CN110750818A CN201910843554.0A CN201910843554A CN110750818A CN 110750818 A CN110750818 A CN 110750818A CN 201910843554 A CN201910843554 A CN 201910843554A CN 110750818 A CN110750818 A CN 110750818A
Authority
CN
China
Prior art keywords
drainage well
marking
information
elevation information
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910843554.0A
Other languages
Chinese (zh)
Other versions
CN110750818B (en
Inventor
邹少武
唐建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jingsen Design Co Ltd
Original Assignee
Jingsen Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingsen Design Co Ltd filed Critical Jingsen Design Co Ltd
Priority to CN201910843554.0A priority Critical patent/CN110750818B/en
Publication of CN110750818A publication Critical patent/CN110750818A/en
Application granted granted Critical
Publication of CN110750818B publication Critical patent/CN110750818B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Design And Manufacture Of Integrated Circuits (AREA)

Abstract

The invention discloses a height marking method, a height marking system and a storage medium for designing a drainage well, wherein the method comprises the following steps: receiving an operation request of height marking of a drainage well; obtaining a layer to which the drainage well belongs according to the operation request; acquiring first elevation information of a first drainage well of a layer to which the drainage well belongs, and acquiring pipeline marking information of the first drainage well and a second drainage well; calculating second elevation information of a second drainage well according to the first elevation information and the pipeline marking information; and marking the second drainage well according to the second elevation information. According to the method, the elevation information of the next drainage well is automatically calculated according to the first elevation information and the pipeline marking information between the first drainage well and the second drainage well, and then the second drainage well is automatically marked according to the calculated elevation information, so that the working efficiency of designers and the accuracy of marking information are improved. The invention can be widely applied to the technical field of computer aided design.

Description

Height marking method and system for drainage well design and storage medium
Technical Field
The invention relates to the technical field of computer aided design, in particular to a height marking method, a height marking system and a storage medium for drainage well design.
Background
AutoCAD, an automated computer design software, can be used to draw two-dimensional drawings and basic three-dimensional designs, through which automatic drawings can be made without the knowledge of programming. AutoCAD can be applied to multiple fields of civil construction, decoration, industrial drawing, engineering drawing, electronic industry, clothing processing and the like.
In the prior art, when the drainage well is designed by using AutoCAD software, repeated labeling steps are generally required, for example: when marking the height of a drainage well, the general steps include: setting a layer and a font, marking a first drainage well by using a straight line command and a character command, copying elevation information of the first drainage well to the positions of other drainage wells, manually calculating the elevation value of the next drainage well, and modifying the copied elevation information into the calculated elevation value. In the whole elevation process of drawing design, the designer is required to continuously repeat the processes of copying, calculating, modifying elevation information and the like, so that the time of the designer is wasted, the working efficiency of the designer is reduced, and meanwhile, the calculation process is easy to make mistakes, so that the design drawing of the drainage well which is led out possibly carries wrong information.
Disclosure of Invention
To solve the above technical problems, the present invention aims to: provided are a height labeling method, system, and storage medium for drainage well design that can improve the working efficiency of designers and the accuracy of labeling information.
The first technical scheme adopted by the invention is as follows:
a height labeling method for drainage well design, comprising the steps of:
receiving an operation request of height marking of a drainage well;
obtaining a layer to which the drainage well belongs according to the operation request;
acquiring first elevation information of a first drainage well of a layer to which the drainage well belongs, and acquiring pipeline marking information of the first drainage well and a second drainage well;
calculating second elevation information of a second drainage well according to the first elevation information and the pipeline marking information;
and marking the second drainage well according to the second elevation information.
Further, acquire first elevation information of the first drainage well on the map layer that the drainage well belongs to, it specifically includes:
acquiring a marked position of a first drainage well;
marking the first drainage well at the marking position of the first drainage well to obtain first elevation information of the first drainage well.
Further, acquire the pipeline marking information of first drainage well and second drainage well, it specifically includes:
acquiring the character information of the pipeline marks of the first drainage well and the second drainage well;
and extracting the length and the gradient of the pipeline from the text information.
Further, the second elevation information of the second drainage well is calculated according to the first elevation information and the pipeline marking information, and the method specifically comprises the following steps:
acquiring a calculation mode of the drainage well, wherein the calculation mode comprises a down slope calculation and an anti-slope calculation;
and calculating second elevation information of a second drainage well by adopting a calculation mode of the drainage well according to the first elevation information, the pipeline length and the pipeline gradient.
Further, mark second drainage well according to second elevation information, it specifically includes:
acquiring the position coordinates of the second drainage well in the layer to which the drainage well belongs;
determining the marking position of the second drainage well according to the position coordinate of the second drainage well;
and marking the second drainage well at the marking position of the second drainage well according to the second elevation information.
Further, between the step of obtaining the layer to which the drainage well belongs according to the operation request and the step of obtaining the first elevation information of the first drainage well of the layer to which the drainage well belongs, the method further comprises the following steps:
and setting the type of the marking font of the layer to which the drainage well belongs.
Further, before the step of receiving an operation request for height marking of a drainage well, the method further comprises the following steps:
loading a labeling plug-in according to the software starting signal, and enabling a software operation interface to display a menu of the labeling plug-in;
receiving a setting signal of a chart proportion uploaded by an operation interface;
and setting the map drawing proportion of the map layer to which the drainage well belongs according to the setting signal.
The second technical scheme adopted by the invention is as follows:
a height marking system for drainage well design, comprising:
the receiving module is used for receiving an operation request of height marking of the drainage well;
the first obtaining module is used for obtaining the layer to which the drainage well belongs according to the operation request;
the second acquisition module is used for acquiring first elevation information of a first drainage well of the layer to which the drainage well belongs and acquiring pipeline marking information of the first drainage well and the second drainage well;
the calculation module is used for calculating second elevation information of the second drainage well according to the first elevation information and the pipeline marking information;
and the marking module is used for marking the second drainage well according to the second elevation information.
The third technical scheme adopted by the invention is as follows:
a height marking system for drainage well design, comprising:
at least one memory for storing a program;
at least one processor configured to load the program to perform the method for height labeling for drainage well design.
The fourth technical scheme adopted by the invention is as follows:
a storage medium having stored therein processor-executable instructions for implementing the height tagging method for drainage well design when executed by a processor.
The invention has the beneficial effects that: according to the method, the layer to which the drainage well belongs is obtained according to the operation request, the first elevation information of the first drainage well and the pipeline marking information of the first drainage well and the second drainage well are obtained according to the layer to which the drainage well belongs, then the elevation information of the next drainage well is automatically calculated according to the first elevation information and the pipeline marking information, and finally the second drainage well is marked according to the calculated elevation information, so that the whole marking process does not need to spend a large amount of time to repeatedly carry out the processes of marking, calculating and the like, and the working efficiency of designers and the accuracy of the marking information are improved.
Drawings
FIG. 1 is a flow chart of a height labeling method for drainage well design according to one embodiment of the present invention.
Detailed Description
The invention is described in further detail below with reference to the figures and the specific embodiments. The step numbers in the following embodiments are provided only for convenience of illustration, the order between the steps is not limited at all, and the execution order of each step in the embodiments can be adapted according to the understanding of those skilled in the art.
Referring to fig. 1, an embodiment of the present invention provides a height labeling method for drainage well design, which is applied in a background server that provides a service to a computer terminal installed with design software, where the background server communicates with the design software on the computer terminal, and the design software may be AutoCAD.
The present embodiment includes steps S101 to S105:
s101, receiving an operation request for height marking of a drainage well; the operation request is a request command triggered to the background server by a designer through a computer terminal provided with design software. The request command is used to request that the elevation of the drainage well design process be noted.
S102, obtaining a layer to which the drainage well belongs according to the operation request; in the design process of a complete drawing, the drawing comprises a plurality of layers, and the labeling mode of each layer can use the same labeling type or different labeling types. By obtaining the layer to which the drainage well belongs, a unified marking mode of the drainage well height on the layer is set conveniently.
S103, acquiring first elevation information of a first drainage well of a layer to which the drainage well belongs, and acquiring pipeline marking information of the first drainage well and a second drainage well; the first elevation information is the basis for calculating the height of other drainage wells, and the numerical value can be manually input by a designer or can be a numerical value arbitrarily selected on a design drawing by using software. All be equipped with an at least drainage pipe between per two continuous drainage wells, pipeline marking information all can influence the size of drainage well height value, wherein, pipeline marking information includes pipeline length and pipeline slope.
S104, calculating second elevation information of a second drainage well according to the first elevation information and the pipeline marking information; the second elevation information is height marking information corresponding to a second drainage well. And the second elevation information is obtained by calculation according to the first elevation information and the pipeline marking information in a preset calculation mode.
And S105, marking the second drainage well according to the second elevation information. Particularly, marking is carried out at the marking position of the second drainage well.
References to "first" and "second" in this embodiment are not intended to be absolute references to "first" and "second," nor are they intended to be used to limit the number of drainage wells that need to be labeled to only two, but are intended to indicate the order in which such labeling is performed. For example, in a drawing design process, including drainage shaft a, b and c, connect through an at least pipe between per two drainage shafts, then when mark drainage shaft a and b, drainage shaft a corresponds first drainage shaft, drainage shaft b corresponds second drainage shaft, accomplish the mark back when drainage shaft a and drainage shaft b, need mark drainage shaft c, then this moment, drainage shaft b corresponds first drainage shaft, drainage shaft c corresponds second drainage shaft, however, the elevation information of this time first drainage shaft need not reacquire, analogize in proper order, all the drainage shafts that need the mark of this picture layer all mark and accomplish.
This embodiment is through acquireing the picture layer that the drainage well belongs to according to the operation request to acquire the first elevation information of first drainage well according to the picture layer that belongs to, and the pipeline marking information of first drainage well and second drainage well, then through the elevation information of automatically computing next drainage well according to first elevation information and pipeline marking information, mark the second drainage well according to the elevation information that calculates at last, whole marking process need not the designer and spends the repeated process such as mark, calculation of a large amount of time, thereby improve designer's work efficiency and marking information's rate of accuracy.
Further as a preferred embodiment, the obtaining of the first elevation information of the first drainage well of the layer to which the drainage well belongs specifically includes:
acquiring a marked position of a first drainage well; the marking position of the first drainage well is determined by the position coordinate of the first drainage well on the layer.
Marking the first drainage well at the marking position of the first drainage well to obtain first elevation information of the first drainage well.
The method is only carried out when the whole elevation process is started, or is carried out when the software operation interface is entered again for marking after the exit condition occurs in the marking process. This embodiment is through the mark position who acquires first drainage shaft to confirm the order of whole mark process, and through marking first drainage shaft, then enable remaining drainage shaft and can mark automatically, save designer's design time, improve work efficiency.
Further as a preferred embodiment, the acquiring of the pipeline marking information of the first drainage well and the second drainage well specifically includes:
acquiring the character information of the pipeline marks of the first drainage well and the second drainage well; because the pipeline is marked by using characters in the process of marking the pipeline, the length of the pipeline, the gradient of the pipeline and the inclination angle of the pipeline are all carried by the character information marked by the pipeline.
And extracting the length and the gradient of the pipeline from the text information. This embodiment reduces designer's work load through automatic extraction pipeline length and pipeline slope in the literal information from the pipeline mark, simultaneously, can also ensure the accuracy of pipeline length and pipeline slope.
Further, as a preferred embodiment, the calculating the second elevation information of the second drainage well according to the first elevation information and the pipeline marking information specifically includes:
acquiring a calculation mode of the drainage well, wherein the calculation mode comprises a down slope calculation and an anti-slope calculation; for example, when the downslope calculation is adopted, when the elevation information of the first drainage well is 1.0m, the length of the pipeline between the first drainage well and the second drainage well is 20m, and the slope is 0.003, the elevation information of the second drainage well is 1.0-20 × 0.003-0.94 m; when the reverse slope calculation is adopted, when the elevation information of the first drainage well is 1.0m, the length of the pipeline between the first drainage well and the second drainage well is 20m, and the slope is 0.003, the elevation information of the second drainage well is 1.0+20 × 0.003-1.06 m.
And calculating second elevation information of a second drainage well by adopting a calculation mode of the drainage well according to the first elevation information, the pipeline length and the pipeline gradient.
In the embodiment, the second elevation information of the second drainage well is calculated according to the calculation mode preset by the designer, so that the calculated result can meet the design requirement of the designer.
As a further preferred embodiment, the marking the second drainage well according to the second elevation information specifically includes:
acquiring the position coordinates of the second drainage well in the layer to which the drainage well belongs; in the drawing design process, each drainage well on each layer has a unique corresponding position coordinate, and the position coordinates are used for determining the position of the drainage well on the layer.
Determining the marking position of the second drainage well according to the position coordinate of the second drainage well; the elevation information of the drainage well is generally marked corresponding to the position of the drainage well, so that the designer can quickly determine the elevation information of the drainage well in the information checking process.
And marking the second drainage well at the marking position of the second drainage well according to the second elevation information.
The embodiment is through the position coordinate according to the drainage shaft and confirms the mark position to make the mark process can carry out accurate mark, simultaneously, still can make the designer at the in-process that carries out the information check, the drainage shaft's that can look for fast mark information.
Further, as a preferred embodiment, between the step of obtaining the layer to which the drainage well belongs according to the operation request and the step of obtaining the first elevation information of the first drainage well of the layer to which the drainage well belongs, the method further includes the following steps:
and setting the type of the marking font of the layer to which the drainage well belongs. The type of the marked font is designed according to the needs of designers, such as: the font type may be set to song style four smaller. By setting the marking fonts, the export drawing form can meet the requirements of designers.
Further as a preferred embodiment, before the step of receiving an operation request for height marking of a drainage well, the method further comprises the following steps:
loading a labeling plug-in according to the software starting signal, and enabling a software operation interface to display a menu of the labeling plug-in; and the software plug-in carries the shortcut of the drainage well marking.
Receiving a setting signal of a chart proportion uploaded by an operation interface; the setting signal is a request command which is sent to a background server by a designer through an operation interface and is used for setting the proportion of the drawing.
And setting the map drawing proportion of the map layer to which the drainage well belongs according to the setting signal.
In the embodiment, the operation interface sends a request command to the background server according to the drawing setting option selected by the designer on the menu bar of the operation interface, and the background server sets the drawing proportion according to the request command, so that the proportion of the derived design drawing is ensured to meet the requirement of the designer.
The following is an application process in some embodiments:
step one, starting AutoCAD software;
secondly, loading the marked plug-in by using a plug-in loading command;
selecting 'total graph proportion setting' or 'monomer proportion setting' from a menu of the labeling plug-in to set a graph proportion and determine the size of a labeling font;
inputting elevation information of the first drainage well through an operation interface, or selecting the elevation information of one drainage well on a design drawing as the elevation information of the first drainage well;
acquiring position coordinates of the second drainage well, determining a marking position of the second drainage well according to the position coordinates, acquiring pipeline marking information between the first drainage well and the second drainage well, and reading the pipeline length and the pipeline gradient from the pipeline marking information;
sixthly, acquiring elevation information of a second drainage well according to the elevation information, the pipeline length and the pipeline gradient of the first drainage well;
seventhly, marking the marking position of the second drainage well according to the elevation information of the second drainage well;
and step eight, repeating the step five to the step seven until all the drainage wells needing to be marked on the layer are marked, wherein the elevation information of the first drainage well is the marking information of the second drainage well in the last marking process.
An embodiment of the present invention provides a height marking system for drainage well design corresponding to the method of fig. 1, which includes:
the receiving module is used for receiving an operation request of height marking of the drainage well;
the first obtaining module is used for obtaining the layer to which the drainage well belongs according to the operation request;
the second acquisition module is used for acquiring first elevation information of a first drainage well of the layer to which the drainage well belongs and acquiring pipeline marking information of the first drainage well and the second drainage well;
the calculation module is used for calculating second elevation information of the second drainage well according to the first elevation information and the pipeline marking information;
and the marking module is used for marking the second drainage well according to the second elevation information.
The contents in the above method embodiments are all applicable to the embodiment of the present system, the functions specifically implemented by the embodiment of the present system are the same as those in the above method embodiments, and the beneficial effects achieved by the embodiment of the present system are also the same as those achieved by the above method.
An embodiment of the present invention provides a height marking system for drainage well design corresponding to the method of fig. 1, which includes:
at least one memory for storing a program;
at least one processor configured to load the program to perform the method for height labeling for drainage well design.
The contents in the above method embodiments are all applicable to the embodiment of the present system, the functions specifically implemented by the embodiment of the present system are the same as those in the above method embodiments, and the beneficial effects achieved by the embodiment of the present system are also the same as those achieved by the above method.
Furthermore, embodiments of the present invention also provide a storage medium having stored therein processor-executable instructions for implementing the height labeling method for drainage well design described herein when executed by a processor.
In summary, the layer to which the drainage well belongs is obtained according to the operation request, the first elevation information of the first drainage well and the pipeline marking information of the first drainage well and the second drainage well are obtained according to the layer to which the drainage well belongs, then the elevation information of the next drainage well is automatically calculated according to the first elevation information and the pipeline marking information, and finally the second drainage well is marked according to the calculated elevation information, so that the whole marking process does not need to spend a lot of time to repeatedly carry out the processes of marking, calculating and the like, and the working efficiency of designers and the accuracy of the marking information are improved.
While the preferred embodiments of the present invention have been illustrated and described, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.

Claims (10)

1. A height marking method for designing a drainage well is characterized by comprising the following steps: the method comprises the following steps:
receiving an operation request of height marking of a drainage well;
obtaining a layer to which the drainage well belongs according to the operation request;
acquiring first elevation information of a first drainage well of a layer to which the drainage well belongs, and acquiring pipeline marking information of the first drainage well and a second drainage well;
calculating second elevation information of a second drainage well according to the first elevation information and the pipeline marking information;
and marking the second drainage well according to the second elevation information.
2. A height marking method for drainage well design according to claim 1, characterized in that: obtain the first elevation information of the first drainage well on picture layer that drainage well belongs to, it specifically includes:
acquiring a marked position of a first drainage well;
marking the first drainage well at the marking position of the first drainage well to obtain first elevation information of the first drainage well.
3. A height marking method for drainage well design according to claim 1, characterized in that: acquire the pipeline marking information of first drainage well and second drainage well, it specifically includes:
acquiring the character information of the pipeline marks of the first drainage well and the second drainage well;
and extracting the length and the gradient of the pipeline from the text information.
4. A height marking method for drainage well design according to claim 3, characterized in that: the second elevation information of the second drainage well is calculated according to the first elevation information and the pipeline marking information, and the method specifically comprises the following steps:
acquiring a calculation mode of the drainage well, wherein the calculation mode comprises a down slope calculation and an anti-slope calculation;
and calculating second elevation information of a second drainage well by adopting a calculation mode of the drainage well according to the first elevation information, the pipeline length and the pipeline gradient.
5. A height marking method for drainage well design according to claim 1, characterized in that: mark according to second elevation information second drainage well, it specifically includes:
acquiring the position coordinates of the second drainage well in the layer to which the drainage well belongs;
determining the marking position of the second drainage well according to the position coordinate of the second drainage well;
and marking the second drainage well at the marking position of the second drainage well according to the second elevation information.
6. A height marking method for drainage well design according to claim 1, characterized in that: between the step of obtaining the layer to which the drainage well belongs according to the operation request and the step of obtaining the first elevation information of the first drainage well of the layer to which the drainage well belongs, the method further comprises the following steps:
and setting the type of the marking font of the layer to which the drainage well belongs.
7. A height marking method for drainage well design according to claim 1, characterized in that: before the step of receiving the operation request of the height marking of the drainage well, the method further comprises the following steps:
loading a labeling plug-in according to the software starting signal, and enabling a software operation interface to display a menu of the labeling plug-in;
receiving a setting signal of a chart proportion uploaded by an operation interface;
and setting the map drawing proportion of the map layer to which the drainage well belongs according to the setting signal.
8. A height marking system for drainage well design, characterized in that: the method comprises the following steps:
the receiving module is used for receiving an operation request of height marking of the drainage well;
the first obtaining module is used for obtaining the layer to which the drainage well belongs according to the operation request;
the second acquisition module is used for acquiring first elevation information of a first drainage well of the layer to which the drainage well belongs and acquiring pipeline marking information of the first drainage well and the second drainage well;
the calculation module is used for calculating second elevation information of the second drainage well according to the first elevation information and the pipeline marking information;
and the marking module is used for marking the second drainage well according to the second elevation information.
9. A height marking system for drainage well design, characterized in that: the method comprises the following steps:
at least one memory for storing a program;
at least one processor for loading the program to perform a height marking method for drainage well design according to any one of claims 1-7.
10. A storage medium having stored therein instructions executable by a processor, the storage medium comprising: the processor-executable instructions, when executed by the processor, are for implementing a height tagging method for drainage well design as claimed in any one of claims 1 to 7.
CN201910843554.0A 2019-09-06 2019-09-06 Height marking method, system and storage medium for drainage well design Active CN110750818B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910843554.0A CN110750818B (en) 2019-09-06 2019-09-06 Height marking method, system and storage medium for drainage well design

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910843554.0A CN110750818B (en) 2019-09-06 2019-09-06 Height marking method, system and storage medium for drainage well design

Publications (2)

Publication Number Publication Date
CN110750818A true CN110750818A (en) 2020-02-04
CN110750818B CN110750818B (en) 2023-08-22

Family

ID=69276132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910843554.0A Active CN110750818B (en) 2019-09-06 2019-09-06 Height marking method, system and storage medium for drainage well design

Country Status (1)

Country Link
CN (1) CN110750818B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104572647A (en) * 2013-10-11 2015-04-29 北大方正集团有限公司 Labeling device and labeling method
CN105117572A (en) * 2015-10-06 2015-12-02 北京工业大学 Automatic SWMM hydraulic model building method based on rainwater pipe network design computation sheet
US20160275208A1 (en) * 2015-03-20 2016-09-22 Chevron U.S.A. Inc. Methods and systems for analyzing cable or pipe
CN106528943A (en) * 2016-10-14 2017-03-22 厦门什嘉信息科技有限公司 Cable well data imaging method
CN106777460A (en) * 2016-11-11 2017-05-31 重庆大学 A kind of method that Urban Rainwater Pipe Networks caliber and the gradient are determined based on SWMM hydraulic models
CN110008612A (en) * 2019-04-12 2019-07-12 深圳市瑞云科技有限公司 A method of 3D model is labeled automatically

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104572647A (en) * 2013-10-11 2015-04-29 北大方正集团有限公司 Labeling device and labeling method
US20160275208A1 (en) * 2015-03-20 2016-09-22 Chevron U.S.A. Inc. Methods and systems for analyzing cable or pipe
CN105117572A (en) * 2015-10-06 2015-12-02 北京工业大学 Automatic SWMM hydraulic model building method based on rainwater pipe network design computation sheet
CN106528943A (en) * 2016-10-14 2017-03-22 厦门什嘉信息科技有限公司 Cable well data imaging method
CN106777460A (en) * 2016-11-11 2017-05-31 重庆大学 A kind of method that Urban Rainwater Pipe Networks caliber and the gradient are determined based on SWMM hydraulic models
CN110008612A (en) * 2019-04-12 2019-07-12 深圳市瑞云科技有限公司 A method of 3D model is labeled automatically

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
温勇彪: "小议AutoCAD LISP在市政排水测量中的程序设计", 《中小企业管理与科技(下旬刊)》 *
温勇彪: "小议AutoCAD LISP在市政排水测量中的程序设计", 《中小企业管理与科技(下旬刊)》, no. 06, 25 June 2009 (2009-06-25) *

Also Published As

Publication number Publication date
CN110750818B (en) 2023-08-22

Similar Documents

Publication Publication Date Title
US9141746B1 (en) System and method to drag instance master physical shell
CN111400899B (en) Processing method, system and storage medium for cable laying modeling
CN103793178B (en) Vector graph editing method of touch screen of mobile device
CN109272571B (en) System and method for converting PDS three-dimensional data into Flowmaster model
CN109271697B (en) System and method for processing interrupt data in AutoCAD based on VBA, and computer program
CN113051885B (en) AutoCAD-based design drawing rapid typesetting method
CN111143478A (en) Two-three-dimensional file association method based on lightweight model and engineering object bit number
CN113326314A (en) Data visualization method and device, electronic equipment and readable storage medium
CN114581639A (en) Method for generating information of beam steel bars in BIM (building information modeling) model based on beam leveling construction drawing
CN110717207B (en) Labeling method, system and storage medium for pipeline design
CN114565703A (en) Method, device and equipment for adjusting centralized labeling and readable storage medium
CN105045948A (en) Method for automatically batch generating configuration diagrams of transmitter protection box
CN103678736B (en) A kind of method that CAD acceptance of the bid high level automatically updates
CN110750818B (en) Height marking method, system and storage medium for drainage well design
CN110516333A (en) Device layout methods, device, equipment and readable storage medium storing program for executing in a kind of PCB
CN116956837A (en) Project determining method and device for engineering quantity list
CN116956838A (en) Project determining method and device for engineering quantity list
CN105653549A (en) Method and device for extracting document information
CN107240150A (en) A kind of three-dimensional tube numeral dissolves drawing method
CN111259640B (en) Dynamic list layout method based on text content
CN112906572B (en) Identification method and identification device for vertical section in construction drawing
CN111859495A (en) Axle network creating method and device, server and computer readable storage medium
CN116301519B (en) Local information pickup method, device and equipment of rendering entity and storage medium
CN110728114A (en) Analysis report generation method
CN107908813B (en) Urban planning digital terrain parameterization processing method based on ObjectARX

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant