CN110763952A - Underground cable fault monitoring method and device - Google Patents
Underground cable fault monitoring method and device Download PDFInfo
- Publication number
- CN110763952A CN110763952A CN201911038044.2A CN201911038044A CN110763952A CN 110763952 A CN110763952 A CN 110763952A CN 201911038044 A CN201911038044 A CN 201911038044A CN 110763952 A CN110763952 A CN 110763952A
- Authority
- CN
- China
- Prior art keywords
- data
- underground cable
- fault
- current
- location
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/088—Aspects of digital computing
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Mathematical Physics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Locating Faults (AREA)
Abstract
The invention discloses a method and a device for monitoring underground cable faults, wherein the method comprises the following steps: acquiring current environment data and current operation data of the underground cable through an underground cable acquisition system; judging whether the underground cable is in fault or not according to the current environmental data and the current operation data; when the underground cable is in fault, extracting a first position of the fault underground cable; comparing the first location to a second location of the historical failed underground cable in a stored log; if the first position is the same as the second position, adjusting the failure times of the first position; and judging whether the adjusted failure frequency of the first position exceeds a preset value or not, and if so, outputting the first position. By adopting the method, the historical environmental data and the historical operating data of the underground cable can be comprehensively considered, so that the key area can be monitored.
Description
Technical Field
The invention relates to a method and a device for monitoring underground cable faults, and belongs to the field of underground cable monitoring.
Background
Cables buried underground are often exploded due to the temperature rise of the cables during power transmission; or, the cable is damaged due to water inflow of the underground laying pipeline, so that normal transmission of the cable is influenced.
In the conventional technology, in order to monitor underground cables, manual work is needed, and every time when underground cables break down, engineering processing is carried out, a large amount of manpower and material resources are consumed, so that no emphasis is caused, and time and labor are consumed.
Disclosure of Invention
In view of the above problems in the prior art, the present invention is directed to a method and apparatus for monitoring a fault of an underground cable.
A method of underground cable fault monitoring, the method comprising:
acquiring current environment data and current operation data of the underground cable through an underground cable acquisition system;
judging whether the underground cable is in fault or not according to the current environmental data and the current operation data;
when the underground cable is in fault, extracting a first position of the fault underground cable;
comparing the first location to a second location of the historical failed underground cable in a stored log;
if the first position is the same as the second position, adjusting the failure times of the first position;
and judging whether the adjusted failure frequency of the first position exceeds a preset value or not, and if so, outputting the first position.
In one embodiment, the outputting the first position includes:
inquiring a region monitoring center corresponding to the first position;
and sending the first position to the regional monitoring center, so that the regional monitoring center displays the first position with a warning mark.
In one embodiment, the displaying the first location with a warning indicator includes:
inquiring a visual map corresponding to the region monitoring center;
the first location is located on the visual map and displayed with a warning indicia.
In one embodiment, the method further comprises:
and when the failure times do not exceed a preset value, storing the current log corresponding to the first position, and filing the stored current log into a cluster of the log corresponding to the second position.
In one embodiment, the determining whether the underground cable is faulty according to the current environmental data and the current operation data includes:
acquiring historical environment data of the current environment data in a forward preset time period and historical operating data of the current operating data in the forward preset time period;
generating an environment data trend graph according to the current environment data and the historical environment data, and generating an operation data trend graph according to the current operation data and the historical operation data;
and judging whether the underground cable is in fault or not according to the environment data trend graph and the operation data trend graph.
In one embodiment, the current environmental data includes one or more of temperature data, water sensitivity data, ambient gas data, and displacement data, and the operational data includes, but is not limited to, partial discharge signals.
A subterranean cable fault monitoring device, the device comprising:
the acquisition module is used for acquiring current environmental data and current operation data of the underground cable through the underground cable acquisition system;
the judging module is used for judging whether the underground cable is in fault or not according to the current environment data and the current operation data;
the extracting module is used for extracting a first position of the underground cable with the fault when the underground cable with the fault is in fault;
a comparison module for comparing the first location to a second location of the historical failed underground cable in a stored log;
the adjusting module is used for adjusting the failure times of the first position if the first position is the same as the second position;
and the monitoring module is used for judging whether the number of the adjusted faults of the first position exceeds a preset value or not, and if the number of the adjusted faults of the first position exceeds the preset value, outputting the first position.
In one embodiment, the monitoring module comprises:
the query unit is used for querying a region monitoring center corresponding to the first position;
and the display unit is used for sending the first position to the area monitoring center so that the area monitoring center displays the first position by a warning mark.
A computer device comprising a memory storing a computer program and a processor implementing the steps of any of the methods described above when the processor executes the computer program.
A computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the steps of the method of any of the above.
Compared with the prior art, the underground cable fault detection method and the underground cable fault detection device provided by the invention have the following advantages:
the current environment data and the current operation data of the underground cable are acquired through the cable acquisition system, whether the underground cable breaks down or not is judged according to the current environment data and the current operation data, if the underground cable breaks down, a first position can be extracted, the first position is compared with the stored data in a log, whether the first position breaks down or not is determined, if the first position breaks down, the number of times of the fault can be adjusted, whether the number of times of the fault exceeds a preset value or not is judged, and if the number of times of the fault exceeds the preset value, the first position is output, so that the first position can be monitored, for example, the underground cable is thoroughly transformed, equipment is timely replaced, regular manual inspection and.
Drawings
FIG. 1 is a diagram of an environment in which the present invention provides for underground cable fault monitoring;
FIG. 2 is a flow chart of a method of underground cable fault monitoring provided by the present invention;
FIG. 3 is a block diagram of an underground cable fault monitoring apparatus provided by the present invention;
fig. 4 is an internal block diagram of a computer device provided by the present invention.
Detailed Description
The present invention will be described more fully with reference to the following examples and comparative examples.
The underground cable fault monitoring method provided by the application can be applied to the application environment shown in figure 1. Wherein the underground cable collection system 102 communicates with the server 104 via a network. The server 104 collects current environmental data and current operating data of the underground cable through the cable collection system 102, so as to judge whether the underground cable has a fault according to the current environmental data and the current operating data, if the underground cable has the fault, a first position can be extracted and compared with data stored in a log to determine whether the first position has the fault before, if the underground cable has the fault, the number of times of the fault can be adjusted, and whether the number of times of the fault exceeds a preset value is judged, if the first position and the second position are in time, the first position are output, and therefore the first position can be monitored, for example, complete reconstruction, equipment replacement in time, regular manual inspection and the like are performed. The terminal 102 may be, but not limited to, various personal computers, notebook computers, smart phones, tablet computers, and portable wearable devices, and the server 104 may be implemented by an independent server or a server cluster formed by a plurality of servers.
In one embodiment, as shown in fig. 2, a method for monitoring underground cable faults is provided, which is described by taking the method as an example applied to the server in fig. 1, and comprises the following steps:
s202: and acquiring current environment data and current operation data of the underground cable through an underground cable acquisition system.
Specifically, the current environmental data includes one or more of temperature data, water sensitive data, environmental gas data, and displacement data, the operational data includes, but is not limited to, partial discharge signals, and the current operational data may also refer to the magnitude of current in the underground cable, etc. Underground cable collection systems are installed underground, for example, at the junction of underground cables, and are used for collecting environmental data and operational data at the junction of underground cables. After the underground cable acquisition system acquires the environmental data and the operation data of the underground cable, the environmental data and the operation data are sent to the server, so that the server can judge whether the underground cable breaks down or not after processing. In order to ensure the data queryability, the underground cable acquisition system and the geographical position of the underground cable are sent to the server together when sending data, and optionally, the label of the underground cable can be preset, and the corresponding relation between the label and the position of the underground cable is established, so that when the service receives the data sent by the underground cable acquisition system with a certain label, the geographical position information corresponding to the underground cable can be queried according to the label.
S204: and judging whether the underground cable is in fault or not according to the current environmental data and the current operation data.
Specifically, the server may determine whether the underground cable is faulty according to a fault determination model generated from the historical data, or generate a trend graph from the historical data and determine whether the underground cable is faulty according to the trend graph.
The fault judgment model is a training model which is generated according to historical data and used for judging whether the underground cable has faults or not, the input of the model is current environment data and current operation data, and the output of the model is the probability of the underground cable having faults. And the server inputs the current environment data and the current operation data into a fault judgment model which is trained in advance to obtain a fault judgment result, the fault judgment result is compared with a predetermined threshold value, if the fault judgment result is larger than the predetermined threshold value, the underground cable is judged to have a fault, and otherwise, the underground cable does not have the fault. Optionally, when the fault judgment model processes the current environment data and the current operation data, the current environment data may be compared with the environment data of the historical fault during the training of the model, the current operation data may be compared with the operation data of the historical fault, so as to obtain the similarity, and then all the similarities are integrated to obtain the fault judgment result.
S206: when the underground cable fails, a first location of the failed underground cable is extracted.
Specifically, as described above, the label of the underground cable may be preset, and the correspondence between the label and the position of the underground cable may be established, so that when the service receives data sent by the underground cable acquisition system of a certain label, the geographical position information corresponding to the underground cable, that is, the first position of the underground cable, may be queried according to the label.
S208: the first location is compared to a second location of the cable below the historical failure in the stored log.
Specifically, the server stores previously data of a failure, including the type of a historical failure, the location of the failure, and the like, i.e., the second location here.
The server compares the first position with the second position to judge whether the original first position has a fault, wherein the log can be an abnormal log only, namely a fault log, and the server can extract the fault log to generate a fault record and store the fault record in the database.
S210: and if the first position is the same as the second position, adjusting the failure times of the first position.
Specifically, if the first location and the second location are the same, or the distance between the first location and the second location is smaller than the preset value, the first location and the second location may be considered to be the same, that is, the first location has failed, and the failure occurs again this time, the number of failures at the first location may be increased by 1. Optionally, the type of the fault may also be determined according to the current environmental data and the current operating data, so as to classify the fault.
S212: and judging whether the adjusted failure frequency of the first position exceeds a preset value or not, and if so, outputting the first position.
The server judges whether the fault at the first position exceeds a preset value, for example, if the fault exceeds the preset value, the fault is more, furthermore, the server can obtain the fault frequency at the first position within a certain time, and if the fault exceeds the preset value, the fault at the position is always shown recently, and management needs to be enhanced, for example, complete reconstruction, equipment replacement in time, regular manual inspection and the like. The server outputs the first position for storage, and then reminds the user. Furthermore, the server obtains the type of the fault, judges the type of the historical fault at the first position, and classifies the historical fault to determine the type of the frequent fault at the first position, so that the first position can be further adjusted according to the type, for example, the type is always related to a cable, the cable may need to be replaced, and if the type is always due to water leakage, waterproof treatment and the like may be needed.
Compared with the prior art, the underground cable fault detection method provided by the invention has the following advantages:
the current environment data and the current operation data of the underground cable are acquired through the cable acquisition system, whether the underground cable breaks down or not is judged according to the current environment data and the current operation data, if the underground cable breaks down, a first position can be extracted, the first position is compared with the stored data in a log, whether the first position breaks down or not is determined, if the first position breaks down, the number of times of the fault can be adjusted, whether the number of times of the fault exceeds a preset value or not is judged, and if the number of times of the fault exceeds the preset value, the first position is output, so that the first position can be monitored, for example, the underground cable is thoroughly transformed, equipment is timely replaced, regular manual inspection and.
In one embodiment, the outputting the first position includes: inquiring a region monitoring center corresponding to the first position; and sending the first position to the regional monitoring center, so that the regional monitoring center displays the first position with a warning mark.
Specifically, each location may be provided with a corresponding area monitoring center, for example, one area corresponds to one area monitoring center, or one city corresponds to one area monitoring center. The server determines the area monitoring center through the position of the underground cable and sends the first position to the area monitoring center so that the area monitoring center can process the information in time.
Optionally, the area monitoring center includes a plurality of terminals, where the terminals include a terminal in operation and a terminal not in operation, and the terminals in operation include an idle terminal and a non-idle terminal, where the non-idle terminal may further include a terminal with low resource occupancy rate and a terminal with high resource occupancy rate, and the terminals capable of performing data processing are the idle terminal and the terminal with low resource occupancy rate. And displaying said first location with a warning label at the terminal. The warning mark may be an exclamation mark or the like, and may be a warning lamp or the like by voice.
In one embodiment, the displaying the first location with a warning indicator includes: inquiring a visual map corresponding to the region monitoring center; the first location is located on the visual map and displayed with a warning indicia.
Specifically, in order to implement the visual processing, after the number of times of the underground cable failure exceeds the preset value is determined, the server sends the first position to the area monitoring center, and obtains a city map corresponding to the area monitoring center, where the first position may also be an area map, so that the server locates the position of the underground cable, that is, the first position, in the city map, and then displays the first position through an early warning identifier, such as an exclamation mark.
In the embodiment, the fault information is displayed in the city map, so that the method is more intuitive.
In one embodiment, the method further comprises: and when the failure times do not exceed a preset value, storing the current log corresponding to the first position, and filing the stored current log into a cluster of the log corresponding to the second position.
Specifically, after determining the fault each time, an abnormal log is generated, wherein the server generates a log in each processing, but if determining the fault, the abnormal log is generated, that is, the log is determined to be the abnormal log by distinguishing through a label and is stored, so that the server stores the log, and then performs the step S206, that is, the first position of the underground cable with the fault is extracted, and the subsequent steps, that is, generating the abnormal log each time is equivalent to generating a processing task, and the server determines when to process the processing task according to the resource occupation condition of the server, for example, when the resource occupation condition meets a preset value, the server performs the step S206 and the like. In addition, after the server executes step S206 and the like, when it is determined that the number of failures does not exceed the preset value, the server archives the stored current log to the cluster of the log corresponding to the second location, so that the server can conveniently read the historical data, and a foundation is laid for statistics of the number of failures.
In one embodiment, the determining whether the underground cable is faulty according to the current environmental data and the current operation data includes: acquiring historical environment data of the current environment data in a forward preset time period and historical operating data of the current operating data in the forward preset time period; generating an environment data trend graph according to the current environment data and the historical environment data, and generating an operation data trend graph according to the current operation data and the historical operation data; and judging whether the underground cable is in fault or not according to the environment data trend graph and the operation data trend graph.
The embodiment sufficiently considers the change of environmental variables such as temperature, gas composition and the like, for example, if the underground cable fault is caused by fire, the temperature is not abrupt change, so whether the underground cable fault or the underground cable is about to fault can be judged according to the change trend of the temperature, and if the underground cable fault or the underground cable is about to fault, the underground cable fault can be timely processed so as to solve the problem before the fault occurs.
The method comprises the steps of obtaining current environment data and a current operation data time point, obtaining reference environment data and reference operation data in a preset time period before the time point, generating an environment data trend graph according to the current environment data and the reference environment data, generating an operation data trend graph according to the current operation data and the reference operation data, then calculating a first similarity between the environment data trend graph and an environment data trend graph with a fault in a model and a second similarity between the operation data trend graph and an operation data trend graph with the fault in the model, finally calculating to obtain a comprehensive similarity according to the first similarity and the second similarity, then judging whether the comprehensive similarity is larger than a preset threshold value, if so, judging the fault or possible fault, and if not, indicating that no problem exists currently.
It should be understood that, although the steps in the flowchart of fig. 2 are shown in order as indicated by the arrows, the steps are not necessarily performed in order as indicated by the arrows. The steps are not performed in the exact order shown and described, and may be performed in other orders, unless explicitly stated otherwise. Moreover, at least a portion of the steps in fig. 2 may include multiple sub-steps or multiple stages that are not necessarily performed at the same time, but may be performed at different times, and the order of performance of the sub-steps or stages is not necessarily sequential, but may be performed in turn or alternately with other steps or at least a portion of the sub-steps or stages of other steps.
In one embodiment, as shown in fig. 3, there is provided a underground cable fault monitoring apparatus comprising:
the system comprises an acquisition module 100, a data processing module and a data processing module, wherein the acquisition module is used for acquiring current environment data and current operation data of an underground cable through an underground cable acquisition system;
a judging module 200, configured to judge whether the underground cable fails according to the current environmental data and the current operating data;
an extraction module 300 for extracting a first location of a failed underground cable when the underground cable fails;
a comparison module 400 for comparing the first location to a second location of the historical failed underground cable in the stored log;
an adjusting module 500, configured to adjust the number of failures of a first location if the first location is the same as the second location;
and the monitoring module 600 is configured to determine whether the number of failures of the adjusted first position exceeds a preset value, and if the number of failures of the adjusted first position exceeds the preset value, output the first position.
In one embodiment, the monitoring module comprises:
the query unit is used for querying a region monitoring center corresponding to the first position;
and the display unit is used for sending the first position to the area monitoring center so that the area monitoring center displays the first position by a warning mark.
In one embodiment, the apparatus may further include:
and the storage module is used for storing the current log corresponding to the first position when the failure times do not exceed a preset value, and filing the stored current log into the cluster of the log corresponding to the second position.
In one embodiment, the determining module may include:
the data acquisition unit is used for acquiring historical environment data of the current environment data in a forward preset time period and historical operating data of the current operating data in the forward preset time period;
the trend graph generating unit is used for generating an environment data trend graph according to the current environment data and the historical environment data and generating an operation data trend graph according to the current operation data and the historical operation data;
and the fault judging unit is used for judging whether the underground cable is in fault or not according to the environment data trend graph and the operation data trend graph.
In one embodiment, the current environmental data includes one or more of temperature data, water sensitivity data, ambient gas data, and displacement data, and the operational data includes, but is not limited to, partial discharge signals.
For specific definition of the underground cable fault monitoring device, reference may be made to the above definition of the underground cable fault monitoring method, which is not described herein again. The modules in the underground cable fault monitoring device can be wholly or partially realized by software, hardware and a combination thereof. The modules can be embedded in a hardware form or independent from a processor in the computer device, and can also be stored in a memory in the computer device in a software form, so that the processor can call and execute operations corresponding to the modules.
In one embodiment, a computer device is provided, which may be a server, the internal structure of which may be as shown in fig. 4. The computer device includes a processor, a memory, a network interface, and a database connected by a system bus. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device comprises a nonvolatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program, and a database. The internal memory provides an environment for the operation of an operating system and computer programs in the non-volatile storage medium. The database of the computer device is used for storing environmental data and operational data. The network interface of the computer device is used for communicating with an external terminal through a network connection. The computer program is executed by a processor to implement a method of underground cable fault monitoring.
Those skilled in the art will appreciate that the architecture shown in fig. 4 is merely a block diagram of some of the structures associated with the disclosed aspects and is not intended to limit the computing devices to which the disclosed aspects apply, as particular computing devices may include more or less components than those shown, or may combine certain components, or have a different arrangement of components.
In one embodiment, there is provided a computer device comprising a memory storing a computer program and a processor implementing the following steps when the processor executes the computer program: acquiring current environment data and current operation data of the underground cable through an underground cable acquisition system; judging whether the underground cable is in fault or not according to the current environmental data and the current operation data; when the underground cable is in fault, extracting a first position of the fault underground cable; comparing the first location to a second location of the historical failed underground cable in a stored log; if the first position is the same as the second position, adjusting the failure times of the first position; and judging whether the adjusted failure frequency of the first position exceeds a preset value or not, and if so, outputting the first position.
In one embodiment, said outputting said first location, as implemented by a processor executing a computer program, comprises: inquiring a region monitoring center corresponding to the first position; and sending the first position to the regional monitoring center, so that the regional monitoring center displays the first position with a warning mark.
In one embodiment, said displaying said first location with an alert indicator implemented when the processor executes the computer program comprises: inquiring a visual map corresponding to the region monitoring center; the first location is located on the visual map and displayed with a warning indicia.
In one embodiment, the processor, when executing the computer program, further performs the steps of: and when the failure times do not exceed a preset value, storing the current log corresponding to the first position, and filing the stored current log into a cluster of the log corresponding to the second position.
In one embodiment, said determining whether said underground cable is faulty based on said current environmental data and current operational data, as implemented by the processor executing the computer program, comprises: acquiring historical environment data of the current environment data in a forward preset time period and historical operating data of the current operating data in the forward preset time period; generating an environment data trend graph according to the current environment data and the historical environment data, and generating an operation data trend graph according to the current operation data and the historical operation data; and judging whether the underground cable is in fault or not according to the environment data trend graph and the operation data trend graph.
In one embodiment, said current environmental data involved in the execution of the computer program by the processor comprises one or more of temperature data, water sensitive data, ambient gas data and displacement data, said operational data including, but not limited to, partial discharge signals.
In one embodiment, a computer-readable storage medium is provided, having a computer program stored thereon, which when executed by a processor, performs the steps of: acquiring current environment data and current operation data of the underground cable through an underground cable acquisition system; judging whether the underground cable is in fault or not according to the current environmental data and the current operation data; when the underground cable is in fault, extracting a first position of the fault underground cable; comparing the first location to a second location of the historical failed underground cable in a stored log; if the first position is the same as the second position, adjusting the failure times of the first position; and judging whether the adjusted failure frequency of the first position exceeds a preset value or not, and if so, outputting the first position.
In one embodiment, said outputting said first location, as implemented by a computer program when executed by a processor, comprises: inquiring a region monitoring center corresponding to the first position; and sending the first position to the regional monitoring center, so that the regional monitoring center displays the first position with a warning mark.
In one embodiment, said displaying said first location with an alert indicator implemented when the computer program is executed by the processor comprises: inquiring a visual map corresponding to the region monitoring center; the first location is located on the visual map and displayed with a warning indicia.
In one embodiment, the computer program when executed by the processor further performs the steps of: and when the failure times do not exceed a preset value, storing the current log corresponding to the first position, and filing the stored current log into a cluster of the log corresponding to the second position.
In one embodiment, the determining whether the underground cable is faulty based on the current environmental data and current operational data, as implemented by the computer program when executed by the processor, comprises: acquiring historical environment data of the current environment data in a forward preset time period and historical operating data of the current operating data in the forward preset time period; generating an environment data trend graph according to the current environment data and the historical environment data, and generating an operation data trend graph according to the current operation data and the historical operation data; and judging whether the underground cable is in fault or not according to the environment data trend graph and the operation data trend graph.
In one embodiment, the current environmental data to which the computer program is executed by the processor includes one or more of temperature data, water sensitive data, ambient gas data, and displacement data, and the operational data includes, but is not limited to, a partial discharge signal.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by hardware instructions of a computer program, which can be stored in a non-volatile computer-readable storage medium, and when executed, can include the processes of the embodiments of the methods described above. Any reference to memory, storage, database, or other medium used in the embodiments provided herein may include non-volatile and/or volatile memory, among others. Non-volatile memory can include read-only memory (ROM), Programmable ROM (PROM), Electrically Programmable ROM (EPROM), Electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), Dynamic RAM (DRAM), Synchronous DRAM (SDRAM), Double Data Rate SDRAM (DDRSDRAM), Enhanced SDRAM (ESDRAM), Synchronous Link DRAM (SLDRAM), Rambus Direct RAM (RDRAM), direct bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
The technical features of the above embodiments can be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the above embodiments are not described, but should be considered as the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
The above-mentioned embodiments only express several embodiments of the present application, and the description thereof is more specific and detailed, but not construed as limiting the scope of the invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the concept of the present application, which falls within the scope of protection of the present application. Therefore, the protection scope of the present patent shall be subject to the appended claims.
Claims (10)
1. A method of underground cable fault monitoring, the method comprising:
acquiring current environment data and current operation data of the underground cable through an underground cable acquisition system;
judging whether the underground cable is in fault or not according to the current environmental data and the current operation data;
when the underground cable is in fault, extracting a first position of the fault underground cable;
comparing the first location to a second location of the historical failed underground cable in a stored log;
if the first position is the same as the second position, adjusting the failure times of the first position;
and judging whether the adjusted failure frequency of the first position exceeds a preset value or not, and if so, outputting the first position.
2. The method of claim 1, wherein said outputting the first position comprises:
inquiring a region monitoring center corresponding to the first position;
and sending the first position to the regional monitoring center, so that the regional monitoring center displays the first position with a warning mark.
3. The method of claim 2, wherein displaying the first location with a warning indicator comprises:
inquiring a visual map corresponding to the region monitoring center;
the first location is located on the visual map and displayed with a warning indicia.
4. A method according to any one of claims 1 to 3, characterized in that the method further comprises:
and when the failure times do not exceed a preset value, storing the current log corresponding to the first position, and filing the stored current log into a cluster of the log corresponding to the second position.
5. The method of any one of claims 1 to 3, wherein said determining whether the underground cable is faulty based on the current environmental data and current operational data comprises:
acquiring historical environment data of the current environment data in a forward preset time period and historical operating data of the current operating data in the forward preset time period;
generating an environment data trend graph according to the current environment data and the historical environment data, and generating an operation data trend graph according to the current operation data and the historical operation data;
and judging whether the underground cable is in fault or not according to the environment data trend graph and the operation data trend graph.
6. The method of any one of claims 1 to 3, wherein the current environmental data comprises one or more of temperature data, water sensitive data, ambient gas data, and displacement data, and wherein the operational data includes, but is not limited to, partial discharge signals.
7. An underground cable fault monitoring device, the device comprising:
the acquisition module is used for acquiring current environmental data and current operation data of the underground cable through the underground cable acquisition system;
the judging module is used for judging whether the underground cable is in fault or not according to the current environment data and the current operation data;
the extracting module is used for extracting a first position of the underground cable with the fault when the underground cable with the fault is in fault;
a comparison module for comparing the first location to a second location of the historical failed underground cable in a stored log;
the adjusting module is used for adjusting the failure times of the first position if the first position is the same as the second position;
and the monitoring module is used for judging whether the number of the adjusted faults of the first position exceeds a preset value or not, and if the number of the adjusted faults of the first position exceeds the preset value, outputting the first position.
8. The apparatus of claim 1, wherein the monitoring module comprises:
the query unit is used for querying a region monitoring center corresponding to the first position;
and the display unit is used for sending the first position to the area monitoring center so that the area monitoring center displays the first position by a warning mark.
9. A computer device comprising a memory and a processor, the memory storing a computer program, wherein the processor implements the steps of the method of any one of claims 1 to 6 when executing the computer program.
10. A computer-readable storage medium, on which a computer program is stored, which, when being executed by a processor, carries out the steps of the method of any one of claims 1 to 6.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911038044.2A CN110763952A (en) | 2019-10-29 | 2019-10-29 | Underground cable fault monitoring method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911038044.2A CN110763952A (en) | 2019-10-29 | 2019-10-29 | Underground cable fault monitoring method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110763952A true CN110763952A (en) | 2020-02-07 |
Family
ID=69334329
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911038044.2A Pending CN110763952A (en) | 2019-10-29 | 2019-10-29 | Underground cable fault monitoring method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110763952A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112213667A (en) * | 2020-09-28 | 2021-01-12 | 重庆朗天通讯股份有限公司 | Tunnel multi-state monitoring method and device, computer equipment and storage medium |
CN113095523A (en) * | 2021-05-08 | 2021-07-09 | 北京潞电电气设备有限公司 | Cable fault big data early warning system |
CN113740776A (en) * | 2021-08-17 | 2021-12-03 | 广州番禺电缆集团有限公司 | Cable sheath grounding circulation fault prediction method, device, equipment and storage medium |
CN114062842A (en) * | 2021-11-10 | 2022-02-18 | 国网江苏省电力有限公司徐州供电分公司 | Cable monitoring method and terminal |
CN116704735A (en) * | 2023-08-08 | 2023-09-05 | 湖南江河能源科技股份有限公司 | Hydropower station intelligent alarm method, system, terminal and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN207817110U (en) * | 2017-12-30 | 2018-09-04 | 南京华博供用电工程有限公司 | Feeder line fault detection control apparatus |
CN108917827A (en) * | 2018-05-17 | 2018-11-30 | 尹林 | It is a kind of that system is monitored based on the buried cable of temperature and water-sensitive information |
CN208833869U (en) * | 2018-08-31 | 2019-05-07 | 广州市泺立能源科技有限公司 | High voltage transmission line insulation flashover fault locator |
CN109782130A (en) * | 2019-01-25 | 2019-05-21 | 中铁电气化局集团有限公司 | High-speed rail on-line monitoring of cable system |
-
2019
- 2019-10-29 CN CN201911038044.2A patent/CN110763952A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN207817110U (en) * | 2017-12-30 | 2018-09-04 | 南京华博供用电工程有限公司 | Feeder line fault detection control apparatus |
CN108917827A (en) * | 2018-05-17 | 2018-11-30 | 尹林 | It is a kind of that system is monitored based on the buried cable of temperature and water-sensitive information |
CN208833869U (en) * | 2018-08-31 | 2019-05-07 | 广州市泺立能源科技有限公司 | High voltage transmission line insulation flashover fault locator |
CN109782130A (en) * | 2019-01-25 | 2019-05-21 | 中铁电气化局集团有限公司 | High-speed rail on-line monitoring of cable system |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112213667A (en) * | 2020-09-28 | 2021-01-12 | 重庆朗天通讯股份有限公司 | Tunnel multi-state monitoring method and device, computer equipment and storage medium |
CN113095523A (en) * | 2021-05-08 | 2021-07-09 | 北京潞电电气设备有限公司 | Cable fault big data early warning system |
CN113095523B (en) * | 2021-05-08 | 2023-01-10 | 北京潞电电气设备有限公司 | Cable fault big data early warning system |
CN113740776A (en) * | 2021-08-17 | 2021-12-03 | 广州番禺电缆集团有限公司 | Cable sheath grounding circulation fault prediction method, device, equipment and storage medium |
CN113740776B (en) * | 2021-08-17 | 2024-04-12 | 广州番禺电缆集团有限公司 | Cable sheath grounding loop fault prediction method, device, equipment and storage medium |
CN114062842A (en) * | 2021-11-10 | 2022-02-18 | 国网江苏省电力有限公司徐州供电分公司 | Cable monitoring method and terminal |
CN114062842B (en) * | 2021-11-10 | 2024-04-19 | 国网江苏省电力有限公司徐州供电分公司 | Cable monitoring method and terminal |
CN116704735A (en) * | 2023-08-08 | 2023-09-05 | 湖南江河能源科技股份有限公司 | Hydropower station intelligent alarm method, system, terminal and storage medium |
CN116704735B (en) * | 2023-08-08 | 2023-11-03 | 湖南江河能源科技股份有限公司 | Hydropower station intelligent alarm method, system, terminal and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110763952A (en) | Underground cable fault monitoring method and device | |
CN110868241B (en) | Underground cable fault early warning method and device based on multiple models | |
CN110798245B (en) | Underground cable fault early warning method and device based on single model | |
CN108564181B (en) | Power equipment fault detection and maintenance method and terminal equipment | |
CN110875851B (en) | Underground cable fault early warning method and device | |
CN110750413B (en) | Multi-machine room temperature alarm method and device and storage medium | |
CN105637432A (en) | Identifying anomalous behavior of a monitored entity | |
CN110345602B (en) | Air conditioner maintenance method and device, computer equipment and storage medium | |
CN110866634A (en) | Underground cable fault early warning method and device based on model selection | |
CN110618890B (en) | Fault processing method and device, electronic equipment and computer readable storage medium | |
CN114514141A (en) | Charging station monitoring method and device | |
CN110825923A (en) | Underground cable fault repairing method and device based on single model | |
CN110837956A (en) | Underground cable inspection task distribution method and device | |
CN114076873A (en) | Cable fault analysis and prediction method and device | |
CN110956288A (en) | Underground cable fault early warning method and device based on three-dimensional modeling | |
CN110674149B (en) | Service data processing method and device, computer equipment and storage medium | |
CN113808725B (en) | Equipment early warning system and method | |
CN107968727A (en) | A kind of detection method, device and the medium of CIFS services | |
CN110838940A (en) | Underground cable inspection task configuration method and device | |
CN110321770B (en) | Pipeline monitoring method, device, equipment and storage medium | |
CN110866839A (en) | Underground cable fault repairing method and device based on multiple models | |
CN110852461A (en) | Method and device for positioning fault underground cable | |
CN110889357A (en) | Underground cable fault detection method and device based on marked area | |
CN113689042B (en) | Fault source prediction method for monitoring node | |
CN112303811B (en) | Processing method, device and system for air conditioner operation data, air conditioner and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200207 |
|
RJ01 | Rejection of invention patent application after publication |