CN110876290A - 顾及开采沉陷的风积沙区山水林田湖草综合配置方法 - Google Patents
顾及开采沉陷的风积沙区山水林田湖草综合配置方法 Download PDFInfo
- Publication number
- CN110876290A CN110876290A CN201911128461.6A CN201911128461A CN110876290A CN 110876290 A CN110876290 A CN 110876290A CN 201911128461 A CN201911128461 A CN 201911128461A CN 110876290 A CN110876290 A CN 110876290A
- Authority
- CN
- China
- Prior art keywords
- subsidence
- mining
- forest
- mountainous
- watery
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01B—SOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
- A01B79/00—Methods for working soil
- A01B79/02—Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/22—Improving land use; Improving water use or availability; Controlling erosion
Abstract
本发明公开了一种顾及开采沉陷的风积沙区山水林田湖草综合配置方法,其特征是首先构建基于生态位理论的风积沙区山水林田湖草生命共同体相关要素关系;其次进行开采沉陷的风积沙区山水林田湖草综合配置:包括(1)预测开采沉陷对地形的影响;(2)预测开采沉陷对地下潜水位的影响;最后按以下步骤具体治理:(1)树木的移植;(2)土壤种子库剥离与利用;(3)沉陷湿地预处理;(4)植被恢复;(5)耕地开发。本发明以风积沙区开采沉陷分布规律为依据,以生态位理论为指导,以荒漠化防治为目的,优化配置治理区山水林田湖草各生态要素,促进风积沙区采煤沉陷地生态环境改善与提升。该方法适用于陕北毛乌素沙地区,地表赋存萨拉乌苏组含水层的煤层开采所造成的损毁土地的治理。
Description
技术领域
本发明涉及西部风积沙区采煤沉陷地治理的新方法。
背景技术
随着我国能源资源战略西移,西部地区正成为重要的煤炭生产基地。其中大量的煤炭资源位于风积沙地貌类型区。风积沙区生态环境脆弱,采煤所造成的地表沉陷导致周围浅层土壤水变化,进而影响植被的生长,加剧了荒漠化过程。多年来,采煤沉陷地的治理主要集中于受损的局部区域,头疼医头,脚痛医脚,缺乏系统观。这种模式显然满足不了“整体保护、系统修复、综合治理”的要求。采煤沉陷地的治理必须要遵循“山水林田湖草”生命共同体的原则,兼顾生态系统中的各要素,这样才能对沉陷区生态系统进行科学合理地保护与修复。
发明内容
本发明的目的是提供一种顾及开采沉陷的风积沙区山水林田湖草综合配置方法,本发明以风积沙区开采沉陷分布规律为依据,以生态位理论为指导,以荒漠化防治为目的,优化配置治理区山水林田湖草各生态要素,促进风积沙区采煤沉陷地生态环境改善与提升。
本发明的技术方案是,一种顾及开采沉陷的风积沙区山水林田湖草综合配置方法,其特征是
首先构建基于生态位理论的风积沙区山水林田湖草生命共同体相关要素关系,见表1;
表1风积沙区山水林田湖草生命共同体相关要素关系表
备注:1、I\II\III\IV表示生态要素的适宜性程度,其中: I>II>III>IV;N表示不适宜;不同要素之间,坚持生态保护优先的原则。2、坡向是指与当地主风向的关系。
其次进行开采沉陷的风积沙区山水林田湖草综合配置:
包括(1)预测开采沉陷对地形的影响;
(2)预测开采沉陷对地下潜水位的影响;
最后按以下步骤具体治理:
(1)树木的移植;
(2)土壤种子库剥离与利用;
(3)沉陷湿地预处理;
(4)植被恢复;
(5)耕地开发。
该方法适用于陕北毛乌素沙地区,地表赋存萨拉乌苏组含水层的煤层开采所造成的损毁土地的治理。该区域大气降雨较少,维系地表生态的基础是萨拉乌苏组含水层。地下煤层开采所引发的开采沉陷,虽然不破坏萨拉乌苏组之下的隔水层的结构,但改变了萨拉乌苏组含水层的赋存状态,进而影响地表植被的生长。为此,需要根据变化后的地形及生态水位条件,合理布局地表的植被及土地利用,重新构建山水林田湖草生命共同体。
附图说明
图1是风积沙区山水林田湖草典型配置。
图2是开采沉陷对地形的影响预测示意图。
图3是开采沉陷对地下潜水位的影响预测示意图。
图4是实施例沉陷后的地形图。
图5是实施例山水林田湖草系统配置示意图。
具体实施方式
为了使本发明的目的、技术方案和优点更加清楚,下面将对本发明的技术方案进行详细描述。显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明的实施例,本领域普通技术人员在没有付出创造性劳动的前提下所得到的所有其他实施方式,都属于本发明所保护的范围。
1)基于生态位理论的山水林田湖草综合配置模式
生态位理论:生态位是指在生物群落或生态系统中,每一个物种都拥有自己的角色和地位,即占据一定的空间,发挥一定的功能。自然生态系统中的物种或种群首先只有生活在适宜的微环境中才能得以延续和发展。生态位现象对所有生命现象都具有普适性,不仅适用于生物界,也适用于山水林田湖草生命共同体。
应用分析:根据相关研究成果,陕北毛乌素沙地区地表生态系统对地下水位具有很强的依赖性,同时地形条件也决定着风沙土的理化特性,进而影响植被分布。基于以上分析,认为风积区山水林田湖草生命共同体各因素中,山(地形)和水(潜水位和河流)是基础,是决定其他要素空间分布的生态位条件;林和草是根系,是维系区域生态系统可持续性的关键,是生态系统服务价值体现;耕地和湿地(湖泊)是枝干和叶子,是生物多样性的体现。
基于以上分析,构建了基于生态位理论的风积沙区山水林田湖草生命共同体相关要素关系,具体见表1所示。
表1风积沙区山水林田湖草生命共同体相关要素关系表
备注:1、I\II\III\IV表示生态要素的适宜性程度,其中: I>II>III>IV;N表示不适宜;不同要素之间,坚持生态保护优先的原则。2、坡向是指与当地主风向的关系
风积沙区山水林田湖草典型配置见图1所示。
2)顾及开采沉陷的风积沙区山水林田湖草综合配置
(1)开采沉陷对地形的影响预测
根据地表移动盆地主断面上的下沉值和原地表高程值,分析开采沉陷对地形的影响,如图2所示。其中:
主断面上的下沉值(S)利用概率积分法或几何法进行计算。
主断面上的原地表高程值(E0)根据地形等高线内插生成。
沉陷后的地面高程值(E1)=原地表高程值(E0)-下沉值(S)
根据沉陷后的地形,分析坡度和坡向等生态条件。
(2)开采沉陷对地下潜水位的影响预测
开采沉陷导致地面高程下降,当地面高程低于周边潜水位标高时,地面出现积水,形成湿地(也称海子或湖泊),见图3所示。
潜水位的变化可依据地下水数值模拟软件进行分析。
(3)树木的移植
由于开采沉陷,导致植被的立地条件发生变换。根据相关研究成果及现场实际调查,陕北毛乌素沙地区地表生态系统对地下水位具有很强的依赖性,当潜水位埋深小于0.5m时,土壤出现盐渍化,部分植被的根系完全处于潜水位以下,导致植被死亡。因此,在开采沉陷导致潜水位埋深小于0.5m前,需要对该区域的树木进行移植。移植位置参考上文的山水林田湖草综合配置模式。
(4)土壤种子库剥离与利用
土壤种子库是指存在于土壤表层凋落物和土壤中全部活性种子的总和,对于该类型区生态恢复具有重要意义。对于开采沉陷可能导致地表积水的区域,需要在积水前,对地表10cm左右的表层土进行剥离,撒播位置参考前文的山水林田湖草综合配置模式。
(5)沉陷湿地预处理
陕北风积沙区气候干旱,风沙大,对湿地生态系统的稳定性影响较大。因此,需要人工采取措施,维护稳定性。
措施一:挖深垫浅,提高湿地的蓄水量。在积水前,根据鱼类等水体动物生存的要求,适当深挖,增加蓄水深度,提高蓄水量。
措施二:引种水生植物,为鸟类及其他野生动物提供栖息地,促进生态系统演替,营造小型沙漠绿洲。
案例分析
(1)案例简介
某矿位于陕北黄土高原北端,属于半干旱气候,降雨量较少,地貌类型为风积沙地貌,植被类型以沙生植被为主。地面标高在1274~ 1290m,地下潜水位平均埋深3~5m左右。地区主要风向为西北风,某工作面长度1600m,宽度350m,煤层倾角平均1°。煤层平均埋深为300m,平均煤厚6.08m,下沉系数为0.72,采动影响角正切值为2.0。
(1)沉陷影响分析
选择某倾向主断面进行沉陷影响分析。根据该矿的采矿地质条件可知,开采结束后,地表最大下沉值达4.40m,沉陷盆地部分地方地表高程将低于当地潜水位标高,局部区域将出现积水,形成沙漠湿地。沉陷前地表沙丘的坡度15~25°左右,沉陷所产生的附加坡度对其总体地貌坡度影响较小,沉陷后的沙丘的坡度基本维持原数值。
沉陷后的地形见图4所示。
(2)山水林田湖草系统配置
根据沉陷影响预测的结果及地面植被及土地利用情况,选择该倾向主断面进行山水林田湖草系统配置,具体见图5所示。
图中:
A表示湿地(海子)
B表示耐盐碱的灌草
C表示灌草混合林地(以灌木为主)
D表示生态农业用地(耕地)
E表示防护林地(乔木为主)
F表示灌草混合林地(以草为主)
具体治理措施
苗木移植:在地表下沉接近潜水位前,将位于A区的乔木和灌木移植至E区;
土壤种子库再利用:将A区和B区地表10cm左右的表层土进行剥离,撒播至F区;
沉陷湿地预处理:对A区进行挖深,保证常年蓄水位深度1.5m左右,边缘补种水生植物,挖出的土方填至B区;
植被恢复:对B区种植耐盐碱的灌草,E区种植耐干旱的乔木,C 区种植灌木,F区撒播草籽;
耕地开发:对D区的土地进行平整,修建灌排设施,土壤培肥。
以上所述,仅仅是本发明的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本领域的技术人员在本发明披露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围内。
Claims (4)
1.顾及开采沉陷的风积沙区山水林田湖草综合配置方法,其特征是
首先构建基于生态位理论的风积沙区山水林田湖草生命共同体相关要素关系;
其次进行开采沉陷的风积沙区山水林田湖草综合配置:
包括(1)预测开采沉陷对地形的影响;
(2)预测开采沉陷对地下潜水位的影响;
最后按以下步骤具体治理:
(1)树木的移植;
(2)土壤种子库剥离与利用;
(3)沉陷湿地预处理;
(4)植被恢复;
(5)耕地开发;
该方法适用于陕北毛乌素沙地区,地表赋存萨拉乌苏组含水层的煤层开采所造成的损毁土地的治理。
3.如权利要求1所述的顾及开采沉陷的风积沙区山水林田湖草综合配置方法,其特征是进行开采沉陷的风积沙区山水林田湖草综合配置方法如下:
(1)预测开采沉陷对地形的影响
根据地表移动盆地主断面上的下沉值和原地表高程值,分析开采沉陷对地形的影响;
主断面上的下沉值(S)利用概率积分法或几何法进行计算;
主断面上的原地表高程值(E0)根据地形等高线内插生成;
沉陷后的地面高程值(E1)=原地表高程值(E0)-下沉值(S);
(2)预测开采沉陷对地下潜水位的影响
开采沉陷导致地面高程下降,当地面高程低于周边潜水位标高时,地面出现积水,形成湿地,潜水位的变化依据地下水数值模拟软件进行分析。
4.如权利要求1所述的顾及开采沉陷的风积沙区山水林田湖草综合配置方法,其特征是按以下步骤具体治理
(1)树木的移植
在开采沉陷导致潜水位埋深小于0.5m前,需要对该区域的树木进行移植,移植位置参考表1的配置模式;
(2)土壤种子库剥离与利用
对于开采沉陷可能导致地表积水的区域,需要在积水前,对地表10cm左右的表层土进行剥离,撒播位置参考表1的配置模式;
(3)沉陷湿地预处理
措施一:挖深垫浅,提高湿地的蓄水量;
措施二:引种水生植物,为鸟类及其他野生动物提供栖息地,促进生态系统演替,营造小型沙漠绿洲;
(4)植被恢复;
(5)耕地开发。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911128461.6A CN110876290A (zh) | 2019-11-18 | 2019-11-18 | 顾及开采沉陷的风积沙区山水林田湖草综合配置方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911128461.6A CN110876290A (zh) | 2019-11-18 | 2019-11-18 | 顾及开采沉陷的风积沙区山水林田湖草综合配置方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110876290A true CN110876290A (zh) | 2020-03-13 |
Family
ID=69730599
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911128461.6A Pending CN110876290A (zh) | 2019-11-18 | 2019-11-18 | 顾及开采沉陷的风积沙区山水林田湖草综合配置方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110876290A (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102877846A (zh) * | 2012-09-18 | 2013-01-16 | 中国矿业大学(北京) | 基于单元法的边采边复表土剥离时机确定方法 |
CN103216239A (zh) * | 2013-04-27 | 2013-07-24 | 北京科技大学 | 一种矿山活动塌陷区回填处置方法 |
EP2979768A1 (en) * | 2014-07-28 | 2016-02-03 | Politechnika Lubelska | Method of reclaiming mine excavations |
CN107882561A (zh) * | 2017-11-10 | 2018-04-06 | 安徽省交通航务工程有限公司 | 一种高潜水位采煤沉陷区超前治理方法 |
CN107989612A (zh) * | 2018-01-08 | 2018-05-04 | 西安科技大学 | 一种高潜水位煤矿区动态预复垦新方法 |
CN109874441A (zh) * | 2019-03-13 | 2019-06-14 | 杭州市园林工程有限公司 | 一种生态恢复植被的构建方法 |
-
2019
- 2019-11-18 CN CN201911128461.6A patent/CN110876290A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102877846A (zh) * | 2012-09-18 | 2013-01-16 | 中国矿业大学(北京) | 基于单元法的边采边复表土剥离时机确定方法 |
CN103216239A (zh) * | 2013-04-27 | 2013-07-24 | 北京科技大学 | 一种矿山活动塌陷区回填处置方法 |
EP2979768A1 (en) * | 2014-07-28 | 2016-02-03 | Politechnika Lubelska | Method of reclaiming mine excavations |
CN107882561A (zh) * | 2017-11-10 | 2018-04-06 | 安徽省交通航务工程有限公司 | 一种高潜水位采煤沉陷区超前治理方法 |
CN107989612A (zh) * | 2018-01-08 | 2018-05-04 | 西安科技大学 | 一种高潜水位煤矿区动态预复垦新方法 |
CN109874441A (zh) * | 2019-03-13 | 2019-06-14 | 杭州市园林工程有限公司 | 一种生态恢复植被的构建方法 |
Non-Patent Citations (1)
Title |
---|
李树志、周锦华、张怀新: "《矿区生态破坏防治技术》", 30 April 1984, 煤炭工业出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Teh | Soil erosion modeling using RUSLE and GIS on Cameron highlands, Malaysia for hydropower development | |
CN111149630B (zh) | 一种退化湿地植被恢复方法 | |
Okorafor et al. | Soil erosion in south eastern Nigeria: a review | |
Dinka et al. | Identifying the potential causes of waterlogging in irrigated agriculture: the case of the wonji‐shoa sugar cane plantation (Ethiopia) | |
Paul et al. | Artificial conservation measures on groundwater recharge, irrigation potential and productivity of crops of Bharkatia Watershed, Odisha | |
Pannigrahi | Irrigation systems engineering | |
Odeh et al. | Wise water resources management under the increasing number of refugees in the third poorest water resources country (Jordan)–a suggested future spatial plan for water resources investments | |
CN115486311A (zh) | 一种高寒露天铁矿生态修复的植物群落配置方法及应用 | |
CN110876290A (zh) | 顾及开采沉陷的风积沙区山水林田湖草综合配置方法 | |
Srivastava et al. | Suitability of soil and water conservation measures for watershed management using geographical information system | |
Romshoo et al. | Sediment yield estimation for developing soil conservation strategies in GIS environment for the mountainous Marusudar catchment, Chenab basin, J&K, India | |
Ouessar et al. | Report on water harvesting inventory history and success stories | |
Ayetan | GIS Assessment of Groundwater Recharge Potential in Whatcom County, Washington State: Implications for Land Use | |
Udoumoh et al. | Gully erosion menace in Uyo: causes, effects and control measures | |
Tadesse et al. | Initiatives, opportunities and challenges in shallow groundwater utilization: A case study from Debrekidane Watershed, Hawzien Woreda, Tigray Region, Northern Ethiopia | |
Kumar et al. | Delineation of Micro-Watershed using Geo-Spatial Techniques” | |
Rath et al. | Impact Assignment of Integrated Watershed Management in the Micro Watersheds of S ambalpur District, O disha, I ndia | |
Jain et al. | Management of Hard Rock Basaltic Aquifer through Aquifer Mapping: A Case Study of Nashik District, Maharashtra, India | |
Paul et al. | Impact of soil and water conservation measures on groundwater recharge, irrigation potential and productivity of crops of a watershed | |
Okereke et al. | Soil erosion as an emerging environmental challenges in South-East geopolitical zone of Nigeria: Towards a sustainable land conservation for national development | |
Manivannan et al. | Geospatial Technology Based Water Management Action Plan for South Forest Division of Nilgiris, Tamil Nadu | |
Manjunatha | Artificial Recharge Structures for Heggada Devana Kote Taluk in Southern tip of Karnataka, India using Geospatial Tools | |
Suresh et al. | Water Conservation and Artificial Recharge Efforts in India | |
Rajput et al. | Water Resources Management through Rainwater Harvesting in Arid and Semi-Arid Regions | |
Posiak | The scope of survey necessary to identify water-related hazards in rural areas |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200313 |
|
RJ01 | Rejection of invention patent application after publication |