CN110847833A - 一种钻井泥浆降温装置 - Google Patents

一种钻井泥浆降温装置 Download PDF

Info

Publication number
CN110847833A
CN110847833A CN201911301266.9A CN201911301266A CN110847833A CN 110847833 A CN110847833 A CN 110847833A CN 201911301266 A CN201911301266 A CN 201911301266A CN 110847833 A CN110847833 A CN 110847833A
Authority
CN
China
Prior art keywords
mud
heat exchanger
control box
slurry pump
blower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911301266.9A
Other languages
English (en)
Inventor
郑家远
张振华
刘湘华
丁海斌
徐曙光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Chuangjia New Energy Technology Co Ltd
Original Assignee
Shandong Chuangjia New Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Chuangjia New Energy Technology Co Ltd filed Critical Shandong Chuangjia New Energy Technology Co Ltd
Priority to CN201911301266.9A priority Critical patent/CN110847833A/zh
Publication of CN110847833A publication Critical patent/CN110847833A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

一种钻井泥浆降温装置,控制箱、泥浆泵、泥浆换热器安装在机箱的箱底上,泥浆管的上端与泥浆泵的进口端连接相通,泥浆泵的出口端与泥浆换热器的进口连接相通,泥浆换热器的出口处于机箱外,风机安装在机箱上,风机处于泥浆换热器的上方,控制箱与泥浆泵之间有电缆输送电力,控制箱与风机之间有电缆输送电力,控制箱能分别控制风机、泥浆泵的启停,泥浆泵、风机运转时,高温泥浆经过泥浆换热器后,泥浆的热量散发出来,再被风机将热量排至大气中,从而使高温泥浆降温,达到泥浆能重复利用的要求,本发明能达到设计目的,保证钻头和井下工具正常工作,能提高钻井质量,本发明结构紧凑,占用井场少泥浆为密闭运转,能避免污染地表和大气。

Description

一种钻井泥浆降温装置
技术领域
本发明是油田钻井用的地面辅助设备,是一种钻井泥浆降温装置。
背景技术
目前,石油钻井等作业中,需要使用泥浆,用于将钻头钻出的岩硝携带至地面,同时起润滑钻头的作用,更重要的作用是降低钻头和井下设备的温度的作用,使钻头和井下设备能正常工作。由于钻井深度数千米,地层温度达60-160︒C,泥浆从地层返出后泥浆的温度高达80︒C左右,为了环保和减少材料费用,从地层返出的温度高达还80︒C左右的泥浆还要重复使用,如果将温度已高达80︒C左右的泥浆再打入井里用于钻井,高温泥浆将对钻头和井下设备产生影响,使其钻头和井下设备的性能下降或性能消失,造成钻头的钻进方向发生改变,使其所钻井达不到设计要求,产生重大经济损失。为了降低泥浆的温度,目前是在井场上挖一个泥浆池,让从井里返出的泥浆在泥浆池里自然降温。这种降温方法,一方面需要占用井场用地,需要扩大井场面积,增加土地使用费用;另一方面泥浆落地容易被污染,破坏了泥浆的使用性能,重复使用时影响钻井质量和进度;再一方面会污染环境,这种方法泥浆系统为开放式循环,泥浆中的有害物会向地下渗透污染地表,泥浆中的多种有害气体散发到大气中,对环境造成重大污染。
发明内容
本发明的目的是设计一种钻井泥浆降温装置,使从井里返出的高温泥浆经过本发明能将其温度降低到符合钻头和井下工具要求温度,并能克服上述存在的问题,保证钻井质量。
本发明的目的是这样实现的:包括风机、控制箱、泥浆管、泥浆泵、泥浆换热器、机箱,控制箱、泥浆泵、泥浆换热器安装在机箱的箱底上,泥浆管的上端与泥浆泵的进口端连接相通,泥浆泵的出口端与泥浆换热器的进口连接相通,泥浆换热器的出口处于机箱外,风机安装在机箱上,风机处于泥浆换热器的上方,控制箱与泥浆泵之间有电缆输送电力,控制箱与风机之间有电缆输送电力,控制箱能分别控制风机、泥浆泵的启停。
本发明的有益效果是:泥浆泵、风机运转时,高温泥浆经过泥浆换热器后,泥浆的热量散发出来,再被风机将热量排至大气中,从而使高温泥浆降温,达到泥浆能重复利用的要求,本发明能达到设计目的,保证钻头和井下工具正常工作,能提高钻井质量,本发明结构紧凑,设计合理,占用井场少,便于搬运安装,泥浆为密闭运转,能避免污染地表和大气,具有显著的社会效益和经济效益。
附图说明
附图1是本发明实施例的示意图。
具体实施方式
下面结合附图1对本发明的实施例进行说明。
由图1可知,本发明的实施例包括风机1、控制箱2、泥浆管3、泥浆泵4、泥浆换热器5、机箱6,控制箱2、泥浆泵4、泥浆换热器5安装在机箱6的箱底上,泥浆管3的上端与泥浆泵4的进口端连接相通,泥浆泵4的出口端与泥浆换热器5的进口连接相通,泥浆换热器5的出口处于机箱6外,风机1安装在机箱6上,风机1处于泥浆换热器5的上方,控制箱2与泥浆泵4之间有电缆输送电力,控制箱2与风机1之间有电缆输送电力,控制箱2能分别控制风机1、泥浆泵4的启停。
风机1可为多个,均匀分布在泥浆换热器5的上方。
泥浆泵4、风机1运转时,高温泥浆经过泥浆换热器5后,泥浆的热量散发出来,再被风机1将热量排至大气中,从而使高温泥浆降温。本发明能将80︒C的高温泥浆的温度降低到30︒C。使从井里返出的泥浆能重复利用。

Claims (1)

1.一种钻井泥浆降温装置,包括风机(1)、控制箱(2)、泥浆管(3)、泥浆泵(4)、泥浆换热器(5)、机箱(6),其特征是:控制箱(2)、泥浆泵(4)、泥浆换热器(5)安装在机箱(6)的箱底上,泥浆管(3)的上端与泥浆泵(4)的进口端连接相通,泥浆泵(4)的出口端与泥浆换热器(5)的进口连接相通,泥浆换热器(5)的出口处于机箱(6)外,风机(1)安装在机箱(6)上,风机(1)处于泥浆换热器(5)的上方,控制箱(2)与泥浆泵(4)之间有电缆输送电力,控制箱(2)与风机(1)之间有电缆输送电力,控制箱(2)能分别控制风机(1)、泥浆泵(4)的启停。
CN201911301266.9A 2019-12-17 2019-12-17 一种钻井泥浆降温装置 Pending CN110847833A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911301266.9A CN110847833A (zh) 2019-12-17 2019-12-17 一种钻井泥浆降温装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911301266.9A CN110847833A (zh) 2019-12-17 2019-12-17 一种钻井泥浆降温装置

Publications (1)

Publication Number Publication Date
CN110847833A true CN110847833A (zh) 2020-02-28

Family

ID=69609561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911301266.9A Pending CN110847833A (zh) 2019-12-17 2019-12-17 一种钻井泥浆降温装置

Country Status (1)

Country Link
CN (1) CN110847833A (zh)

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4215753A (en) * 1978-12-04 1980-08-05 Elwood Champness Drilling fluid cooling system
CA1149728A (en) * 1980-02-06 1983-07-12 Elwood Champness Drilling fluid cooling system
WO1999027228A1 (en) * 1997-11-24 1999-06-03 Elwood Champness Tool cooling system
CN203655193U (zh) * 2013-12-24 2014-06-18 沧州市华油飞达钻采设备有限公司 石油钻井液冷却装置
US20150330165A1 (en) * 2014-05-13 2015-11-19 National Oilwell Varco, L.P. Drilling mud cooling system
WO2016111616A1 (en) * 2015-01-05 2016-07-14 Meto Beheer B.V. Mud cooling device
GB201610648D0 (en) * 2016-06-17 2016-08-03 Sces Ltd Cooling system and method
CN205561585U (zh) * 2016-03-31 2016-09-07 四川昆仑石油设备制造有限公司 泥浆冷却塔
CN205936466U (zh) * 2016-08-25 2017-02-08 成都市齐易机械电气有限责任公司 石油钻井现场固体无害化处理系统
CN206192154U (zh) * 2016-11-17 2017-05-24 淄博万昌化工设备有限公司 泥浆冷却装置
CN206655670U (zh) * 2017-04-25 2017-11-21 娄飞 一种应用于钻井作业的冷却装置
CN206785333U (zh) * 2017-03-23 2017-12-22 西南石油大学 一种石油钻井液冷却装置
CN208203186U (zh) * 2018-05-03 2018-12-07 张向雷 钻井泥浆净化及降温装置
CN109441379A (zh) * 2018-10-23 2019-03-08 中国石油集团渤海钻探工程有限公司 高温钻井液强制冷却系统
CN110159335A (zh) * 2019-06-25 2019-08-23 中国铁建重工集团股份有限公司 一种基于泥浆环流的隧道降温系统
CN211342839U (zh) * 2019-12-17 2020-08-25 山东创佳新能源科技有限公司 一种钻井泥浆降温装置

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4215753A (en) * 1978-12-04 1980-08-05 Elwood Champness Drilling fluid cooling system
CA1149728A (en) * 1980-02-06 1983-07-12 Elwood Champness Drilling fluid cooling system
WO1999027228A1 (en) * 1997-11-24 1999-06-03 Elwood Champness Tool cooling system
CN203655193U (zh) * 2013-12-24 2014-06-18 沧州市华油飞达钻采设备有限公司 石油钻井液冷却装置
US20150330165A1 (en) * 2014-05-13 2015-11-19 National Oilwell Varco, L.P. Drilling mud cooling system
WO2016111616A1 (en) * 2015-01-05 2016-07-14 Meto Beheer B.V. Mud cooling device
CN205561585U (zh) * 2016-03-31 2016-09-07 四川昆仑石油设备制造有限公司 泥浆冷却塔
GB201610648D0 (en) * 2016-06-17 2016-08-03 Sces Ltd Cooling system and method
CN205936466U (zh) * 2016-08-25 2017-02-08 成都市齐易机械电气有限责任公司 石油钻井现场固体无害化处理系统
CN206192154U (zh) * 2016-11-17 2017-05-24 淄博万昌化工设备有限公司 泥浆冷却装置
CN206785333U (zh) * 2017-03-23 2017-12-22 西南石油大学 一种石油钻井液冷却装置
CN206655670U (zh) * 2017-04-25 2017-11-21 娄飞 一种应用于钻井作业的冷却装置
CN208203186U (zh) * 2018-05-03 2018-12-07 张向雷 钻井泥浆净化及降温装置
CN109441379A (zh) * 2018-10-23 2019-03-08 中国石油集团渤海钻探工程有限公司 高温钻井液强制冷却系统
CN110159335A (zh) * 2019-06-25 2019-08-23 中国铁建重工集团股份有限公司 一种基于泥浆环流的隧道降温系统
CN211342839U (zh) * 2019-12-17 2020-08-25 山东创佳新能源科技有限公司 一种钻井泥浆降温装置

Similar Documents

Publication Publication Date Title
US8672058B2 (en) Method for repairing aberrations along a drill bore wall
CN102966304B (zh) 泥浆护壁空气潜孔锤钻具及钻井工艺
PT1644671E (pt) Método de construção de um permutador de calor geotérmico
CN102322216A (zh) 激光钻井装置
US20150252653A1 (en) System to enable geothermal field interaction with existing hvac systems, method to enable geothermal field interaction with existing hvac system
AU2014295716B2 (en) Drilling and draining integrated floor anchoring driller
CN102913166A (zh) 一种连续油管钻铣水平井滑套与球座的方法
CN104653136B (zh) 一种常规油管井下动力钻磨复合桥塞的方法
CN105401878A (zh) 一种大直径潜孔锤钻机
CN112727352A (zh) 一种旋挖钻驱动气举反循环潜孔锤钻机及其使用方法
CN211342839U (zh) 一种钻井泥浆降温装置
CN205330527U (zh) 一种顶驱钻修系统
CN201078192Y (zh) 打井取芯钻具
CN107476773A (zh) 一种消除井内障碍的工具串和方法
CN110847833A (zh) 一种钻井泥浆降温装置
CN211314141U (zh) 钻井泥浆降温装置
DE3268535D1 (en) Hydraulic down-the-hole rock drill
CN114086882B (zh) 一种适用于极地冰盖钻进的装置及方法
CN104879058A (zh) 一种气水两用模块化钻机
CN215485888U (zh) 一种钻杆回转悬吊式潜孔锤钻机
CN201301666Y (zh) 微控定向钻机
CN203697950U (zh) 用于地下工程车辆的冷却系统及掘进凿岩台车
CN110847832A (zh) 钻井泥浆降温装置
CN201190533Y (zh) 一种轻便钻机
CN100487222C (zh) 利用深井采矿用水势能驱动的矿山节能凿岩掘进方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination