CN110847610A - Vertical steel bar sleeve grouting auxiliary device and method - Google Patents

Vertical steel bar sleeve grouting auxiliary device and method Download PDF

Info

Publication number
CN110847610A
CN110847610A CN201911104280.XA CN201911104280A CN110847610A CN 110847610 A CN110847610 A CN 110847610A CN 201911104280 A CN201911104280 A CN 201911104280A CN 110847610 A CN110847610 A CN 110847610A
Authority
CN
China
Prior art keywords
grouting
slurry
steel bar
vertical steel
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911104280.XA
Other languages
Chinese (zh)
Inventor
潘峰
韩亚明
曹刘坤
沈浅灏
徐沈京
王太源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 5 Group Co Ltd filed Critical Shanghai Construction No 5 Group Co Ltd
Priority to CN201911104280.XA priority Critical patent/CN110847610A/en
Publication of CN110847610A publication Critical patent/CN110847610A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention provides a vertical steel bar sleeve grouting auxiliary device and method. The main body of the invention is shaped like a funnel, the upper return funnel is used as a temporary storage place for redundant slurry during grouting, and two ends of the guide pipe are respectively connected with the upper return funnel and the upper slurry overflow hole of the lower sleeve. The invention considers that the gap of the grouting head is pulled out from the grouting hole at the lower part, the slurry can overflow from the grouting hole at the lower part, so that the slurry level of the slurry in the slurry overflow hole at the upper part is reduced, the effective length of the slurry overflow hole is increased from the concept of filling the slurry overflow hole, the overflowed slurry which is filled more than once is temporarily stored in the guide pipe and the backflow funnel during grouting, and the slurry flowing out from the gap of the grouting head is subjected to refilling compensation by the redundant slurry in the guide pipe and the backflow funnel, so that the fullness of the slurry in the sleeve is ensured.

Description

Vertical steel bar sleeve grouting auxiliary device and method
Technical Field
The invention relates to a vertical steel bar sleeve grouting auxiliary device and method.
Background
When the existing vertical steel bar sleeve is in grouting connection construction, grouting is carried out from one grouting hole, and after the cylindrical slurry flows out of the grouting hole, the grouting hole can be blocked, a grouting machine is stopped, and the grouting hole is blocked finally. In stopping the clearance of grouter to shutoff injected hole, thick liquids are because the influence of gravity, flow out from the injected hole, lead to the interior thick liquids of sleeve not full.
Disclosure of Invention
The invention aims to provide an auxiliary device and method for grouting a vertical steel bar sleeve.
In order to solve the above problems, the present invention provides an auxiliary grouting device for a vertical steel sleeve, comprising:
the backflow funnel is provided with an upper opening and a lower opening;
one end of the guide pipe is connected with the lower opening, the other end of the guide pipe is communicated with a grout overflow hole of the vertical steel bar sleeve, and the vertical steel bar sleeve is further provided with a grouting hole which is positioned at the lower part of the grout overflow hole.
Further, in the above device, the conduit is a rigid tube or a flexible tube having a bending degree.
Further, in the above apparatus, further comprising:
and the supporting device is arranged at the bottom of the reflux funnel.
Further, in the above device, the support means is a hollow cylindrical tube having an open upper end and a lower end.
Further, in the above apparatus, a diameter of the hollow cylindrical tube is smaller than a maximum diameter of the return funnel.
Further, in the above device, an opening at the upper end of the hollow cylindrical tube is provided with a hole groove, and the guide tube passes through the hole groove.
Further, in the above device, the diameter of the conduit is matched with the diameter of the grout outlet.
Further, in the above device, a waterproof tape is disposed at a joint of one end of the conduit and the lower opening.
According to another aspect of the present invention, there is provided a vertical steel bar sleeve grouting auxiliary method, which uses any one of the above vertical steel bar sleeve grouting auxiliary devices, the method including:
before the vertical steel bar sleeve is grouted, inserting a guide pipe of a vertical steel bar sleeve grouting auxiliary device into a grout overflow hole in the upper part of the vertical steel bar sleeve;
grouting the grouting hole at the lower part of the vertical steel bar sleeve by using a grouting pipe, and after redundant slurry appears in the reflux funnel, pulling out the grouting pipe on the grouting hole and plugging the grouting hole;
and when the slurry in the backflow funnel does not flow back and descend any more, removing the vertical steel bar sleeve grouting auxiliary device, and finally plugging the slurry overflow hole to finish grouting.
Compared with the prior art, the main body of the invention is funnel-shaped, the upper reflux funnel is used as a temporary storage place for redundant slurry during grouting, and two ends of the guide pipe are respectively connected with the upper reflux funnel and the upper slurry overflow hole of the lower sleeve.
The invention considers that the gap of the grouting head is pulled out from the grouting hole at the lower part, the slurry can overflow from the grouting hole at the lower part, so that the slurry level of the slurry in the slurry overflow hole at the upper part is reduced, the effective length of the slurry overflow hole is increased from the concept of filling the slurry overflow hole, the overflowed slurry which is filled more than once is temporarily stored in the guide pipe and the backflow funnel during grouting, and the slurry flowing out from the gap of the grouting head is subjected to refilling compensation by the redundant slurry in the guide pipe and the backflow funnel, so that the fullness of the slurry in the sleeve is ensured.
Aiming at the situation that slurry in the sleeve is not full due to the existing vertical steel bar grouting connection process, the invention provides the vertical steel bar sleeve grouting auxiliary device which mainly plays a role in prolonging the length of a slurry overflow hole, temporarily retaining the redundant slurry for grouting and supplementing the slurry in the sleeve lost due to process reasons, so that the slurry fullness in the sleeve meets the requirement, the defect of sleeve grouting construction is overcome, and the steel bar connection quality of an assembly type building is improved.
The grouting connection method solves the problem that the existing grouting connection construction process of the steel bar sleeve is not full, and improves the grouting connection quality of the steel bar sleeve; the invention utilizes the excessive slurry overflowing from the top to make up the lost slurry, thereby saving the cost; the invention can be made by a plurality of materials on site, which is beneficial to environmental protection.
Drawings
Fig. 1 is a structural view of a vertical reinforcing bar sleeve grouting auxiliary device according to an embodiment of the present invention;
fig. 2 is a disassembled schematic view of the vertical steel bar sleeve grouting auxiliary device according to an embodiment of the invention;
fig. 3 is an installation diagram of the vertical steel bar sleeve grouting auxiliary device according to an embodiment of the invention.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in further detail below.
As shown in fig. 1 to 3, the present invention provides an auxiliary grouting device for a vertical steel sleeve, comprising:
the backflow funnel 1 is provided with an upper opening and a lower opening;
one end of the guide pipe 2 is connected with the lower opening, the other end of the guide pipe 2 is communicated with a grout overflow hole 3 of the vertical steel bar sleeve, a grouting hole 4 is further formed in the vertical steel bar sleeve, and the grouting hole 4 is located on the lower portion of the grout overflow hole 3.
The main body of the invention is shaped like a funnel, the upper return funnel is used as a temporary storage place for the redundant slurry during grouting, and two ends of the guide pipe are respectively connected with the upper return funnel and the upper slurry overflow hole of the lower sleeve.
The invention considers that the gap of the grouting head is pulled out from the grouting hole at the lower part, the slurry can overflow from the grouting hole at the lower part, so that the slurry level of the slurry in the slurry overflow hole at the upper part is reduced, the effective length of the slurry overflow hole is increased from the concept of filling the slurry overflow hole, the overflowed slurry which is filled more than once is temporarily stored in the guide pipe and the backflow funnel during grouting, and the slurry flowing out from the gap of the grouting head is subjected to refilling compensation by the redundant slurry in the guide pipe and the backflow funnel, so that the fullness of the slurry in the sleeve is ensured.
Aiming at the situation that slurry in the sleeve is not full due to the existing vertical steel bar grouting connection process, the invention provides the vertical steel bar sleeve grouting auxiliary device which mainly plays a role in prolonging the length of a slurry overflow hole, temporarily retaining the redundant slurry for grouting and supplementing the slurry in the sleeve lost due to process reasons, so that the slurry fullness in the sleeve meets the requirement, the defect of sleeve grouting construction is overcome, and the steel bar connection quality of an assembly type building is improved.
The grouting connection method solves the problem that the existing grouting connection construction process of the steel bar sleeve is not full, and improves the grouting connection quality of the steel bar sleeve; the invention utilizes the excessive slurry overflowing from the top to make up the lost slurry, thereby saving the cost; the invention can be made by a plurality of materials on site, which is beneficial to environmental protection.
As shown in fig. 1 to 3, in an embodiment of the present invention, the vertical steel sleeve grouting auxiliary device further includes:
and the supporting device 5 is arranged at the bottom of the reflux funnel.
In consideration of the limitation of personnel during grouting construction operation, the invention also comprises a supporting device for supporting the backflow funnel, so that the backflow funnel can be conveniently supported without being held by hands of extra personnel.
As shown in fig. 1 to 3, in an embodiment of the auxiliary grouting device for a vertical steel sleeve of the present invention, the supporting device 5 is a hollow cylindrical tube with an opening at an upper end and a lower end.
Here, the supporting device may be cylindrical.
As shown in fig. 1 to 3, in an embodiment of the auxiliary grouting device for a vertical steel sleeve of the present invention, a diameter of the hollow cylindrical tube is smaller than a maximum diameter of the backflow funnel.
Here, the supporting means is formed in a cylindrical shape having a diameter slightly smaller than the maximum diameter of the funnel to support the funnel.
As shown in fig. 1 to 3, in an embodiment of the auxiliary grouting device for a vertical steel sleeve of the present invention, the conduit 2 is a rigid pipe or a flexible hose with a bending degree.
Here, the conduit 2 may be a bent hard pipe or a bent flexible hose, facilitating the flow of the slurry.
In an embodiment of the vertical steel bar sleeve grouting auxiliary device, a hole groove 6 is formed in an opening at the upper end of the hollow cylindrical pipe, and the guide pipe 2 penetrates out of the hole groove 6.
In this case, the support device 5 can be provided with a bore 6, so that the guide tube can be guided out of the bore 6.
In an embodiment of the vertical steel bar sleeve grouting auxiliary device, the diameter of the guide pipe is matched with the diameter of the grout overflow hole.
The size of the conduit is matched with the size of a grout overflow hole of the grouting sleeve, and the conduit can be just plugged into the vertical steel bar sleeve.
In an embodiment of the grouting auxiliary device for the vertical steel bar sleeve, a waterproof adhesive tape is arranged at a joint of one end of the guide pipe 2 and the lower opening.
The joint part can be sealed by a waterproof adhesive tape, so that the slurry is prevented from overflowing from a gap of the joint part.
As shown in fig. 1 to 3, the invention further provides another vertical steel sleeve grouting auxiliary method, which comprises the following steps:
step S1, before grouting the vertical steel bar sleeve, inserting the guide pipe 2 of the vertical steel bar sleeve grouting auxiliary device into the grout overflow hole 3 at the upper part of the vertical steel bar sleeve;
step S2, grouting the grouting hole 4 at the lower part of the vertical steel bar sleeve by using a grouting pipe, and after redundant slurry appears in the reflux funnel 1, pulling out the grouting pipe on the grouting hole 4 and plugging the grouting hole 4;
and step S3, when the slurry in the backflow funnel 1 does not flow back and descend any more, removing the vertical steel bar sleeve grouting auxiliary device, and finally plugging the slurry overflow hole 3 to finish grouting.
The main body of the invention is shaped like a funnel, the upper return funnel is used as a temporary storage place for the redundant slurry during grouting, and two ends of the guide pipe are respectively connected with the upper return funnel and the upper slurry overflow hole of the lower sleeve.
The invention considers that the gap of the grouting head is pulled out from the grouting hole at the lower part, the slurry can overflow from the grouting hole at the lower part, so that the slurry level of the slurry in the slurry overflow hole at the upper part is reduced, the effective length of the slurry overflow hole is increased from the concept of filling the slurry overflow hole, the overflowed slurry which is filled more than once is temporarily stored in the guide pipe and the backflow funnel during grouting, and the slurry flowing out from the gap of the grouting head is subjected to refilling compensation by the redundant slurry in the guide pipe and the backflow funnel, so that the fullness of the slurry in the sleeve is ensured.
Aiming at the situation that slurry in the sleeve is not full due to the existing vertical steel bar grouting connection process, the invention provides the vertical steel bar sleeve grouting auxiliary device which mainly plays a role in prolonging the length of a slurry overflow hole, temporarily retaining the redundant slurry for grouting and supplementing the slurry in the sleeve lost due to process reasons, so that the slurry fullness in the sleeve meets the requirement, the defect of sleeve grouting construction is overcome, and the steel bar connection quality of an assembly type building is improved.
The grouting connection method solves the problem that the existing grouting connection construction process of the steel bar sleeve is not full, and improves the grouting connection quality of the steel bar sleeve; the invention utilizes the excessive slurry overflowing from the top to make up the lost slurry, thereby saving the cost; the invention can be made by a plurality of materials on site, which is beneficial to environmental protection.
The embodiments in the present description are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other.
It will be apparent to those skilled in the art that various changes and modifications may be made in the invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (9)

1. The utility model provides a vertical steel sleeve auxiliary device that is in milk which characterized in that includes:
the backflow funnel is provided with an upper opening and a lower opening;
one end of the guide pipe is connected with the lower opening, the other end of the guide pipe is communicated with a grout overflow hole of the vertical steel bar sleeve, and the vertical steel bar sleeve is further provided with a grouting hole which is positioned at the lower part of the grout overflow hole.
2. The vertical rebar sleeve grouting aid of claim 1, wherein the conduit is a bent rigid pipe or a bendable hose.
3. The vertical rebar sleeve grouting aid of claim 1, further comprising:
and the supporting device is arranged at the bottom of the reflux funnel.
4. A vertical rebar sleeve grouting aid as claimed in claim 3, wherein the support means is a hollow cylindrical tube open at the upper and lower ends.
5. A vertical rebar sleeve grouting aid as claimed in claim 4, wherein the diameter of the hollow cylindrical tube is less than the maximum diameter of the return funnel.
6. The grouting aid for the vertical steel bar sleeve as claimed in claim 4, wherein a hole slot is formed at the opening at the upper end of the hollow cylindrical pipe, and the guide pipe penetrates out of the hole slot.
7. A vertical rebar sleeve grouting aid as claimed in claim 1, wherein the diameter of the conduit is sized to match the diameter of the grout hole.
8. The grouting aid for a vertical steel bar sleeve as claimed in claim 1, wherein a waterproof tape is provided at a junction of one end of the guide pipe and the lower opening.
9. A vertical steel bar sleeve grouting auxiliary method, which is characterized in that the vertical steel bar sleeve grouting auxiliary device of any one of the claims 1-8 is adopted, and the method comprises the following steps:
before the vertical steel bar sleeve is grouted, inserting a guide pipe of a vertical steel bar sleeve grouting auxiliary device into a grout overflow hole in the upper part of the vertical steel bar sleeve;
grouting the grouting hole at the lower part of the vertical steel bar sleeve by using a grouting pipe, and after redundant slurry appears in the reflux funnel, pulling out the grouting pipe on the grouting hole and plugging the grouting hole;
and when the slurry in the backflow funnel does not flow back and descend any more, removing the vertical steel bar sleeve grouting auxiliary device, and finally plugging the slurry overflow hole to finish grouting.
CN201911104280.XA 2019-11-09 2019-11-09 Vertical steel bar sleeve grouting auxiliary device and method Pending CN110847610A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911104280.XA CN110847610A (en) 2019-11-09 2019-11-09 Vertical steel bar sleeve grouting auxiliary device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911104280.XA CN110847610A (en) 2019-11-09 2019-11-09 Vertical steel bar sleeve grouting auxiliary device and method

Publications (1)

Publication Number Publication Date
CN110847610A true CN110847610A (en) 2020-02-28

Family

ID=69600514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911104280.XA Pending CN110847610A (en) 2019-11-09 2019-11-09 Vertical steel bar sleeve grouting auxiliary device and method

Country Status (1)

Country Link
CN (1) CN110847610A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017014707A (en) * 2015-06-29 2017-01-19 株式会社富士ボルト製作所 Grout injector and method for injecting grout
CN108265629A (en) * 2018-02-01 2018-07-10 上海市政工程设计研究总院(集团)有限公司 A kind of half grouting reinforced steel coupling sleeve of prefabricated assembled column
CN208347139U (en) * 2018-06-04 2019-01-08 广州市建工设计院有限公司 A kind of sleeve grouting visual detection instrument of plumpness
CN208586820U (en) * 2018-06-26 2019-03-08 镇江建科建设科技有限公司 A kind of grout sleeve benefit sizing device
CN212154165U (en) * 2019-11-09 2020-12-15 上海建工五建集团有限公司 Vertical steel bar sleeve grouting auxiliary device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017014707A (en) * 2015-06-29 2017-01-19 株式会社富士ボルト製作所 Grout injector and method for injecting grout
CN108265629A (en) * 2018-02-01 2018-07-10 上海市政工程设计研究总院(集团)有限公司 A kind of half grouting reinforced steel coupling sleeve of prefabricated assembled column
CN208347139U (en) * 2018-06-04 2019-01-08 广州市建工设计院有限公司 A kind of sleeve grouting visual detection instrument of plumpness
CN208586820U (en) * 2018-06-26 2019-03-08 镇江建科建设科技有限公司 A kind of grout sleeve benefit sizing device
CN212154165U (en) * 2019-11-09 2020-12-15 上海建工五建集团有限公司 Vertical steel bar sleeve grouting auxiliary device

Similar Documents

Publication Publication Date Title
CN102561992B (en) Grouting plugging process adopting deformation water stopper
CN109268048B (en) Construction method for improving grouting quality of hollow anchor rod of tunnel anchor
CN204551461U (en) A kind of pressure dispersing type electric hoist enlarged footing anchor cable
CN104727463A (en) Grouting connecting structure of prefabricated part and construction method thereof
CN212154165U (en) Vertical steel bar sleeve grouting auxiliary device
CN111733823A (en) Grouting pipe burying structure and broken pile processing method in cast-in-situ bored pile pouring process
CN110847610A (en) Vertical steel bar sleeve grouting auxiliary device and method
CN205976230U (en) Sleeve grout connection structure
CN207194036U (en) Fixing device of piping lane dowel bar
CN104213642B (en) Built-in bonded type butt connector and construction method thereof
CN206158192U (en) Concrete pump pipe's simple easily fixable device on concrete face
CN205839812U (en) A kind of post-cast strip pretreatment unit
CN106869133B (en) Soil nail grouting head device and construction method thereof
CN210105129U (en) A grout sleeve for steel bar connection for assembly type structure
CN206189406U (en) Novel artifical anchor eye fill device
CN213267966U (en) Double-liquid grouting machine
CN210049592U (en) Two-way adjustable shoring system for reserved hole
CN203967665U (en) Metal catheter in piping once and metal wire box bindiny mechanism
CN217420248U (en) End device for slurry patching of assembled partition wall board and assembled partition wall board structure
CN212248910U (en) Novel steel bar grouting sleeve
CN208844597U (en) A kind of single-ended fixed water-stopping pull rod
CN218643381U (en) Steel strand wires subassembly and excavation supporting stock structure
CN212200409U (en) Elevation mortar anchor rod
CN210636311U (en) Location is mended thick liquid device
CN206625229U (en) A kind of soil nailing casting head device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination