CN110847061A - Pier cushion cap template installation appurtenance in bridge work progress - Google Patents
Pier cushion cap template installation appurtenance in bridge work progress Download PDFInfo
- Publication number
- CN110847061A CN110847061A CN201911367724.9A CN201911367724A CN110847061A CN 110847061 A CN110847061 A CN 110847061A CN 201911367724 A CN201911367724 A CN 201911367724A CN 110847061 A CN110847061 A CN 110847061A
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- block
- plate
- cushion cap
- installation box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a pier cushion cap template installation auxiliary tool in a bridge construction process, which comprises an installation box, wherein one side of the installation box is provided with an opening, one side of the opening of the installation box is fixedly connected with a through inserting plate, one side of the opening of the installation box is provided with a plurality of splicing vertical plates, a bottom plate is fixedly connected between the splicing vertical plates, the side walls of the splicing vertical plates are fixedly connected with a push plate, one side of the installation box, which is close to the push plate, is fixedly connected with a bottom block, the top of the bottom block is provided with an I-shaped guide groove, a sliding block is slidably connected in the I-shaped guide groove, the top of the sliding block is fixedly connected with a pushing block, the pushing block is movably connected with the push plate, one side of the splicing vertical plates, which is far away from the installation box, is fixedly, very inconvenient problem.
Description
Technical Field
The invention relates to the technical field of auxiliary tools, in particular to an auxiliary tool for mounting a pier bearing platform template in a bridge construction process.
Background
In recent years, the construction strength of infrastructure is increased in China, and particularly the construction of a high-speed railway is rapidly developed, so that the rapid development of a pier template and the great increase of the demand are brought.
Among the prior art, a hyperbola pier shaft concatenation appurtenance that notice number is CN207277216U, including the single template body, be provided with hoist device on the single template body, the slide has been seted up to hoist device front side lower extreme internal surface, wire rope runs through in the slide, the fixed welding in hoist device upper surface middle part has spacing section of thick bamboo, spacing section of thick bamboo internalization is inserted and is equipped with the jack-post, the fixed surface welding of jack-post upper end has the pull ring, the screens device all passes through knob bolt fastening block on the sideboard surface, equal fixed mounting has the post handle in the screens device recess, anti-skidding stripe has been seted up on post handle surface.
However, the device still has the following obvious defects in the using process, and the device cannot be rapidly disassembled and assembled, so that the device is very inconvenient.
Therefore, the invention provides an auxiliary tool for mounting a pier cushion cap template in a bridge construction process.
Disclosure of Invention
The invention aims to provide an auxiliary tool for installing a pier bearing platform template in a bridge construction process, so as to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a pier cushion cap template installation auxiliary tool in a bridge construction process comprises an installation box, wherein one side of the installation box is provided with an opening, one side of the opening of the installation box is fixedly connected with a through inserting plate, one side of the opening of the installation box is provided with a plurality of splicing vertical plates, a bottom plate is fixedly connected between the splicing vertical plates, the side walls of the splicing vertical plates are fixedly connected with a push plate, one side of the installation box close to the push plate is fixedly connected with a bottom block, the top of the bottom block is provided with an I-shaped guide groove, the I-shaped guide groove is internally and slidably connected with a sliding block, the top of the sliding block is fixedly connected with a pushing block, the pushing block is movably connected with the push plate, one side of the splicing vertical plates far away from the installation box is fixedly provided with a sealing plate, the through inserting plate, hinge other end fixedly connected with stopper, the stopper is kept away from and is worn picture peg one side threaded connection have run through the stopper and with alternate board threaded connection's screw bolt.
Through adopting above-mentioned technical scheme, during the dismantlement, unscrew the screw bolt, turn over a stopper, promote to promote the piece and will splice the riser and take off from wearing the picture peg, can accomplish the dismantlement, otherwise then the installation has solved unable quick dismantlement and installation, very inconvenient problem.
Preferably, the side wall of the installation box is fixedly connected with a stabilizing plate, one side, far away from the pushing block, of the stabilizing plate is in threaded connection with a pushing bolt, and the pushing bolt penetrates through the stabilizing plate and is rotatably connected with the sliding block.
Through adopting above-mentioned technical scheme, through setting up firm board and promoting the bolt, rotatory promotion bolt alright top moves and promotes the piece for it is more laborsaving to remove to promote the piece.
Preferably, the slider is far away from concatenation riser one side fixedly connected with pulling handle, pulling handle perpendicular to slider.
Through adopting above-mentioned technical scheme, through setting up the pulling handle for the pulling promotes piece and slider more convenient.
Preferably, the bottom of the I-shaped guide groove is provided with a through groove, and the through groove is communicated to the bottom of the bottom block.
Through adopting above-mentioned technical scheme, through setting up through the groove, be convenient for clean the interior long-pending soil of I shape guide slot.
Preferably, one side of the limiting block, which is close to the installation box, is fixedly connected with a cushion pad, and the cushion pad is movably connected with the installation box.
Through adopting above-mentioned technical scheme, through setting up the blotter, be convenient for cushion the striking of stopper and install bin.
Compared with the prior art, the invention has the beneficial effects that: when dismantling, screw bolt unscrews, turn over a stopper, promote to promote the piece and will splice the riser and take off from wearing the picture peg, can accomplish the dismantlement, otherwise then the installation, unable quick dismantlement and installation have been solved, very inconvenient problem, tie through setting up firm board and promotion, rotatory promotion is tied alright top and is moved and promote the piece, it is more laborsaving to make to remove to promote the piece, through setting up the pulling handle, it is more convenient to make the pulling promote piece and slider, through setting up the groove, be convenient for clean long-pending soil in the I shape guide slot, through setting up the blotter, be convenient for cushion the striking of stopper and install bin, the practicality is very strong, be very worth promoting.
Drawings
FIG. 1 is a schematic external view of the present invention;
FIG. 2 is a side view of the present invention;
fig. 3 is a schematic bottom structure of the present invention.
In the figure: 1. installing a box; 2. splicing the vertical plates; 3. a base plate; 4. pushing the plate; 5. a bottom block; 6. an I-shaped guide groove; 7. a slider; 8. a pushing block; 9. a stabilizing plate; 10. pushing the bolt; 11. pulling the handle; 12. passing through the slot; 14. inserting plates; 15. a hinge; 16. a limiting block; 17. a threaded bolt; 18. a limiting block; 19. and (3) closing the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 3, the present invention provides a technical solution:
a pier cushion cap template installation auxiliary tool in the bridge construction process comprises an installation box 1, one side of the installation box 1 is provided with an opening, one side of the opening of the installation box 1 is fixedly connected with a through inserting plate 14 for serially connecting all splicing vertical plates 2, one side of the opening of the installation box 1 is provided with a plurality of splicing vertical plates 2, a bottom plate 3 is fixedly connected between the splicing vertical plates 2, the side walls of the splicing vertical plates 2 are fixedly connected with a push plate 4 for enabling the splicing vertical plates 2 to be moved together, one side of the installation box 1 close to the push plate 4 is fixedly connected with a bottom block 5, the top of the bottom block 5 is provided with an I-shaped guide groove 6, a sliding block 7 is slidably connected in the I-shaped guide groove 6, the top of the sliding block 7 is fixedly connected with a pushing block 8 for moving the splicing vertical plates 2, the pushing block 8 is movably connected with the push plate 4 in a close manner, one side, the right side of splicing riser 2 is used for sealing, and interlude board 14 runs through closure plate 19 and splicing riser 2, and it is connected with hinge 15 to wear picture peg 14 to keep away from 1 one side rotation of install bin, and hinge 15 other end fixedly connected with stopper 16, stopper 16 keep away from to wear picture peg 14 one side threaded connection have run through stopper 16 and with wear picture peg 14 threaded connection's threaded bolt 17.
1 lateral wall fixedly connected with of install bin 9 stabilizes board 9, stabilize board 9 and keep away from promotion piece 8 one side threaded connection and promote bolt 10, it is more laborsaving to make the removal promote piece 8, it is the metal material to promote bolt 10, it runs through firm board 9 and rotates with slider 7 to be connected to promote bolt 10, slider 7 is kept away from 2 one side fixedly connected with pulling handle 11 of concatenation riser, pulling handle 11 perpendicular to slider 7, the bottom has been seted up through groove 12 in the I shape guide slot 6, through setting up through groove 12, be convenient for clean long-pending soil in the I shape guide slot 6, make its inside dust can fall out, communicate to bottom block 5 bottom through groove 12, stopper 16 is close to install bin 1 one side fixedly connected with blotter 18, blotter 18 and install bin 1 are with the mode swing joint of hugging closely.
The working principle is as follows: during the dismantlement, screw bolt 17 is unscrewed, it 16 to turn over a stopper, promote to promote piece 8 and take off concatenation riser 2 from alternate board 14, can accomplish the dismantlement, otherwise then the installation, unable quick dismantlement and installation have been solved, very inconvenient problem, tie 10 with promoting through setting up firm board 9, rotatory promotion is tied 10 alright the top and is moved and is promoted piece 8, make to remove and promote piece 8 more laborsaving, through setting up pulling handle 11, it is more convenient to make the pulling promote piece 8 and slider 7, pass through groove 12 through the setting, be convenient for clean long-pending soil in the I shape guide slot 6, through setting up blotter 18, be convenient for cushion stopper 16 and install bin 1's striking, the practicality is very strong, be worth promoting very much.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a pier cushion cap template installation appurtenance in bridge work progress, includes install bin (1), its characterized in that: the mounting box is characterized in that one side of the mounting box (1) is set to be an opening, one side of the opening of the mounting box (1) is fixedly connected with a through inserting plate (14), one side of the opening of the mounting box (1) is provided with a plurality of splicing vertical plates (2), a bottom plate (3) is fixedly connected between the splicing vertical plates (2), a push plate (4) is fixedly connected to the side wall of each splicing vertical plate (2), the mounting box (1) is close to one side of the push plate (4) and is fixedly connected with a bottom block (5), an I-shaped guide groove (6) is formed in the top of the bottom block (5), a sliding block (7) is slidably connected in the I-shaped guide groove (6), a pushing block (8) is fixedly connected to the top of the sliding block (7), the pushing block (8) is movably connected with the push plate (4), one side of the mounting box (1, wear picture peg (14) to run through closure plate (19) and concatenation riser (2), it is connected with hinge (15) to wear picture peg (14) to keep away from install bin (1) one side rotation, hinge (15) other end fixedly connected with stopper (16), stopper (16) are kept away from and are worn picture peg (14) one side threaded connection have run through stopper (16) and with wear picture peg (14) threaded connection's screw bolt (17).
2. The pier cushion cap template installation appurtenance in bridge construction process of claim 1, characterized in that: the lateral wall of the installation box (1) is fixedly connected with a stabilizing plate (9), one side, far away from the pushing block (8), of the stabilizing plate (9) is connected with a pushing bolt (10) through threads, and the pushing bolt (10) penetrates through the stabilizing plate (9) and is rotatably connected with the sliding block (7).
3. The pier cushion cap template installation appurtenance in bridge construction process of claim 1, characterized in that: one side fixedly connected with pulling handle (11) is kept away from concatenation riser (2) in slider (7), pulling handle (11) perpendicular to slider (7).
4. The pier cushion cap template installation appurtenance in bridge construction process of claim 1, characterized in that: the bottom in the I-shaped guide groove (6) is provided with a through groove (12), and the through groove (12) is communicated to the bottom of the bottom block (5).
5. The pier cushion cap template installation appurtenance in bridge construction process of claim 1, characterized in that: the limiting block (16) is close to one side of the installation box (1) and is fixedly connected with a cushion pad (18), and the cushion pad (18) is movably connected with the installation box (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911367724.9A CN110847061A (en) | 2019-12-26 | 2019-12-26 | Pier cushion cap template installation appurtenance in bridge work progress |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911367724.9A CN110847061A (en) | 2019-12-26 | 2019-12-26 | Pier cushion cap template installation appurtenance in bridge work progress |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110847061A true CN110847061A (en) | 2020-02-28 |
Family
ID=69610565
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911367724.9A Pending CN110847061A (en) | 2019-12-26 | 2019-12-26 | Pier cushion cap template installation appurtenance in bridge work progress |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110847061A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111742726A (en) * | 2020-06-24 | 2020-10-09 | 浙江穗丰机电科技有限公司 | Easy open and close ventilation opening |
-
2019
- 2019-12-26 CN CN201911367724.9A patent/CN110847061A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111742726A (en) * | 2020-06-24 | 2020-10-09 | 浙江穗丰机电科技有限公司 | Easy open and close ventilation opening |
CN111742726B (en) * | 2020-06-24 | 2021-07-09 | 浙江穗丰机电科技有限公司 | Easy open and close ventilation opening |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202755627U (en) | Wall plaster troweling machine | |
CN110847061A (en) | Pier cushion cap template installation appurtenance in bridge work progress | |
CN211446630U (en) | Pier cushion cap template installation appurtenance in bridge work progress | |
CN207480857U (en) | A kind of concrete experimental block mould | |
CN205236830U (en) | Die rotation type of borduring side positioning mechanism | |
CN208168357U (en) | A kind of pillar steel form bottom leakproof sizing device | |
CN207159993U (en) | A kind of civil engineering built pile used temporarily | |
CN201704586U (en) | Screw spike anchoring frame | |
CN206570650U (en) | Road repair construction Special rake | |
CN107953763A (en) | A kind of battery installation structure of electric car | |
CN208267373U (en) | A kind of construction joint inner side template support device | |
CN209637360U (en) | A kind of modular finished product guard rail of deep basal pit | |
CN209637682U (en) | A kind of block stamp guiding device of the vertical pore-forming of Punching Borehole Cast-in-place Concrete Pile | |
CN209704026U (en) | A kind of aluminum alloy mould plate for building | |
CN204868714U (en) | Belt drags smooth skid -mounted and puts | |
CN207076505U (en) | Hammer mill | |
CN207177285U (en) | A kind of building aluminum dipping form alloy templates for railing taper hole | |
CN107443569B (en) | Concrete prefabricated bridge plate production equipment | |
CN206783138U (en) | A kind of trestle crane running gear wheel group | |
CN200974195Y (en) | Polish rod caliper | |
CN206941321U (en) | A kind of high speed or the special turnout rail of visitor are away from regulation eccentric bushing withdrawing device | |
CN205078036U (en) | Vice lock transmission structure of world lock | |
CN209323387U (en) | A kind of bridge coping combined steel formwork | |
CN219431844U (en) | Tunnel lining end mould plugging device | |
CN209410925U (en) | Conjuncted compression box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |