CN110942245A - Enterprise management method based on Internet - Google Patents

Enterprise management method based on Internet Download PDF

Info

Publication number
CN110942245A
CN110942245A CN201911161527.1A CN201911161527A CN110942245A CN 110942245 A CN110942245 A CN 110942245A CN 201911161527 A CN201911161527 A CN 201911161527A CN 110942245 A CN110942245 A CN 110942245A
Authority
CN
China
Prior art keywords
management
assessment
staff
internet
performance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201911161527.1A
Other languages
Chinese (zh)
Inventor
陈兖清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201911161527.1A priority Critical patent/CN110942245A/en
Publication of CN110942245A publication Critical patent/CN110942245A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1091Recording time for administrative or management purposes

Abstract

The invention relates to the technical field of enterprise management and discloses an enterprise management method based on the Internet, which comprises the following steps: firstly, according to the step A: the cloud management platform belongs to a management decision layer and is used for managing, auditing and evaluating main business of a company; then according to the step B, checking the attendance of the staff by the GPS information management and sharing requirements and face recognition; if the attendance information is correct and complete, according to the step C: and the system app makes a plan according to the latest assessment performance and the condition of the staff and issues tasks to be finished by the system app. According to the enterprise management method based on the Internet, the task progress management and assessment mode is adopted for the employees in real time, transparent performance assessment is carried out according to the task conditions of the employees and other objective factors every day, corresponding reward and punishment measures are appointed according to the performance completion quantity based on the assessment management system of the employee performances, and the working efficiency of the employees of the company is improved.

Description

Enterprise management method based on Internet
Technical Field
The invention relates to the technical field of enterprise management, in particular to an enterprise management method based on the Internet.
Background
The enterprise management system can embody most functions of enterprise management, such as: the system comprises decision, plan, organization, leadership, monitoring, analysis and the like, can provide accurate and complete data, and provides a management mode of decision basis for managers.
The existing enterprise management method does not perform reasonable distribution according to respective abilities of employees in employee business distribution, so that the work efficiency of the employees is easily maximized, meanwhile, the existing enterprise management method cannot efficiently and orderly perform employee supervision and management, cannot perform multi-angle assessment on the employees in real time, cannot fulfill the aim of timely improving the operation of a company, cannot well improve the economic benefit of the company, and therefore the enterprise management method based on the Internet is provided.
Disclosure of Invention
The invention provides an enterprise management method based on the Internet, which has the advantages of improving the working efficiency of employees and the economic benefit of companies and solves the problems in the background technology.
In order to achieve the above purpose, the invention provides the following technical scheme to realize: an enterprise management method based on the Internet comprises the following steps:
firstly, according to the step A: the cloud management platform belongs to a management decision layer and is used for managing, auditing and evaluating main business of a company;
then according to the step B, checking the attendance of the staff by the GPS information management and sharing requirements and face recognition;
if the attendance information is correct and complete, according to the step C: the system app makes a plan according to the latest assessment performance and the condition of the staff and issues tasks to be completed by the system app; if the attendance information is not complete, according to the step H: personnel management personnel know the information and supplement the audit, the following operation is carried out when the audit is passed, and the operation cannot be carried out when the audit is not passed;
the corresponding staff is located at the designated position to work, and when the difficulty which can not be solved is met, according to the step D: according to the work content teaching course, the staff can timely master the key points of the work content through system video or background staff prompt;
managing and assessing task progress, and performing transparent performance assessment according to the daily task completion condition and other objective factors;
after the corresponding order service is completed, according to the step F, the order payment is completed and submitted to the client, and the client needs to pay the corresponding price to the App;
finally, through the step G: and (4) service evaluation, wherein the client can evaluate according to the completion condition of the order and the service attitude of the staff, and the evaluation content is directly fed back to the A, namely the cloud management platform is used for sorting, analyzing and verifying.
Optionally, the main business in step a includes four modules, namely supply chain management, production and cost management, financial accounting management and human resource management.
Optionally, the supply chain management in the main service in step a mainly includes purchasing management, sales management, inventory management, and quality management; the production and cost management comprises the steps of making a production plan and adopting a management mode of an operation cost method for the cost.
Optionally, in the main business of step a, the financial accounting mainly includes modules of general ledger management, financial statements, fixed assets, management due to charge and the like; human resource management refers to reasonable configuration planned according to the requirements of enterprise development strategies.
Optionally, the performance assessed in the step C is divided into four parts, and different plans are formulated for different employees based on an assessment management system of personal abilities of the employees; and (4) assigning corresponding reward and punishment measures according to the achievement completion quantity based on the assessment management system of the employee achievement.
Optionally, the performance assessed in the step C also has a human assessment management system based on the role of the staff, and standardized assessment management is performed on the staff of different levels; and an assessment management system based on customer assessment, which assesses the staff according to the assessment and suggestion of the customers to the staff.
Optionally, the performance assessed in the step C is used for reasonably assessing the performance of the employees of the company through four corresponding assessment projects.
The invention provides an enterprise management method based on the Internet, which has the following beneficial effects:
1. according to the enterprise management method based on the Internet, the task progress management and assessment mode is adopted for the employees in real time, transparent performance assessment is carried out according to the task conditions of the employees and other objective factors every day, corresponding reward and punishment measures are appointed according to the performance completion quantity based on the assessment management system of the employee performances, and the working efficiency of the employees of the company is improved.
2. The enterprise management method based on the Internet carries out standardized assessment management aiming at personnel at different levels; the system is based on the assessment management system of the client for evaluating the staff and the evaluation and suggestion of the client for the company products, and is beneficial to continuously improving the self management mechanism of the company, so that the operation mode of the company is always in the optimized operation mode, and the economic benefit of the company is improved.
Drawings
FIG. 1 is a schematic flow diagram of the system of the present invention;
FIG. 2 is a schematic flow chart of the main service in FIG. 1;
fig. 3 is a schematic illustration of the steps of the performance assessment of fig. 1.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-3, an internet-based enterprise management method includes the following steps:
firstly, according to the step A: the cloud management platform belongs to a management decision layer and is used for managing, auditing and evaluating main business of a company;
then according to the step B, checking the attendance of the staff by the GPS information management and sharing requirements and face recognition;
if the attendance information is correct and complete, according to the step C: the system app makes a plan according to the latest assessment performance and the condition of the staff and issues tasks to be completed by the system app; if the attendance information is not complete, according to the step H: personnel management personnel know the information and supplement the audit, the following operation is carried out when the audit is passed, and the operation cannot be carried out when the audit is not passed;
the corresponding staff is located at the designated position to work, and when the difficulty which can not be solved is met, according to the step D: according to the work content teaching course, the staff can timely master the key points of the work content through system video or background staff prompt;
managing and assessing task progress, and performing transparent performance assessment according to the daily task completion condition and other objective factors;
after the corresponding order service is completed, according to the step F, the order payment is completed and submitted to the client, and the client needs to pay the corresponding price to the App;
finally, through the step G: and (4) service evaluation, wherein the client can evaluate according to the completion condition of the order and the service attitude of the staff, and the evaluation content is directly fed back to the A, namely the cloud management platform is used for sorting, analyzing and verifying.
The main business in the step A comprises four modules of supply chain management, production and cost management, financial accounting management and human resource management.
Wherein, the supply chain management in the main business of the step A mainly comprises purchase management, sales management, inventory management and quality management; the production and cost management comprises the steps of making a production plan and adopting a management mode of an operation cost method for the cost.
Wherein, the financial accounting in the main business of the step A mainly comprises modules of general account management, financial statements, fixed assets, management due to charge and the like; human resource management refers to reasonable configuration planned according to the requirements of enterprise development strategies.
The performance assessed in the step C is divided into four parts, and different plans are formulated for different employees based on an assessment management system of the personal abilities of the employees; and (4) assigning corresponding reward and punishment measures according to the achievement completion quantity based on the assessment management system of the employee achievement.
The performance assessed in the step C is also provided with a manpower assessment management system based on the role of the staff, and standardized assessment management is carried out aiming at the staff of different levels; the working efficiency of the company staff is improved, the assessment management system based on the client assessment is provided, and the staff is assessed according to the assessment and suggestion of the client to the staff.
And C, reasonably evaluating the performance of the staff of the company through the four corresponding assessment items and evaluating and suggesting the products of the company by the client, so that the company can continuously improve the self management mechanism, the operation mode of the company is always in the optimal operation mode, and the economic benefit of the company is improved.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. An enterprise management method based on the Internet is characterized in that: the method comprises the following steps:
firstly, according to the step A: the cloud management platform belongs to a management decision layer and is used for managing, auditing and evaluating main business of a company;
then according to the step B, checking the attendance of the staff by the GPS information management and sharing requirements and face recognition;
if the attendance information is correct and complete, according to the step C: the system app makes a plan according to the latest assessment performance and the condition of the staff and issues tasks to be completed by the system app; if the attendance information is not complete, according to the step H: personnel management personnel know the information and supplement the audit, the following operation is carried out when the audit is passed, and the operation cannot be carried out when the audit is not passed;
the corresponding staff is located at the designated position to work, and when the difficulty which can not be solved is met, according to the step D: according to the work content teaching course, the staff can timely master the key points of the work content through system video or background staff prompt;
managing and assessing task progress, and performing transparent performance assessment according to the daily task completion condition and other objective factors;
after the corresponding order service is completed, according to the step F, the order payment is completed and submitted to the client, and the client needs to pay the corresponding price to the App;
finally, through the step G: and (4) service evaluation, wherein the client can evaluate according to the completion condition of the order and the service attitude of the staff, and the evaluation content is directly fed back to the A, namely the cloud management platform is used for sorting, analyzing and verifying.
2. The internet-based enterprise management method of claim 1, wherein: the main business in the step A comprises four modules of supply chain management, production and cost management, financial accounting management and human resource management.
3. The internet-based enterprise management method of claim 2, wherein: step A, supply chain management in main business mainly comprises purchase management, sales management, inventory management and quality management; the production and cost management comprises the steps of making a production plan and adopting a management mode of an operation cost method for the cost.
4. The internet-based enterprise management method of claim 2, wherein: in the main business of the step A, the financial accounting mainly comprises modules of general account management, financial statements, fixed assets, management due to management, management due to receipt and the like; human resource management refers to reasonable configuration planned according to the requirements of enterprise development strategies.
5. The internet-based enterprise management method of claim 1, wherein: c, dividing the performance of the assessment in the step C into four parts, and making different plans aiming at different employees based on an assessment management system of the personal abilities of the employees; and (4) assigning corresponding reward and punishment measures according to the achievement completion quantity based on the assessment management system of the employee achievement.
6. The internet-based enterprise management method of claim 5, wherein: the performance assessed in the step C is also provided with a manpower assessment management system based on the role of the staff, and standardized assessment management is carried out aiming at the staff of different levels; and an assessment management system based on customer assessment, which assesses the staff according to the assessment and suggestion of the customers to the staff.
7. The internet-based enterprise management method of claim 1, wherein: and C, reasonably evaluating the performance of the staff of the company through four corresponding assessment projects.
CN201911161527.1A 2019-11-25 2019-11-25 Enterprise management method based on Internet Withdrawn CN110942245A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911161527.1A CN110942245A (en) 2019-11-25 2019-11-25 Enterprise management method based on Internet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911161527.1A CN110942245A (en) 2019-11-25 2019-11-25 Enterprise management method based on Internet

Publications (1)

Publication Number Publication Date
CN110942245A true CN110942245A (en) 2020-03-31

Family

ID=69907492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911161527.1A Withdrawn CN110942245A (en) 2019-11-25 2019-11-25 Enterprise management method based on Internet

Country Status (1)

Country Link
CN (1) CN110942245A (en)

Similar Documents

Publication Publication Date Title
CN110766528A (en) Client credit self-evaluation factory real-time intelligent analysis management system
US9965735B2 (en) System and method for it sourcing management and governance covering multi geography, multi sourcing and multi vendor environments
CA2402664A1 (en) Method and apparatus for evaluating relative performance of a business in an association of the same or similar businesses
Stopka et al. Methodology for measuring the customer satisfaction with the logistics services
RU133639U1 (en) AUTOMATED SYSTEM FOR DETERMINING THE COST OF SCIENTIFIC-RESEARCH OR EXPERIMENTAL-DESIGN WORKS AT THE CONCLUSION OF STATE CONTRACTS
Belov et al. Business performance management in small and medium businesses and functional automation
Şişman Implementing lean six sigma methodology to reduce the logistics cost: a case study in Turkey
CN107077647A (en) Improved system and method for the distribution value that worked to timekeeper
Jetmarová Benchmarking: methods of raising company efficiency by learning from the best-in-class
Bilovol et al. Improving marketing logistics management of enterprises of agro-industrial complex
Mathur et al. Materiality analysis of SCM issues for Competitive Advantage: Study of an Indian FMEG Organization
Zamfir et al. The Budget-Reference System in Assessing the Performance of the Public Enterprise
CN110942245A (en) Enterprise management method based on Internet
El-Wafi Siemens: process mining for operational efficiency in Purchase2Pay
Tin AComparative ANALYSIS OF COST-VOLUME-PROFIT (CVP) ANALYSIS AND ACTIVITY-BASED COSTING (ABC) IN IMPROVING MANAGERIAL DECISION-MAKING
Kolinski et al. Impact of transposing the strategic objectives on supply efficiency
Kitungu Supply chain factors and delivery of power generation projects at the Kenya electricity generating company limited
JP2001306779A (en) Managed account system coping with iso9000 series for linking document management of iso9000 and remarks items of journal voucher nd displaying the same on computer calendar
Muraya Order to cash business process standardization for audit compliance and accreditation at Ascensia Diabetes Care.
Shalakha Innovative supply chain management practices and organisational performance of oil marketing companies in Kenya
Wang et al. Improvement of oil industry procurement of logistics based on TCO
CN117408529A (en) Enterprise simulation operation management system
Gil-Goyzueta et al. Process Improvement Proposal Storage to Increase the Service Level Using Lean Warehousing in Commerce Companies
Gadžo Designing methodology for evaluating level of development of accounting systems in function of comparison between them
Petersson et al. Centralization of inventory management for spare parts

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20200331

WW01 Invention patent application withdrawn after publication