CN107948987B (en) * | 2016-10-13 | 2021-08-03 | 华为技术有限公司 | Communication method, device and system |
WO2018195910A1 (en) * | 2017-04-28 | 2018-11-01 | 北京小米移动软件有限公司 | Method and device for allocating scheduling request (sr) resources |
-
2018
- 2018-09-27 CN CN201811132721.2A patent/CN110958695A/en active Pending
-
2019
- 2019-09-25 WO PCT/CN2019/107651 patent/WO2020063610A1/en active Application Filing
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021212315A1 (en) * | 2020-04-21 | 2021-10-28 | Qualcomm Incorporated | Physical uplink control channel enhancement for indoor coverage holes |
Also Published As
Publication number | Publication date |
---|---|
WO2020063610A1 (en) | 2020-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3393167B1 (en) | Resource allocation method and device, and base station | |
CN110932833B (en) | Information transmission method and device | |
CN105191356B (en) | Paging method and device | |
JP6642842B2 (en) | Information transmission method, base station, and user equipment | |
CN109716843A (en) | A kind of resource determining method and device, computer storage medium of control channel | |
RU2758106C1 (en) | Method for data transmission, terminal apparatus and network apparatus | |
CN109495966B (en) | Method for determining and configuring resources for transmitting downlink data, terminal and base station | |
CN113038603A (en) | Blind detection and descrambling method and device, storage medium and electronic equipment | |
CN111436149A (en) | Transmission resource selection method and device | |
CN110383914B (en) | Information sending method, device, terminal, access network equipment and system | |
EP3993542B1 (en) | Transmission of configuration information for detecting multiple signals on an unlicensed frequency band | |
CN110971362B (en) | Discovery reference signal sending method and device | |
CN112042143B (en) | Monitoring method, device, equipment and system of PDCCH (physical Downlink control channel) | |
WO2017031643A1 (en) | Resource allocation, resource type instruction and recognition, and data receiving methods and apparatuses | |
US10873879B2 (en) | Data transmission method, device, and system | |
CN110958695A (en) | Resource processing method, device and system, and resource receiving method and device | |
CN107046672B (en) | Random access method and device | |
JP6952739B2 (en) | Information transmission method and equipment | |
CN110708707B (en) | Method and equipment for returning terminal to resident sub-band in private network wireless communication | |
JP2020036343A (en) | Information transmission method, base station, and user equipment | |
CN111525993B (en) | Resource allocation method and device | |
US20170202010A1 (en) | Terminal, Base Station, System, and Notification Method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |