CN110814622A - Welding tower group is to frock - Google Patents
Welding tower group is to frock Download PDFInfo
- Publication number
- CN110814622A CN110814622A CN201911253404.0A CN201911253404A CN110814622A CN 110814622 A CN110814622 A CN 110814622A CN 201911253404 A CN201911253404 A CN 201911253404A CN 110814622 A CN110814622 A CN 110814622A
- Authority
- CN
- China
- Prior art keywords
- guide rail
- connecting plate
- brake
- positioning device
- slider
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000003466 welding Methods 0.000 title claims abstract description 43
- 239000000463 material Substances 0.000 claims abstract description 51
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 22
- 239000010959 steel Substances 0.000 claims abstract description 22
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 8
- 229910052742 iron Inorganic materials 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 241001631030 Explorator Species 0.000 description 1
- 241000357293 Leptobrama muelleri Species 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass
- B23K37/04—Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass for holding or positioning work
- B23K37/0426—Fixtures for other work
- B23K37/0435—Clamps
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
The invention discloses a welding tower group pairing tool, which comprises a main material positioning device, an auxiliary material positioning device and a ground template, wherein the main material positioning device and the auxiliary material positioning device are both arranged on the flat ground template, and the main material positioning device consists of a pairing platform, a supporting steel plate, a first slider connecting plate, a slide rail, a guide rail slider, a slider cover plate, positive and negative screws, a bearing seat and a screw handle.
Description
Technical Field
The invention relates to the related field of manufacturing and processing of power transmission line iron towers, in particular to a welding tower assembly tool.
Background
In the power transmission line iron tower, main materials and auxiliary materials are connected in a welding mode and called as a welding tower, the welding tower is diverse in structure and size, and large difficulty is caused to pairing pairs.
Disclosure of Invention
Therefore, in order to solve the above-mentioned disadvantages, the present invention provides a welding tower pair tool.
The invention is realized in such a way, a welding tower group pair tool is constructed, the device comprises a main material positioning device, an auxiliary material positioning device and a ground template, the main material positioning device and the auxiliary material positioning device are both arranged on the straight ground template, the main material positioning device comprises a pairing platform, a supporting steel plate, a first slider connecting plate, a slide rail, a guide rail slider, a slider cover plate, a positive and negative screw rod, a bearing seat and a screw rod handle, the pairing platform and the supporting steel plate are in a crisscross shape and are welded into a whole, the supporting steel plate is welded on the first slider connecting plate, the first slider connecting plate is connected and fixed with four guide rail sliders and is positioned on the slide rail, the middle of the first slider connecting plate at two sides is connected with the bearing seat and is connected with the positive and negative screw rod through the bearing, the two sides of the slider cover plate are respectively connected with, the screw rod handle is installed in the positive and negative screw rod outside, the slide rail is installed on the bottom plate, the leading wheel is installed to the bottom plate bottom, sliding connection on leading wheel bottom and the second guide rail, the second guide rail is installed on the ground template.
Preferably, assist material positioner and constitute by assisting material profiling angle steel, carousel, second slider connecting plate, slider, first guide rail, minor axis and bearing, assist material profiling angle steel to weld on the carousel, the carousel is connected through the bearing with the second slider connecting plate, the carousel is connected through the minor axis with the second slider connecting plate, the minor axis lower extreme is fixed on the second slider connecting plate, and the pot head has the bearing on the upper end, closely cooperates with the carousel, second slider connecting plate is connected fixedly and is located first guide rail with the slider, first guide rail arrange to the positive center of frock and install on the template of ground.
Preferably, both ends all are equipped with brake equipment about the bottom plate.
Preferably, brake equipment includes brake fixed block, brake screw and brake lever, sliding connection on brake fixed block and the second guide rail, brake screw passes through the screw rod fixed block and installs in the bottom plate side, brake screw bottom and brake fixed block fixed connection, brake lever is installed at brake fixed block top.
Preferably, the second slider connecting plate is provided with a circular groove, the turntable is provided with the same circular groove, and the second slider connecting plate and the turntable are fixedly connected through a bolt.
Preferably, the second guide rail is provided with four.
Preferably, the main material positioning device is provided with three main material positioning devices.
Preferably, each main material positioning device is provided with eight guide wheels, and every two guide wheels are symmetrically connected with the second guide rail in a front-back manner.
Preferably, the turntable is capable of 360 degree rotation through a bearing.
Preferably, rubber stoppers are arranged at two ends of the second guide rail.
The invention has the following advantages: the invention provides a welding tower pairing tool through improvement, and compared with the same type of equipment, the welding tower pairing tool has the following improvement:
the welding tower group pairing tool is simple in structure, convenient to operate, suitable for welding tower pairing with different root opening sizes, wide in application range, capable of achieving batch pairing after auxiliary material profiling positioning is good during first group pairing, capable of meeting multi-base batch pairing of welding towers, greatly improving welding tower group pairing efficiency and pairing accuracy, saving pairing time and reducing labor intensity of workers.
Drawings
FIG. 1 is a front view of a batch assembly fixture for welding towers according to the present invention;
FIG. 2 is a top view of a batch assembly fixture for welding towers according to the present invention;
FIG. 3 is a left side view of a batch assembly fixture for welding towers according to the present invention;
FIG. 4 is an effect diagram of a batch assembly fixture for welding towers according to the present invention;
FIG. 5 is a partial view of a batch assembly tooling assembly platform and associated components of a welding tower of the present invention;
FIG. 6 is a partial view of a welding tower batch assembly tooling auxiliary profile and associated components of the present invention;
FIG. 7 is a working diagram of a batch group assembly tool of the welding tower of the present invention.
Wherein: the device comprises a pairing platform-1, a supporting steel plate-2, a first sliding block connecting plate-3, a sliding rail-4, a guide rail sliding block-5, a ground template-6, a sliding block cover plate-7, a positive and negative screw rod-8, a bearing seat-9, a screw rod handle-10, auxiliary material profiling angle steel-11, a rotary table-12, a second sliding block connecting plate-13, a sliding block-14, a guide wheel-15, a bottom plate-16, a first guide rail-17, a second guide rail-18, a brake fixing block-19, a brake screw rod-20, a brake handle-21, a short shaft-22 and a bearing-23.
Detailed Description
The present invention will be described in detail below with reference to fig. 1 to 7, and the technical solutions in the embodiments of the present invention will be clearly and completely described, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides a welding tower group pair tool through improvement, which comprises a main material positioning device, an auxiliary material positioning device and a ground template 6, wherein the main material positioning device and the auxiliary material positioning device are arranged on the straight ground template 6, the main material positioning device consists of a pairing platform 1, a supporting steel plate 2, a first slider connecting plate 3, a slide rail 4, a guide rail slider 5, a slider cover plate 7, a positive and negative screw 8, a bearing seat 9 and a screw handle 10, the pairing platform 1 and the supporting steel plate 2 are in a crisscross shape and are welded into a whole, the supporting steel plate 2 is welded on the first slider connecting plate 3, the first slider connecting plate 3 and four guide rail sliders 5 are fixedly connected and are positioned on the slide rail 4, the middle of the first slider connecting plate 3 at two sides is connected with the bearing seat 9 and is connected with the positive and negative screw 8 through the bearing, when the screw handle 10 is rotated, the opening size of the pairing platform 1 at two sides is increased or, further reach the required size of assembling, slider apron 7 both sides are connected the first slider connecting plate 3 of both sides respectively, and positive and negative screw rod 8 outsides are installed screw rod handle 10, and slide rail 4 is installed on bottom plate 16, and leading wheel 15 is installed to bottom plate 16 bottom, can make the group walk on second guide rail 18 to platform 1, and leading wheel 15 bottom and second guide rail 18 go up sliding connection, and second guide rail 18 is installed on ground template 6.
Furthermore, supplementary material positioner comprises supplementary material profiling angle steel 11, carousel 12, second slider connecting plate 13, slider 14, first guide rail 17, minor axis 22 and bearing 23, supplementary material profiling angle steel 11 welds on carousel 12, carousel (12) are connected through minor axis (22) with second slider connecting plate (13), minor axis (22) lower extreme is fixed on second slider connecting plate (13), and the upper end cover has bearing (23), closely cooperates with carousel (12), second slider connecting plate 13 is connected fixedly and is located on first guide rail 17 with slider 14, first guide rail 17 arranges and arranges that the group is to the frock positive center and install on ground template 6.
Furthermore, both ends all are equipped with brake equipment about bottom plate 16, can lock the group of both sides to the platform after the main material is fixed a position to the leading wheel takes place to remove.
Further, brake equipment includes brake fixed block 19, brake screw 20 and brake handle 21, sliding connection on brake fixed block 19 and the second guide rail 18, brake screw 20 passes through the screw rod fixed block and installs in the 16 sides of bottom plate, brake screw 20 bottom and 19 fixed connection of brake fixed block, brake handle 21 is installed at 19 tops of brake fixed block.
Furthermore, circular grooves are formed in the second slider connecting plate 13, the same circular grooves are formed in the rotary table 12, the second slider connecting plate and the rotary table are fixedly connected through bolts, and the circular grooves can be locked and fixed through bolts when the auxiliary profile angle steel rotates to a required position.
Further, four second guide rails 18 are provided.
Further, the main material positioning devices are provided in three numbers.
Furthermore, each main material positioning device is provided with eight guide wheels 15, every two guide wheels are symmetrically connected with the second guide rails 18 in a sliding manner from front to back, and the eight guide wheels 15 are used for sliding on the four second guide rails 18, so that the sliding stability is ensured.
Further, the turntable 12 can rotate 360 degrees through the bearing 23 for adjusting the angle.
Further, rubber stoppers are provided at both ends of the second guide rail 18 for limiting the position of the guide wheel 15 so as to prevent the guide wheel 15 from being separated from the rail.
The invention provides a welding tower group pair tool through improvement, which has the following working principle:
firstly, during pairing, the opening size of the platform 1 is adjusted according to the opening size of the paper iron tower root, the screw handle 10 is rotated, and the opening size of the platform 1 is increased or decreased by the pairing at two sides;
secondly, the brake handle 21 is rotated, and the brake fixing block 19 is buckled on the second guide rail 18, so that the assembly platform 1 is not moved any more, and the brake function is achieved;
thirdly, the main material is placed on the assembly platform 1, the edges of the main material on two sides are tightly propped against the 90-degree right-angle position of the supporting steel plate 2, the assembly platform 1 in the middle is adjusted to a proper position, and the main material is clamped and fixed on the assembly platform 1 by using locking pliers;
fourthly, marking the positions of the auxiliary material nodes on the main material by marking lines according to the sizes of the auxiliary material nodes on the drawing, and fixing by spot welding after the auxiliary material angle steels are positioned;
fifthly, moving the auxiliary material positioning device to the auxiliary material position along the middle linear track, rotating the turntable 12 to tightly attach the auxiliary material profiling angle steel and the welding auxiliary material angle steel back to back, and tightening the turntable bolt for locking;
sixthly, marking the position of the angle steel of the explorator, loosening each limit bolt after finishing the assembly, and hoisting the workpiece;
and seventhly, during batch assembly and time synchronization, the assembly platform 1 is moved to the last identification position, and the batch assembly is carried out on all main materials and auxiliary materials of the welding tower.
The welding tower assembling tool is provided through improvement, the structure is simple, the operation is convenient, the welding tower assembling tool is suitable for welding tower assembling of different iron tower root opening sizes, the application range is wide, batch assembling is realized after the first group is well positioned during assembling, multi-base batch assembling of welding towers is met, the welding tower assembling efficiency and assembling precision are improved to a great extent, the assembling time is saved, and the labor intensity of workers is reduced.
The basic principles and main features of the present invention and the advantages of the present invention are shown and described above, and the standard parts used in the present invention are all available on the market, the special-shaped parts can be customized according to the description of the specification and the description of the attached drawings, and the specific connection mode of each part adopts the conventional means of bolt, welding and the like mature in the prior art, and the detailed description is not provided herein.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (10)
1. The utility model provides a welding tower group is to frock which characterized in that: the device comprises a main material positioning device, an auxiliary material positioning device and a ground template (6), wherein the main material positioning device and the auxiliary material positioning device are arranged on the straight ground template (6), the main material positioning device consists of a pairing platform (1), a supporting steel plate (2), a first sliding block connecting plate (3), a sliding rail (4), a guide rail sliding block (5), a sliding block cover plate (7), a positive and negative screw rod (8), a bearing seat (9) and a screw rod handle (10), the pairing platform (1) and the supporting steel plate (2) are in a cross shape and are welded into a whole, the supporting steel plate (2) is welded on the first sliding block connecting plate (3), the first sliding block connecting plate (3) is fixedly connected with the four guide rail sliding blocks (5) and is located on the sliding rail (4), the middle parts of the first sliding block connecting plates (3) at two sides are connected with the bearing seat (9) and are connected with the positive and negative screw rods (8) through, slider apron (7) both sides are connected the first slider connecting plate (3) of both sides respectively, screw handle (10) are installed in positive and negative screw rod (8) outside, install on bottom plate (16) slide rail (4), leading wheel (15) are installed to bottom plate (16) bottom, sliding connection on leading wheel (15) bottom and second guide rail (18), second guide rail (18) are installed on ground template (6).
2. The welding tower group pair tool of claim 1, wherein: auxiliary material positioner comprises auxiliary material profiling angle steel (11), carousel (12), second slider connecting plate (13), slider (14), first guide rail (17), minor axis (22) and bearing (23), auxiliary material profiling angle steel (11) welds on carousel (12), carousel (12) are connected through minor axis (22) with second slider connecting plate (13), minor axis (22) lower extreme is fixed on second slider connecting plate (13), and the pot head has bearing (23) on, closely cooperates with carousel (12), second slider connecting plate (13) are connected fixedly and are located on first guide rail (17) with slider (14), first guide rail (17) are arranged in the positive center of group's frock and are installed on ground template (6).
3. The welding tower group pair tool of claim 1, wherein: and brake devices are arranged at the left end and the right end of the bottom plate (16).
4. The welding tower assembly tool of claim 3, wherein: brake equipment includes brake fixed block (19), brake screw rod (20) and brake lever (21), sliding connection on brake fixed block (19) and second guide rail (18), brake screw rod (20) are installed in bottom plate (16) side through the screw rod fixed block, brake screw rod (20) bottom and brake fixed block (19) fixed connection, brake lever (21) are installed at brake fixed block (19) top.
5. The welding tower group pair tool of claim 2, wherein: circular grooves are formed in the second sliding block connecting plate (13), the same circular grooves are formed in the rotary disc (12), and the second sliding block connecting plate and the rotary disc are fixedly connected through bolts.
6. The welding tower group pair tool of claim 1, wherein: four second guide rails (18) are arranged.
7. The welding tower group pair tool of claim 1, wherein: the main material positioning devices are provided with three.
8. The welding tower group pair tool of claim 7, wherein: eight guide wheels (15) are arranged on each main material positioning device, and each two guide wheels are symmetrically connected with the second guide rail (18) in a sliding mode in the front-back mode.
9. The welding tower group pair tool of claim 2, wherein: the rotary disc (12) can rotate 360 degrees through a bearing (23).
10. The welding tower group pair tool of claim 2, wherein: rubber stoppers are arranged at two ends of the second guide rail (18).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911253404.0A CN110814622B (en) | 2019-12-09 | 2019-12-09 | Welding tower group is to frock |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911253404.0A CN110814622B (en) | 2019-12-09 | 2019-12-09 | Welding tower group is to frock |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110814622A true CN110814622A (en) | 2020-02-21 |
CN110814622B CN110814622B (en) | 2021-06-29 |
Family
ID=69544194
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911253404.0A Active CN110814622B (en) | 2019-12-09 | 2019-12-09 | Welding tower group is to frock |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110814622B (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202411725U (en) * | 2011-12-23 | 2012-09-05 | 湖南鑫众工业装备有限责任公司 | Fixture for assembling track frame |
CN203045212U (en) * | 2012-11-30 | 2013-07-10 | 湖南鑫众工业装备有限责任公司 | Welding assembly tooling for crane crawler beam |
CN203184855U (en) * | 2013-03-29 | 2013-09-11 | 广州创研自动化设备有限公司 | Key weld joint assembling and intelligent welding device for 1000 kV transmission and transformation electric tower |
CN204235033U (en) * | 2014-11-20 | 2015-04-01 | 中国北车集团大同电力机车有限责任公司 | Locomotive bogie group is to frock |
CN104741850A (en) * | 2015-01-30 | 2015-07-01 | 浙江金盛钢管塔有限公司 | Steel tube tower welding device |
CN204504572U (en) * | 2014-12-17 | 2015-07-29 | 湖南通源机电科技有限公司 | For the supporting leg case positioning clamping device of crane frame group to frock |
CN204711594U (en) * | 2015-04-23 | 2015-10-21 | 济南大学 | Bar or materials in the tube index hole processing clamping tooling |
CN205551882U (en) * | 2016-04-20 | 2016-09-07 | 长沙湘邦焊接设备有限公司 | Host computer cylinder body group is to processing frock |
CN106825973A (en) * | 2017-03-10 | 2017-06-13 | 广州增立钢管结构股份有限公司 | A kind of power transmission and transformation framework A words column cap welding device |
CN108326491A (en) * | 2017-07-04 | 2018-07-27 | 广州增立钢管结构股份有限公司 | The branch pipe group of power transmission and transformation steel tube tower is to equipment |
CN108326768A (en) * | 2017-07-04 | 2018-07-27 | 广州增立钢管结构股份有限公司 | Power transmission and transformation steel pipe pole cross-arm attachment group is to tooling |
-
2019
- 2019-12-09 CN CN201911253404.0A patent/CN110814622B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202411725U (en) * | 2011-12-23 | 2012-09-05 | 湖南鑫众工业装备有限责任公司 | Fixture for assembling track frame |
CN203045212U (en) * | 2012-11-30 | 2013-07-10 | 湖南鑫众工业装备有限责任公司 | Welding assembly tooling for crane crawler beam |
CN203184855U (en) * | 2013-03-29 | 2013-09-11 | 广州创研自动化设备有限公司 | Key weld joint assembling and intelligent welding device for 1000 kV transmission and transformation electric tower |
CN204235033U (en) * | 2014-11-20 | 2015-04-01 | 中国北车集团大同电力机车有限责任公司 | Locomotive bogie group is to frock |
CN204504572U (en) * | 2014-12-17 | 2015-07-29 | 湖南通源机电科技有限公司 | For the supporting leg case positioning clamping device of crane frame group to frock |
CN104741850A (en) * | 2015-01-30 | 2015-07-01 | 浙江金盛钢管塔有限公司 | Steel tube tower welding device |
CN204711594U (en) * | 2015-04-23 | 2015-10-21 | 济南大学 | Bar or materials in the tube index hole processing clamping tooling |
CN205551882U (en) * | 2016-04-20 | 2016-09-07 | 长沙湘邦焊接设备有限公司 | Host computer cylinder body group is to processing frock |
CN106825973A (en) * | 2017-03-10 | 2017-06-13 | 广州增立钢管结构股份有限公司 | A kind of power transmission and transformation framework A words column cap welding device |
CN108326491A (en) * | 2017-07-04 | 2018-07-27 | 广州增立钢管结构股份有限公司 | The branch pipe group of power transmission and transformation steel tube tower is to equipment |
CN108326768A (en) * | 2017-07-04 | 2018-07-27 | 广州增立钢管结构股份有限公司 | Power transmission and transformation steel pipe pole cross-arm attachment group is to tooling |
Also Published As
Publication number | Publication date |
---|---|
CN110814622B (en) | 2021-06-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203184855U (en) | Key weld joint assembling and intelligent welding device for 1000 kV transmission and transformation electric tower | |
CN215617641U (en) | Wheel rim steel wire positioning machine capable of achieving quick positioning | |
CN110814622B (en) | Welding tower group is to frock | |
CN113492284B (en) | Automatic welding device for loader hood | |
CN211387088U (en) | Steel edge planing device | |
CN108067804B (en) | Fork frame overturning workbench | |
CN214021528U (en) | Thermal spraying tool for spraying annular coating | |
CN211192025U (en) | Effectual numerical control lathe of work piece location | |
CN209758320U (en) | Tooling trolley and assembly line | |
CN220312192U (en) | Welding workbench | |
CN218556129U (en) | Repair welding trolley | |
CN206084231U (en) | Switch bed plate modularization combination positioning die | |
CN215092046U (en) | Steel construction steel sheet does not have track groove cutting machine fixture | |
CN112008455A (en) | Alignment and turnover device of gantry milling arm support | |
CN216228791U (en) | Clamp for automatic grinding machine for special-shaped cambered surface | |
CN216325729U (en) | Quick revolving body crevasse cutting machine | |
CN221363851U (en) | Positioning mechanism of numerical control grooving machine | |
CN214021527U (en) | Hot spraying auxiliary tool | |
CN216938904U (en) | Manual argon arc welding operation platform | |
CN221538616U (en) | Welding device for high-efficiency production steel pipe tower | |
CN220093763U (en) | Gear machining bearing platform structure with adjustable supporting position | |
CN221066622U (en) | Five machining centers of high-speed high accuracy | |
CN215238744U (en) | Rotatory welded platform of draw beam riser | |
CN216734388U (en) | Clamping transfer tool for finishing of machine case | |
CN216099304U (en) | Device for conveniently cutting heat-shrinkable tube |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A welding tower assembly tooling Effective date of registration: 20211209 Granted publication date: 20210629 Pledgee: China Co. truction Bank Corp Guangzhou Zengcheng branch Pledgor: GUANGZHOU ZENGLI STEEL STRUCTURE Co.,Ltd. Registration number: Y2021440000367 |