CN110879188B - Movable rapid coal and rock permeability measuring instrument - Google Patents

Movable rapid coal and rock permeability measuring instrument Download PDF

Info

Publication number
CN110879188B
CN110879188B CN201911188089.8A CN201911188089A CN110879188B CN 110879188 B CN110879188 B CN 110879188B CN 201911188089 A CN201911188089 A CN 201911188089A CN 110879188 B CN110879188 B CN 110879188B
Authority
CN
China
Prior art keywords
packer
pressure sensor
pipeline
gas injection
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911188089.8A
Other languages
Chinese (zh)
Other versions
CN110879188A (en
Inventor
李秉芮
井上雅弘
满天雷
杨满征
李书波
王伟
陈凤梅
刘娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201911188089.8A priority Critical patent/CN110879188B/en
Publication of CN110879188A publication Critical patent/CN110879188A/en
Priority to PCT/CN2020/083005 priority patent/WO2021103372A1/en
Application granted granted Critical
Publication of CN110879188B publication Critical patent/CN110879188B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N7/00Analysing materials by measuring the pressure or volume of a gas or vapour
    • G01N7/10Analysing materials by measuring the pressure or volume of a gas or vapour by allowing diffusion of components through a porous wall and measuring a pressure or volume difference
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N15/082Investigating permeability by forcing a fluid through a sample
    • G01N15/0826Investigating permeability by forcing a fluid through a sample and measuring fluid flow rate, i.e. permeation rate or pressure change

Landscapes

  • Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Dispersion Chemistry (AREA)
  • Fluid Mechanics (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention provides a mobile rapid coal and rock permeability measuring instrument, and belongs to the technical field of coal and rock permeability measurement. The movable rapid coal and rock permeability measuring instrument comprises a support sleeve, a left main packer, a right main packer, a left secondary packer, a right secondary packer, a first high-pressure gas cylinder, a second high-pressure gas cylinder, a data recorder and the like. The invention has the beneficial effects that: the material can be repeatedly used, and the service life is long; the measurement operation is simple, multipoint and rapid measurement can be implemented in one drill hole, the measurement time is generally 10-30 minutes, the measurement time is short, the switching of the measurement points can be realized only by deflating each packer through an exhaust valve, the switching speed of the measurement points is high, the air tightness between the packers and the inner wall of the drill hole is detected in real time in the measurement process, the accuracy of measurement data is ensured, and the intensive, rapid and accurate measurement of the coal bed air permeability coefficient is realized.

Description

Movable rapid coal and rock permeability measuring instrument
Technical Field
The invention relates to the technical field of coal rock permeability measurement, in particular to a mobile rapid coal rock permeability measuring instrument.
Background
The coal bed permeability coefficient is a numerical index reflecting the difficulty of flowing of gas in a coal bed, is an important parameter for gas drainage design, gas flow simulation analysis and measurement of coal and gas outburst risk, and is also the most direct technical index for evaluating the permeability increasing effect. There are laboratory and in situ (on site) measurements of coal bed permeability. Because of the influence of the crack distribution, stress, moisture, temperature and sampling, processing and analyzing processes in the coal body, the correlation between the air permeability coefficient of the coal sample obtained in a laboratory and the air permeability coefficient of the original coal bed is poor, the result of the laboratory measurement is usually used as a substitute for field measurement for model verification and the like, and the result of the in-situ measurement is used as the actually applied air permeability coefficient of the coal bed.
Along with the diversification of the application of the coal bed air permeability in the fields of gas disaster prediction and prevention, coal bed gas development and the like, the demand for quickly and accurately measuring the coal bed air permeability coefficient is more and more, in the past, the air permeability coefficient of one point is used for representing the air permeability of one region or one coal bed, and the air permeability distribution needs to be measured by the current accurate evaluation of the effects of drainage, outburst elimination, displacement and the like, obviously, the traditional measuring method can not meet the requirement, and the main performance is as follows: (1) the measuring efficiency is low, and only one point can be measured by one drilling hole; (2) the determination time is long, and generally more than three weeks are needed; (3) the method of rapid determination and its theoretical support are lacking.
Disclosure of Invention
The invention aims to provide a mobile rapid coal rock permeability measuring instrument, which can realize the intensive, rapid and accurate measurement of the coal bed permeability coefficient of coal rock.
The invention provides a mobile rapid coal-rock permeability measuring instrument which comprises a support sleeve, a left main packer, a right main packer, a left secondary packer, a right secondary packer, a first high-pressure gas cylinder, a second high-pressure gas cylinder and a data recorder, wherein the support sleeve is fixedly connected with the left main packer;
a left main packer and a right main packer are arranged on the supporting sleeve, the left main packer and the right main packer are arranged around the supporting sleeve, and a space is reserved between the left main packer and the right main packer;
a left secondary packer is arranged on the supporting sleeve outside the left main packer, a right secondary packer is arranged on the supporting sleeve outside the right main packer, the left secondary packer and the right secondary packer are arranged around the supporting sleeve, a space is reserved between the left secondary packer and the left main packer, and a space is reserved between the right secondary packer and the right main packer;
the first high-pressure gas cylinder is respectively connected with a left secondary packer, a left main packer, a right main packer and a right secondary packer through a gas injection pipeline, a first valve is arranged on the gas injection pipeline, a first pressure gauge is arranged on the gas injection pipeline and on the outer side of the first valve, a gas exhaust pipeline is connected on the gas injection pipeline and on the inner side of the first valve, and a gas exhaust valve is arranged on the gas exhaust pipeline;
the second high-pressure gas cylinder is connected with one end of the measuring pipeline, the other end of the measuring pipeline is positioned between the left main packer and the right main packer, and a second pressure gauge and a second valve are arranged on the measuring pipeline;
a first pressure sensor is arranged on the gas injection pipeline and on the inner side of the first valve, a second pressure sensor is arranged between the left secondary packer and the left main packer, a third pressure sensor is arranged between the right secondary packer and the right main packer, a fourth pressure sensor is arranged between the left main packer and the right main packer, and the data recorder is respectively in signal connection with the first pressure sensor, the second pressure sensor, the third pressure sensor and the fourth pressure sensor.
Further, each packer is provided as an air bag, the air bag comprises an inner air bag and an outer air bag which are arranged in a stacked mode from inside to outside, the inner air bag is arranged around the support sleeve, and the outer air bag is arranged around the inner air bag.
Further, the inner bladder is made of material a and the outer bladder is made of material B, the hardness of material a being greater than the hardness of material B.
Further, the gas injection pipeline and the measuring pipeline are both positioned inside the supporting sleeve.
Furthermore, the gas injection pipeline is respectively connected with a first gas injection branch pipeline, a second gas injection branch pipeline, a third gas injection branch pipeline and a fourth gas injection branch pipeline, each gas injection branch pipeline is positioned inside the support sleeve, the support sleeve is provided with a gas injection hole at the position surrounded by each packer, and the tail end of each gas injection branch pipeline is connected with the gas injection hole; the position of the support sleeve between the left main packer and the right main packer is provided with a measuring hole, and the other end of the measuring pipeline is connected with the measuring hole.
Furthermore, the data recorder is respectively connected with the first pressure sensor, the second pressure sensor, the third pressure sensor and the fourth pressure sensor through signal cables, and the signal cables connected with the second pressure sensor, the third pressure sensor and the fourth pressure sensor are positioned in the supporting sleeve.
Furthermore, sensor detection holes are formed in the positions of the supporting sleeve between the left secondary packer and the left main packer, the positions of the right secondary packer and the right main packer and the positions of the left main packer and the right main packer, the second pressure sensor, the third pressure sensor and the fourth pressure sensor are assembled in the sensor detection holes, and the detection parts of the second pressure sensor, the third pressure sensor and the fourth pressure sensor are located outside the supporting sleeve.
Furthermore, the mobile rapid coal and rock permeability measuring instrument further comprises a guide rod, and the guide rod is connected with the support sleeve.
Further, the data recorder is a computer.
Further, the high-pressure gas filled in the first high-pressure gas cylinder and the second high-pressure gas cylinder is nitrogen.
Compared with the prior art, the mobile rapid coal and rock permeability measuring instrument has the following characteristics and advantages:
the mobile rapid coal and rock permeability measuring instrument can be repeatedly used, and has long service life; the measurement operation is simple, multipoint and rapid measurement can be implemented in one drill hole, the measurement time is generally 10-30 minutes, the measurement time is short, the switching of the measurement points can be realized only by deflating each packer through an exhaust valve, the switching speed of the measurement points is high, the air tightness between the packers and the inner wall of the drill hole is detected in real time in the measurement process, the accuracy of measurement data is ensured, and the intensive, rapid and accurate measurement of the coal bed air permeability coefficient is realized.
The features and advantages of the present invention will become more apparent from the detailed description of the invention when taken in conjunction with the drawings.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic structural diagram of a mobile rapid coal-rock permeability measuring instrument according to an embodiment;
FIG. 2 is a cross-sectional view taken along line C-C of FIG. 1;
FIG. 3 is a schematic structural diagram of an packer in the mobile rapid coal-rock permeability measuring apparatus according to the embodiment;
FIG. 4 is a graph of pressure versus time measured in an enclosed space.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, a mobile rapid coal-rock permeability measuring instrument according to the present invention will be described in detail with reference to the accompanying drawings.
In the description of the present invention, it should be noted that the terms "upper", "lower", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
As shown in fig. 1 to fig. 3, the present embodiment provides a mobile fast coal rock permeability measuring instrument, which includes a support sleeve 1, a left main packer 21, a right main packer 22, a left sub-packer 23, a right sub-packer 24, a first high pressure gas cylinder 31, a second high pressure gas cylinder 32, a data recorder 4, and a guide rod.
The guide rod is connected with the support sleeve 1, and the support sleeve 1 and each packer on the support sleeve are conveyed to a set position in the drill hole through the guide rod.
A left main packer 21 and a right main packer 22 are arranged in the middle of the support casing 1, the left main packer 21 and the right main packer 22 are arranged around the support casing 1, and a distance is reserved between the left main packer 21 and the right main packer 22.
The high-pressure gas filled in the first high-pressure gas cylinder 31 and the second high-pressure gas cylinder 32 is nitrogen gas which is nontoxic and harmless.
The high-pressure gas in the first high-pressure gas cylinder 31 inflates and expands the left main packer 21 and the right main packer 22 through the gas injection pipeline 41, and the expanded left main packer 21 and the expanded right main packer 22 are tightly attached to the drilled hole. The left main packer 21, the right main packer 22, the outer wall of the support sleeve 1 and the inner wall of the borehole jointly enclose a measurement enclosed space.
A left secondary packer 23 is arranged on the supporting sleeve 1 on the outer side of the left main packer 21, a right secondary packer 24 is arranged on the supporting sleeve 1 on the outer side of the right main packer 22, and the left secondary packer 23 and the right secondary packer 24 are arranged around the supporting sleeve 1. A space is left between the left secondary packer 23 and the left main packer 21, and a space is left between the right secondary packer 24 and the right main packer 22.
The high-pressure gas in the first high-pressure gas cylinder 31 inflates and expands the left secondary packer 23 through the gas injection pipeline 41, and the expanded left secondary packer 23 and the left main packer 21 are tightly attached to the drilled hole. And a left detection closed space is formed by the left secondary packer 23, the left main packer 21, the outer wall of the support sleeve 1 and the inner wall of the borehole.
The high-pressure gas in the first high-pressure gas cylinder 31 inflates and expands the right secondary packer 24 through the gas injection pipeline 41, and the expanded right secondary packer 24 and the right main packer 22 are tightly attached to the drilled hole. And the right secondary packer 24, the right main packer 22, the outer wall of the support sleeve 1 and the inner wall of the borehole jointly form a right detection closed space.
The first high-pressure gas cylinder 31 is connected to the left sub-packer 23, the left main packer 21, the right main packer 22, and the right sub-packer 24, respectively, via a gas injection line 41. The gas injection pipeline 41 is provided with a first valve 51, and the gas injection pipeline 41 is provided with a first pressure gauge 61 outside the first valve 51. Based on the pressure reading from the first pressure gauge 61, the operator controls the rate of gas injection into the packer via the first valve 51.
An exhaust line 43 is connected to the gas injection line 41 inside the first valve 51, and an exhaust valve 53 is provided in the exhaust line 43. The high-pressure gas in each packer can be discharged through the discharge line 43 through the discharge valve 53 to realize the switching of the measurement point.
The second high-pressure gas cylinder 32 is connected with one end of a measuring pipeline 42, the other end of the measuring pipeline 42 is positioned between the left main packer 21 and the right main packer 22, and a second pressure gauge 62 and a second valve 52 are arranged on the measuring pipeline 42. The high-pressure gas in the second high-pressure gas cylinder 32 is injected into the measurement closed space through the measurement line 42. Based on the pressure reading from the second pressure gauge 62, the operator controls the rate of gas injection into the measurement enclosure through the second valve 52.
The packers (the left main packer 21, the right main packer 22, the left sub packer 23 and the right sub packer 24) are provided as air bags, the air bags comprise an inner air bag A1 and an outer air bag A2 which are arranged in a stacked manner from inside to outside, the inner air bag A1 is arranged around the support sleeve 1, and the outer air bag A2 is arranged around the inner air bag A1. Wherein the inner bladder A1 is made of material A and the outer bladder A2 is made of material B, the hardness of material A being greater than the hardness of material B.
The packer adopts the air bag, and compared with a water bag, the air bag has high expansion and contraction speed, and the measurement efficiency is improved. The injected gas is nitrogen which is nontoxic and harmless gas, and the safety of measurement construction is ensured. The packer adopts a double-layer structure, the hardness of the inner air bag A1 is high, so that high-pressure gas can be borne, the set shape of the air bag can be kept, the hardness of the outer air bag A2 is low, and when coal rock particles exist on the uneven inner wall of a drill hole, the outer air bag A2 deforms to wrap the coal rock particles, so that the outer air bag A2 is tightly attached to the inner wall of the drill hole, and the air tightness between the air bag and the inner wall of the drill hole is improved.
In this embodiment, the gas injection pipeline 41 and the measurement pipeline 42 are both located inside the support sleeve 1, so as to prevent the gas injection pipeline 41 and the measurement pipeline 42 from being damaged during the measurement construction process. The gas injection pipeline 41 is connected to a first gas injection branch pipeline 411, a second gas injection branch pipeline 412, a third gas injection branch pipeline 413 and a fourth gas injection branch pipeline 414, respectively. Each gas injection branch pipe (the first gas injection branch pipe 411, the second gas injection branch pipe 412, the third gas injection branch pipe 413, and the fourth gas injection branch pipe 414) is located inside the support sleeve 1, so as to prevent each gas injection branch pipe from being damaged during the measurement construction process. The support sleeve 1 is provided with gas injection holes at the positions surrounded by the packers (a left main packer 21, a right main packer 22, a left secondary packer 23 and a right secondary packer 24), and the tail end of the gas injection branch pipeline is connected with the gas injection holes. Specifically, the end of the first gas injection branch pipe 411 is connected to the gas injection hole at the position of the left main packer 21, the end of the second gas injection branch pipe 412 is connected to the right main packer 22, the end of the third gas injection branch pipe 413 is connected to the left sub-packer 23, and the end of the fourth gas injection branch pipe 414 is connected to the right sub-packer 24. The support casing 1 is provided with a measuring hole at a position between the left main packer 21 and the right main packer 22, and the other end of the measuring pipeline 42 is connected with the measuring hole.
A first pressure sensor 71 is arranged on the gas injection pipeline 41 and on the inner side of the first valve 51, a second pressure sensor 72 is arranged between the left secondary packer 23 and the left main packer 21, a third pressure sensor 73 is arranged between the right secondary packer 24 and the right main packer 22, and a fourth pressure sensor 74 is arranged between the left main packer 21 and the right main packer 22.
Sensor detection holes are formed in the positions, between the left secondary packer 23 and the left main packer 21, between the right secondary packer 24 and the right main packer 22 and between the left main packer 21 and the right main packer 22, of the support sleeve 1. The second pressure sensor 72, the third pressure sensor 73, and the fourth pressure sensor 74 are fitted to the sensor detection holes, and the detection portions of the second pressure sensor 72, the third pressure sensor 73, and the fourth pressure sensor 74 are located outside the support sleeve 1.
The first function of the first pressure sensor 71 is to determine whether the pressure in each packer reaches a set pressure value when each packer (the left main packer 21, the right main packer 22, the left secondary packer 23 and the right secondary packer 24) is inflated, so that each packer is tightly attached to the borehole to ensure the sealing performance, and the packer cannot burst due to the excessive inflation pressure of each packer; the second function is to detect the pressure stabilization (drop) condition in the packer during the measurement construction process after the packer is inflated, and determine whether the contact surface between the packer and the borehole leaks air, so as to analyze whether the sealing performance between the packer and the borehole meets the requirement. In addition, if a packer ruptures, the pressure reading from the first pressure sensor 71 will drop rapidly, and the measurement will fail.
Even if the high-pressure gas is filled in the packer to reach enough pressure, the contact surfaces between the left main packer 21 and the right main packer 22 and the drill hole cannot be ensured not to leak due to the uneven local position of the inner wall of the drill hole. The second pressure sensor 72 detects a pressure change in the left detection closed space, and the third pressure sensor 73 detects a pressure change in the right detection closed space. The tightness of the measurement closed space is detected by the second pressure sensor 72 and the third pressure sensor 73. For example, when the contact surface between the left main packer 21 and the borehole leaks gas and gas injection into the measurement enclosed space is continued, the pressure in the left detection enclosed space will rise; when the air leakage occurs at the interface between the right main packer 22 and the borehole and air injection continues into the measurement enclosure, the pressure in the right test enclosure will increase. Further, when initially injecting gas into the measurement closed space, if there is a little leakage (without affecting the measurement) at the contact surfaces between the left main packer 21, the right main packer 22, and the borehole. At this time, the left sub packer 23 and the right sub packer 24 achieve secondary sealing, and gas leakage of the measurement closed space is reduced.
The fourth pressure sensor 74 detects a pressure change in the measurement closed space by injecting high-pressure gas into the measurement closed space through the measurement line 42 by the second high-pressure gas cylinder 32.
The data recorder 8 is in signal connection with a first pressure sensor 71, a second pressure sensor 72, a third pressure sensor 73 and a fourth pressure sensor 74, respectively. In this embodiment, the data recorder 8 is a computer, and the data recorder 8 is connected to the first pressure sensor 71, the second pressure sensor 72, the third pressure sensor 73, and the fourth pressure sensor 74 via signal cables, respectively. The signal cables connecting the second pressure sensor 72, the third pressure sensor 73 and the fourth pressure sensor 74 are located inside the support sleeve 1, and the signal cables are prevented from being damaged during the measurement construction process.
The data recorder 8 reads and records the pressure data of each pressure sensor in real time.
The embodiment also provides an in-situ measurement method for the coal seam air permeability, and by applying the mobile rapid coal and rock air permeability measurement instrument, the airless spraying method for the coating comprises the following steps:
step one, drilling holes along a coal seam by adopting bedding drilling, and cleaning rock debris in the drilled holes;
step two, the support sleeve 1 and each packer on the support sleeve are conveyed to a set position in a drill hole through a guide rod;
step three, opening a first valve 51, inflating each packer through a first high-pressure gas cylinder 31 through a gas injection pipeline 41 to expand, observing pressure through a first pressure gauge 61 and a data recorder 8 to a set value, and then closing the first valve 51;
step four, opening a second valve 52, enabling a measurement closed space to be formed by the left main packer 21, the right main packer 22, the outer wall of the support sleeve 1 and the inner wall of the drill hole through a second high-pressure gas bottle 32 through a measurement pipeline 42 to inject gas, closing the second valve 52 after the pressure detected by the data recorder 8 through a fourth pressure sensor 74 reaches a set value and is kept stable, and enabling the data recorder 8 to continuously detect the pressure through the fourth pressure sensor 74 and reduce the pressure to a stable state to stop measurement;
in the third and fourth steps, the data recorder 8 detects whether the sealed space is air-leaked or not through the first pressure sensor 71, the second pressure sensor 72 and the third pressure sensor 73, if the air-leaked space is air-leaked, the measurement is invalid, and the measurement needs to be carried out again;
step five, after the measurement is stopped, opening the exhaust valve 53, deflating the high-pressure gas in each packer through the exhaust pipeline 43, closing the exhaust valve 53 after the deflation is finished, repeating the step two to the step four, and measuring the data required by the calculation of the permeability coefficient of the coal seam at other set positions in the drill hole;
step six, recording the pressure-time curve in the closed space by the data recorder 8, as shown in figure 4, and measuring the pressure-time curve
Figure BDA0002292894110000061
Coordinate transformation is carried out for the ordinate and the measuring time t is the abscissa and the ordinate, the slope b of the linear function after the coordinate transformation is solved, the coal bed air permeability coefficient lambda is calculated as follows,
Figure BDA0002292894110000062
wherein the content of the first and second substances,
α, is constant, is determined by the borehole length and the borehole radius,
Figure BDA0002292894110000063
b is the slope of the linear function after coordinate transformation; l is the borehole length, m; r isbIs the borehole radius, m; vtM is the volume of the pressure measurement interval3;PtThe drilling gas pressure at the time t is MPa; p0The original gas pressure of the coal bed is MPa; psThe gas pressure is 0.1 MPa in the standard state.
The mobile rapid coal rock permeability measuring instrument is applied to the coal seam permeability in-situ measuring method of the embodiment, the mode of 'bedding drilling + mobile rapid permeability measuring instrument + gas injection' is adopted, intensive, rapid and accurate measurement of the coal seam permeability coefficient is achieved, and through verification, compared with other complex measuring methods, the measuring results are basically consistent.
It is to be understood that the above description is not intended to limit the present invention, and the present invention is not limited to the above examples, and those skilled in the art may make modifications, alterations, additions or substitutions within the spirit and scope of the present invention.

Claims (9)

1. The utility model provides a portable quick coal petrography gas permeability measuring apparatu which characterized in that: the device comprises a guide rod, a support sleeve, a left main packer, a right main packer, a left secondary packer, a right secondary packer, a first high-pressure gas cylinder, a second high-pressure gas cylinder and a data recorder;
the guide rod is connected with the support sleeve;
a left main packer and a right main packer are arranged on the supporting sleeve, the left main packer and the right main packer are arranged around the supporting sleeve, and a space is reserved between the left main packer and the right main packer;
a left secondary packer is arranged on the supporting sleeve outside the left main packer, a right secondary packer is arranged on the supporting sleeve outside the right main packer, the left secondary packer and the right secondary packer are arranged around the supporting sleeve, a space is reserved between the left secondary packer and the left main packer, and a space is reserved between the right secondary packer and the right main packer;
the first high-pressure gas cylinder is respectively connected with a left secondary packer, a left main packer, a right main packer and a right secondary packer through a gas injection pipeline, a first valve is arranged on the gas injection pipeline, a first pressure gauge is arranged on the gas injection pipeline and on the outer side of the first valve, a gas exhaust pipeline is connected on the gas injection pipeline and on the inner side of the first valve, and a gas exhaust valve is arranged on the gas exhaust pipeline;
the second high-pressure gas cylinder is connected with one end of the measuring pipeline, the other end of the measuring pipeline is positioned between the left main packer and the right main packer, and a second pressure gauge and a second valve are arranged on the measuring pipeline;
a first pressure sensor is arranged on the gas injection pipeline and on the inner side of the first valve, a second pressure sensor is arranged between the left secondary packer and the left main packer, a third pressure sensor is arranged between the right secondary packer and the right main packer, a fourth pressure sensor is arranged between the left main packer and the right main packer, and the data recorder is respectively in signal connection with the first pressure sensor, the second pressure sensor, the third pressure sensor and the fourth pressure sensor.
2. The mobile rapid coal rock permeability measuring instrument according to claim 1, characterized in that: each packer all sets up to the gasbag, and the gasbag includes interior gasbag and the outer gasbag of from inside to outside range upon range of setting, interior gasbag encircles the support sleeve and arranges, the outer gasbag encircles interior gasbag and arranges.
3. The mobile rapid coal rock permeability measuring instrument according to claim 2, characterized in that: the inner bladder is made of material A and the outer bladder is made of material B, wherein the hardness of the material A is greater than that of the material B.
4. The mobile rapid coal rock permeability measuring instrument according to claim 1, characterized in that: the gas injection pipeline and the measuring pipeline are both positioned inside the supporting sleeve.
5. The mobile rapid coal rock permeability measuring instrument according to claim 4, characterized in that: the gas injection pipeline is respectively connected with a first gas injection branch pipeline, a second gas injection branch pipeline, a third gas injection branch pipeline and a fourth gas injection branch pipeline, each gas injection branch pipeline is positioned inside the supporting sleeve, the supporting sleeve is provided with gas injection holes at the positions surrounded by the packers, and the tail end of each gas injection branch pipeline is connected with the gas injection holes; the position of the support sleeve between the left main packer and the right main packer is provided with a measuring hole, and the other end of the measuring pipeline is connected with the measuring hole.
6. The mobile rapid coal rock permeability measuring instrument according to claim 1, characterized in that: the data recorder is respectively connected with the first pressure sensor, the second pressure sensor, the third pressure sensor and the fourth pressure sensor through signal cables, and the signal cables connected with the second pressure sensor, the third pressure sensor and the fourth pressure sensor are positioned in the supporting sleeve.
7. The mobile rapid coal rock permeability measuring instrument according to claim 6, characterized in that: the position of the support sleeve between the left secondary packer and the left main packer, the position between the right secondary packer and the right main packer and the position between the left main packer and the right main packer are all provided with sensor detection holes, the second pressure sensor, the third pressure sensor and the fourth pressure sensor are assembled in the sensor detection holes, and the detection parts of the second pressure sensor, the third pressure sensor and the fourth pressure sensor are positioned outside the support sleeve.
8. The mobile rapid coal rock permeability measuring instrument according to claim 1, characterized in that: the data recorder is a computer.
9. The mobile rapid coal rock permeability measuring instrument according to claim 1, characterized in that: the high-pressure gas filled in the first high-pressure gas cylinder and the second high-pressure gas cylinder is nitrogen.
CN201911188089.8A 2019-11-28 2019-11-28 Movable rapid coal and rock permeability measuring instrument Active CN110879188B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201911188089.8A CN110879188B (en) 2019-11-28 2019-11-28 Movable rapid coal and rock permeability measuring instrument
PCT/CN2020/083005 WO2021103372A1 (en) 2019-11-28 2020-04-02 Mobile rapid coal rock permeability measuring instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911188089.8A CN110879188B (en) 2019-11-28 2019-11-28 Movable rapid coal and rock permeability measuring instrument

Publications (2)

Publication Number Publication Date
CN110879188A CN110879188A (en) 2020-03-13
CN110879188B true CN110879188B (en) 2020-10-09

Family

ID=69729994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911188089.8A Active CN110879188B (en) 2019-11-28 2019-11-28 Movable rapid coal and rock permeability measuring instrument

Country Status (2)

Country Link
CN (1) CN110879188B (en)
WO (1) WO2021103372A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110879188B (en) * 2019-11-28 2020-10-09 山东科技大学 Movable rapid coal and rock permeability measuring instrument

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1014634B (en) * 1990-07-31 1991-11-06 李大勇 Method and apparatus for fast testing air permeability of sand casting mould
TW200422604A (en) * 2002-12-25 2004-11-01 Matsushita Electric Ind Co Ltd Gas permeability measurement method and gas permeability measurement device
US6981403B2 (en) * 2003-10-31 2006-01-03 Mocon, Inc. Method and apparatus for measuring gas transmission rates of deformable or brittle materials
CN102297831B (en) * 2011-05-23 2013-04-03 山东科技大学 Test device and method for rapid gas logging of permeability of coal seam
CN203241325U (en) * 2013-04-17 2013-10-16 南京大学 Portable device for water-pressure test in situ
CN103411868B (en) * 2013-07-25 2015-10-28 陕西煤业化工技术研究院有限责任公司 A kind of method of testing of Permeability Coefficent in Coal Seam
CN106124380B (en) * 2016-06-22 2019-01-15 太原理工大学 The device and method of coal column gas permeability is measured in a kind of similarity simulation experiment
CN109269955B (en) * 2018-09-29 2023-11-21 中国矿业大学 In-situ testing device and method for permeability of coal stratum
CN209247593U (en) * 2018-11-16 2019-08-13 广州市杉特无纺布科技有限公司 A kind of gas permeability Quick testing instrument device
CN109975125A (en) * 2019-03-11 2019-07-05 山东科技大学 The pressure water experimental facilities and method detected based on coal body or rock-mass relaxing circle
CN110320146A (en) * 2019-07-24 2019-10-11 北京耐尔得智能科技有限公司 A kind of concrete air permeability apparatus and measuring method
CN110987754B (en) * 2019-11-28 2022-03-18 山东科技大学 In-situ measurement method for coal seam permeability
CN110879188B (en) * 2019-11-28 2020-10-09 山东科技大学 Movable rapid coal and rock permeability measuring instrument

Also Published As

Publication number Publication date
CN110879188A (en) 2020-03-13
WO2021103372A1 (en) 2021-06-03

Similar Documents

Publication Publication Date Title
CN110987754B (en) In-situ measurement method for coal seam permeability
CN110160885B (en) Experimental device and method for measuring permeability of low-permeability coal rock under multi-field coupling effect
CN209875145U (en) Oil gas well cement sheath sealing integrity testing arrangement
CN102900428B (en) Device and method for detecting sealing quality and gas-leakage position of coal seam gas extraction drill-hole
US11371905B2 (en) Methods for detecting leakage in permeability measurement system
CN108709815B (en) Experimental device and method for measuring fracture toughness of rock at low temperature
CN110985106B (en) Ultrasonic detection system and detection method for hole sealing quality of underground gas extraction drill hole
CN111551475B (en) Portable device and method for rapidly testing permeability of coal seam in situ through layer drilling
CN217332081U (en) CO in rock chemical corrosion environment 2 Triaxial seepage test system
CN113266315B (en) Method for determining permeability coefficient of coal seam
CN110879188B (en) Movable rapid coal and rock permeability measuring instrument
CN110530772B (en) Integrative test device of coal sample high pressure meeting an emergency and carbon dioxide displacement coal bed methane
CN105257281A (en) Method for detecting casing leakage
CN112903957B (en) Shale stress-damage-drilling fluid interaction experimental device and testing method
CN110927359B (en) Experimental test device and method for gas loss content in low-permeability porous medium coring process
CN205333483U (en) Gas permeability test system
CN109707371B (en) Device and method for rapidly measuring drilling depth of coal seam
CN111157428A (en) Method for measuring permeability of rock before and after grouting
CN106645432A (en) Auto-coupling acoustic wave test system and acoustic wave test method
CN115929286A (en) Sealing detection system and sealing detection method for well drilling casing
CN112362551B (en) Indoor convenient determination method and system for permeability of tight rock
CN215830491U (en) High-pressure airtight simulation device of underground packing system
CN110987326A (en) Experimental device for evaluating sealing capacity of packer rubber barrel
CN113216940B (en) Multi-point rock stratum pore pressure testing method and system
CN213986110U (en) Indoor convenient survey system of tight rock permeability

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant