CN110941606A - Calculation method for calculating reasonable water amount aiming at water resource monitoring data - Google Patents

Calculation method for calculating reasonable water amount aiming at water resource monitoring data Download PDF

Info

Publication number
CN110941606A
CN110941606A CN201911144983.5A CN201911144983A CN110941606A CN 110941606 A CN110941606 A CN 110941606A CN 201911144983 A CN201911144983 A CN 201911144983A CN 110941606 A CN110941606 A CN 110941606A
Authority
CN
China
Prior art keywords
data
data area
area
achievement
hour
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911144983.5A
Other languages
Chinese (zh)
Other versions
CN110941606B (en
Inventor
孙伟华
刘增强
杨杰
张建峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Hengyuan Water Technology Co ltd
Original Assignee
Hebei Hengyuan Water Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Hengyuan Water Technology Co Ltd filed Critical Hebei Hengyuan Water Technology Co Ltd
Priority to CN201911144983.5A priority Critical patent/CN110941606B/en
Publication of CN110941606A publication Critical patent/CN110941606A/en
Application granted granted Critical
Publication of CN110941606B publication Critical patent/CN110941606B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/21Design, administration or maintenance of databases
    • G06F16/215Improving data quality; Data cleansing, e.g. de-duplication, removing invalid entries or correcting typographical errors
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/23Updating
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Databases & Information Systems (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Health & Medical Sciences (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • General Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Development Economics (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Computational Linguistics (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a calculation method for calculating reasonable water amount aiming at water resource monitoring data, which comprises the following steps that 1) data uploaded by metering equipment are used as original data; 2) performing data comparison on the sorted original data to obtain result data; 3) and calculating and updating the result data to obtain display data. The method has the advantages of realizing water quantity data calculation of provincial-level ten-thousand-level water resource monitoring equipment, solving the cleaning and separating work of tens of millions of data, ensuring tens of thousands of equipment not to sleep again, fully playing the monitoring and collecting roles of the equipment and greatly improving the management level of water resource monitoring.

Description

Calculation method for calculating reasonable water amount aiming at water resource monitoring data
Technical Field
The invention relates to water resource monitoring, in particular to a calculation method for calculating reasonable water amount according to water resource monitoring data.
Background
The water resource monitoring equipment is electronic equipment and is installed at a water intake, and under the current condition, the phenomenon that the number of the monitoring equipment is lost and abnormal is relatively common under various complex conditions of embedded program leaks, weak moving signals, aging of electronic components, temperature, humidity, water passing (heavy rain), shading of a solar panel by grass blades, battery life, artificial damage, theft, defaulting, meter changing and the like.
These outliers, if not reasonably calculated, can ruin the outcome of the monitored data once, as one outlier can be tens of thousands of times the normal water volume. The existing water amount calculation method is to subtract the value recorded in the previous step from the final value of the data to obtain a difference value, and then the water amount is calculated by removing the negative number. This method does not substantially remove outliers. The prior art is difficult to consider under the condition of solving the above requirements of abnormal data and time.
An effective solution to the problems in the related art has not been proposed yet.
Disclosure of Invention
Aiming at the technical problems in the related art, the invention provides a calculation method for calculating the reasonable water amount according to the water resource monitoring data, which can solve the problems.
In order to achieve the technical purpose, the technical scheme of the invention is realized as follows:
a calculation method for calculating reasonable water amount aiming at water resource monitoring data is used for calculating the reasonable water amount, and comprises the following steps:
1) setting calculation initial calculation time, simply arranging data received by a center into an original data area, and carrying out technical duplicate checking; the data is divided into three areas, namely an original data area, a result data area and a display data area;
2) inserting the newly added data of the primary processing data area into an hour table of the achievement data area, carrying out technical duplicate checking, sorting the hour table data of the achievement data area, and carrying out technical duplicate checking to clear invalid data;
3) calculating the maximum value and the minimum value of the hour table data in the achievement data area in the month, deleting the maximum value and the minimum value in the month, marking the maximum value and the minimum value of the abnormal number in the original data area according to the calculation result, and marking the data with the bottom of the original data area being 0 or negative number as the invalid value of the abnormal number;
4) recalculating the sorted hour meter data of the result data area, calculating the water amount of each record, and rechecking the data in the hour meter data of the result data area;
5) summarizing the calculated hour table data of the achievement data area into the day data of the achievement data area, adding increment into the day data table of the achievement data area, updating stock into the day data table of the achievement data area, and checking technical duplication;
6) summarizing the calculated daily data of the achievement data area into monthly data of the achievement data area, adding increment into a monthly data table of the achievement data area, updating stock into the monthly data table of the achievement data area, and calculating annual accumulated water volume of the monthly data according to the monthly data of the achievement data area;
7) and inserting the calculated schedule data of the result data area into the schedule of the data display area. Increment is put into a daily data table of the display data area, stock is updated into the daily data table of the display data area, and achievement small water quantity data and bar number of large data volume are converted into column data to be stored into the daily data table of the display data area;
8) and establishing a receiving equipment list, and establishing an hour maximum water consumption rule for maintaining the equipment.
Further, setting the initial calculation time to be that the calculation time before the No. 1 and the No. 8 points of each month starts from the No. 1 of the last month, and the calculation time after the No. 8 points is more than the No. 1 of the present month; the default not explicitly noted by the algorithm at each step is calculated from the initial calculation time.
Furthermore, the technology checks the duplicate to ensure that the original data area has no repeated data and the authenticity and the integrity of the original received data are preserved.
Further, when the newly added data is inserted into the hour table of the achievement data area, the previous month data is not received any more, meanwhile, the table bottom is 0 or negative number and is not received any more, and the sending time exceeds the current time by 1 hour and is not received any more.
Furthermore, the newly added data is inserted into the hour meter of the achievement data area, and a breakpoint continuous transmission technology is adopted.
Furthermore, when data in the hour table data of the result data area is rechecked, the first record of the number of the devices cannot calculate the water amount, and is uniformly updated to 0; the water quantity with the water quantity data smaller than 0 is uniformly updated to 0; according to the hour maximum water consumption rule of the equipment, the water quantity exceeding the rule is uniformly updated to be 0.
Further, labeling an invalid value of the original data area according to abnormal calculation of hour table data of the achievement data area; if the data of the original data area is not in the result data area, marking the data as an invalid value of the original data area; data that did not participate in the calculation in the previous month of the original data region are labeled as abnormal "late value".
Further, the calculated hour table data of the achievement data area is inserted into the hour table of the data display area, the data which are removed from the hour table data of the achievement data area in the hour table of the data display area are deleted, and the water amount in the hour table of the data display area is updated according to the calculated hour table data of the achievement data area.
Further, the hourly maximum water usage rule for maintaining equipment is three times the average water usage, which is less than 1 million by 1 million.
The invention has the beneficial effects that: the water quantity data calculation of provincial-level ten-thousand-level water resource monitoring equipment is realized, the cleaning separation work of tens of millions of data is solved, tens of thousands of equipment are prevented from falling asleep, the monitoring and collecting effects of the equipment are fully exerted, and the management level of water resource monitoring is greatly improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
FIG. 1 is a flow chart of a method for calculating a reasonable water amount according to water resource monitoring data according to the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments that can be derived by one of ordinary skill in the art from the embodiments given herein are intended to be within the scope of the present invention.
As shown in fig. 1, according to the calculation method for calculating the reasonable water amount according to the water resource monitoring data in the embodiment of the present invention, the calculation method is used for calculating the reasonable water amount, and includes the following steps:
1) uploading data by metering equipment as original data;
2) performing data comparison on the sorted original data to obtain result data;
3) and calculating and updating the result data to obtain display data.
In a specific embodiment of the invention, the initial calculation time is set to be 1/8/month before the calculation time starts from 1/month before the last calculation time, and the calculation time after 8/month is more than 1/month; the default not explicitly noted by the algorithm at each step is calculated from the initial calculation time.
In a specific embodiment of the present invention, when the new data is inserted into the hour table in the achievement data area, the previous month data is no longer received, meanwhile, the table bottom is 0 or negative number and is no longer received, and the sending time exceeds the current time by 1 hour and is no longer received.
In a specific embodiment of the invention, when data in the hour table data of the achievement data area is rechecked, the first record of the number of the devices is uniformly updated to 0 because the water amount cannot be calculated; the water quantity with the water quantity data smaller than 0 is uniformly updated to 0; according to the hour maximum water consumption rule of the equipment, the water quantity exceeding the rule is uniformly updated to be 0.
In one embodiment of the present invention, the "invalid value" of the marked original data area is computed abnormally from the hour table data of the achievement data area; if the data of the original data area is not in the result data area, marking the data as an invalid value of the original data area; data that did not participate in the calculation in the previous month of the original data region are labeled as abnormal "late value".
In a specific embodiment of the present invention, the calculated hour table data of the achievement data area is inserted into the hour table of the data presentation area, the data in the hour table of the data presentation area, which has been removed from the hour table data of the achievement data area, is deleted, and the water amount in the hour table of the data presentation area is updated according to the calculated hour table data of the achievement data area.
In order to facilitate understanding of the above-described technical aspects of the present invention, the above-described technical aspects of the present invention will be described in detail below in terms of specific usage.
When the method is used specifically, the calculation method for calculating the reasonable water amount aiming at the water resource monitoring data is used for calculating the reasonable water amount, and the calculation method comprises the following steps:
1) setting calculation initial calculation time, simply arranging data received by a center into an original data area, and carrying out technical duplicate checking; the data is divided into three areas, namely an original data area, a result data area and a display data area;
2) inserting the newly added data of the primary processing data area into an hour table of the achievement data area, carrying out technical duplicate checking, sorting the hour table data of the achievement data area, and carrying out technical duplicate checking to clear invalid data;
3) calculating the maximum value and the minimum value of the hour table data in the achievement data area in the month, deleting the maximum value and the minimum value in the month, marking the maximum value and the minimum value of the abnormal number in the original data area according to the calculation result, and marking the data with the bottom of the original data area being 0 or negative number as the invalid value of the abnormal number;
4) recalculating the sorted hour meter data of the result data area, calculating the water amount of each record, and rechecking the data in the hour meter data of the result data area;
5) summarizing the calculated hour table data of the achievement data area into the day data of the achievement data area, adding increment into the day data table of the achievement data area, updating stock into the day data table of the achievement data area, and checking technical duplication;
6) summarizing the calculated daily data of the achievement data area into monthly data of the achievement data area, adding increment into a monthly data table of the achievement data area, updating stock into the monthly data table of the achievement data area, and calculating annual accumulated water volume of the monthly data according to the monthly data of the achievement data area;
7) and inserting the calculated schedule data of the result data area into the schedule of the data display area. Increment is put into a daily data table of the display data area, stock is updated into the daily data table of the display data area, and achievement small water quantity data and bar number of large data volume are converted into column data to be stored into the daily data table of the display data area;
8) and establishing a receiving equipment list, and establishing an hour maximum water consumption rule for maintaining the equipment.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (9)

1. A calculation method for calculating reasonable water amount aiming at water resource monitoring data is used for calculating the reasonable water amount, and is characterized in that the calculation method comprises the following steps:
1) setting calculation initial calculation time, simply arranging data received by a center into an original data area, and carrying out technical duplicate checking; the data is divided into three areas, namely an original data area, a result data area and a display data area;
2) inserting the newly added data of the primary processing data area into an hour table of the achievement data area, carrying out technical duplicate checking, sorting the hour table data of the achievement data area, and carrying out technical duplicate checking to clear invalid data;
3) calculating the maximum value and the minimum value of the hour table data in the achievement data area in the current month, deleting the maximum value and the minimum value in the current month, marking the maximum value and the minimum value of the abnormal constant of the original data area according to the calculation result, and marking the data with the bottom of 0 or negative number in the original data area as the invalid value of the abnormal number;
4) recalculating the sorted hour meter data of the result data area, calculating the water amount of each record, and rechecking the data in the hour meter data of the result data area;
5) summarizing the calculated hour table data of the achievement data area into the day data of the achievement data area, adding increment into the day data table of the achievement data area, updating stock into the day data table of the achievement data area, and checking technical duplication;
6) summarizing the calculated daily schedule data of the achievement data area into monthly data of the achievement data area, adding increments into a monthly data table of the achievement data area, updating the stock into the monthly data table of the achievement data area, and calculating the annual accumulated water volume of the monthly data according to the monthly data of the achievement data area;
7) increment is put into the daily data sheet of the display data area, stock is updated into the daily data sheet of the display data area, and the small achievement water quantity data and the number of the large data quantity are converted into column data to be stored into the daily data sheet of the display data area;
8) and establishing a receiving equipment list, and establishing an hour maximum water consumption rule for maintaining the equipment.
2. The method for calculating the reasonable water amount according to the water resource monitoring data as claimed in claim 1, wherein the initial calculation time is set to be 1/8/th; the default not explicitly noted by the algorithm at each step is calculated from the initial calculation time.
3. The method of claim 1, wherein the technology checks for duplication to ensure that there is no duplicate data in the original data area and to preserve the authenticity and integrity of the original received data.
4. The method as claimed in claim 1, wherein when the new data is inserted into the hour table in the achievement data area, the last month data is not received, and at the same time, the table bottom is 0 or negative and is not received, and the sending time exceeds the current time by 1 hour.
5. The method for calculating the reasonable water amount according to the water resource monitoring data as claimed in claim 4, wherein the newly added data is inserted into the hour meter of the result data area, and a breakpoint resuming technology is adopted.
6. The method for calculating the reasonable water amount according to the water resource monitoring data in claim 1, wherein when the data in the hour table data of the result data area is reviewed, the first record of the number of devices is uniformly updated to 0 because the water amount cannot be calculated; the water quantity with the water quantity data smaller than 0 is uniformly updated to 0; according to the hour maximum water consumption rule of the equipment, the water quantity exceeding the rule is uniformly updated to be 0.
7. The method according to claim 1, wherein the "invalid value" in the original data area is labeled and calculated abnormally according to the hour table data in the achievement data area; if the data of the original data area is not in the result data area, marking the data as an invalid value of the original data area; and marking the data which does not participate in calculation in the previous month of the original data area as an abnormal late value.
8. The method as claimed in claim 1, wherein the hour meter data of the result data area is inserted into the hour meter of the data display area, the data in the hour meter of the data display area, which has been removed from the hour meter data of the result data area, is deleted, and the water amount in the hour meter of the data display area is updated according to the hour meter data of the result data area.
9. The method of claim 1, wherein the maximum hourly water usage for maintaining the facility is three times the average water usage, less than 1 million by 1 million.
CN201911144983.5A 2019-11-21 2019-11-21 Calculation method for calculating reasonable water quantity aiming at water resource monitoring data Active CN110941606B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911144983.5A CN110941606B (en) 2019-11-21 2019-11-21 Calculation method for calculating reasonable water quantity aiming at water resource monitoring data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911144983.5A CN110941606B (en) 2019-11-21 2019-11-21 Calculation method for calculating reasonable water quantity aiming at water resource monitoring data

Publications (2)

Publication Number Publication Date
CN110941606A true CN110941606A (en) 2020-03-31
CN110941606B CN110941606B (en) 2023-04-25

Family

ID=69907915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911144983.5A Active CN110941606B (en) 2019-11-21 2019-11-21 Calculation method for calculating reasonable water quantity aiming at water resource monitoring data

Country Status (1)

Country Link
CN (1) CN110941606B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150286950A1 (en) * 2014-04-08 2015-10-08 Lsis Co., Ltd. Apparatus for forecasting water demand
CN106203769A (en) * 2016-06-23 2016-12-07 上海交通大学 A kind of festivals or holidays based on the time difference coefficient sky level water requirement on-line prediction method
US20170234717A1 (en) * 2014-11-21 2017-08-17 Fujitsu Limited Water amount measurement device and water amount monitoring system
CN109582836A (en) * 2018-11-08 2019-04-05 熊猫智慧水务有限公司 A kind of water measurement management system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150286950A1 (en) * 2014-04-08 2015-10-08 Lsis Co., Ltd. Apparatus for forecasting water demand
US20170234717A1 (en) * 2014-11-21 2017-08-17 Fujitsu Limited Water amount measurement device and water amount monitoring system
CN106203769A (en) * 2016-06-23 2016-12-07 上海交通大学 A kind of festivals or holidays based on the time difference coefficient sky level water requirement on-line prediction method
CN109582836A (en) * 2018-11-08 2019-04-05 熊猫智慧水务有限公司 A kind of water measurement management system

Non-Patent Citations (10)

* Cited by examiner, † Cited by third party
Title
DAVID D.HALL 等: ""Critical heat flux (CHF) for water flow in tubes—I. Compilation and assessment of world CHF data"", 《HTTPS://WWW.SCIENCEDIRECT.COM/SCIENCE/ARTICLE/PII/S001793109900191X》 *
LI ZHANSONG 等: ""Comprehensive Analysis on Calculation Iterative Methods for Natural River and Open Channel Water Curve"", 《HTTPS://IEEEXPLORE.IEEE.ORG/STAMP/STAMP.JSP?TP=&ARNUMBER=7120694》 *
YULONG GAO 等: ""An improved method for the calculation of unsaturated–saturated water flow by coupling the FEM and FDM"", 《HTTPS://WWWNATURE.53YU.COM/ARTICLES/S41598-019-51405-4》 *
哈依拉提?哈什肯别克: "不同雨量计观测降水量结果的对比及相关性分析", 《能源与节能》 *
岳胜如等: "基于多波段MODIS遥感数据的乌审旗土壤含水量监测研究", 《水土保持通报》 *
张峰等: "水资源监测异常数据模态分解-支持向量机重构方法", 《农业机械学报》 *
方海泉等: "取用水监测点的水量计算与变化趋势分析", 《系统工程理论与实践》 *
董建凡等: "南宁市2018年取用水监测数据质量评价", 《水利信息化》 *
诸葛燕等: "基于大数据的水量监测系统有效性分析", 《浙江海洋大学学报(自然科学版)》 *
马瑞婷: ""西安市黑河金盆水库入库水量计算"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Also Published As

Publication number Publication date
CN110941606B (en) 2023-04-25

Similar Documents

Publication Publication Date Title
CN112730938B (en) Electricity larceny user judging method based on electricity utilization acquisition big data
CN110288239B (en) Flood limiting water level dynamic control method and system based on self-adaptive grading pre-discharge method
CN107566910B (en) The customized distribution monitoring method of resource, storage medium, electronic equipment and system is broadcast live
CN107483981B (en) Resource Calculation monitoring distribution method, storage medium, electronic equipment and system is broadcast live
CN106940625A (en) The date storage method of intelligent electric meter
CN110059915A (en) A kind of winter wheat meteorological disaster integrated risk dynamic evaluation method and device
CN111711192B (en) Real-time line loss analysis method and system for lean management of line loss of support station area
CN105049298A (en) Method and system for monitoring cloud resource
CN116012087B (en) Electric charge settlement plan creation method based on dynamic strategy
CN116231633A (en) Method, device, equipment and storage medium for monitoring carbon emission of power distribution network
CN109684320A (en) The method and apparatus of monitoring data on-line cleaning
CN110941606A (en) Calculation method for calculating reasonable water amount aiming at water resource monitoring data
CN111401793B (en) Ecological base flow calculation method and device
CN103439758A (en) Data processing method for rain sensor
CN113037643A (en) Efficient water meter data sending method and system
JP5556418B2 (en) Power leveling control device, power leveling control method, and power leveling control program
CN116644920A (en) Intelligent power failure management method and system
CN108765140A (en) Batch service abnormality monitoring method and the first electronic equipment
CN108989088A (en) A kind of log method for uploading and communication equipment
CN108550084A (en) A method of based on history electricity charge information assessment distribution transforming drop damage potentiality
CN112052147A (en) Monitoring method, electronic device and storage medium
CN111666537B (en) Energy consumption statistical method based on table bottom value
CN110633270B (en) Multi-strategy electric meter daily freezing value automatic substitution method and device based on priority
CN113112158A (en) Method and device for processing equipment use data, storage medium and electronic device
CN107292486B (en) Power grid asset insurance expenditure measuring and calculating model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Building 10, Liandong U Valley, No. 695 Tianshan South Street, High tech Zone, Shijiazhuang City, Hebei Province, 050000

Patentee after: Hebei Hengyuan Water Technology Co.,Ltd.

Country or region after: China

Address before: 050091 No.399, Xinshi North Road, high tech Zone, Shijiazhuang City, Hebei Province

Patentee before: Hebei Hengyuan Water Technology Co.,Ltd.

Country or region before: China