CN110778130A - Connecting device for discharging steel platform of high-rise building - Google Patents

Connecting device for discharging steel platform of high-rise building Download PDF

Info

Publication number
CN110778130A
CN110778130A CN201910946464.4A CN201910946464A CN110778130A CN 110778130 A CN110778130 A CN 110778130A CN 201910946464 A CN201910946464 A CN 201910946464A CN 110778130 A CN110778130 A CN 110778130A
Authority
CN
China
Prior art keywords
wall body
platform
discharging
steel
connecting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910946464.4A
Other languages
Chinese (zh)
Inventor
章国超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910946464.4A priority Critical patent/CN110778130A/en
Publication of CN110778130A publication Critical patent/CN110778130A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/166Landings, receiving platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a connecting device for a discharging steel platform of a high-rise building, which comprises a safety net and a discharging platform fixed on a wall body through a steel frame, wherein the wall body and the discharging platform are fixed together through a plurality of first lifting hooks and a first steel wire rope, one side of the discharging platform, which is far away from the wall body, is provided with a door body, two supporting frames are fixedly arranged between the wall body and the discharging platform through a connecting mechanism and a fixing mechanism, and a placing plate is placed in the wall body. Has the advantages that: the invention reduces the standing time of construction workers due to unloading on the unloading platform, simultaneously arranges the baffle plate for preventing the threat of falling objects in high school to the construction workers, ensures that the wall body and the unloading platform are more firmly fixed through the arrangement of the supporting frame and the bracket, ensures that the weight of the construction workers is more born on the side wall of the unloading platform through the arrangement of the standing plate, does not directly apply pressure on the inner bottom wall of the unloading platform, and improves the stability when the construction workers stand.

Description

Connecting device for discharging steel platform of high-rise building
Technical Field
The invention relates to the field of buildings, in particular to a connecting device for a discharging steel platform of a high-rise building.
Background
The method is characterized in that various lines on a design drawing are converted into a process of building a solid building at a specified place, which is called building construction, a large amount of building materials are required for the building construction, and a high-rise discharging platform is required for discharging when a high-rise building is carried out.
However, the existing high-rise discharging platform has the following defects: when unloading, a construction worker needs to unload the material from the construction elevator onto the unloading platform, and then unloads the material from the unloading platform into a building, so that the time for the construction worker to stand in the unloading platform is long, certain risks exist, meanwhile, a shielding part is not arranged on the existing unloading platform, and if a high school falling object occurs in the unloading process, huge safety threats exist to the construction worker.
Disclosure of Invention
The invention aims to solve the problems in the prior art and provides a connecting device for a steel discharging platform of a high-rise building.
In order to achieve the purpose, the invention adopts the following technical scheme:
a connecting device for a discharging steel platform of a high-rise building comprises a safety net and a discharging platform fixed on a wall body through a steel frame, wherein the wall body and the discharging platform are fixed together through a plurality of first lifting hooks and a first steel wire rope, one side of the discharging platform, which is far away from the wall body, is provided with a door body, two support frames are fixedly arranged between the wall body and the discharging platform through a connecting mechanism and a fixing mechanism, a placing plate is placed in the wall body, two standing plates are symmetrically and fixedly arranged on the inner side wall of the wall body, the placing plate is simultaneously contacted with one sides, which are close to each other, of the two standing plates, a resistance reducing mechanism is arranged between the wall body and the placing plate, a limiting structure is arranged between the placing plate and the two standing plates, four support rods are fixedly arranged on the discharging platform, and the upper ends of the four, a layer of rubber pad is fixedly adhered to the upper surface of the baffle plate, and a plurality of supports are fixedly arranged between the wall body and the steel frame.
In foretell a connecting device for high-rise building steel platform of unloading, coupling mechanism comprises four fixing bases, two pivots, two carousels, two wind-up rolls, four diversion rollers, two wire rope two, two lifting hooks two and four group's block structures, the inside fixed mounting of wall body has four fixing bases, lies in two with one side the fixing base rotates through a pivot and is connected with a wind-up roll, and the both ends of pivot run through fixing base and fixed mounting respectively have a carousel, install the block structure between fixing base and the carousel, still rotate in the wall body and be connected with four diversion rollers, the winding has wire rope two on the wind-up roll, and the one end of wire rope two passes corresponding diversion roller and is connected with the support frame through lifting hook two.
In the above connecting device for the discharging steel platform of the high-rise building, each group of clamping structures consists of eight clamping grooves, eight clamping blocks and four strip-shaped holding rods, eight clamping grooves are formed in one side, close to the turntable, of each fixing seat, one clamping block is fixedly clamped on each clamping groove, and one strip-shaped holding rod is fixedly arranged between every two adjacent clamping blocks through a roller.
In the above connecting device for the discharging steel platform of the high-rise building, the fixing mechanism is composed of two fixing rods, two fixing blocks and two stepped holes, the two stepped holes are formed in the lower surface of the wall body, the two support frames are both fixedly provided with one fixing rod, and the upper ends of the fixing rods are located in the stepped holes and are in threaded connection with one fixing block.
In the above connecting device for the discharging steel platform of the high-rise building, two through holes are formed in the placing plate, and the size of each through hole is larger than that of each stepped hole.
In the above connecting device for the discharging steel platform of the high-rise building, the resistance reducing mechanism comprises a plurality of mounting grooves and a plurality of supporting rollers, the wall body is provided with a plurality of mounting grooves, and each mounting groove is internally and rotatably connected with one supporting roller.
In the above connecting device for the discharging steel platform of the high-rise building, the lower surface of the wall body is provided with a plurality of discharging troughs, the discharging troughs are communicated with the corresponding mounting grooves, and the lower surface of the wall body is fixedly provided with a collecting box through a plurality of bolts.
In the above connecting device for the discharging steel platform of the high-rise building, each of the two limiting structures comprises a limiting groove and a limiting block, the two sides of the placing plate are both provided with a limiting groove, one side of each of the two standing plates, which is close to each other, is fixedly provided with a limiting block, and the limiting blocks are respectively located in the corresponding limiting grooves.
Compared with the prior art, the invention has the advantages that:
1: on the basis that a steel frame, a first lifting hook and a wall body and an unloading platform are fixed, a detachable support frame is arranged to enable the wall body and the unloading platform to be fixed more firmly (a triangle is formed between the wall body, the unloading platform and the support frame), the upper end of the support frame is fixed through a fixing mechanism, the lower end of the support frame is tensioned through a second steel wire rope which can be wound, and the support frame can better support the wall body and the unloading platform.
2: the clamping structure is easy and convenient to operate, the turntable can be quickly and more required to be fixed or the rotation of the turntable convenient to detach from the fixing seat, and therefore the support frame can be used for winding the second steel wire rope, and the support frame can be conveniently detached.
3: the setting of plate washer avoids high altitude junk to injure the construction worker who carries out the work of unloading in the platform of unloading by a crashing object, and the setting of rubber pad utilizes its elasticity to reduce the impact of junk to the platform of unloading, improves the life of plate washer and makes its better carry out safety protection to the construction worker who carries out the work of unloading in the platform of unloading.
4: the setting up of backing roll makes and places the board and remove more portably, and be rolling friction between the two, frictional force is little, is convenient for place the removal of board, is convenient for to place the board portion and removes the operation of unloading in the wall body, reduces construction workman and is located the interior engineering time of the platform of unloading, the security when improving the unloading.
In conclusion, the time of a construction worker standing on the unloading platform due to unloading is reduced, the baffle is arranged to prevent the construction worker from being threatened by a falling object in the high school, the wall body and the unloading platform are fixed more firmly through the arrangement of the support frame and the support, the weight of the construction worker is more born on the side wall of the unloading platform through the arrangement of the standing plate, the inner bottom wall of the platform is not directly pressed, and the stability of the platform during standing is improved.
Drawings
FIG. 1 is a schematic structural diagram of a connecting device for a steel platform for discharging of a high-rise building, which is provided by the invention;
FIG. 2 is an enlarged view of the structure of part A in FIG. 1;
FIG. 3 is a rear view of the structure of the holder portion of FIG. 2;
FIG. 4 is an enlarged view of the structure of part B in FIG. 1;
fig. 5 is an enlarged schematic view of the structure of the portion C in fig. 1.
In the figure: the device comprises a wall body 1, a safety net 2, a steel frame 3, a discharging platform 4, a first lifting hook 5, a first steel wire rope 6, a door body 7, a fixed seat 8, a rotating shaft 9, a rotating disc 10, a clamping groove 11, a clamping block 12, a strip-shaped holding rod 13, a winding roller 14, a turning roller 15, a second steel wire rope 16, a support frame 17, a fixed rod 18, a fixed block 19, a stepped hole 20, a placing plate 21, a through hole 22, a mounting groove 23, a support roller 24, a blanking groove 25, a collecting box 26, a bolt 27, a standing plate 28, a limiting groove 29, a limiting block 30, a support rod 31, a baffle plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Referring to fig. 1-5, a connecting device for a steel platform for discharging of a high-rise building comprises a safety net 2 and a discharging platform 4 fixed on a wall 1 through a steel frame 3, wherein the wall 1 and the discharging platform 4 are further fixed together through a plurality of lifting hooks one 5 and steel wire ropes one 6, and the parts are not specifically illustrated in the prior art.
One side of unloading platform 4 far away from wall body 1 installs a body 7, still there are two support frames 17 through coupling mechanism and fixed establishment fixed mounting between wall body 1 and the platform 4 of unloading, the setting up of support frame 17 makes the platform 4 of unloading fixed more firm outside wall body 1, forms a supporting part similar to triangle-shaped between wall body 1, the platform 4 of unloading and two support frames 17 to make the platform 4 of unloading fixed more firm outside wall body 1.
The connecting mechanism comprises four fixed seats 8, two rotating shafts 9, two rotating discs 10, two winding rollers 14, four turning rollers 15, two steel wire ropes 16, two lifting hooks II and four groups of clamping structures, the four fixed seats 8 are fixedly installed inside the wall body 1, the two fixed seats 8 positioned on the same side are rotatably connected with one winding roller 14 through one rotating shaft 9, and two ends of each rotating shaft 9 respectively penetrate through the fixed seats 8 and are fixedly provided with one rotating disc 10;
clamping structures are arranged between the fixed seat 8 and the rotary table 10, each group of clamping structures consists of eight clamping grooves 11, eight clamping blocks 12 and four strip-shaped holding rods 13, one side, close to the rotary table 10, of each fixed seat 8 is provided with eight clamping grooves 11, each clamping groove 11 is fixedly clamped with one clamping block 12, and a strip-shaped holding rod 13 is fixedly arranged between two adjacent clamping blocks 12;
still rotate in the wall body 1 and be connected with four diversion rollers 15, wind on the wind-up roll 14 and have two 16 wire rope, and the one end of two 16 wire rope passes corresponding diversion roller 15 and is connected with support frame 17 through second lifting hook, and the setting of two 16 wire rope makes the one end that the platform 4 was left from to the support frame 17 can be better contact (counterbalance) with wall body 1.
The fixing mechanism comprises two fixing rods 18, two fixing blocks 19 and two stepped holes 20, the lower surface of the wall body 1 is provided with the two stepped holes 20, the two supporting frames 17 are all fixedly provided with the fixing rods 18, and the upper ends of the fixing rods 18 are located in the stepped holes 20 and are in threaded connection with the fixing blocks 19.
Two through holes 22 are formed in the placing plate 21, the size of each through hole 22 is larger than that of the corresponding stepped hole 20, and the fixing blocks 19 are conveniently installed due to the through holes 22, so that the fixing rods 18 inserted into the stepped holes 20 are fixed.
A placing plate 21 is placed in a wall body 1, two standing plates 28 are symmetrically and fixedly mounted on the inner side wall of the wall body 1, the placing plate 21 is in contact with one side, close to the two standing plates 28, of each other, and a resistance reducing mechanism is mounted between the wall body 1 and the placing plate 21.
Drag reduction mechanism comprises a plurality of mounting grooves 23, a plurality of backing roll 24, has seted up a plurality of mounting grooves 23 on the wall body 1, all rotates in every mounting groove 23 and is connected with a backing roll 24, can drive backing roll 24 when placing board 21 and removing, and the rolling friction between the two is little, is convenient for place the removal of board 21.
A plurality of charging chutes 25 have been seted up to the lower surface of wall body 1, and charging chute 25 and corresponding mounting groove 23 intercommunication, and there is a collecting box 26 lower surface of wall body 1 through a plurality of bolts 27 fixed mounting, and the impurity card in the platform 4 of unloading is avoided in the setting of collecting box 26 to influence the rotation of backing roll 24 in mounting groove 23.
Place and all be equipped with a limit structure between board 21 and two standing plates 28, two limit structure comprise a spacing groove 29 and a stopper 30, place the both sides of board 21 and all seted up a spacing groove 29, two standing plates 28 equal fixed mounting in one side that is close to each other have a stopper 30, and stopper 30 is located corresponding spacing groove 29 respectively.
Four support rods 31 are fixedly mounted on the discharging platform 4, a baffle 32 is clamped at the upper ends of the four support rods 31 together, a layer of rubber pad 33 is fixedly adhered to the upper surface of the baffle 32, and a plurality of supports 34 are fixedly mounted between the wall body 1 and the steel frame 3.
Further, unless otherwise specifically stated or limited, the above-described fixed connection is to be understood in a broad sense, and may be, for example, welded, glued, or integrally formed as is conventional in the art.
In the invention, during unloading, a construction worker stands on the standing plate 28, the material to be unloaded is placed on the placing plate 21, then the construction worker standing on the standing plate 28 and the construction worker standing in the wall body 1 exert an acting force on the placing plate 21 together, so that the placing plate 21 is partially moved into the wall body 1, and then the construction worker in the unloading platform 4 enters the wall body 1 to unload the material in the placing plate 21, thereby reducing the construction time of the construction worker in the unloading platform 4 and improving the safety during unloading.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (8)

1. A connecting device for a discharging steel platform of a high-rise building comprises a safety net (2) and a discharging platform (4) fixed on a wall body (1) through a steel frame (3), wherein the wall body (1) and the discharging platform (4) are fixed together through a plurality of first lifting hooks (5) and first steel wire ropes (6), and is characterized in that a door body (7) is installed on one side, away from the wall body (1), of the discharging platform (4), two supporting frames (17) are fixedly installed between the wall body (1) and the discharging platform (4) through a connecting mechanism and a fixing mechanism, a placing plate (21) is placed in the wall body (1), two standing plates (28) are symmetrically and fixedly installed on the inner side wall of the wall body (1), the placing plate (21) is simultaneously contacted with one side, close to each other, and a resistance reducing mechanism is installed between the wall body (1) and the placing plate (21), the novel steel frame unloading device is characterized in that a limiting structure is arranged between each placing plate (21) and each two standing plates (28), four supporting rods (31) are fixedly mounted on each unloading platform (4), the upper ends of the supporting rods (31) are clamped together to form a baffle plate (32), a layer of rubber gasket (33) is fixedly adhered to the upper surface of each baffle plate (32), and a plurality of supports (34) are fixedly mounted between each wall body (1) and each steel frame (3).
2. The connecting device for the steel platform for discharging of the high-rise building as claimed in claim 1, wherein the connecting mechanism comprises four fixing seats (8), two rotating shafts (9), two rotating discs (10), two winding rollers (14), four turning rollers (15), two steel wire ropes (16), two hooks (16) and four groups of clamping structures, the four fixing seats (8) are fixedly installed inside the wall body (1), the two fixing seats (8) positioned on the same side are rotatably connected with one winding roller (14) through one rotating shaft (9), two ends of the rotating shaft (9) respectively penetrate through the fixing seats (8) and are fixedly installed with one rotating disc (10), the clamping structure is installed between the fixing seats (8) and the rotating disc (10), and the four turning rollers (15) are rotatably connected in the wall body (1), and a second steel wire rope (16) is wound on the winding roller (14), and one end of the second steel wire rope (16) penetrates through the corresponding turning roller (15) and is connected with the support frame (17) through a second lifting hook.
3. The connecting device for the steel platform of the high-rise building discharging according to claim 2, wherein each group of the clamping structures consists of eight clamping grooves (11), eight clamping blocks (12) and four strip-shaped holding rods (13), each fixing seat (8) is provided with eight clamping grooves (11) at one side close to the rotating disc (10), each clamping groove (11) is fixedly clamped with one clamping block (12), and one strip-shaped holding rod (13) is fixedly arranged between two adjacent clamping blocks (12) together.
4. The connecting device for the steel platform of the high-rise building discharging according to claim 1, wherein the fixing mechanism is composed of two fixing rods (18), two fixing blocks (19) and two stepped holes (20), the lower surface of the wall body (1) is provided with two stepped holes (20), one fixing rod (18) is fixedly installed on each of the two supporting frames (17), and the upper end of each fixing rod (18) is located in the corresponding stepped hole (20) and is in threaded connection with one fixing block (19).
5. The connecting device for the steel platform of the high-rise building unloading according to claim 4, wherein the placing plate (21) is provided with two through holes (22) opposite to each other, and the size of the through holes (22) is larger than that of the stepped hole (20).
6. The connecting device for the steel discharging platform of the high-rise building as claimed in claim 1, wherein the drag reduction mechanism is composed of a plurality of mounting grooves (23) and a plurality of supporting rollers (24), the wall body (1) is provided with a plurality of mounting grooves (23), and each mounting groove (23) is rotatably connected with one supporting roller (24).
7. The connecting device for the steel platform of the high-rise building discharging according to claim 6, wherein a plurality of charging chutes (25) are formed on the lower surface of the wall body (1), the charging chutes (25) are communicated with the corresponding mounting grooves (23), and a collecting box (26) is fixedly mounted on the lower surface of the wall body (1) through a plurality of bolts (27).
8. The connecting device for the steel platform of the high-rise building discharging according to claim 1, wherein the two limiting structures are composed of a limiting groove (29) and a limiting block (30), the two sides of the placing plate (21) are respectively provided with a limiting groove (29), one side of the two standing plates (28) close to each other is fixedly provided with a limiting block (30), and the limiting blocks (30) are respectively located in the corresponding limiting grooves (29).
CN201910946464.4A 2019-10-05 2019-10-05 Connecting device for discharging steel platform of high-rise building Withdrawn CN110778130A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910946464.4A CN110778130A (en) 2019-10-05 2019-10-05 Connecting device for discharging steel platform of high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910946464.4A CN110778130A (en) 2019-10-05 2019-10-05 Connecting device for discharging steel platform of high-rise building

Publications (1)

Publication Number Publication Date
CN110778130A true CN110778130A (en) 2020-02-11

Family

ID=69385633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910946464.4A Withdrawn CN110778130A (en) 2019-10-05 2019-10-05 Connecting device for discharging steel platform of high-rise building

Country Status (1)

Country Link
CN (1) CN110778130A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111946072A (en) * 2020-09-04 2020-11-17 福建省燕城建设工程有限公司 High-rise building construction discharge apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111946072A (en) * 2020-09-04 2020-11-17 福建省燕城建设工程有限公司 High-rise building construction discharge apparatus
CN111946072B (en) * 2020-09-04 2021-10-19 福建省燕城建设工程有限公司 High-rise building construction discharge apparatus

Similar Documents

Publication Publication Date Title
CN210659327U (en) Be applied to building engineering's platform of unloading
CN110778130A (en) Connecting device for discharging steel platform of high-rise building
CN112249923A (en) Roof frame crane for building construction
CN215154788U (en) Electric appliance cabinet fixed mounting structure
CN215851398U (en) Water supply and drainage pipeline conveyer that convenience is high
CN214329965U (en) Assembly type construction is with platform of unloading
CN213749442U (en) Building engineering technical service detection device
CN210346729U (en) Automobile detection rack
CN211740591U (en) Detection test device for safety lock of lifting basket
CN210523449U (en) Stable-rotation uncoiler
CN109834116B (en) Replacing system and replacing method for top roller of horizontal loop
CN208377375U (en) A kind of lifting equipment cable wire containing box
CN220976418U (en) Winch frame for well
CN217326545U (en) Slidable discharging platform device
CN112496046A (en) Hot-rolled coil finishing mill back-up roll replacing device and replacing method thereof
CN217516531U (en) Crane lifting device
CN220645102U (en) Device for building outer elevation construction
CN211090166U (en) Circuit board mounting groove device with buffering protection function
CN217867741U (en) Material conveying device suitable for BIPV
CN218798169U (en) Material receiving and discharging platform and rolling mill
CN215928949U (en) Hydraulic engineering ground detects uses protector
CN217059758U (en) Glass curtain wall detecting system
CN220906995U (en) Hoisting tool and hoisting equipment
CN210510944U (en) Test host placing structure for software development
CN218881637U (en) Assembled building construction platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20200211