CN110863657B - Glass curtain wall construction handling device - Google Patents

Glass curtain wall construction handling device Download PDF

Info

Publication number
CN110863657B
CN110863657B CN201911164383.5A CN201911164383A CN110863657B CN 110863657 B CN110863657 B CN 110863657B CN 201911164383 A CN201911164383 A CN 201911164383A CN 110863657 B CN110863657 B CN 110863657B
Authority
CN
China
Prior art keywords
frame
curtain wall
glass curtain
wall construction
pressure relief
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911164383.5A
Other languages
Chinese (zh)
Other versions
CN110863657A (en
Inventor
朱仁奎
沈志江
童国军
张维榜
田伟春
周洁红
张国平
刘慧�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xinsheng Construction Group Co ltd
Original Assignee
Zhejiang Xinsheng Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xinsheng Construction Group Co ltd filed Critical Zhejiang Xinsheng Construction Group Co ltd
Priority to CN201911164383.5A priority Critical patent/CN110863657B/en
Publication of CN110863657A publication Critical patent/CN110863657A/en
Application granted granted Critical
Publication of CN110863657B publication Critical patent/CN110863657B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a glass curtain wall construction and carrying device. The glass curtain wall construction and carrying device comprises a containing frame; the two storage chambers with rectangular structures for storing glass are symmetrically arranged in the containing frame; eight limiting plates; four pressure relief structures; the four clamping grooves are symmetrically arranged on the containing frame in pairs and are communicated with the storage chamber; protective structure, protective structure includes anticollision cover and gag lever post, the anticollision cover with accomodate the frame block, be used for right the locker room seals anticollision cover and draw-in groove block, gag lever post through connection in accomodate the frame with the anticollision cover, the gag lever post with rotate between the anticollision cover and be connected, the gag lever post with accomodate threaded connection between the frame. The glass curtain wall construction carrying device provided by the invention has the advantages of flexible operation, recycling, high carrying efficiency and good anti-collision performance.

Description

Glass curtain wall construction handling device
Technical Field
The invention relates to the technical field of glass curtain wall carrying devices, in particular to a glass curtain wall construction carrying device.
Background
The glass curtain wall is a beautiful and novel building wall decoration method, is a remarkable characteristic of modern high-rise building times, and needs to be protected by a packaging box body in the carrying process of the glass curtain wall so as to avoid damage in the carrying process.
However, the traditional glass curtain wall construction carrying device adopts the paper box to match the packaging belt to carry the glass curtain wall, the anti-collision performance of the paper box in the carrying process is poor, the glass curtain wall is easily damaged, the recycling effect of the paper box is poor, and the flexibility of the glass curtain wall which is taken by disassembling after packaging is poor.
Therefore, there is a need to provide a new glass curtain wall construction carrying device to solve the above technical problems.
Disclosure of Invention
The invention aims to provide a glass curtain wall construction carrying device which is flexible to operate, recyclable, high in carrying efficiency and good in anti-collision performance.
In order to solve the technical problem, the invention provides a glass curtain wall construction carrying device, which comprises: a storage frame; the two storage chambers with rectangular structures for storing glass are symmetrically arranged in the containing frame; the eight limiting plates are symmetrically arranged in the containing frame in pairs, and the limiting plates are connected with the containing frame through bolts; the pressure relief structure comprises four pressure relief structures, two of the pressure relief structures are fixed at the bottom end of the containing frame, the other two pressure relief structures are fixed at the top of the containing frame and correspond to the two pressure relief structures at the bottom end of the containing frame one by one, and eight limiting plates, four of which are in a group of rectangular arrays, are fixed on the two pressure relief structures; the four clamping grooves are symmetrically arranged on the containing frame in pairs and are communicated with the storage chamber; protective structure, it is right to be used for the locker room seals protective structure is fixed in accomodate the frame, protective structure includes anticollision cover and gag lever post, the anticollision cover with accomodate the frame block, it is right to be used for the locker room seals anticollision cover and draw-in groove block, gag lever post through connection in accomodate the frame with the anticollision cover, the gag lever post with rotate between the anticollision cover and be connected, the gag lever post with accomodate threaded connection between the frame.
Preferably, the protective structure further comprises a groove, and the groove which is provided with a rectangular structure and used for accommodating the limiting rod is arranged on the anti-collision sleeve.
Preferably, the bottom of anticollision cover is equipped with the cross-section and is trapezoidal spacing frame, spacing frame with accomodate the frame block.
Preferably, the pressure release structure includes pressure release groove, rubber sleeve, rubber slab and baffle, wherein two the baffle is fixed in accomodate the bottom of frame, two in addition the baffle with accomodate two of frame bottom the baffle one-to-one, eight four of limiting plate are fixed in two for a set of rectangle array the baffle, be fixed with on the baffle the rubber slab, be equipped with the wave structure on the rubber slab the rubber sleeve, the inside of rubber sleeve is equipped with a plurality of linear distribution's half cylinder structure the pressure release groove.
Preferably, the rubber pad of rectangle structure is equipped with in the inside of accomodating the frame, the rubber pad is located the inside of locker room.
Preferably, two adjacent rubber pads with enclose into the through-hole with the corner of locker room, just the through-hole with locker room switches on.
Preferably, the bottom end of the storage frame is provided with two conveying grooves with rectangular structures.
Preferably, accomodate and be equipped with on the frame and carry and draw the structure, carry and draw the structure and include pull ring and two constant head tanks, two be used for fixed hawser the constant head tank symmetry run through in the anticollision cover extends to accomodate the inside of frame, the semicircle annular the pull ring is fixed in accomodate the frame, the pull ring is located the inside of constant head tank.
Compared with the prior art, the glass curtain wall construction carrying device provided by the invention has the following beneficial effects:
the invention provides a glass curtain wall construction carrying device, wherein two storage chambers for storing glass curtain walls are arranged in a storage frame, the top end of the storage frame is provided with an anti-collision sleeve for sealing the storage chambers, the anti-collision sleeve is fixed on the storage frame through a limiting rod, the anti-collision sleeve is clamped with the clamping grooves arranged on the side wall of the storage frame in pairwise symmetry, so that the glass curtain walls are completely stored in the storage frame and the anti-collision sleeve, the glass curtain walls are effectively prevented from being impacted in the glass curtain wall carrying process, the carrying quality of the glass curtain walls is greatly improved, the limiting rod is in threaded connection with the storage frame, the end part of the limiting rod is of a regular octagonal structure, the limiting rod is in collision with the anti-collision sleeve, and the anti-collision sleeve and the storage frame are mounted and dismounted more conveniently and rapidly, and then improved greatly the anticollision cover with accomodate the installation of frame and dismantle efficiency, make the anticollision cover with accomodate the frame circulated use, dismantle simultaneously behind the anticollision cover, two bisymmetry on accomodating the frame the draw-in groove exposes, and then makes taking and depositing of glass curtain wall convenient and fast more, and then has improved glass curtain wall's handling efficiency and quality greatly.
Drawings
FIG. 1 is a schematic structural view of a glass curtain wall construction handling device according to a preferred embodiment of the present invention;
fig. 2 is a schematic view of a connection structure between the receiving frame and the anti-collision cover shown in fig. 1;
FIG. 3 is an enlarged view of portion A of FIG. 2;
FIG. 4 is an enlarged view of the portion B shown in FIG. 2;
FIG. 5 is a schematic view of a connection structure between the receiving frame and the anti-collision cover shown in FIG. 4;
fig. 6 is an enlarged schematic view of the portion C shown in fig. 5.
Reference numbers in the figures: 1. accomodate frame, 2, transport groove, 3, protective structure, 31, anticollision cover, 32, recess, 33, gag lever post, 4, rubber pad, 5, locker room, 6, carry and draw the structure, 61, pull ring, 62, constant head tank, 7, pressure release structure, 71, pressure release groove, 72, rubber sleeve, 73, rubber slab, 74, baffle, 8, spacing frame, 9, limiting plate, 9a, draw-in groove, 9b, through-hole.
Detailed Description
The invention is further described with reference to the following figures and embodiments.
Please refer to fig. 1, fig. 2, fig. 3, fig. 4, fig. 5 and fig. 6 in combination, wherein fig. 1 is a schematic structural view of a glass curtain wall construction handling device according to a preferred embodiment of the present invention; fig. 2 is a schematic view of a connection structure between the receiving frame and the anti-collision cover shown in fig. 1; FIG. 3 is an enlarged view of portion A of FIG. 2; FIG. 4 is an enlarged view of the portion B shown in FIG. 2; FIG. 5 is a schematic view of a connection structure between the receiving frame and the anti-collision cover shown in FIG. 4; fig. 6 is an enlarged schematic view of the portion C shown in fig. 5. Glass curtain wall construction handling device includes: a storage frame 1; the two storage chambers 5 are symmetrically arranged inside the containing frame 1, and the two storage chambers 5 are of rectangular structures and are used for storing glass; the eight limiting plates 9 are symmetrically arranged in pairs inside the containing frame 1, and the limiting plates 9 are connected with the containing frame 1 through bolts; the pressure relief structures 7 are fixed at the bottom end of the containing frame 1, the other two pressure relief structures 7 are fixed at the top of the containing frame 1, the other two pressure relief structures 7 correspond to the two pressure relief structures 7 at the bottom end of the containing frame 1 one by one, and the eight limiting plates 9, four of which are in a group of rectangular arrays, are fixed on the two pressure relief structures 7; the four clamping grooves 9a are symmetrically arranged on the containing frame 1 in pairs, and the clamping grooves 9a are communicated with the storage chamber 5; protective structure 3, it is right to store up room 5 and seal protective structure 3 is fixed in accomodate frame 1, protective structure 3 includes anticollision cover 31 and gag lever post 33, anticollision cover 31 with accomodate 1 block of frame, it is right to store up room 5 and seal anticollision cover 31 and the block of draw-in groove 9a, gag lever post 33 through connection in store up frame 1 with anticollision cover 31, gag lever post 33 with rotate between the anticollision cover 31 and be connected, gag lever post 33 with threaded connection between the frame 1 is accomodate.
The protective structure 3 further comprises a groove 32, and the collision-prevention sleeve 31 is provided with the groove 32 which is of a rectangular structure and is used for accommodating the limiting rod 33; the limiting rod 33 is arranged at the top end of the anti-collision sleeve 31 inside the groove 32, so that misoperation of the limiting rod 33 in the carrying process is avoided, and meanwhile, the space utilization efficiency is improved.
The bottom of anticollision cover 31 is equipped with the cross-section and is trapezoidal spacing frame 8, spacing frame 8 with accomodate 1 block of frame, spacing frame 8's installation makes the installation anticollision cover 31 convenient and fast more.
The pressure relief structure 7 comprises a pressure relief groove 71, a rubber sleeve 72, a rubber plate 73 and baffle plates 74, wherein two baffle plates 74 are fixed at the bottom end of the receiving frame 1, the other two baffle plates 74 correspond to the two baffle plates 74 at the bottom end of the receiving frame 1 one by one, eight limiting plates 9 are fixed to the two baffle plates 74 in a group of rectangular arrays, the rubber plate 73 is fixed on the baffle plates 74, the rubber sleeve 72 with a wave-shaped structure is arranged on the rubber plate 73, and the pressure relief groove 71 with a plurality of linearly distributed semi-cylindrical structures is arranged in the rubber sleeve 72; will limiting plate 9a with accomodate 1 block of frame, then it is rotatory bolt on the limiting plate 9 makes limiting plate 9 drives baffle 74 drive rubber plate 73 bottom rubber sleeve 72 conflict glass, the wave rubber sleeve 72 conflict glass fixes glass, the rubber sleeve is the wave structure, and then is convenient for accomodate the surperficial sweeps of glass, and the effectual sweeps that prevents the glass surface causes glass to scrape the flower, works as simultaneously when rubber sleeve 72's pressure is too big, rubber sleeve 72 extrusion deformation, the half cylinder structure the pressure release groove 71 extrusion deformation, and then the effectual too big glass that causes of preventing pressure damages.
A rubber pad 4 with a rectangular structure is arranged inside the containing frame 1, and the rubber pad 4 is arranged inside the storage chamber 5; simultaneously be equipped with in the inside circumference of accomodating frame 1 the rubber pad 4, and then avoid glass to scrape the flower and damage, and then improved glass's storage quality greatly.
The corners of the two adjacent rubber pads 4 and the storage chambers 5 are surrounded to form through holes 9b, and the through holes 9b are communicated with the storage chambers 5; meanwhile, the through holes 9b are formed by the corners of the two adjacent rubber pads 4 and the containing chamber 5 in a surrounding mode, so that the corner of glass is effectively prevented from being damaged when the glass is stored.
The bottom end of the containing frame 1 is provided with two conveying grooves 2 with rectangular structures; through the cooperation of fork truck accomodate 1 bottom of frame the use of haulage groove 2 makes transport glass curtain wall convenient and fast more.
The receiving frame 1 is provided with a lifting structure 6, the lifting structure 6 comprises a pull ring 61 and two positioning grooves 62, the two positioning grooves 62 for fixing cables symmetrically penetrate through the anti-collision sleeve 31 and extend to the inside of the receiving frame 1, the semi-circular pull ring 61 is fixed on the receiving frame 1, and the pull ring 61 is arranged inside the positioning grooves 62; the hook of the hoisting equipment is fixed to the pull ring 61, the cable is clamped to the positioning groove 62, the pull ring 61 and the positioning groove 62 are arranged to hoist the storage frame 1 more conveniently and quickly, and therefore the carrying efficiency is greatly improved.
Respectively manufacturing 10 sets of the glass curtain wall construction and carrying device provided by the invention, respectively storing the same type of glass by the glass curtain wall construction and carrying device provided by the invention and a common glass curtain wall storage box with the same specification of 10 sets, and comparing the data periodically for a plurality of times to obtain that the glass storage quality of the glass curtain wall construction and carrying device provided by the invention is 3% higher than that of the common glass curtain wall storage box, and the glass carrying efficiency of the glass curtain wall construction and carrying device provided by the invention is 4% higher than that of the common glass curtain wall storage box; the recycling efficiency of the glass curtain wall construction carrying device provided by the invention is 25% higher than that of a common glass curtain wall storage box.
The working principle of the glass curtain wall construction and transportation device provided by the invention is as follows:
firstly, the limiting rod 33 is clamped with the limiting rod 33 through an inner hexagonal wrench, the limiting rod 33 is rotated, the limiting rod 33 is in threaded connection with the storage frame 1, the limiting rod 33 is separated from the storage frame 1, then the anti-collision sleeve 31 is disassembled, the bolt between the limiting plate 9 and the storage frame 1 is disassembled, then two operators lift up the glass, the hands of the operators pass through the clamping groove 9a, the glass is placed in the storage chamber 5, a sponge mat or other spacer mats can be placed between two adjacent pieces of glass according to the thickness and the requirements of the glass, further the scratching between the two adjacent pieces of glass is avoided, the storage chamber 5 for storing the glass curtain wall is arranged in the storage frame 1, the limiting plate 9 is clamped with the storage frame 1, then the bolt on the limiting plate 9 is rotated, so that the limiting plate 9 drives the baffle plate 74 to drive the rubber sleeve 72 glass at the bottom end of the rubber plate 73 to abut against the glass, the wavy rubber sleeve 72 abuts against the glass to fix the glass, the rubber sleeve is of a wavy structure, so that scraps on the surface of the glass can be conveniently stored, the glass is effectively prevented from being scraped due to the scraps on the surface of the glass, meanwhile, when the pressure of the rubber sleeve 72 is too high, the rubber sleeve 72 is extruded and deformed, the pressure relief groove 71 of a semi-cylindrical structure is extruded and deformed, so that the glass is effectively prevented from being damaged due to the too high pressure, meanwhile, the rubber pads 4 are circumferentially arranged inside the storage frame 1, the glass is prevented from being scraped and damaged, the storage quality of the glass is greatly improved, meanwhile, the through holes 9b are defined by the adjacent two rubber pads 4 and the corners of the storage chamber 5 in a surrounding mode, when the glass is effectively prevented from being stored, the corners of the glass are damaged, the limiting plate 9a is of a trapezoidal structure, and meanwhile, the limiting plate 9a is in sliding connection with the storage frame 1, so as to adjust the storage capacity of the glass conveniently, the anti-collision sleeve 31 is fixed on the receiving frame 1 through the limiting rod 33, and simultaneously, the anti-collision sleeve 31 is clamped with the clamping grooves 9a arranged on the side wall of the receiving frame 1 in pairwise symmetry, so that the glass curtain wall is completely received in the receiving frame 1 and the anti-collision sleeve 31, the glass curtain wall is effectively prevented from being impacted in the process of carrying the glass curtain wall, the carrying quality of the glass curtain wall is greatly improved, meanwhile, the limiting rod 33 is in threaded connection with the receiving frame 1, the end part of the limiting rod 33 is in a regular octagonal structure, the limiting rod 33 is in collision with the anti-collision sleeve 31, so that the installation and the disassembly of the anti-collision sleeve 31 and the receiving frame 1 are more convenient and rapid, the installation and the disassembly efficiency of the anti-collision sleeve 31 and the receiving frame 1 is greatly improved, and the anti-collision sleeve 31 and the receiving frame 1 can be recycled, dismantle simultaneously behind the anticollision cover 31, accomodate two bisymmetry on the frame 1 draw-in groove 9a exposes, and then makes taking and depositing of glass curtain wall convenient and fast more, and then has improved glass curtain wall's handling efficiency and quality greatly, gag lever post 33 is located the top of anticollision cover 31 the inside of recess 32, and then avoided the maloperation in handling gag lever post 33 has improved space utilization efficiency simultaneously, through the fork truck cooperation accomodate 1 bottom the use of transport groove 2 makes transport glass curtain wall convenient and fast more, then carry to formulating the place after, will lift by crane the equipment the couple with pull ring 61 is fixed, the hawser with positioning groove 62 block, pull ring 61 with positioning groove 62 set up the messenger and lift by crane accomodate frame 1 convenient and fast more, and then improved handling efficiency greatly.
Compared with the prior art, the glass curtain wall construction carrying device provided by the invention has the following beneficial effects:
the invention provides a glass curtain wall construction carrying device, wherein two storage chambers 5 for storing glass curtain walls are arranged in a storage frame 1, an anti-collision sleeve 31 for sealing the storage chambers 5 is arranged at the top end of the storage frame 1, the anti-collision sleeve 31 is fixed on the storage frame 1 through a limiting rod 33, the anti-collision sleeve 31 is clamped with clamping grooves 9a which are arranged on the side wall of the storage frame 1 and are symmetrical in pairs, so that the glass curtain walls are completely stored in the storage frame 1 and the anti-collision sleeve 31, the glass curtain walls are effectively prevented from being impacted in the glass curtain wall carrying process, the carrying quality of the glass curtain walls is greatly improved, meanwhile, the limiting rod 33 is in threaded connection with the storage frame 1, the end part of the limiting rod 33 is of a regular octagonal structure, and the limiting rod 33 is abutted against the anti-collision sleeve 31, and then make anticollision cover 31 with accomodate frame 1's installation dismantlement convenient and fast more, and then improved greatly anticollision cover 31 with accomodate frame 1's installation dismantlement efficiency, make anticollision cover 31 with accomodate frame 1 circulated use, dismantle simultaneously behind the anticollision cover 31, accomodate two bisymmetry on the frame 1 draw-in groove 9a exposes, and then makes taking and depositing of glass curtain wall convenient and fast more, and then improved glass curtain wall's handling efficiency and quality greatly.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (8)

1. The utility model provides a glass curtain wall construction handling device which characterized in that includes:
a storage frame;
the two storage chambers with rectangular structures for storing glass are symmetrically arranged in the containing frame;
the eight limiting plates are symmetrically arranged in the containing frame in pairs, and the limiting plates are connected with the containing frame through bolts;
the pressure relief structure comprises four pressure relief structures, two of the pressure relief structures are fixed at the bottom end of the containing frame, the other two pressure relief structures are fixed at the top of the containing frame and correspond to the two pressure relief structures at the bottom end of the containing frame one by one, and eight limiting plates, four of which are in a group of rectangular arrays, are fixed on the two pressure relief structures;
the four clamping grooves are symmetrically arranged on the containing frame in pairs and are communicated with the storage chamber;
protective structure, it is right to be used for the locker room seals protective structure is fixed in accomodate the frame, protective structure includes anticollision cover and gag lever post, the anticollision cover with accomodate the frame block, it is right to be used for the locker room seals anticollision cover and draw-in groove block, gag lever post through connection in accomodate the frame with the anticollision cover, the gag lever post with rotate between the anticollision cover and be connected, the gag lever post with accomodate threaded connection between the frame.
2. The glass curtain wall construction handling device of claim 1, wherein the protective structure further comprises a groove, and the groove which is of a rectangular structure and used for accommodating the limiting rod is arranged on the anti-collision sleeve.
3. The glass curtain wall construction handling device of claim 2, wherein a limiting frame with a trapezoidal cross section is arranged at the bottom end of the anti-collision sleeve, and the limiting frame is clamped with the storage frame.
4. The glass curtain wall construction handling device of claim 3, wherein the pressure relief structure comprises a pressure relief groove, a rubber sleeve, a rubber plate and baffle plates, wherein two of the baffle plates are fixed at the bottom end of the storage frame, the other two baffle plates are in one-to-one correspondence with the two baffle plates at the bottom end of the storage frame, eight of the four limiting plates are fixed at two baffle plates for a group of rectangular arrays, the rubber plate is fixed on the baffle plates, the rubber sleeve plate is provided with a wave-shaped structure, and the pressure relief groove of a plurality of linearly distributed semi-cylindrical structures is formed in the rubber sleeve.
5. The glass curtain wall construction handling device as claimed in claim 4, wherein the receiving frame is provided with a rubber pad of a rectangular structure inside, and the rubber pad is arranged inside the storage chamber.
6. The glass curtain wall construction handling device of claim 5, wherein the corners of the two adjacent rubber mats and the storage chambers are surrounded to form through holes, and the through holes are communicated with the storage chambers.
7. The glass curtain wall construction handling device as claimed in claim 1, wherein the bottom end of the receiving frame is provided with two handling grooves of rectangular structure.
8. The glass curtain wall construction handling device of claim 7, wherein the accommodating frame is provided with a lifting structure, the lifting structure comprises a pull ring and two positioning grooves, the two positioning grooves for fixing a cable symmetrically penetrate through the anti-collision sleeve and extend to the inside of the accommodating frame, the semi-circular pull ring is fixed to the accommodating frame, and the pull ring is arranged inside the positioning grooves.
CN201911164383.5A 2019-11-25 2019-11-25 Glass curtain wall construction handling device Active CN110863657B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911164383.5A CN110863657B (en) 2019-11-25 2019-11-25 Glass curtain wall construction handling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911164383.5A CN110863657B (en) 2019-11-25 2019-11-25 Glass curtain wall construction handling device

Publications (2)

Publication Number Publication Date
CN110863657A CN110863657A (en) 2020-03-06
CN110863657B true CN110863657B (en) 2021-07-20

Family

ID=69656529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911164383.5A Active CN110863657B (en) 2019-11-25 2019-11-25 Glass curtain wall construction handling device

Country Status (1)

Country Link
CN (1) CN110863657B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005105541A1 (en) * 2004-05-05 2005-11-10 Quantum Workhealth Programmes Pty Ltd Glass handling systems
EP2832664B1 (en) * 2013-07-29 2016-08-24 ERNE AG Holzbau Storing device for a plate-like article
CN207311539U (en) * 2017-09-29 2018-05-04 山东美达建工集团股份有限公司 Glass curtain wall conveying arrangement
CN207377147U (en) * 2017-10-18 2018-05-18 哈尔滨商业大学 Architectural engineering glass clamping device
CN108396972A (en) * 2018-03-26 2018-08-14 中江志诚钢化玻璃制品有限公司 Moving glass curtain wall clamping device
CN208502276U (en) * 2018-05-31 2019-02-15 宜昌鸿康建筑工程有限公司 A kind of glass curtain wall transport rack

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005105541A1 (en) * 2004-05-05 2005-11-10 Quantum Workhealth Programmes Pty Ltd Glass handling systems
EP2832664B1 (en) * 2013-07-29 2016-08-24 ERNE AG Holzbau Storing device for a plate-like article
CN207311539U (en) * 2017-09-29 2018-05-04 山东美达建工集团股份有限公司 Glass curtain wall conveying arrangement
CN207377147U (en) * 2017-10-18 2018-05-18 哈尔滨商业大学 Architectural engineering glass clamping device
CN108396972A (en) * 2018-03-26 2018-08-14 中江志诚钢化玻璃制品有限公司 Moving glass curtain wall clamping device
CN208502276U (en) * 2018-05-31 2019-02-15 宜昌鸿康建筑工程有限公司 A kind of glass curtain wall transport rack

Also Published As

Publication number Publication date
CN110863657A (en) 2020-03-06

Similar Documents

Publication Publication Date Title
CN110863657B (en) Glass curtain wall construction handling device
CN216375790U (en) Stacking device for stacking steel pipe rows
CN207276045U (en) One kind transhipment slab hanging apparatus
CN205114102U (en) Frame is deposited, is transported in special use of prefabricated PCF board
CN211305451U (en) Special external member is dismantled to deep-well pump threaded connection pipe
CN213535854U (en) Protection device is used in transportation of LED screen convenient to installation
CN219860165U (en) Novel lifting device for building curtain wall
CN212953790U (en) Detachable lifting bar for thin-wall shell structure
CN217919191U (en) Accessory case packaging appliance
CN201711916U (en) Improved structure of sleeve
CN215711080U (en) Cement fibre building carrier plate hoist and mount protection device convenient to maintenance
CN215666632U (en) Inner hole hoisting device
CN105129324A (en) Bucket elevator
CN217581264U (en) Early-dismantling assembly of plastic template
CN216235694U (en) Crane for hoisting container
CN219857750U (en) A turning device for evaporating press haydite board bundling process
CN215244563U (en) Heavy object transfer device for logistics management
CN204185203U (en) Fragment of brick equipment for supporting patient with burn
CN215168451U (en) Noise prevention and control equipment for environmental protection engineering
CN209739674U (en) Handle detachable plastic drum
CN209956494U (en) Automobile brake drum fixing device convenient to store and transport
CN211254966U (en) Constructional steel constructs hoist ware mounting
CN210915042U (en) Auxiliary support for mounting triple energy supply station
CN214881718U (en) Furnace chassis of vacuum gas quenching furnace
CN211895938U (en) Brick clamping device for forklift

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Glass curtain wall construction handling device

Effective date of registration: 20221214

Granted publication date: 20210720

Pledgee: Industrial and Commercial Bank of China Limited Hangzhou Banshan sub branch

Pledgor: ZHEJIANG XINSHENG CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2022330003664

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231204

Granted publication date: 20210720

Pledgee: Industrial and Commercial Bank of China Limited Hangzhou Banshan sub branch

Pledgor: ZHEJIANG XINSHENG CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2022330003664

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Glass curtain wall construction handling device

Effective date of registration: 20231222

Granted publication date: 20210720

Pledgee: Industrial and Commercial Bank of China Limited Hangzhou Banshan sub branch

Pledgor: ZHEJIANG XINSHENG CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2023330003083