CN110940792A - 一种双向倒梯形路堑边坡滑坡模型试验方法 - Google Patents
一种双向倒梯形路堑边坡滑坡模型试验方法 Download PDFInfo
- Publication number
- CN110940792A CN110940792A CN201911175765.8A CN201911175765A CN110940792A CN 110940792 A CN110940792 A CN 110940792A CN 201911175765 A CN201911175765 A CN 201911175765A CN 110940792 A CN110940792 A CN 110940792A
- Authority
- CN
- China
- Prior art keywords
- slope
- model test
- cutting
- test device
- baffle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N33/00—Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
- G01N33/24—Earth materials
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B23/00—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes
- G09B23/40—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for geology
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/23—Dune restoration or creation; Cliff stabilisation
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Chemical & Material Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Computational Mathematics (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- Food Science & Technology (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Remote Sensing (AREA)
- Paleontology (AREA)
- Algebra (AREA)
- Medicinal Chemistry (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Mathematical Physics (AREA)
- Pure & Applied Mathematics (AREA)
- Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- Theoretical Computer Science (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本发明公开了一种双向倒梯形路堑边坡滑坡模型试验方法,属于边坡工程与滑坡灾害试验领域,以解决现有模型试验装置普遍存在的因侧向摩阻过大而导致模型模拟结果失真或失误的问题。该方法包括下列步骤:模型材料采用填筑或砌筑的方式构建于模型试验装置的中后部和中下方空间内,后起后挡板,前止前挡板,下接底板,两侧由左右侧板约束,模拟自然斜坡;在自然斜坡体上采用开挖切坡的方法形成路堑和开挖边坡,开挖边坡在人工降雨或地下水模拟等因素作用下诱发路堑边坡滑坡,形成滑坡和滑床。本发明解决了一般模型试件因侧向约束导致其变形和破坏失真的问题,其侧向摩阻因断面扩容而有效消减,制做简单,操作方便,效果显著,结果可靠,成本低廉。
Description
技术领域
本发明属于边坡工程与滑坡灾害试验领域,尤其涉及一种路堑边坡滑坡模型试验装置及方法。
背景技术
我国是一个多山国家,山地灾害十分发育,随着道路工程向山区拓展和延伸,深挖高填不可避免,特别是因路堑开挖而产生的滑坡灾害尤为突出。路堑边坡滑坡的形成机理有其必然的普遍性和复杂性,为了再现其滑坡发生的现象与规律,模型试验方法是其最为有效的研究手段之一。
滑坡模型试验是一种典型的地质力学模型试验,是基于一定的相似原理对滑坡灾害现象进行缩尺研究的一种物理模拟方法。滑坡模型试验有槽架式模型试验、底摩擦模型试验、现场足尺模型试验、土工离心模型试验等,其中槽架式模型试验又以二维平面应变模型试验较为普遍。由于二维平面应变模型试验需要对模型模拟材料进行侧向约束,存在侧向摩阻影响坡体变形和破坏的边界效应,如何减少侧向摩阻是二维平面应变模型试验的关键技术之一。
现有模型试验装置一般采用光滑、润滑或者滚动的侧向挡板以降低摩阻,但其降阻效果对于低强度、高粘度模拟材料不甚明显,特别是对于路堑开挖卸荷回弹扩容和滑坡向前滑移变形和破坏扩容的情况,侧向压应力显著增大,侧向摩阻也相应增大,其较大的侧向摩阻将导致模型模拟结果失真或失误,当前侧向摩阻已成为模型试验装置设计的一个技术瓶颈。因此,如何有效降低模型槽架的侧向摩阻是路堑边坡滑坡模型试验需要优先解决的问题之一。
发明内容
本发明的目的是提出一种双向倒梯形路堑边坡滑坡模型试验方法,以解决现有模型试验装置普遍存在的因侧向摩阻过大而导致模型模拟结果失真或失误的问题。
本发明所采取的技术方案是: 一种双向倒梯形路堑边坡滑坡模型试验方法,包括下列步骤:模型材料采用填筑或砌筑的方式构建于模型试验装置的中后部和中下方空间内,后起后挡板,前止前挡板,下接底板,两侧由左右侧板约束,模拟自然斜坡;在自然斜坡体上采用开挖切坡的方法形成路堑和开挖边坡,开挖边坡在人工降雨或地下水模拟等因素作用下诱发路堑边坡滑坡,形成滑坡和滑床。
进一步的,所述模型试验装置,包括呈六面体的槽架,槽架上设有左侧板、右侧板、后挡板、底板,槽架的后面为矩形,槽架的正面、底面、顶面均为倒梯形,槽架的两个侧面均为梯形。
进一步的,所述槽架的正面设有前挡板。
进一步的,后挡板顶部宽度大于后挡板底部宽度,前挡板顶部宽度大于前挡板底部宽度,前挡板底部宽度大于后挡板底部宽度,后挡板顶底宽差值等于前部顶底宽差值。
本发明一种超低侧向摩阻滑坡模型试验装置,即力图使侧向摩阻力降为零。本发明基本上解决了一般模型试件因侧向约束导致其变形和破坏失真的问题,其侧向摩阻因断面扩容而有效消减,制做简单,操作方便,效果显著,结果可靠,成本低廉。
附图说明
图1为一种双向倒梯形路堑边坡滑坡模型试验装置的结构示意图。
图2为一种双向倒梯形路堑边坡滑坡模型试验装置的正面图;
图3为一种双向倒梯形路堑边坡滑坡模型试验装置的俯视图。
图中:P1-左侧板;P2-右侧板;P3-后挡板;P4-前挡板;P5-底板;C1-开挖边坡;C2-路面;C3-自然斜坡;S1-滑体;S2-滑床;B1-后挡板顶部宽度;B2-后挡板底部宽度;B3-前挡板顶部宽度; B4:前挡板底部宽度。
具体实施方式
下面结合附图对本发明做进一步详细的说明。
实施例1
模型材料可以采用填筑或砌筑的方式构建于模型试验装置内的中后部之中下方空间,后起后挡板,前止前挡板,下接底板,两侧由左右侧板约束,模拟自然斜坡(C3)。
在自然斜坡体上采用人工开挖切坡的方法形成路堑(C2)和开挖边坡(C1),因开挖边坡在人工降雨或地下水模拟等因素作用下诱发路堑边坡滑坡,形成滑坡(S1)和滑床(S2)。
如图所示,上述模型试验装置,包括呈六面体的槽架,槽架上设有左侧板(P1)、右侧板(P2)、后挡板(P3)、底板(P5),槽架的后面为矩形,槽架的正面、底面、顶面均为倒梯形,槽架的两个侧面均为梯形。
后挡板顶部宽度(B1)大于后挡板底部宽度(B2),前挡板顶部宽度(B3)大于前挡板底部宽度(B4),前挡板底部宽度(B4)大于后挡板底部宽度(B2),而且为保证侧面为平面,后挡板顶底宽差值等于前部顶底宽差值。即:B1>B2,B3>B4,B4>B2,且B1-B2=B3-B4。
顶面设计为敞开,正面设计为敞开或封闭,正面封闭或半封闭时即设有前挡板(P4)。槽架底面为等腰梯形,其上设置有底板(P5).槽架平面(俯视图)和立面(正面图)均为倒梯形,即双向倒梯形。立面倒梯形(正面图)将显著减少路堑开挖卸荷向上回弹扩容所产生的侧向摩阻力,平面倒梯形(俯视图)将显著减少路堑边坡滑坡向前滑移扩容所产生的侧向摩阻力,模型材料与侧板之间还可以铺设单层微塑滚珠等以进一步消减侧向摩阻,使变形块体的侧向摩阻力几乎接近于零。
槽架与侧板活动连接,采用现有技术球铰或限位拉杆连接固定,可以控制侧板张开度。槽架与后挡板用螺栓、螺母和垫片紧固。正面槽架与前挡板用螺栓、螺母和垫片紧固。底面槽架与底板用螺栓、螺母和垫片紧固。
由于路堑(C2)开挖的卸荷作用,开挖边坡(C1)岩土体首先将存在向上方和向临空即前方的回弹变形和扩容,边坡岩土体扩容势必增大侧向压应力,而其向上和向前的回弹变形将相应地在侧向界面上产生增大的摩擦阻力。特别是,在大气降雨、地下水、地震等诱发因素作用下造成边坡失稳产生滑坡(S1),其滑动变形和破坏块体将产生显著的扩容,相应部位侧向压应力显著增大,对于浇筑、夯填或者粘性材料的滑坡相似材料模型,其滑体与侧面板的摩擦系数的降低方法与效果均是很有限的,因而其侧向摩阻力也将显著增大。
由于本发明模型槽架平面(俯视图)和立面(正面图)均设计为倒梯形,即向上和向前均为渐变扩大开口,在其向上和向前两个方向相应的断面都是逐渐扩大的,以满足或适应边坡岩土体变形或破坏扩容,相应地保持侧向压应力不变甚至降低为零,从而可以实现侧向超低摩阻甚至零摩阻。
《滑坡模型试验》
滑坡模型试验是一种典型的地质力学模型试验,是基于一定的相似原理对滑坡灾害现象进行缩尺研究的一种物理模拟方法。在槽架式模型试验中,受模型尺寸、侧向摩阻力、回弹扩容等众多因素的影响,一些复杂的物理现象无法按相似要求进行模拟,特别是路堑边坡模型开挖所产生的回弹扩容摩阻力和前滑移扩容所产生的侧向摩阻力等影响,可能会使模拟结果失真或失误。同样是槽架式模型试验,双向倒梯形模型试验装置比起普通框架式边坡模型装置将显著减少回弹扩容和边坡向前滑移扩容所产生的侧向摩阻力,更有利于边坡变形破坏现象在物理模型上的试验。试验方法如下:
步骤1:设计所需尺寸的双向倒梯形模型箱,进行力学验算,选取符合强度要求的钢骨架、钢板和玻璃板,制作模型箱。
步骤2:根据模型箱尺寸计算试验材料用量,并按试验目的,准备模型试验相似材料。
步骤3:根据实际路堑边坡滑坡坡体结构,铺设相应的岩土体材料,制作边坡模型,铺设岩土体材料时可埋设所需传感器(如应力、应变或水传感器),对模拟过程中的坡体应力、位移、岩土体含水率等进行监测。
步骤4:视要求对边坡模型进行加工或试验,如进行开挖-支护、堆载、降雨或干湿循环等处理,观察记录路堑边坡滑坡的变形破坏特征。
步骤5:根据模型试验所得数据,对路堑边坡滑坡的现象和规律进行分析,与现场实际情况进行对比,研究总结其灾变机理、过程和模式。有条件下,利用数值软件,对试验结果进行反演分析计算,进一步研究路堑边坡卸荷松弛区、剪应变等结果。
Claims (4)
1.一种双向倒梯形路堑边坡滑坡模型试验方法,其特征在于包括下列步骤:模型材料采用填筑或砌筑的方式构建于模型试验装置的中后部和中下方空间内,后起后挡板,前止前挡板,下接底板,两侧由左右侧板约束,模拟自然斜坡;在自然斜坡体上采用开挖切坡的方法形成路堑和开挖边坡,开挖边坡在人工降雨或地下水模拟等因素作用下诱发路堑边坡滑坡,形成滑坡和滑床。
2.根据权利要求1所述的一种双向倒梯形路堑边坡滑坡模型试验方法,其特征在于:所述模型试验装置,包括呈六面体的槽架,槽架上设有左侧板、右侧板、后挡板、底板,槽架的后面为矩形,槽架的正面、底面、顶面均为倒梯形,槽架的两个侧面均为梯形。
3.根据权利要求2所述的一种双向倒梯形路堑边坡滑坡模型试验方法,其特征在于:所述槽架的正面设有前挡板。
4.根据权利要求2或3所述的一种双向倒梯形路堑边坡滑坡模型试验方法,其特征在于:后挡板顶部宽度大于后挡板底部宽度,前挡板顶部宽度大于前挡板底部宽度,前挡板底部宽度大于后挡板底部宽度,后挡板顶底宽差值等于前部顶底宽差值。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911175765.8A CN110940792B (zh) | 2019-11-26 | 2019-11-26 | 一种双向倒梯形路堑边坡滑坡模型试验方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911175765.8A CN110940792B (zh) | 2019-11-26 | 2019-11-26 | 一种双向倒梯形路堑边坡滑坡模型试验方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110940792A true CN110940792A (zh) | 2020-03-31 |
CN110940792B CN110940792B (zh) | 2023-01-06 |
Family
ID=69908952
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911175765.8A Active CN110940792B (zh) | 2019-11-26 | 2019-11-26 | 一种双向倒梯形路堑边坡滑坡模型试验方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110940792B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111627279A (zh) * | 2020-05-19 | 2020-09-04 | 中国安全生产科学研究院 | 一种模拟滑坡泥石流灾害链全过程的试验系统 |
Citations (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004177358A (ja) * | 2002-11-29 | 2004-06-24 | National Institute Of Advanced Industrial & Technology | 地質構造及び水理のモデリング装置 |
CN201148619Y (zh) * | 2008-01-11 | 2008-11-12 | 肖世国 | 异型纵墙抗滑结构 |
WO2010005258A2 (ko) * | 2008-07-10 | 2010-01-14 | Lee Dong Hyuk | 산사태 모의 실험장치 |
CN102519790A (zh) * | 2011-12-07 | 2012-06-27 | 上海大学 | 确定泥水盾构隧道开挖面支护压力的方法 |
KR20120073406A (ko) * | 2010-12-27 | 2012-07-05 | 상지대학교산학협력단 | 인공강우 장치를 이용한 산사태 모형토조 시험기 |
CN103954740A (zh) * | 2014-04-11 | 2014-07-30 | 中国科学院武汉岩土力学研究所 | 一种膨胀土边坡吸湿变形模型试验方法及系统 |
CN204287177U (zh) * | 2014-12-18 | 2015-04-22 | 山西省交通科学研究院 | 一种土质边坡模型试验开挖装置 |
CN204287176U (zh) * | 2014-12-18 | 2015-04-22 | 山西省交通科学研究院 | 一种基于充气气囊的边坡模型试验开挖装置 |
CN104677739A (zh) * | 2015-03-04 | 2015-06-03 | 东北大学 | 一种二元结构土质边坡破坏的三维模型试验平台装置 |
CN104977147A (zh) * | 2015-07-13 | 2015-10-14 | 昆明理工大学 | 一种无限库水域自由边界的模拟装置 |
CN205102995U (zh) * | 2015-10-31 | 2016-03-23 | 长安大学 | 振动载荷作用下边坡锚固系统动力响应试验用模型箱 |
CN105651969A (zh) * | 2016-03-09 | 2016-06-08 | 中国工程物理研究院总体工程研究所 | 多功能土工试验模型箱 |
CN206146925U (zh) * | 2016-10-24 | 2017-05-03 | 华侨大学 | 一种斜向滑动断层模拟装置 |
CN106918486A (zh) * | 2017-04-18 | 2017-07-04 | 西安长庆科技工程有限责任公司 | 现场人工降雨边坡试验中隔渗和减阻的侧向边界实现方法 |
CN107121252A (zh) * | 2017-06-20 | 2017-09-01 | 重庆大学 | 一种适用于岩、土边坡的振动台试验方法及模型箱 |
CN107687968A (zh) * | 2017-05-15 | 2018-02-13 | 长安大学 | 一种黄土塬边滑坡物理模型 |
CN107830980A (zh) * | 2017-10-24 | 2018-03-23 | 浙江大学 | 一种空心变截面单向剪切模型箱 |
CN108333063A (zh) * | 2018-04-09 | 2018-07-27 | 三峡大学 | 支挡结构冲击荷载模拟试验装置及试验方法 |
CN108982814A (zh) * | 2018-08-03 | 2018-12-11 | 深圳大学 | 多渗流条件下边坡稳定性机理研究通用模型试验系统 |
US20190113496A1 (en) * | 2018-11-26 | 2019-04-18 | Huiming Tang | Landslide experimental device and experimental method for simulating constant seepage flow |
CN110244026A (zh) * | 2019-07-31 | 2019-09-17 | 长江师范学院 | 滑坡模型试验系统 |
CN110426458A (zh) * | 2019-07-05 | 2019-11-08 | 中国矿业大学(北京) | 一种利用弹性波波速预测滑坡的新方法及监测系统 |
-
2019
- 2019-11-26 CN CN201911175765.8A patent/CN110940792B/zh active Active
Patent Citations (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004177358A (ja) * | 2002-11-29 | 2004-06-24 | National Institute Of Advanced Industrial & Technology | 地質構造及び水理のモデリング装置 |
CN201148619Y (zh) * | 2008-01-11 | 2008-11-12 | 肖世国 | 异型纵墙抗滑结构 |
WO2010005258A2 (ko) * | 2008-07-10 | 2010-01-14 | Lee Dong Hyuk | 산사태 모의 실험장치 |
KR20120073406A (ko) * | 2010-12-27 | 2012-07-05 | 상지대학교산학협력단 | 인공강우 장치를 이용한 산사태 모형토조 시험기 |
CN102519790A (zh) * | 2011-12-07 | 2012-06-27 | 上海大学 | 确定泥水盾构隧道开挖面支护压力的方法 |
CN103954740A (zh) * | 2014-04-11 | 2014-07-30 | 中国科学院武汉岩土力学研究所 | 一种膨胀土边坡吸湿变形模型试验方法及系统 |
CN204287177U (zh) * | 2014-12-18 | 2015-04-22 | 山西省交通科学研究院 | 一种土质边坡模型试验开挖装置 |
CN204287176U (zh) * | 2014-12-18 | 2015-04-22 | 山西省交通科学研究院 | 一种基于充气气囊的边坡模型试验开挖装置 |
CN104677739A (zh) * | 2015-03-04 | 2015-06-03 | 东北大学 | 一种二元结构土质边坡破坏的三维模型试验平台装置 |
CN104977147A (zh) * | 2015-07-13 | 2015-10-14 | 昆明理工大学 | 一种无限库水域自由边界的模拟装置 |
CN205102995U (zh) * | 2015-10-31 | 2016-03-23 | 长安大学 | 振动载荷作用下边坡锚固系统动力响应试验用模型箱 |
CN105651969A (zh) * | 2016-03-09 | 2016-06-08 | 中国工程物理研究院总体工程研究所 | 多功能土工试验模型箱 |
CN206146925U (zh) * | 2016-10-24 | 2017-05-03 | 华侨大学 | 一种斜向滑动断层模拟装置 |
CN106918486A (zh) * | 2017-04-18 | 2017-07-04 | 西安长庆科技工程有限责任公司 | 现场人工降雨边坡试验中隔渗和减阻的侧向边界实现方法 |
CN107687968A (zh) * | 2017-05-15 | 2018-02-13 | 长安大学 | 一种黄土塬边滑坡物理模型 |
CN107121252A (zh) * | 2017-06-20 | 2017-09-01 | 重庆大学 | 一种适用于岩、土边坡的振动台试验方法及模型箱 |
CN107830980A (zh) * | 2017-10-24 | 2018-03-23 | 浙江大学 | 一种空心变截面单向剪切模型箱 |
CN108333063A (zh) * | 2018-04-09 | 2018-07-27 | 三峡大学 | 支挡结构冲击荷载模拟试验装置及试验方法 |
CN108982814A (zh) * | 2018-08-03 | 2018-12-11 | 深圳大学 | 多渗流条件下边坡稳定性机理研究通用模型试验系统 |
US20190113496A1 (en) * | 2018-11-26 | 2019-04-18 | Huiming Tang | Landslide experimental device and experimental method for simulating constant seepage flow |
CN110426458A (zh) * | 2019-07-05 | 2019-11-08 | 中国矿业大学(北京) | 一种利用弹性波波速预测滑坡的新方法及监测系统 |
CN110244026A (zh) * | 2019-07-31 | 2019-09-17 | 长江师范学院 | 滑坡模型试验系统 |
Non-Patent Citations (6)
Title |
---|
MILLEDGE, DAVID G.等: "A multidimensional stability model for predicting shallow landslide size and shape across landscapes", 《JOURNAL OF GEOPHYSICAL RESEARCH-EARTH SURFACE 》 * |
俞晓等: "抗滑桩截面尺寸和桩侧摩阻对边坡稳定性影响的数值分析", 《武汉理工大学学报》 * |
徐光明等: "离心模型中的粒径效应和边界效应研究", 《岩土工程学报》 * |
袁从华等: "坡积松散体稳定性模型试验研究", 《岩土力学》 * |
陈伟等: "人工降雨作用下黄土边坡的室内模型试验研究", 《中国农村水利水电》 * |
黄井武等: "路堑边坡施工过程离心模型试验及数值模拟研究", 《岩土力学》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111627279A (zh) * | 2020-05-19 | 2020-09-04 | 中国安全生产科学研究院 | 一种模拟滑坡泥石流灾害链全过程的试验系统 |
Also Published As
Publication number | Publication date |
---|---|
CN110940792B (zh) | 2023-01-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ngo et al. | Modelling geogrid-reinforced railway ballast using the discrete element method | |
Chawla et al. | Reinforcement and mud-pumping benefits of geosynthetics in railway tracks: Numerical analysis | |
Sharma et al. | Study and remedy of Kotropi landslide in Himachal Pradesh, India | |
Indraratna et al. | Implications of ballast breakage on ballasted railway track based on numerical modelling | |
Nagahara et al. | FEM analysis of high airport embankment with horizontal drains | |
Parsa-Pajouh et al. | Trial embankment analysis to predict smear zone characteristics induced by prefabricated vertical drain installation | |
Turan et al. | Investigation of induced trench method using a full scale test embankment | |
CN110940792B (zh) | 一种双向倒梯形路堑边坡滑坡模型试验方法 | |
Lazorenko et al. | Failure analysis of widened railway embankment with different reinforcing measures under heavy axle loads: A comparative FEM study | |
Vibha et al. | Performance of geosynthetic reinforced MSE walls with marginal backfills at the onset of rainfall infiltration | |
Berg et al. | Case history on failure of a 67 M tall reinforced soil slope | |
Vadavadagi et al. | Effect of rail axle load on geosynthetic reinforced back-to-back mechanically stabilized earth walls: Experimental and numerical studies | |
Wang et al. | Effect of particle breakage-induced frictional weakening on the dynamics of landslides | |
Ma et al. | An improved nonlinear settlement calculation method for soft clay considering structural characteristics | |
Yildiz et al. | Numerical modelling of Haarajoki test embankment on soft clays with and without PVDs | |
Yildiz | Numerical analyses of embankments on PVD improved soft clays | |
Li et al. | Tunnel bottom cavity laws of heavy-haul railway tunnel under train load and groundwater in weak surrounding rock condition | |
Liu et al. | Experimental investigation of geosynthetic-reinforced pile-supported composite foundations under cyclic loading | |
Eslami et al. | Health monitoring and dynamic analysis of an earth-fill dam at the stage of first impounding: case study—Siahoo dam of Iran | |
CN211453615U (zh) | 一种双向倒梯形路堑边坡滑坡模型试验装置 | |
Cao et al. | Investigation of air bulging beneath geomembranes used as a liner for the datun reservoir | |
Jiang et al. | Numerical Analyses of Erosion in Sand-Gravel Mixtures Caused by Buried Defective Pipeline under Intense Rainfall | |
Li et al. | Vertical earth pressure design for high-filled cut-and-cover tunnels | |
Li et al. | Influence of Structural Shape on Earth Pressure for High‐Filled Cut‐and‐Cover Tunnel with and without Load Reduction Based on Discrete Element Method | |
Yang et al. | Coupled hydro-mechanical analyses of a multi-tier geosynthetic reinforced soil slope subject to rainfall infiltration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |