CN110831171A - Transmission resource determination method and device, electronic equipment and storage medium - Google Patents

Transmission resource determination method and device, electronic equipment and storage medium Download PDF

Info

Publication number
CN110831171A
CN110831171A CN201810903574.8A CN201810903574A CN110831171A CN 110831171 A CN110831171 A CN 110831171A CN 201810903574 A CN201810903574 A CN 201810903574A CN 110831171 A CN110831171 A CN 110831171A
Authority
CN
China
Prior art keywords
pbch block
candidate
symbol
index
indexes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810903574.8A
Other languages
Chinese (zh)
Other versions
CN110831171B (en
Inventor
童辉
刘磊
江天明
曹丽芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Communications Group Co Ltd
China Mobile Communications Ltd Research Institute
Original Assignee
China Mobile Communications Group Co Ltd
China Mobile Communications Ltd Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Communications Group Co Ltd, China Mobile Communications Ltd Research Institute filed Critical China Mobile Communications Group Co Ltd
Priority to CN201810903574.8A priority Critical patent/CN110831171B/en
Publication of CN110831171A publication Critical patent/CN110831171A/en
Application granted granted Critical
Publication of CN110831171B publication Critical patent/CN110831171B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/0446Resources in time domain, e.g. slots or frames

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The embodiment of the invention discloses a transmission resource determining method and device, electronic equipment and a storage medium. The transmission resource determining method comprises the following steps: for a half frame containing a synchronization signal SS/physical broadcast control channel PBCH block, the index of the first symbol in the candidate SS/PBCH block is: indexes { N1, …, Nm } + L × N, N ═ N1, N2, … nk; n1, n2, … nk comprises: discrete natural numbers, or fractions of n1, n2, … nk.

Description

Transmission resource determination method and device, electronic equipment and storage medium
Technical Field
The present invention relates to the field of communications technologies, and in particular, to a method and an apparatus for determining transmission resources, an electronic device, and a storage medium.
Background
When a signal such as a synchronization signal is transmitted by using a beam, if a carrier frequency of 6GHz or less is used, a maximum of 8 beams can be transmitted, and a continuous downlink time of 2 milliseconds needs to be occupied. However, in actual communication, the communication system cannot actually transmit 8 beams, so that the coverage of signals transmitted by the 8 beams is smaller than expected, and the communication quality is poor.
However, in the scale experiment, since a small uplink and downlink switching period (such as 2ms or 2.5 ms) is adopted, the frame structure cannot provide continuous two-ms downlink time, so that an actual system cannot transmit 8 beams, and the coverage of the synchronization signal is lower than that expected by the standard.
Disclosure of Invention
In view of this, embodiments of the present invention are intended to provide a transmission resource determining method and apparatus, an electronic device, and a storage medium.
The technical scheme of the invention is realized as follows:
a transmission resource determination method, comprising:
for a half frame containing a synchronization signal SS/physical broadcast control channel PBCH block, the index of the first symbol in the candidate SS/PBCH block is: indexes { N1, …, Nm } + L × N, N ═ N1, N2, … nk;
n1, n2, … nk comprises: discrete natural numbers, or fractions of n1, n2, … nk.
Optionally, the Nm is less than the L.
Optionally, for the half frame containing the synchronization signal SS block or the physical broadcast control channel PBCH block, the index of the first symbol in the candidate SS/PBCH block is: indexes { N1, …, Nm } + L × N, comprising:
if the subcarrier spacing is 30kHz, the index of the first symbol in the candidate SS/PBCH block is: indexes {2, 8} +14 × n.
Alternatively, n is 0, 1, 4, 5;
alternatively, the first and second electrodes may be,
n=0,1,5,6。
optionally, for the half frame containing the synchronization signal SS block or the physical broadcast control channel PBCH block, the index of the first symbol in the candidate SS/PBCH block is: indexes { N1, …, Nm } + L × N, comprising:
if the subcarrier spacing is 30kHz, the index of the first symbol in the candidate SS/PBCH block is: indexes {4, 8, 16, 20} +28 × n.
Alternatively, n is 0, 2;
alternatively, the first and second electrodes may be,
N=0,2.5。
optionally, the carrier frequency of the SS/PBCH block is greater than 3GHz and less than or equal to 6 GHz.
A transmission resource determination method, comprising:
for a half frame containing a synchronization signal SS/physical broadcast control channel PBCH block, the index of the first symbol in the candidate SS/PBCH block is: indexes { N1, …, Nm } + L × N, N ═ N1, N2, … nk;
m x k is greater than L, L being related to the carrier frequency.
Optionally, if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, L ═ 8.
Optionally, if the carrier frequency is greater than 6GHz, L is 64.
Optionally, if the carrier frequency is greater than or equal to 3GHz, L ═ 4.
Optionally, the Nm is less than the L.
Optionally, for the half frame containing the synchronization signal SS block or the physical broadcast control channel PBCH block, the index of the first symbol in the candidate SS/PBCH block is: indexes { N1, …, Nm } + L × N, comprising:
if the subcarrier spacing is 30kHz, the index of the first symbol in the candidate SS/PBCH block is: indexes {2, 8} +14 × n;
if the carrier frequency is less than or equal to 3GHz, n is equal to 0 or 1.
Alternatively, n is 0, 1, 4, 5, 6;
alternatively, the first and second electrodes may be,
n=0,1,2,3,4,56,7,8,9;
alternatively, the first and second electrodes may be,
n=0,1。
optionally, for the half frame containing the synchronization signal SS block or the physical broadcast control channel PBCH block, the index of the first symbol in the candidate SS/PBCH block is: indexes { N1, …, Nm } + L × N, comprising:
if the subcarrier spacing is 30kHz, the index of the first symbol in the candidate SS/PBCH block is: indexes {4, 8, 16, 20} +28 × n.
Alternatively, n is 0, 1, 4, 6;
alternatively, the first and second electrodes may be,
n=0,1,2,3,4,5,6,7,8,9。
optionally, L is the maximum number of candidate SS/PBCH blocks in each field.
A transmission resource determination apparatus, comprising:
a first determining module, configured to determine, for a half frame containing a synchronization signal SS/physical broadcast control channel PBCH block, an index of a first symbol in a candidate SS/PBCH block as: indexes { N1, …, Nm } + L × N, N ═ N1, N2, … nk;
n1, n2, … nk comprises: discrete natural numbers, or fractions of n1, n2, … nk.
A transmission resource determination apparatus, comprising:
a second determining module, configured to, for a half frame containing a synchronization signal SS/physical broadcast control channel PBCH block, index of a first symbol in the candidate SS/PBCH block: indexes { N1, …, Nm } + L × N, N ═ N1, N2, … nk;
m x k is greater than L, L being related to the carrier frequency.
A communication device, comprising:
a memory;
and the processor is connected with the memory and is used for realizing the arbitrary signal transmission resource determination method by executing the computer executable instructions stored on the memory.
A computer storage medium having stored thereon computer-executable instructions; the computer-executable instructions, when executed, enable any of the foregoing signal transmission resource determination methods.
The technical scheme provided by the embodiment of the invention provides a determining function for determining the index of the first symbol in the candidate SS/PBCH block; the resource positions of the candidate SS/PBCH blocks can be conveniently determined by the terminal according to the function, so that the signals transmitted by the SS or PBCH are monitored in the corresponding resource positions, the candidate SS/PBCH blocks determined by the method can meet the comprehensive coverage of SS signals under different conditions, and meanwhile, the flexible setting of special subframes can be met.
Drawings
Fig. 1 is a flowchart illustrating a first method for determining transmission resources according to an embodiment of the present invention;
fig. 2 is a flowchart illustrating a second method for determining transmission resources according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of a first transmission resource determining apparatus according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of a second transmission resource determining apparatus according to an embodiment of the present invention;
fig. 5 is a schematic resource location diagram of a first SSB according to an embodiment of the present invention;
fig. 6 is a resource location diagram of a second SSB according to an embodiment of the present invention;
FIG. 7 is a resource location diagram of a third SSB according to an embodiment of the present invention;
FIG. 8 is a resource location diagram of a fourth SSB according to an embodiment of the present invention;
fig. 9 is a schematic resource location diagram of a fifth SSB according to an embodiment of the present invention;
FIG. 10 is a resource location diagram of a sixth SSB according to an embodiment of the present invention;
fig. 11 is a schematic resource location diagram of a seventh SSB according to an embodiment of the present invention;
fig. 12 is a schematic structural diagram of an electronic device according to an embodiment of the present invention.
Detailed Description
The technical solution of the present invention is further described in detail with reference to the drawings and the specific embodiments of the specification.
Research shows that the uplink and downlink periods of the frame structure have the following characteristics: 2 milliseconds (ms) and 2.5 ms. If a frame adopts a special subframe ratio of 10: 2: the uplink and downlink period of 2, 2ms can send 5 SS/PBCH blocks at most, the uplink and downlink period of 2.5ms can send 7 SS/PBCH blocks at most; there are less than 8 SS/PBCH blocks.
If a special subframe ratio adopted by one uplink and downlink period is as follows: 12: 2: 0; sending 6 SS/PBCH blocks at most in the uplink and downlink period of 2 ms; there are less than 8 SS/PBCH blocks.
The subframe ratio is as follows: the number of downlink subframes in one uplink and downlink period is: number of Guard Period (GP) subframes: the ratio between the number of uplink subframes. For example, the ratio of 10: 2: 2, if the special subframe ratio is taken as an example, the frame structure includes: including 10 downlink subframes, 2 guard interval subframes, and 2 uplink subframes.
One of the uplink and downlink periods is: one transmission cycle of signal transmission.
The uplink and downlink periods of the special subframe ratio include Guard Period (GP), on one hand, due to the introduction of GP, the configuration flexibility of the frame is limited, and on the other hand, the Guard Period of 4 transmission symbols cannot be met, so that a reference signal (SRS) or a random access control channel (PRCH) cannot be transmitted on the special subframe.
If far-end base station interference needs to be considered in the later stage of 5G deployment, a relatively long GP needs to be set aside in the system in the hall to avoid uplink and downlink cross slot interference, for example, 12 symbols are set aside in a 2ms period (corresponding to a special subframe ratio of 6: 6: 2, where there are 6 symbols with subcarrier bandwidth of 15 kHz), or 18 symbols are set aside in a 2.5ms period (corresponding to a special subframe ratio of 3: 9: 2, where there are 9 symbols with subcarrier bandwidth of 15 kHz), as shown in fig. 3. Wherein, the 2ms period can only send 4 SS blocks, and the 2.5ms period can only send 5 SS blocks, which can not reach the maximum number supported by the standard.
If a worse GP is introduced, less resources are available for SS/PBCH blocks within one frame.
In the embodiment of the present invention, in order to implement transmission of an SS on each beam in a cell in a half frame, implement overall coverage of the SS in the entire cell, and/or facilitate flexible configuration of a GP on each subframe, in the embodiment of the present invention, a resource location of a candidate SS/PBCH block is determined according to at least one of a subcarrier interval, a carrier frequency, and an uplink and downlink period. For example, a resource location of a candidate SS/PBCH block is determined by determining an index determination of a first symbol of the candidate SS/PBCH block. Fig. 5 is a schematic diagram illustrating that the entire cell is covered by 8 SS blocks (SS blocks, SSBs); SSB 0-SSB 7 are shown in FIG. 5. Fig. 6 is a schematic diagram illustrating resource locations of 8 SSBs in a 2ms, 2.5ms uplink and downlink period. Comparing fig. 6 and fig. 7, if the number of symbols occupied by GP in fig. 7 is increased, the positions of the candidate SSBs may be occupied by GP is increased, and the number of SSBs actually used for transmitting the synchronization signal is decreased. After 8 SSBs are sent in two uplink and downlink periods, the flexibility of GP configuration can be increased and the overall coverage of synchronization signals can be ensured. Fig. 8 and 9 show schematic diagrams of sending 8 SS blocks in two uplink and downlink periods.
As shown in fig. 1, the present embodiment provides a method for determining transmission resources of a signal, including:
step S100: for a field containing a SS/PBCH block, the index of the first symbol in the candidate SS/PBCH block is: indexes { N1, …, Nm } + L × N, N ═ N1, N2, … nk; n1, n2, … nk comprises: discrete natural numbers, or fractions of n1, n2, … nk. The method can be applied to a receiving end, and the receiving end can determine the index of the first symbol of the candidate SS/PBCH block according to the functional relation. The receiving end may comprise a terminal. The terminal may include various User Equipment (UE), for example, a mobile phone, a tablet computer, a wearable device, an in-vehicle device, or an internet of things terminal.
The terminal may be connected to an access network element, which is a network element located in an access network. The access network element is various network elements located in an access network, and includes: evolved base stations, next generation base stations, radio remote units or relay nodes, etc. In summary, the access network element may be a network element providing a connection of the terminal to the network.
The access network element may transmit a beam on which a synchronization signal or a PBCH signal may be transmitted on a candidate SS/PBCH block. The synchronization signal may be used for synchronization between the terminal and the access network element, and the synchronization signal may include: a primary synchronization signal and/or a secondary synchronization signal. The PBCH block may carry various signals transmitted by PBCH; for example, a Master System Information (MSI) transmitted by PBCH, etc.
In some embodiments, the SS block is: a resource block for transmitting a synchronization signal; the PBCH block is a resource block for sending PBCH signals. The candidate SS blocks may be: candidate resource blocks for the SS block. The candidate PBCH block may be: candidate resource blocks for the PBCH block.
One of the resource blocks may include: a plurality of symbols. These symbols are distributed continuously in the video domain, for example, one of the SS block and the PBCH block may include: n symbols, for example, N may be 4, and optionally, the N symbols are consecutive time-frequency resources, for example, frequency-domain resources of N symbols belonging to the same SS/PBCH block are the same, and time-domain resources are consecutive. The symbol may be a basic unit of a kind of time-frequency resource used for communication. The symbols may include: orthogonal Frequency Division Multiplexing (OFDM).
In some embodiments, the candidate PBCH block and the candidate SS block may correspond to the same resource block. For example, different time-frequency resources of the same resource block are used to transmit the synchronization signal or the PBCH signal, respectively. For example, one resource block contains multiple (e.g., 4) symbols, wherein part (e.g., 2) of the symbols may be used for transmitting the synchronization signal, and part (e.g., 2) of the resources may be set to PBCH for the PBCH to transmit its required information. Thus, one resource block is realized to transmit the synchronization signal and the PBCH signal simultaneously, and the resource block may be referred to as an SS block or a PBCH block, which may be referred to as an SS/PBCH block in this embodiment. Of course, the above is merely an example, and in a specific implementation, one of the PBCH blocks may be configured as a dedicated resource block of PBCH, and not configured with a resource for transmitting a synchronization signal; one of the SS blocks may also be configured as a dedicated resource block for transmitting a synchronization signal without the configuration of PBCH. The SS/PBCH block may be used for resource blocks in which SS and PBCH signals are transmitted.
In some embodiments, the terminal may not currently know which beam sent by the access network element can be received, but knows candidate SS/PBCH blocks of each beam in advance, and the terminal may monitor on the candidate SS/PBCH blocks, and if the candidate SS/PBCH block of the currently monitored beam carries a synchronization signal or a PBCH signal, the terminal completes monitoring of the SS/PBCH block and receives the synchronization signal or the PBCH signal sent by the access network element.
The L may be a length of one resource unit; n may be a resource number of a resource unit. For example, if the resource unit is a timeslot, n may be a timeslot number of the timeslot, and if the resource unit is a minislot, n may be an index of the minislot. If the value of n is a decimal number, for example, 2.5 represents the 2.5 th resource unit, indicating the resource at the middle position of the 2 nd resource unit.
In some embodiments, the Nm value is less than the L. The minimum value of N1 may be 0.
In some embodiments, a slot may include a plurality of symbols, e.g., a slot includes: 14 symbols, 7 symbols, or 28 symbols, etc. Taking an example that a time slot includes 14 transmission symbols, according to a communication standard, at least two symbols need to be reserved before and after the time slot and are respectively configured as a downlink control channel and an uplink control channel, so that at least 4 symbols are reserved in the time slot of one 14 symbol and are used for configuring the uplink control channel and the downlink control channel; thus, only 10 symbols remain for transmission of the synchronization signal or the PBCH signal in a 14-symbol slot. If one SS/PBCH block contains 4 symbols, then 8 SS blocks or 8 PBCH blocks are transmitted, requiring at least two slots.
The first symbol may be: the first symbol contained in the candidate SS/PBCH block is described.
Thus, in order to satisfy compatibility with existing communications, it is necessary to complete transmission of 8 SS/PBCH blocks within a certain time duration (e.g., 5ms), i.e., the terminal needs to detect 8 SS/PBCH blocks from different slots. The duration of 1 frame may be 1m and 5ms may be half a frame. The time conversion relationship among the frame, the subframe and the time slot can be as follows: 1 frame-10 sub-frames-20 slots. If the slot contains 14 symbols, then 1 frame is 140 symbols.
In this embodiment, on one hand, the transmission of 8 SS/PBCH blocks needs to be completed within a half frame, and meanwhile, a subframe needs to be reserved and set as a GP, so as to facilitate flexible setting of the GP. In this embodiment, the SS/PBCH block is set on multiple discontinuous timeslots, so the terminal needs to listen to the SS/PBCH block on multiple discontinuous timeslots. On one hand, resources reserved between discontinuous time slots can be used for flexibly setting GP, on the other hand, transmission of SS/PBCH blocks of preset times in a half frame can be completed by repeatedly transmitting the SS/PBCH blocks on a plurality of discontinuous time slots, so that full coverage of synchronous signals or PBCH signals is realized, the problem that a terminal cannot synchronize or cannot successfully receive MSI and other information transmitted by PBCH due to full coverage is solved, and communication quality is improved.
The information interaction between the access network element and the terminal is according to a transmission period, which may be referred to as an uplink and downlink period in this embodiment. The uplink and downlink periods can be divided into: an uplink and downlink period of 2.5ms, and an uplink and downlink period of 2 ms. If the uplink and downlink period is 2.5ms, it means that there is a transition of uplink and downlink transmission within the duration of 2.5 ms. If the uplink and downlink period is 2ms, it means that there is a transition of uplink and downlink transmission within the duration of 2 ms.
In this embodiment, before monitoring the SS/PBCH block, the terminal determines a candidate SS/PBCH block according to at least one of the duration of the uplink and downlink periods, the subcarrier interval of the current beam, and the carrier frequency. After determining the candidate SS/PBCH block, monitoring a synchronization signal or monitoring a PBCH on the candidate SS/PBCH block.
In some embodiments, if one resource unit includes 14 symbols, then indexes { N1, …, Nm } + L × N may be: indexes {2, 8} +14 × n. Further, at this time, n is 0, 1, 4, 5; or, n is 0, 1, 5, 6; but is not limited to these values.
If the number of symbols included in a resource unit is 28, then indexes { N1, …, Nm } + L × N may be: {4,8, 16, 20}+28*. Further, at this time, n is 0, 2; alternatively, N is 0, 2.5.
For example, if the subcarrier spacing is 30kHz, the index of the first symbol of the candidate SS/PBCH block is: indexes {2, 8} +14 × n.
The indexes { N1, …, Nm } represents an initial value of an index of a first symbol of a candidate SS/PBCH block; n denotes a resource number of a resource unit such as a slot number of a slot in which the symbol is located. Usually, a sub-frame or frame comprises a plurality of time slots which are numbered sequentially from the front to the back; for example, the slot number starts from 0.
In some embodiments, the value of n may be determined according to the duration of the current uplink and downlink period, where the value of n may be a value of a timeslot. A communication system may support both 2.5ms and 2ms uplink and downlink periods, but only one uplink and downlink period may be used at a time, and the duration of the uplink and downlink period may be modified if necessary.
For example, the currently used uplink and downlink period of 2.5ms, considering requirements of various aspects, may modify the uplink and downlink period of 2.5ms into the uplink and downlink period of 2ms, and during the modification of the uplink and downlink period, the access network element and the terminal may negotiate through information interaction. For example, if the uplink and downlink periods are:
if the subcarrier spacing is 30kHz and the uplink and downlink period is 2ms, the index of the first symbol of the candidate SS/PBCH block is: indexes {2, 8} +14 × n; for example, if the carrier frequency of the candidate SS/PBCH block is greater than 3GHz and less than or equal to 6GHz, n may be equal to 0, 1, 4, or 5.
If the subcarrier spacing is 30kHz and the uplink and downlink period is 2.5ms, the index of the first symbol of the candidate synchronization signal block or the candidate PBCH block is: indexes {2, 8} +14 × n; if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, n may be equal to 0, 1, 5, or 6.
In some embodiments, step S100 may include:
if the subcarrier spacing is 30kHz, the index of the first symbol in the candidate SS/PBCH block is: indexes {4, 8, 16, 20} +28 × n.
In this embodiment, L is 28, which corresponds to a resource unit including 28 resources; n is the resource number of the resource unit.
In some embodiments, n is 0, 2; alternatively, N is 0, 2.5.
For example, if the period is 2ms for uplink and downlink, the value of n may be 0 or 2. If the uplink and downlink period is 2.5ms, the value of n may be 0 or 2.5.
For another example, the carrier frequency of the SS/PBCH block is greater than 3GHz and less than or equal to 6 GHz; if the uplink and downlink period is 2ms, the value of n may be 0 or 2. If the uplink and downlink period is 2.5ms, the value of n may be 0 or 2.5.
As shown in fig. 2, the present embodiment provides a method for determining transmission resources, including:
step S200: for a half frame containing a synchronization signal SS/physical broadcast control channel PBCH block, the index of the first symbol in the candidate SS/PBCH block is: indexes { N1, …, Nm } + L × N, N ═ N1, N2, … nk; m x k is greater than L.
In some embodiments, L is the maximum number of candidate SS/PBCH blocks in each field.
The first symbol in the candidate SS/PBCH block is the first symbol in the candidate SS/PBCH block. The index of the first symbol may be determined according to the functional relationship, so that the terminal listens to signals transmitted by the SS or PBCH on the candidate SS/PBCH block determined according to the functional relationship.
In this embodiment, m × k is greater than the maximum number of candidate SS/PBCH blocks in each half frame, so that the candidate SS/PBCH blocks can be flexibly configured in the whole half frame.
In some embodiments, if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, L-8.
In other embodiments, if the carrier frequency is greater than 6GHz, L is 64.
In still other embodiments, if the carrier frequency is greater than or equal to 3GHz, L-4. The carrier frequency here is the frequency of the carrier of the candidate SS/PBCH block.
In some embodiments, the Nm is less than the L.
In still other embodiments, the step S200 may include:
if the subcarrier spacing is 30kHz, the index of the first symbol in the candidate SS/PBCH block is: indexes {2, 8} +14 × n.
In other embodiments, n is 0, 1, 4, 5, 6; or, n is 0, 1, 2, 3, 4, 5, 6, 7, 8, 9;
alternatively, n is 0, 1.
For example, 30kHz spacing for subcarriers; if the carrier frequency is less than or equal to 3GHz, n is equal to 0 or 1; if the carrier frequency is greater than 3GHz and less than or equal to 6GHz for a subcarrier spacing of 30kHz, n is 0, 1, 4, 5, 6; or n is 0, 1, 2, 3, 4, 5, 6.
For another example, if the carrier frequency is greater than 3GHz and less than or equal to 6GHz and the uplink and downlink period is 2ms, n is 0, 1, 4, 5, 6. If the carrier frequency is greater than 3GHz and less than or equal to 6GHz and the uplink and downlink period is 2.5ms, n is 0, 1, 2, 3, 4, 5, 6
In some embodiments, the step S200 may include:
if the subcarrier spacing is 30kHz, the index of the first symbol in the candidate SS/PBCH block is: indexes {4, 8, 16, 20} +28 × n.
Further, n is 0, 1; or, n is 0, 1, 4, 6; or n is 0, 1, 2, 3, 4, 5, 6, 7, 8, 9.
For example, the spacing is 30kHz for subcarriers and n may be equal to 0 or 1 if the carrier frequency is less than or equal to 3 GHz.
For another example, if the subcarrier spacing is 30kHz and the carrier frequency is greater than 3GHz and less than or equal to 6GHz, then n is 0, 1, 4, 6; or n is 0, 1, 2, 3, 4, 5, 6, 7, 8, 9. For example, if the uplink and downlink period is 2ms, n is 0, 1, 4 or 6; if the uplink and downlink period is 2.5ms, n is 0, 1, 2, 3, 4, 5, 6, 7, 8 or 9.
As shown in fig. 3, the present embodiment provides a transmission resource determining apparatus, including:
a first determining module 100, configured to determine, for a half frame containing a synchronization signal SS/physical broadcast control channel PBCH block, an index of a first symbol in a candidate SS/PBCH block as: indexes { N1, …, Nm } + L × N, N ═ N1, N2, … nk; n1, n2, … nk comprises: discrete natural numbers, or fractions of n1, n2, … nk.
The first determining module 100 may be a program module and may be configured to determine an index of a first symbol of a candidate SS/PBCH block, so as to determine a resource location of the candidate SS/PBCH block that a terminal needs to monitor.
In some embodiments, the transmission resource determining apparatus further comprises:
and the first monitoring module monitors the candidate SS/PBCH block according to the index of the first symbol. In this way, the terminal may not need to listen to the signals of the SS or PBCH transmissions on the entire resource.
Likewise, the first listening module may be a program module, and may be configured to listen for signals transmitted by the SS or PBCH after being executed by the processor.
The first determining module 100 and the first monitoring module may be: specific hardware structures such as application specific integrated circuits or programmable devices, or combinations of hardware and software, are not limited to program modules that can be executed by a processor. The processor may include: a central processing unit, a microprocessor, a digital signal processor, etc.
In some embodiments, the Nm is less than the L.
In other embodiments, the first determining module 100 is specifically configured to, if the subcarrier spacing is 30kHz, index of the first symbol in the candidate SS/PBCH block is: indexes {2, 8} +14 × n.
In other embodiments, n is 0, 1, 4, 5; alternatively, n is 0, 1, 5, 6.
In other embodiments, the first determining module 100 is specifically configured to, if the subcarrier spacing is 30kHz, index of the first symbol in the candidate SS/PBCH block is: indexes {4, 8, 16, 20} +28 × n.
In some embodiments, n is 0, 2; alternatively, n is 0, 2.5.
In still other embodiments, the carrier frequency of the SS/PBCH block is greater than 3GHz and less than or equal to 6 GHz.
For example, the carrier frequency of the SS/PBCH block is greater than 3GHz and less than or equal to 6GHz, and if the uplink and downlink period is 2ms, n is equal to 0 or 2; for another example, the carrier frequency of the SS/PBCH block is greater than 3GHz and less than or equal to 6GHz, and if the uplink and downlink period is 2.5ms, n is equal to 0 or 2.5.
As shown in fig. 4, the present embodiment provides a transmission resource determining apparatus, including:
a first determining module 200, configured to, for a half frame containing a synchronization signal SS/physical broadcast control channel PBCH block, index of a first symbol in a candidate SS/PBCH block: indexes { N1, …, Nm } + L × N, N ═ N1, N2, … nk;
m x k is greater than L.
In some embodiments, L is the maximum number of candidate SS/PBCH blocks in each field.
The transmission resource determining apparatus may be an apparatus applied to a receiving end such as a terminal.
The first determining module 200 may be a program module, and the first determining module 200, when executed by a processor, is capable of determining resource locations of candidate SS/PBCH blocks, where the resource locations include at least a time domain resource location.
In some embodiments, the apparatus further comprises:
a second monitoring module, configured to monitor signals of SS or PBCH transmissions according to the index of the first symbol of the candidate SS/PBCH block.
The first determining module 200 and the second monitoring module may be: specific hardware structures such as application specific integrated circuits or programmable devices, or combinations of hardware and software, are not limited to program modules that can be executed by a processor. The processor may include: a central processing unit, a microprocessor, a digital signal processor, etc.
In some embodiments, if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, L-8.
In other embodiments, if the carrier frequency is greater than 6GHz, L is 64.
In still other embodiments, if the carrier frequency is greater than or equal to 3GHz, L-4.
In still other embodiments, the Nm is less than the L.
In addition, the second determination ok is specifically configured to, if the subcarrier spacing is 30kHz, index of the first symbol in the candidate SS/PBCH block is: indexes {2, 8} +14 × n. In this case, the value of n may be as follows:
n=0,1,4,5,6;
alternatively, the first and second electrodes may be,
n=0,1,2,3,4,5,6,7,8,9;
alternatively, the first and second electrodes may be,
n=0,1。
in other embodiments, the first determining module 200 is specifically configured to, if the subcarrier spacing is 30kHz, index of the first symbol in the candidate SS/PBCH block is: indexes {4, 8, 16, 20} +28 × n. In this case, the value of n may be as follows:
n=0,1;
alternatively, the first and second electrodes may be,
n=0,1,4,6;
alternatively, the first and second electrodes may be,
n=0,1,2,3,4,5,6,7,8,9。
several specific examples are provided below in connection with any of the embodiments described above:
example 1:
to achieve that the transmission of 8 SS/PBCH blocks is completed in 5 milliseconds, in this example, 8 SS blocks are split and sent in two cycles. The duration of 5 milliseconds is the duration of a half frame.
If the uplink and downlink period of the final fused frame structure is 2ms, the SS block is transmitted in the first ms and the third ms of the field, as shown in fig. 9, it can be seen that this configuration mode can support all types of special subframe allocations, including: GP of 12 symbols and the like greatly enhance deployment flexibility while ensuring SS block coverage.
For example, in a half frame, determining the index of the first symbol of a candidate SS/PBCH block according to subcarrier spacing may be determined in one of the following ways:
if the subcarrier spacing is 15kHz, the index of the first symbol is: indexes {2, 8} +14 × n.
If the carrier frequency is less than or equal to 3GHz, n is equal to 0 or 1, and if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, n is equal to 0, 1, 2, or 3.
If the subcarrier spacing is 30kHz, the index of the first symbol is: indexes {4, 8, 16, 20} +28 × n. If the carrier frequency is less than or equal to 3GHz, n is equal to 0, and if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, n is equal to 0 or 2.
If the subcarrier spacing is 30kHz, the index of the first symbol is: indexes {2, 8} +14 × n.
If the carrier frequency is less than or equal to 3GHz, n is equal to 0 or 1, and if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, n is equal to 0, 1, 4, or 5.
By adopting the method to configure the SS/PBCH block, 8 SS/PBCH blocks can be sent in two periods, and only all special subframe ratios are matched.
Example 2:
if the uplink and downlink period of the final merged frame structure is 2.5ms, the SS block is transmitted in the first ms and 2.5-3.5 ms of the field, as shown in fig. 10. According to the method, all special subframe ratios and the GP of 26 symbols in the uplink and downlink period of the 2.5 millisecond single frame structure can be supported, and all special subframe ratios and the GP of 10 symbols in the uplink and downlink period of the 2.5 millisecond double frame structure can also be supported.
For example, in a half frame, determining the index of the first symbol of a candidate SS/PBCH block according to subcarrier spacing may be determined in one of the following ways:
if the subcarrier spacing is 15kHz, the index of the first symbol is: indexes {2, 8} +14 × n.
If the carrier frequency is less than or equal to 3GHz, n is equal to 0 or 1, and if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, n is equal to 0, 2, or 5.
If the subcarrier spacing is 30kHz, the index of the first symbol is: indexes {4, 8, 16, 20} +28 × n. If the carrier frequency is less than or equal to 3GHz, n is equal to 0, and if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, n is equal to 0 or 2.
If the subcarrier spacing is 30kHz, the index of the first symbol is: indexes {2, 8} +14 × n.
If the carrier frequency is less than or equal to 3GHz, n is equal to 0 or 1, and if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, n is equal to 0, 1, 5, or 6.
By adopting the method to configure the SS/PBCH block, 8 SS/PBCH blocks can be sent in two periods, and only all special subframe ratios are matched.
Once the SS block is determined to be transmitted in the time slots 4 and 5, the uplink and downlink period is actually determined to be 2ms, and if the terminal is implemented according to the determination, the uplink and downlink ratio cannot be modified to be 2.5ms at a later stage.
Once the SS block is determined to be transmitted in the time slots 5 and 6, the uplink and downlink period is actually determined to be 2.5ms, and if the terminal is realized according to the determination, the uplink and downlink ratio cannot be modified to be 2ms any more in the later period.
Example 3:
one solution is to require the terminal to perform SS block monitoring in all of slot 4, slot 5 and slot 6, so that the SS block design can support both 2ms and 2.5ms periods, and the index of the first symbol of the SSB can be as follows:
for example, in a half frame, the index of the first symbol of the candidate SS/PBCH block determined according to the subcarrier spacing is determined based on the subcarrier spacing, and may be specifically determined in one of the following manners:
if the subcarrier spacing is 15kHz, the index of the first symbol of the candidate SS/PBCH block is: indexes {2, 8} +14 × n; if the carrier frequency is less than or equal to 3GHz, n is equal to 0 or 1; if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, n is equal to 0, 1, 2, or 3.
If the subcarrier spacing is 30kHz, the index of the first symbol of the candidate SS/PBCH block is: indexes {4, 8, 16, 20} +28 × n; if the carrier frequency is less than or equal to 3GHz, n is equal to 0; if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, n is equal to 0, 2, or 2.5.
If the subcarrier spacing is 30kHz, the index of the first symbol of the candidate SS/PBCH block is: indexes {4, 8, 16, 20} +28 × n; if the carrier frequency is less than or equal to 3GHz, n is equal to 0 or 1; if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, n is equal to 0, 1, 4, or 6.
If monitoring the time slot 4, the time slot 5 and the time slot 6, after the terminal accesses the network to read the system information, the uplink and downlink periods can be obtained, and the position of the SS block irrelevant to the current uplink and downlink ratio does not need to be monitored subsequently.
Example 4:
a resource location of a candidate SS block is determined by taking all SS block locations within 5ms as SS blocks to be monitored (candidate SS block locations) as follows:
for example, in a half frame, the index of the first symbol of the candidate SS/PBCH block is determined according to the subcarrier spacing, which may be determined in one of the following manners:
the first condition is as follows: if the subcarrier spacing is 15kHz, the index of the first symbol is: indexes {2, 8} +14 × n.
The SSB determined in this manner can be as shown in fig. 11.
If the carrier frequency is less than or equal to 3GHz, n is equal to 0 or 1, if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, n is equal to 0, 1, 2 or 3;
case two: if the subcarrier spacing is 30kHz, the index of the first symbol is: indexes {4, 8, 16, 20} +28 × n. If the carrier frequency is less than or equal to 3GHz, n is equal to 0, and if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, n is equal to 0, 0.5, 1, 1.5, 2, 2.5, 4, or 4.5.
Case three: if the subcarrier spacing is 30kHz, the index of the first symbol is: indexes {2, 8} +14 × n.
If the carrier frequency is less than or equal to 3GHz, n is equal to 0 or 1, and if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, n is equal to 0, 1, 2, 3, 4, 5, 6, 7, 8, or 9.
According to the scheme (the terminal detects all SSB positions) the terminal complexity and power consumption can be increased to a certain extent, and the method for improving the terminal complexity and power consumption is that in the initial access stage, the terminal monitors all possible SSB positions, and after the terminal reads system information and learns the uplink and downlink proportion, the terminal can detect the SSB according to the related uplink and downlink proportion. A table of SSB detection locations associated with uplink and downlink assignments is as follows:
Figure BDA0001760060980000171
as shown in fig. 12, an embodiment of the present invention provides an electronic device, including:
a memory for storing information;
and the processor is connected with the memory and used for implementing the transmission resource determination method provided by one or more of the technical schemes, for example, the method shown in fig. 1 and/or fig. 2, by executing the computer-executable instructions stored on the memory.
In some embodiments, the electronic device further comprises:
a communication interface connected with the processor for transceiving information.
The memory can be various types of memories, such as random access memory, read only memory, flash memory, and the like. The memory may be used for information storage, e.g., storing computer-executable instructions, etc. The computer-executable instructions may be various program instructions, such as object program instructions and/or source program instructions, and the like.
The processor may be various types of processors, such as a central processing unit, a microprocessor, a digital signal processor, a programmable array, a digital signal processor, an application specific integrated circuit, or an image processor, among others.
The processor may be connected to the memory via a bus. The bus may be an integrated circuit bus or the like.
In some embodiments, the electrical device may further comprise: a communication interface, which may include: a network interface, e.g., a local area network interface, a transceiver antenna, etc. The communication interface is also connected with the processor and can be used for information transceiving.
In some embodiments, the electronic device also includes a human interaction interface, which may include various input and output devices, such as a keyboard, a touch screen, and the like, for example.
The embodiment of the invention provides a computer storage medium, which stores computer executable codes; the computer executable code, when executed, can implement the transmission resource determination method provided by one or more of the foregoing technical solutions, for example, the method shown in fig. 1 and/or fig. 2 can be executed.
The storage medium includes: a mobile storage device, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes. The storage medium may be a non-transitory storage medium.
An embodiment of the present invention provides a computer program product, which includes computer-executable instructions; the computer-executable instructions, when executed, can implement the transmission resource determination method provided by one or more of the foregoing technical solutions.
The computer program product of this embodiment may include computer-executable instructions that comprise: an application, a software development kit, a plug-in or patch, and the like.
In the several embodiments provided in the present application, it should be understood that the disclosed apparatus and method may be implemented in other ways. The above-described device embodiments are merely illustrative, for example, the division of the unit is only a logical functional division, and there may be other division ways in actual implementation, such as: multiple units or components may be combined, or may be integrated into another system, or some features may be omitted, or not implemented. In addition, the coupling, direct coupling or communication connection between the components shown or discussed may be through some interfaces, and the indirect coupling or communication connection between the devices or units may be electrical, mechanical or other forms.
The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, that is, may be located in one place, or may be distributed on a plurality of network units; some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, all the functional units in the embodiments of the present invention may be integrated into one processing module, or each unit may be separately used as one unit, or two or more units may be integrated into one unit; the integrated unit can be realized in a form of hardware, or in a form of hardware plus a software functional unit.
Those of ordinary skill in the art will understand that: all or part of the steps for implementing the method embodiments may be implemented by hardware related to program instructions, and the program may be stored in a computer readable storage medium, and when executed, the program performs the steps including the method embodiments; and the aforementioned storage medium includes: a mobile storage device, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present invention, and all the changes or substitutions should be covered within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the appended claims.

Claims (21)

1. A method for transmission resource determination, comprising:
for a half frame containing a synchronization signal SS/physical broadcast control channel PBCH block, the index of the first symbol in the candidate SS/PBCH block is: indexes { N1, …, Nm } + L × N, N ═ N1, N2, … nk;
n1, n2, … nk comprises: discrete natural numbers, or fractions of n1, n2, … nk.
2. The method of claim 1,
the Nm is less than the L.
3. The method of claim 1,
for the half frame containing the synchronization signal SS block or the physical broadcast control channel PBCH block, the index of the first symbol in the candidate SS/PBCH block is as follows: indexes { N1, …, Nm } + L × N, comprising:
if the subcarrier spacing is 30kHz, the index of the first symbol in the candidate SS/PBCH block is: indexes {2, 8} +14 × n.
4. The method of claim 3,
n=0,1,4,5;
alternatively, the first and second electrodes may be,
n=0,1,5,6。
5. the method of claim 1,
for the half frame containing the synchronization signal SS block or the physical broadcast control channel PBCH block, the index of the first symbol in the candidate SS/PBCH block is as follows: indexes { N1, …, Nm } + L × N, comprising:
if the subcarrier spacing is 30kHz, the index of the first symbol in the candidate SS/PBCH block is: indexes {4, 8, 16, 20} +28 × n.
6. The method of claim 4,
n=0,2;
alternatively, the first and second electrodes may be,
n=0,2.5。
7. the method of claim 1,
the carrier frequency of the SS/PBCH block is greater than 3GHz and less than or equal to 6 GHz.
8. A method for transmission resource determination, comprising:
for a half frame containing a synchronization signal SS/physical broadcast control channel PBCH block, the index of the first symbol in the candidate SS/PBCH block is: indexes { N1, …, Nm } + L × N, N ═ N1, N2, … nk;
m x k is greater than L, L being related to the carrier frequency.
9. The method of claim 8,
if the carrier frequency is greater than 3GHz and less than or equal to 6GHz, L is 8.
10. The method of claim 8,
if the carrier frequency is greater than 6GHz, L is 64.
11. The method of claim 8,
if the carrier frequency is greater than or equal to 3GHz, L is 4.
12. The method of claim 8,
the Nm is less than the L.
13. The method of claim 8,
for the half frame containing the synchronization signal SS block or the physical broadcast control channel PBCH block, the index of the first symbol in the candidate SS/PBCH block is as follows: indexes { N1, …, Nm } + L × N, comprising:
if the subcarrier spacing is 30kHz, the index of the first symbol in the candidate SS/PBCH block is: indexes {2, 8} +14 × n.
14. The method of claim 13,
n=0,1,4,5,6;
alternatively, the first and second electrodes may be,
n=0,1,2,3,4,5,6,7,8,9;
alternatively, the first and second electrodes may be,
n=0,1。
15. the method of claim 8,
for the half frame containing the synchronization signal SS block or the physical broadcast control channel PBCH block, the index of the first symbol in the candidate SS/PBCH block is as follows: indexes { N1, …, Nm } + L × N, comprising:
if the subcarrier spacing is 30kHz, the index of the first symbol in the candidate SS/PBCH block is: indexes {4, 8, 16, 20} +28 × n.
16. The method of claim 15,
n=0,1;
alternatively, the first and second electrodes may be,
n=0,1,4,6;
alternatively, the first and second electrodes may be,
n=0,1,2,3,4,5,6,7,8,9。
17. the method of claim 8,
l is the maximum number of candidate SS/PBCH blocks in each field.
18. A transmission resource determination apparatus, comprising:
a first determining module, configured to determine, for a half frame containing a synchronization signal SS/physical broadcast control channel PBCH block, an index of a first symbol in a candidate SS/PBCH block as: indexes { N1, …, Nm } + L × N, N ═ N1, N2, … nk;
n1, n2, … nk comprises: discrete natural numbers, or fractions of n1, n2, … nk.
19. A transmission resource determination apparatus, comprising:
a second determining module, configured to, for a half frame containing a synchronization signal SS/physical broadcast control channel PBCH block, index of a first symbol in the candidate SS/PBCH block: indexes { N1, …, Nm } + L × N, N ═ N1, N2, … nk;
m x k is greater than L, L being related to the carrier frequency.
20. An electronic device, comprising: a memory;
a processor coupled to the memory for implementing the method provided by any one of claims 1 to 7 or 8 to 17 by executing computer executable instructions stored on the memory.
21. A computer storage medium having stored thereon computer-executable instructions; the computer-executable instructions, when executed, enable the method provided by any one of claims 1 to 7 or 8 to 17 to be carried out.
CN201810903574.8A 2018-08-09 2018-08-09 Transmission resource determining method and device, electronic equipment and storage medium Active CN110831171B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810903574.8A CN110831171B (en) 2018-08-09 2018-08-09 Transmission resource determining method and device, electronic equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810903574.8A CN110831171B (en) 2018-08-09 2018-08-09 Transmission resource determining method and device, electronic equipment and storage medium

Publications (2)

Publication Number Publication Date
CN110831171A true CN110831171A (en) 2020-02-21
CN110831171B CN110831171B (en) 2023-05-09

Family

ID=69540945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810903574.8A Active CN110831171B (en) 2018-08-09 2018-08-09 Transmission resource determining method and device, electronic equipment and storage medium

Country Status (1)

Country Link
CN (1) CN110831171B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021114732A1 (en) * 2019-12-12 2021-06-17 展讯通信(上海)有限公司 Candidate synchronization signal block processing method and apparatus
WO2022266873A1 (en) * 2021-06-23 2022-12-29 Zte Corporation Systems and methods for reference signaling design and configuration

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108270710A (en) * 2017-01-03 2018-07-10 中兴通讯股份有限公司 A kind of method for transmitting signals, apparatus and system
WO2018128341A1 (en) * 2017-01-03 2018-07-12 엘지전자 주식회사 Method for encoding and transmitting pbch and communication device therefor
CN110149294A (en) * 2018-02-13 2019-08-20 华为技术有限公司 Transmission method, communication device and the communication equipment of synchronization signal block

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108270710A (en) * 2017-01-03 2018-07-10 中兴通讯股份有限公司 A kind of method for transmitting signals, apparatus and system
WO2018128341A1 (en) * 2017-01-03 2018-07-12 엘지전자 주식회사 Method for encoding and transmitting pbch and communication device therefor
CN110149294A (en) * 2018-02-13 2019-08-20 华为技术有限公司 Transmission method, communication device and the communication equipment of synchronization signal block

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
NTT DOCOMO, INC.: "Remaining issues on synchronization signal", 《3GPP TSG RAN WG1 MEETING #93 R1-1807049》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021114732A1 (en) * 2019-12-12 2021-06-17 展讯通信(上海)有限公司 Candidate synchronization signal block processing method and apparatus
WO2022266873A1 (en) * 2021-06-23 2022-12-29 Zte Corporation Systems and methods for reference signaling design and configuration

Also Published As

Publication number Publication date
CN110831171B (en) 2023-05-09

Similar Documents

Publication Publication Date Title
US10856292B2 (en) Communication method and base station
CN110445597B (en) Feedback resource determination method and device
CN113411171B (en) Data transmission method and device
CN103069899A (en) Configuring an uplink and downlink splitting pattern for device-to-device communication under a cellular network
CN107872302B (en) Data transmission method and device
CN103716776B (en) A kind of D2D communication means and user equipment
CN108496397B (en) Method and apparatus for synchronizing broadcast transmission signal blocks
CN112564868B (en) Signal sending and receiving method and terminal
EP3813412B1 (en) Method for measuring beams, network side device, terminal device, and storage medium
CN107027166B (en) A kind of sending method, device and the node of the synchronizing information of node
CN110831171A (en) Transmission resource determination method and device, electronic equipment and storage medium
CN109496440A (en) Time-frequency resource competition method, device, equipment and system for direct connection communication
CN112636889B (en) Side link information transmission method, device, user terminal and storage medium
EP3641204B1 (en) Indication method and apparatus and determination method and apparatus for synchronization signal block, and base station, terminal and storage medium
EP3740023A1 (en) User device and base station device
CN111147213B (en) Signal sending method and terminal
KR101738319B1 (en) Method, system and device for data transmission and reception
CN105634667B (en) A kind of processing method and processing device of physical down channel
CN107124767A (en) A kind of symbol arranging method, information processing method and device
CN104753658B (en) Data transmission method and device a kind of while in co-channel full duplex system
CN109803287B (en) Paging monitoring method and terminal
EP3496475B1 (en) Signal sending apparatus, signal reception apparatus, and method
CN108282319B (en) Resource indication method and related equipment
WO2019096074A1 (en) Communication method and device
CN113271192B (en) Information sending method, receiving method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant