CN110826139A - Method for evaluating interaction influence of pile inserting under horizontal force on adjacent pile groups - Google Patents

Method for evaluating interaction influence of pile inserting under horizontal force on adjacent pile groups Download PDF

Info

Publication number
CN110826139A
CN110826139A CN201911124099.5A CN201911124099A CN110826139A CN 110826139 A CN110826139 A CN 110826139A CN 201911124099 A CN201911124099 A CN 201911124099A CN 110826139 A CN110826139 A CN 110826139A
Authority
CN
China
Prior art keywords
pile
interaction
group
head
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911124099.5A
Other languages
Chinese (zh)
Other versions
CN110826139B (en
Inventor
王庆功
王建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Frontier Technology Research Institute of Tianjin University Co Ltd
Original Assignee
Frontier Technology Research Institute of Tianjin University Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Frontier Technology Research Institute of Tianjin University Co Ltd filed Critical Frontier Technology Research Institute of Tianjin University Co Ltd
Priority to CN201911124099.5A priority Critical patent/CN110826139B/en
Publication of CN110826139A publication Critical patent/CN110826139A/en
Application granted granted Critical
Publication of CN110826139B publication Critical patent/CN110826139B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses an evaluation method for the interaction influence of pile inserting under horizontal force on adjacent pile groups, which comprises the following steps: establishing a three-dimensional elastoplasticity CEL pile group model according to the engineering geological parameters and the positions of the pile shoe and the adjacent pile group; determining the maximum horizontal force applied by the bearing platform by combining the API specification and the nonlinear foundation beam model according to the pile body parameters and the pile head constraint conditions; determining pile head counter force and pile head displacement of each pile in the pile inserting process under the maximum horizontal force action of the pile group; establishing a corresponding three-dimensional elastoplasticity CEL single pile model according to the relative position of each pile and a pile shoe in the pile group; applying the extracted pile head counter-force to the corresponding CEL single-pile model pile head through the amplitude curve to determine the pile head displacement of each single pile in the pile inserting process; and determining additional displacement and interaction coefficients caused by pile group interaction in the pile inserting process, and evaluating the influence degree of the pile inserting of the drilling ship on the interaction of adjacent pile groups under the action of horizontal force.

Description

Method for evaluating interaction influence of pile inserting under horizontal force on adjacent pile groups
Technical Field
The invention relates to the technical field of ocean engineering, in particular to an evaluation method for the interaction influence of pile inserting under horizontal force on adjacent piles in the offshore oil development process.
Background
The self-elevating drilling ship is an engineering ship with a platform function, and is widely applied to offshore oil development due to the advantages of large bearing capacity, good stability, flexible moving capacity and the like. The drill ship is often required to work near the built jacket platform, large-diameter pile shoes are required to be penetrated to serve as a foundation fixing platform in the process of installing the drill ship in place, and the adjacent pile foundation is greatly influenced if the drill ship is close to the existing platform in the pile inserting process. The existing research shows that under the action of horizontal load, when the pile spacing between two adjacent piles in a pile group is smaller than the critical pile spacing, each single pile generates a pile group effect through the interaction of soil between piles, so that the research on the influence of the pile inserting process of a drilling ship on the interaction of adjacent pile groups is of great significance on the basis of related research at home and abroad.
Disclosure of Invention
The invention provides an evaluation method for the influence of pile insertion under horizontal force on the interaction of adjacent piles to solve the technical problems in the prior art.
In order to achieve the purpose, the invention provides the following technical scheme:
a method for evaluating the influence of pile insertion under horizontal force on the interaction of adjacent piles, comprising the following steps:
1) establishing a three-dimensional elastoplasticity CEL pile group model according to the engineering geological parameters and the positions of the pile shoe and the adjacent pile group;
2) determining the maximum horizontal force applied by the bearing platform by combining the API specification and the nonlinear foundation beam model according to the pile body parameters and the pile head constraint conditions;
3) determining pile head counter force and pile head displacement of each pile in the pile inserting process under the maximum horizontal force action of the pile group;
4) establishing a corresponding three-dimensional elastoplasticity CEL single pile model according to the relative position of each pile and a pile shoe in the pile group;
5) applying the pile head counter-force extracted in the step 3) to the corresponding CEL single-pile model pile head through an amplitude curve to determine the pile head displacement of each single pile in the pile inserting process;
6) and determining additional displacement and interaction coefficients caused by pile group interaction in the pile inserting process, and evaluating the influence degree of the pile inserting of the drilling ship on the interaction of adjacent pile groups under the action of horizontal force.
Further, in step 1), establishing a three-dimensional elastoplasticity CEL pile group model according to the engineering geological parameters and the positions of the pile shoe and the adjacent pile group, specifically comprising: and establishing a three-dimensional elastic-plastic finite element model of the pile shoe-soil body-pile foundation interaction according to the soil body parameters, the assumed pile foundation parameters, the pile shoe parameters and the relative position of the pile shoe and the pile foundation.
Further, in step 2), determining the maximum horizontal force applied by the bearing platform according to the pile body material and the pile head constraint condition by combining the API specification with the nonlinear foundation beam model, specifically including:
① determining the ultimate bending moment of the pile body according to the pile diameter and the yield strength of the pile body material by a material mechanics theory;
②, establishing a nonlinear foundation beam model according to parameters of the adopted piles and pile head constraint conditions by using ABAQUS finite element software;
③ adding a spring on the pile body of the model at intervals of a set distance along the depth direction, and determining the parameters of the earth spring nodes according to the p-y curve suggested by the API specification;
④ repeatedly applying horizontal load on the top of the nonlinear foundation beam to obtain the maximum bending moment of the model pile body under the action of corresponding horizontal load, until the maximum bending moment of the model pile body is equal to the limit bending moment of the adopted pile by the horizontal load applied on the top of the nonlinear foundation beam model, and determining the horizontal load as the limit horizontal load borne by the single pile head of the adopted pile;
⑤, dividing the limit horizontal load borne by the single pile head by a safety factor, namely the maximum allowable value of the horizontal load applied by the single pile head;
⑥ the maximum allowable value of the horizontal load applied by the pile head of the single pile is multiplied by the number of piles in the adjacent pile group, and the maximum allowable value of the horizontal load applied by the pile group bearing platform is obtained.
Further, in the step 4), a corresponding three-dimensional elastoplasticity CEL single pile model is established according to the relative position of each pile and the pile shoe in the pile group, and soil parameters, pile body parameters, pile shoe size and mesh division in the CEL single pile model are all consistent with those of the CEL pile group model.
Further, in step 6), determining additional displacement and an interaction coefficient caused by pile group interaction in the pile inserting process, and evaluating the degree of influence of the pile inserting of the drilling ship on the interaction of adjacent pile groups under the action of horizontal force specifically comprises: the Poulos interaction coefficient method is clear in concept and simple and convenient to calculate, and is widely applied to interaction calculation of pile group foundations, so that the method is adopted for additional displacement and interaction influence coefficients at the position. I.e. the additional displacement is equal to the pile-group head displacement minus the corresponding single-pile head displacement, and the interaction coefficient is equal to the head displacement of the additional position removed to correspond to the single pile.
The invention has the beneficial effects that:
(1) compared with a model test, the method can accurately extract the pile head reaction force of each pile in the pile group with the bearing platform.
(2) The method adopts a finite element CEL (coupled Euler-Lagrange method) method to carry out numerical simulation on the pile inserting process of the drilling ship, absorbs the advantages of Lagrange analysis and Euler analysis, and solves the problem that a finite element grid of a soil body is seriously distorted possibly caused by large deformation of the soil body when a pile shoe is deeply buried compared with the traditional Lagrange finite element method.
(3) The invention has the advantages of convenient implementation, good economy, wide soil application, flexible adjustment of the relative position of the pile shoe and the pile and the size of the pile spacing, and the like.
(4) The invention establishes a practical calculation method convenient for engineering application, can quickly evaluate the influence degree of the drilling ship pile insertion on the interaction of adjacent grouped piles under different working conditions, and promotes the progress and innovation of the offshore oil development technology.
Drawings
The above and other features, properties and advantages of the present invention will become more apparent from the following description of the embodiments with reference to the accompanying drawings in which like reference numerals denote like features throughout the several views, wherein:
FIG. 1 is a flow chart of an evaluation method of the present invention;
FIG. 2 is a diagram of a CEL pile group model according to embodiment 1 of the present invention;
FIG. 3 is a diagram of a non-linear model of a foundation beam according to embodiment 1 of the present invention;
FIG. 4 is a diagram of a CEL monopile model of a pre-pile in accordance with example 1 of the present invention;
FIG. 5 is a diagram of a rear pile CEL single pile model of embodiment 1 of the present invention;
fig. 6 is a diagram illustrating the reaction force variation of each pile head during pile insertion according to embodiment 1 of the present invention;
fig. 7 is a diagram illustrating additional displacement variation of the pile head during pile insertion according to embodiment 1 of the present invention;
fig. 8 is a graph showing the change of the pile group interaction coefficient in the pile inserting process according to example 1 of the present invention.
Detailed Description
The invention is further illustrated below with reference to the accompanying drawings and example 1:
example 1 referring to fig. 1-8, a method for evaluating the effect of drilling vessel pile driving on the interaction of adjacent piles under horizontal force, comprising the steps of:
1) establishing a three-dimensional elastoplasticity CEL pile group model according to the engineering geological parameters and the positions of the pile shoe and the adjacent pile group;
2) determining the maximum horizontal force applied by the bearing platform by combining the API specification and the nonlinear foundation beam model according to the pile body parameters and the pile head constraint conditions;
3) determining pile head counter force and pile head displacement of each pile in the pile inserting process under the maximum horizontal force action of the pile group;
4) establishing a corresponding three-dimensional elastoplasticity CEL single pile model according to the relative position of each pile and a pile shoe in the pile group;
5) applying the pile head counter-force extracted in the step 3) to the corresponding CEL single-pile model pile head through an amplitude curve to determine the pile head displacement of each single pile in the pile inserting process;
6) determining additional displacement and interaction coefficient caused by pile group interaction in the pile inserting process, and evaluating the influence degree of the pile inserting of the drilling ship on the interaction of adjacent pile groups under the action of horizontal force
In step 1), establishing a three-dimensional elastoplasticity CEL pile group model according to engineering geological parameters and positions of a pile shoe and an adjacent pile group, specifically comprising: :
the vertical direction of the CEL pile group model is 70m, and the horizontal direction is 75 m. In order to simulate the uplift and flow of soil around a pile shoe when the pile shoe of a drilling ship penetrates into a soil layer, an Euler cavity area is arranged in a CEL pile group model within the range of 0m to 10m, a mud surface is arranged at the position of 10m, and a soil unit is arranged within the range of 60m below the mud surface.
The maximum diameter of the pile shoe is 18m, adjacent pile groups are connected through a rigid bearing platform, the diameter d of each pile is 1.5m, the length of the pile is 51m, the wall thickness is 0.025m, after the adjacent pile groups are converted into solid piles, the elastic modulus of each pile is 26.12Gpa, and the Poisson ratio is 0.3.
The net distance between the adjacent piles and the pile shoe is 4.5m (0.25D), the pile distance is 4.5m (3D), and the maximum diameter penetration depth of the pile shoe is 15 m.
The average effective gravity of the clay is 6kN/m3And the non-drainage shear strength Su of the clay layer adopts a formula of Su =1.5z + 2: z is the depth below the mud surface.
In step 2), determining the maximum horizontal force applied by the bearing platform according to the pile body parameters and the pile head constraint conditions by combining the API specification with the nonlinear foundation beam model, specifically comprising:
① determining the ultimate bending moment of the pile body to be 9.87MN m according to the pile diameter and the yield strength of the pile body material through a material mechanics theory;
②, establishing a nonlinear foundation beam model according to parameters of the adopted piles and pile head constraint conditions by using ABAQUS finite element software;
③ adding a spring on the pile body of the model every 1m along the depth direction, and determining the parameters of the earth spring nodes according to the p-y curve proposed by the API specification;
④, repeatedly applying horizontal load on the top of the nonlinear foundation beam to obtain the maximum bending moment of the model pile body under the action of the corresponding horizontal load, until the maximum bending moment of the model pile body is equal to the limit bending moment of the adopted pile of 9.87MN m when the horizontal force applied on the top of the nonlinear foundation beam model is 1.2MN, and determining that the horizontal load of 1.2MN is the limit horizontal load which can be borne by the single pile head of the adopted pile;
⑤, dividing the limit horizontal load 1.2MN capable of being borne by the single pile head of the adopted pile by the safety factor 2, so that the maximum allowable value of the horizontal load applied by the single pile head is 0.6 MN;
⑥ multiplying the maximum allowable value of horizontal load applied by the pile head of the single pile by the number of piles in the adjacent pile group to obtain the maximum allowable value of horizontal load applied by the pile group bearing platform;
in step 3), determining pile head counter-force and pile head displacement of each pile in the pile inserting process under the action of the maximum horizontal force of the pile group specifically comprises: because the CEL pile group model adopts a half model, a horizontal load of 0.6MN is applied to a bearing platform, then calculation is submitted, and the pile head counter force and the pile head displacement of each pile in the pile inserting process are extracted. Since it is difficult to correctly extract the pile head reaction force in the CEL pile group model by the method of extracting the pile head shear force, the horizontal direction cell node force caused by the cell stress is extracted here. Practice proves that the sum of the extracted pile head counter forces is equal to the sum of the forces applied by the bearing platform, and the extraction method is proved to be correct.
And 4), establishing a corresponding three-dimensional elastoplasticity CEL single pile model according to the relative position of each pile and the pile shoe in the pile group, wherein the soil body parameters, the pile shoe size and the grid division in the CEL single pile model are consistent with those of the CEL pile group model.
And 6), determining additional displacement and interaction coefficients caused by pile group interaction in the pile inserting process, and evaluating the influence degree of the pile inserting of the drilling ship on the interaction of adjacent pile groups under the action of horizontal force. The method specifically comprises the following steps: the Poulos interaction coefficient method is clear in concept and simple and convenient to calculate, and is widely applied to interaction calculation of pile group foundations, so that the method is adopted for additional displacement and interaction influence coefficients at the position. I.e. the additional displacement is equal to the pile-group head displacement minus the corresponding single-pile head displacement, and the interaction coefficient is equal to the head displacement of the additional position removed to correspond to the single pile.
Compared with a model test, the method can accurately extract the pile head counter force of each pile in the pile group with the bearing platform; the method adopts a finite element CEL (coupled Euler-Lagrange method) method to carry out numerical simulation on the pile inserting process of the drilling ship, absorbs the advantages of Lagrange analysis and Euler analysis, and solves the problem that a finite element grid of a soil body is seriously distorted possibly caused by large deformation of the soil body when a pile shoe is deeply buried compared with the traditional Lagrange finite element method. The invention has the advantages of convenient implementation, good economy, wide soil application, flexible adjustment of the relative position between the pile shoe and the pile and the size of the pile spacing, and the like; the invention establishes a practical calculation method convenient for engineering application, can quickly evaluate the influence degree of the drilling ship pile insertion on the interaction of adjacent grouped piles under different working conditions, and promotes the progress and innovation of the offshore oil development technology.
It should be noted that the specific embodiments are merely representative examples of the present invention, and it is obvious that the technical solution of the present invention is not limited to the above-mentioned examples, and many variations are possible. Those skilled in the art, having the benefit of this disclosure and the benefit of this written description, will appreciate that other embodiments can be devised which do not depart from the specific details disclosed herein.

Claims (6)

1. A method for assessing the influence of pile insertion under horizontal force on the interaction of adjacent piles, comprising the steps of:
1) establishing a three-dimensional elastoplasticity CEL pile group model according to the engineering geological parameters and the positions of the pile shoe and the adjacent pile group;
2) determining the maximum horizontal force applied by the bearing platform by combining the API specification and the nonlinear foundation beam model according to the pile body parameters and the pile head constraint conditions;
3) determining pile head counter force and pile head displacement of each pile in the pile inserting process under the maximum horizontal force action of the pile group;
4) establishing a corresponding three-dimensional elastoplasticity CEL single pile model according to the relative position of each pile and a pile shoe in the pile group;
5) applying the pile head counter-force extracted in the step 3) to the corresponding CEL single-pile model pile head through an amplitude curve to determine the pile head displacement of each single pile in the pile inserting process;
6) and determining additional displacement and interaction coefficients caused by pile group interaction in the pile inserting process, and evaluating the influence degree of the pile inserting of the drilling ship on the interaction of adjacent pile groups under the action of horizontal force.
2. The evaluation method according to claim 1, wherein the step 1) of establishing a three-dimensional elasto-plastic CEL piling model according to the engineering geological parameters and the positions of the pile shoe and the adjacent piling comprises: and establishing a three-dimensional elastic-plastic finite element model of the pile shoe-soil body-pile foundation interaction according to the soil body parameters, the assumed pile foundation parameters, the pile shoe parameters and the relative position of the pile shoe and the pile foundation.
3. The evaluation method according to claim 1, wherein in step 2), determining the maximum horizontal force applied by the bearing platform according to the pile body material and the pile head constraint condition by combining the API specification with the nonlinear foundation beam model specifically comprises:
① determining the ultimate bending moment of the pile body according to the pile diameter and the yield strength of the pile body material by a material mechanics theory;
②, establishing a nonlinear foundation beam model according to parameters of the adopted piles and pile head constraint conditions by using ABAQUS finite element software;
③ adding a spring on the pile body of the model at intervals of a set distance along the depth direction, and determining the parameters of the earth spring nodes according to the p-y curve suggested by the API specification;
④ repeatedly applying horizontal load on the top of the nonlinear foundation beam to obtain the maximum bending moment of the model pile body under the action of corresponding horizontal load, until the maximum bending moment of the model pile body is equal to the limit bending moment of the adopted pile by the horizontal load applied on the top of the nonlinear foundation beam model, and determining the horizontal load as the limit horizontal load borne by the single pile head of the adopted pile;
⑤, dividing the limit horizontal load borne by the single pile head by a safety factor, namely the maximum allowable value of the horizontal load applied by the single pile head;
⑥ the maximum allowable value of the horizontal load applied by the pile head of the single pile is multiplied by the number of piles in the adjacent pile group, and the maximum allowable value of the horizontal load applied by the pile group bearing platform is obtained.
4. The evaluation method according to claim 1, wherein in step 4), a corresponding three-dimensional elastoplasticity CEL single pile model is established according to the relative positions of each pile and the pile shoe in the pile group, and soil parameters, pile body parameters, pile shoe size and grid division in the CEL single pile model are consistent with those of the CEL group pile model.
5. The evaluation method according to claim 1, wherein in step 6), the additional displacement and the interaction coefficient caused by pile group interaction during pile insertion are determined, and the degree of influence of the pile insertion of the drilling vessel on the interaction of the adjacent pile groups under the action of horizontal force is evaluated, and the evaluation method specifically comprises the following steps: the Poulos interaction coefficient method is clear in concept and simple and convenient to calculate, and is widely applied to interaction calculation of pile group foundations, so that the method is adopted for additional displacement and interaction influence coefficients at the position.
6. I.e. the additional displacement is equal to the pile-group head displacement minus the corresponding single-pile head displacement, and the interaction coefficient is equal to the head displacement of the additional position removed to correspond to the single pile.
CN201911124099.5A 2019-11-18 2019-11-18 Method for evaluating influence of pile insertion under horizontal force on interaction of adjacent pile groups Active CN110826139B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911124099.5A CN110826139B (en) 2019-11-18 2019-11-18 Method for evaluating influence of pile insertion under horizontal force on interaction of adjacent pile groups

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911124099.5A CN110826139B (en) 2019-11-18 2019-11-18 Method for evaluating influence of pile insertion under horizontal force on interaction of adjacent pile groups

Publications (2)

Publication Number Publication Date
CN110826139A true CN110826139A (en) 2020-02-21
CN110826139B CN110826139B (en) 2023-01-31

Family

ID=69555898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911124099.5A Active CN110826139B (en) 2019-11-18 2019-11-18 Method for evaluating influence of pile insertion under horizontal force on interaction of adjacent pile groups

Country Status (1)

Country Link
CN (1) CN110826139B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113779688A (en) * 2021-11-10 2021-12-10 中铁大桥科学研究院有限公司 Bucket foundation penetration analysis method and device and processing equipment
CN114357581A (en) * 2022-01-04 2022-04-15 合肥市市政设计研究总院有限公司 Displacement limit control-based pile group design analysis method for resisting large horizontal thrust

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009174158A (en) * 2008-01-23 2009-08-06 Ochiken Kk Deformation analysis method associated with pile foundation and pile draft foundation for bearing horizontal force in multilayered ground, based on hybrid elastic theory
CN105045982A (en) * 2015-07-06 2015-11-11 华东交通大学 Simplified method for allocating foundation pile loads of grouped pile foundation with inverted stepped variable cross section
CN110106929A (en) * 2019-06-03 2019-08-09 天津大学前沿技术研究院 It is a kind of to plug stake to the model test apparatus and test method of neighbouring grouped piles influence
CN110135125A (en) * 2019-01-30 2019-08-16 天津大学前沿技术研究院 Numerical analysis method of the drill ship pitching pile to neighbouring grouped piles influence under a kind of horizontal force

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009174158A (en) * 2008-01-23 2009-08-06 Ochiken Kk Deformation analysis method associated with pile foundation and pile draft foundation for bearing horizontal force in multilayered ground, based on hybrid elastic theory
CN105045982A (en) * 2015-07-06 2015-11-11 华东交通大学 Simplified method for allocating foundation pile loads of grouped pile foundation with inverted stepped variable cross section
CN110135125A (en) * 2019-01-30 2019-08-16 天津大学前沿技术研究院 Numerical analysis method of the drill ship pitching pile to neighbouring grouped piles influence under a kind of horizontal force
CN110106929A (en) * 2019-06-03 2019-08-09 天津大学前沿技术研究院 It is a kind of to plug stake to the model test apparatus and test method of neighbouring grouped piles influence

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
吴秋云等: "一种确定导管架平台群桩p-y数据的方法", 《岩土力学》 *
戴笑如等: "钻井船插桩CEL数值模拟中的若干问题分析", 《岩土力学》 *
李书兆等: "自升式钻井船插桩对邻近平台桩基影响的评价方法探讨", 《海洋通报》 *
梁发云等: "土体水平位移对邻近既有桩基承载性状影响分析", 《岩土力学》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113779688A (en) * 2021-11-10 2021-12-10 中铁大桥科学研究院有限公司 Bucket foundation penetration analysis method and device and processing equipment
CN114357581A (en) * 2022-01-04 2022-04-15 合肥市市政设计研究总院有限公司 Displacement limit control-based pile group design analysis method for resisting large horizontal thrust
CN114357581B (en) * 2022-01-04 2024-03-19 合肥市市政设计研究总院有限公司 Pile group design analysis method for resisting large horizontal thrust based on displacement limit control

Also Published As

Publication number Publication date
CN110826139B (en) 2023-01-31

Similar Documents

Publication Publication Date Title
Wu et al. Foundations of offshore wind turbines: A review
Wang et al. Centrifuge modeling of lateral bearing behavior of offshore wind turbine with suction bucket foundation in sand
Barari et al. Undrained response of bucket foundations to moment loading
Abdel-Rahman et al. Finite element modelling of horizontally loaded monopile foundations for offshore wind energy converters in Germany
CN103870640B (en) The jackup vessel pitching pile appraisal procedure to closing on jacket platform Influence of Pile Foundation
CN110135125A (en) Numerical analysis method of the drill ship pitching pile to neighbouring grouped piles influence under a kind of horizontal force
CN110826139B (en) Method for evaluating influence of pile insertion under horizontal force on interaction of adjacent pile groups
Wang et al. Finite element analyses of improved lateral performance of monopile when combined with bucket foundation for offshore wind turbines
Yang et al. Dimension effect on Py model used for design of laterally loaded piles
Zhang et al. HM bearing capacity of a modified suction caisson determined by using load-/displacement-controlled methods
Ssenyondo et al. Effects of embedment depth on the pullout capacity of bucket foundations in sand
Lau et al. Centrifuge testing of monopile in clay under monotonic loads
Li et al. Assessment of offshore wind turbine with an innovative monopile foundation under lateral loading
CN113011062A (en) Transformer substation foundation treatment numerical simulation analysis method
CN110263402B (en) Self-elevating platform puncture distance calculation method
Garcia Assessment of Helical Anchors Bearing Capacity for Offshore Aquaculture Applications
CN116167229A (en) Efficient offshore wind power pile surrounding soil resistance model algorithm and device
CN115048819A (en) Method and device for predicting pile foundation pull-down force and electronic equipment
Corciulo Dynamic hydro-mechanical analysis of soil-monopile interaction in offshore wind turbines
Haddad et al. Performance of Bucket Foundation Resting on Sand Subjected To Vertical Load
Kavitha et al. Soil Structure Interaction Analysis of a Berthing Structure Under Lateral Loading-By Numerical Approach
Zhang et al. Numerical analysis of lateral behaviour of large-diameter monopile in saturated clay
Rackwitz et al. New design approach for large diameter offshore monopiles based on physical and numerical modelling
Hung et al. Natural frequency and vibration analysis of jacket type foundation for offshore wind power
Johny et al. Laterally loaded pile in cohesionless soil

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant