CN110727921A - Normal type universal part spare part demand calculation method and device - Google Patents

Normal type universal part spare part demand calculation method and device Download PDF

Info

Publication number
CN110727921A
CN110727921A CN201910944859.0A CN201910944859A CN110727921A CN 110727921 A CN110727921 A CN 110727921A CN 201910944859 A CN201910944859 A CN 201910944859A CN 110727921 A CN110727921 A CN 110727921A
Authority
CN
China
Prior art keywords
equal
spare part
demand
less
spare
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910944859.0A
Other languages
Chinese (zh)
Other versions
CN110727921B (en
Inventor
阮旻智
肖剑波
傅健
李华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Naval University of Engineering PLA
Original Assignee
Naval University of Engineering PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Naval University of Engineering PLA filed Critical Naval University of Engineering PLA
Priority to CN201910944859.0A priority Critical patent/CN110727921B/en
Publication of CN110727921A publication Critical patent/CN110727921A/en
Application granted granted Critical
Publication of CN110727921B publication Critical patent/CN110727921B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • G06F17/18Complex mathematical operations for evaluating statistical data, e.g. average values, frequency distributions, probability functions, regression analysis
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

The invention relates to a normal type general part spare part demand calculation method and a device. The method comprehensively considers the demand of the spare parts from the overall demand of all equipment, and fully considers the interchangeability characteristic of the universal parts, so that the calculated final demand of the spare parts can be fit with the actual demand to a great extent, and the excessive purchasing of the universal parts and the waste are avoided.

Description

Normal type universal part spare part demand calculation method and device
Technical Field
The invention relates to the technical field of equipment maintenance, in particular to a method and a device for calculating the demand of normal general spare parts.
Background
Normal distributions are often used to describe the life distribution of mechanical-type units, such as slip rings, gearboxes, speed reducers, and the like. And the common part is a unit having interchangeability among products of different types or the same type and different specifications. The normal type general part refers to a general part with the unit life complying with normal distribution, and the life X complying with normal distribution is recorded as X-N (mu, sigma)2) Where μ is the mean parameter, σ is the root variance parameter, and the density of XFunction is as
Figure BDA0002223865350000011
The universal part has high universality, so that the universal part can be used in a wide range of products. In general, the amount of spare parts required is calculated with the goal of satisfying the spare part requirement of a certain equipment. For general-purpose parts, the methods adopted in the past are as follows: firstly, the spare part demand of each equipment is respectively calculated, and then the sum of all the spare parts is taken as the final spare part demand. The method does not consider the interchangeability characteristic of general parts actually, does not comprehensively consider the demand of spare parts from the overall demand of all equipment, and causes the excessive purchase of general parts and spare parts to cause waste.
Disclosure of Invention
Aiming at the technical problems in the prior art, the invention provides a normal type general part demand calculation method and device, which fully consider the interchangeability characteristic of general parts and comprehensively consider the demand of spare parts from the overall demand of all equipment.
The technical scheme for solving the technical problems is as follows:
in a first aspect, the invention provides a method for calculating the demand of spare parts of normal general parts, which comprises the following steps:
s1, initializing the spare part number S, and making S equal to 0;
S2,i=1;
s3, calculating an array p1, wherein the array comprises S +1 elements,
order to
Figure BDA0002223865350000021
Wherein, TiI is more than or equal to 1 and less than or equal to N, wherein N is the total number of equipment using the universal part;
s4, if i is equal to 1, let p2 be p 1; otherwise, let p2 be p1 p2, where is the sign of convolution;
s5, let i equal to i +1, if i is less than or equal to N, go to step S3, otherwise let i equal to N
Figure BDA0002223865350000022
Then, jumping to step S6;
s6, judging PSWhether the requirement of spare part guarantee is met or not is judged, namely P is judgedSWhether it is less than the lowest spare part satisfaction rate P1, if PSIf P1 is less than the preset value, S is set to S +1, and the process goes to step S2, otherwise, the calculation is terminated and the current value of S is output as the final spare part demand.
The invention has the beneficial effects that: the spare part demand is comprehensively considered from the overall demand of all equipment, and the interchangeability characteristic of general parts is fully considered, so that the final spare part demand obtained by calculation can be fit with the actual demand to a great extent, and the phenomenon that general parts are excessively purchased is avoided, and waste is caused.
In a second aspect, the present invention provides a normal type general-purpose component demand amount calculation apparatus, including:
an input module for setting the equipment number N, the minimum spare part satisfaction rate P1 and the working time T planned by the general parts in each equipment every yeari,1≤i≤N;
The calculating module is used for calculating the demand of spare parts of the universal parts; the specific calculation method is as follows:
s1, initializing the spare part number S, and making S equal to 0;
S2,i=1;
s3, calculating an array p1, wherein the array comprises S +1 elements,
order to
Figure BDA0002223865350000031
Wherein, TiThe working time of the universal piece planned in the ith equipment every year is represented, and i is more than or equal to 1 and less than or equal to N;
s4, if i is equal to 1, let p2 be p 1; otherwise, let p2 be p1 p2, where is the sign of convolution;
s5, let i equal to i +1, if i is less than or equal to N, go to step S3, otherwise let i equal to N
Figure BDA0002223865350000032
Then, jumping to step S6;
s6, judging PSWhether the requirement of spare part guarantee is met or not is judged, namely P is judgedSWhether it is less than the lowest spare part satisfaction rate P1, if PSIf the value is less than P1, making S equal to S +1, and jumping to step S2, otherwise, terminating the calculation and taking the current value of S as the final spare part demand;
and the output display module is used for outputting and displaying the final spare part demand calculated by the calculation module.
In a third aspect, the present invention provides a normal type general-purpose component requirement amount calculation apparatus, including:
a memory for storing a computer software program;
and the processor is used for reading and executing the computer software program stored in the memory, and realizing the method for calculating the requirement quantity of the normal universal part in the first aspect of the invention.
In a fourth aspect, the present invention provides a non-transitory computer-readable storage medium, wherein the storage medium stores a computer software program for implementing the method for calculating the demand for spare parts of a normal general-purpose component according to the first aspect of the present invention.
Drawings
Fig. 1 is a flowchart of a method for calculating a demand of normal general-purpose components according to an embodiment of the present invention;
FIG. 2 is a diagram illustrating exemplary simulation results according to a first embodiment of the present invention;
fig. 3 is a structural diagram of a normal general component demand calculation apparatus according to a second embodiment of the present invention.
Detailed Description
The principles and features of this invention are described below in conjunction with the following drawings, which are set forth by way of illustration only and are not intended to limit the scope of the invention.
In the convention herein: a common part is used in N pieces of equipment (the array number is 1), the equipment can be different types or different specifications of the same type, and the working time T planned each year in each equipment is knowniAnd i is more than or equal to 1 and less than or equal to N, and when the universal part breaks down, the fault is eliminated by adopting a part changing and maintaining mode (the part changing and maintaining time is ignored). At present, a spare part warehouse needs to purchase spare parts of the general parts for one year, the number of the spare parts is recorded as S, and the spare part satisfaction rate of the spare parts is required to be not lower than P1.
Example one
As shown in fig. 1, an embodiment of the present invention provides a method for calculating a demand of a normal general-purpose component, including the following steps:
s1, initializing the spare part number S, and making S equal to 0;
S2,i=1;
s3, calculating an array p1, wherein the array comprises S +1 elements,
order to
Figure BDA0002223865350000041
Wherein, TiI is more than or equal to 1 and less than or equal to N, wherein N is the total number of equipment using the universal part;
s4, if i is equal to 1, let p2 be p 1; otherwise, let p2 be p1 p2, where is the sign of convolution;
s5, let i equal to i +1, if i is less than or equal to N, go to step S3, otherwise let i equal to N
Figure BDA0002223865350000042
Then, jumping to step S6;
s6, judging PSWhether the requirement of spare part guarantee is met or not is judged, namely P is judgedSWhether it is less than the lowest spare part satisfaction rate P1, if PSIf P1 is less than the preset value, S is set to S +1, and the process goes to step S2, otherwise, the calculation is terminated and the current value of S is output as the final spare part demand.
Examples of the design
There is a common part in 4 different types of equipment, the life of which is subject to a normal distribution N (160, 70)2) The working time of this generic part in 4 installations per year amounts to 400, 600, 800, 1000 hours. The method is adopted to calculate the warehouse storage capacity of the universal spare parts for one year, so that the spare parts are fullThe foot rate is not less than 0.8.
Solution: 1) initializing the number of spare parts and making S equal to 0.
2) Calculating spare part satisfaction rate PS
Table 1 lists the corresponding spare part satisfaction rates when the number of spare parts takes various values.
TABLE 1
Figure BDA0002223865350000051
3) When S is 17, the spare part satisfaction rate PSIs 0.8, and meets the spare part guarantee requirement that the spare part satisfaction rate is not less than 0.8.
4) The warehouse stock of the piece of generic spare parts for one year is 17 at the end of the calculation.
In this example, if the conventional method is adopted (the spare part demand of each equipment is calculated separately, and the sum of all the spare parts is taken as the final spare part demand), the spare part demands of 4 pieces of equipment are 3, 4, 5 and 7, and 19 spare parts are required in total.
FIG. 2 shows the result of the satisfaction rate of the spare parts obtained by the method and the simulation method of the present invention when the number of the spare parts of the above calculation examples is from 0 to 20. A large number of simulation results show that: the error of the two is within the range of engineering application.
Example two
As shown in fig. 3, the present invention provides a normal type general-purpose component demand amount calculation apparatus, including:
an input module for setting the equipment number N, the minimum spare part satisfaction rate P1 and the working time T planned by the general parts in each equipment every yeari,1≤i≤N;
The calculating module is used for calculating the demand of spare parts of the universal parts; the specific calculation method is as follows:
s1, initializing the spare part number S, and making S equal to 0;
S2,i=1;
s3, calculating an array p1, wherein the array comprises S +1 elements,
order to
Figure BDA0002223865350000061
Wherein, TiThe working time of the universal piece planned in the ith equipment every year is represented, and i is more than or equal to 1 and less than or equal to N;
s4, if i is equal to 1, let p2 be p 1; otherwise, let p2 be p1 p2, where is the sign of convolution;
s5, let i equal to i +1, if i is less than or equal to N, go to step S3, otherwise let i equal to NThen, jumping to step S6;
s6, judging PSWhether the requirement of spare part guarantee is met or not is judged, namely P is judgedSWhether it is less than the lowest spare part satisfaction rate P1, if PSIf the value is less than P1, making S equal to S +1, and jumping to step S2, otherwise, terminating the calculation and taking the current value of S as the final spare part demand;
and the output display module is used for outputting and displaying the final spare part demand calculated by the calculation module.
EXAMPLE III
The embodiment of the invention provides a normal type general part spare part demand calculating device, which comprises:
a memory for storing a computer software program;
and the processor is used for reading and executing the computer software program stored in the memory, and realizing the method for calculating the requirement quantity of the normal universal part.
Example four
The embodiment of the invention provides a non-transitory computer readable storage medium, wherein a computer software program for realizing the normal type general-purpose part requirement calculation method is stored in the storage medium.
Through the above description of the embodiments, those skilled in the art will clearly understand that each embodiment can be implemented by software plus a necessary general hardware platform, and certainly can also be implemented by hardware. With this understanding in mind, the above-described technical solutions may be embodied in the form of a software product, which can be stored in a computer-readable storage medium such as ROM/RAM, magnetic disk, optical disk, etc., and includes instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute the methods described in the embodiments or some parts of the embodiments.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (4)

1. A normal type general part spare part demand calculation method is characterized by comprising the following steps:
s1, initializing the spare part number S, and making S equal to 0;
S2,i=1;
s3, calculating an array p1, wherein the array comprises S +1 elements,
order to
Wherein, TiI is more than or equal to 1 and less than or equal to N, wherein N is the total number of equipment using the universal part;
s4, if i is equal to 1, let p2 be p 1; otherwise, let p2 be p1 p2, where is the sign of convolution;
s5, let i equal to i +1, if i is less than or equal to N, go to step S3, otherwise let i equal to N
Figure FDA0002223865340000012
Then, jumping to step S6;
s6, judging PSWhether the requirement of spare part guarantee is met or not is judged, namely P is judgedSWhether it is less than the lowest spare part satisfaction rate P1, if PSIf P1 is less than the preset value, S is set to S +1, and the process goes to step S2, otherwise, the calculation is terminated and the current value of S is output as the final spare part demand.
2. A normal type general-purpose spare part demand calculation device, comprising:
an input module for setting the equipment number N, the minimum spare part satisfaction rate P1 and the working time T planned by the general parts in each equipment every yeari,1≤i≤N;
The calculating module is used for calculating the demand of spare parts of the universal parts; the specific calculation method is as follows:
s1, initializing the spare part number S, and making S equal to 0;
S2,i=1;
s3, calculating an array p1, wherein the array comprises S +1 elements,
order to
Figure FDA0002223865340000021
Wherein, TiThe working time of the universal piece planned in the ith equipment every year is represented, and i is more than or equal to 1 and less than or equal to N;
s4, if i is equal to 1, let p2 be p 1; otherwise, let p2 be p1 p2, where is the sign of convolution;
s5, let i equal to i +1, if i is less than or equal to N, go to step S3, otherwise let i equal to N
Figure FDA0002223865340000022
Then, jumping to step S6;
s6, judging PSWhether the requirement of spare part guarantee is met or not is judged, namely P is judgedSWhether it is less than the lowest spare part satisfaction rate P1, if PSIf the value is less than P1, making S equal to S +1, and jumping to step S2, otherwise, terminating the calculation and taking the current value of S as the final spare part demand;
and the output display module is used for outputting and displaying the final spare part demand calculated by the calculation module.
3. A normal type general-purpose spare part demand calculation device, comprising:
a memory for storing a computer software program;
a processor for reading and executing the computer software program stored in the memory to realize the method for calculating the requirement of the normal universal component as claimed in claim 1.
4. A non-transitory computer-readable storage medium, wherein a computer software program for implementing the normal type general-purpose spare part demand calculation method according to claim 1 is stored in the storage medium.
CN201910944859.0A 2019-09-30 2019-09-30 Method and device for calculating demand quantity of normal general spare parts Active CN110727921B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910944859.0A CN110727921B (en) 2019-09-30 2019-09-30 Method and device for calculating demand quantity of normal general spare parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910944859.0A CN110727921B (en) 2019-09-30 2019-09-30 Method and device for calculating demand quantity of normal general spare parts

Publications (2)

Publication Number Publication Date
CN110727921A true CN110727921A (en) 2020-01-24
CN110727921B CN110727921B (en) 2023-11-07

Family

ID=69218738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910944859.0A Active CN110727921B (en) 2019-09-30 2019-09-30 Method and device for calculating demand quantity of normal general spare parts

Country Status (1)

Country Link
CN (1) CN110727921B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004234470A (en) * 2003-01-31 2004-08-19 Ricoh Co Ltd Demand prediction method and demand prediction program
CN106777819A (en) * 2017-01-20 2017-05-31 中国人民解放军海军工程大学 A kind of Normal Type has the computational methods of part replacement cycle in longevity
US10062053B1 (en) * 2013-10-23 2018-08-28 American Airlines, Inc. Spare component ownership planning system and method
CN108470250A (en) * 2018-03-25 2018-08-31 中国人民解放军海军工程大学 A kind of spare parts demand amount computational methods of Normal Type series components
CN108733883A (en) * 2018-04-16 2018-11-02 中国人民解放军海军工程大学 A kind of method of determining Normal Type unit replenished spares demand
CN109523160A (en) * 2018-11-15 2019-03-26 青岛航讯网络技术服务有限公司 The more normal state assembly of elements spare parts demand amounts of the long-term support mission of larger cargo ships determine method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004234470A (en) * 2003-01-31 2004-08-19 Ricoh Co Ltd Demand prediction method and demand prediction program
US10062053B1 (en) * 2013-10-23 2018-08-28 American Airlines, Inc. Spare component ownership planning system and method
CN106777819A (en) * 2017-01-20 2017-05-31 中国人民解放军海军工程大学 A kind of Normal Type has the computational methods of part replacement cycle in longevity
CN108470250A (en) * 2018-03-25 2018-08-31 中国人民解放军海军工程大学 A kind of spare parts demand amount computational methods of Normal Type series components
CN108733883A (en) * 2018-04-16 2018-11-02 中国人民解放军海军工程大学 A kind of method of determining Normal Type unit replenished spares demand
CN109523160A (en) * 2018-11-15 2019-03-26 青岛航讯网络技术服务有限公司 The more normal state assembly of elements spare parts demand amounts of the long-term support mission of larger cargo ships determine method

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
H.REZAEI: "A new methodology to optimize target stock level for unpredictable demand of spare parts: A Case Study in Business Aircrafts’ Industry", IFAC-PAPERSONLINE, vol. 51, no. 11, pages 538 - 543 *
JAMES M. WAKIRU: "A simulation-based optimization approach evaluating maintenance and spare parts demand interaction effects", INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, vol. 208, pages 329 - 342, XP085586364, DOI: 10.1016/j.ijpe.2018.12.014 *
张建军,李树芳,张涛,郭波,高大化: "备件保障度评估与备件需求量模型研究", no. 06 *
林国宝 等: "基于保障概率的初始备件需求预测方法研究", vol. 43, no. 43, pages 428 - 451 *
邵松世;刘任洋;李庆民;李华;: "批量换件下多正态单元表决系统备件量确定", no. 05 *

Also Published As

Publication number Publication date
CN110727921B (en) 2023-11-07

Similar Documents

Publication Publication Date Title
CN106874238B (en) Method for calculating required quantity of Weibull unit spare parts
US20090271235A1 (en) Apparatus and method for generating survival curve used to calculate failure probability
CN111126631A (en) Network health judgment method and device
US20180357582A1 (en) Business Management System
CN110727921A (en) Normal type universal part spare part demand calculation method and device
CN110717267B (en) Gamma-type universal part spare part demand calculation method and device
CN112596557B (en) Method and device for controlling output quantity of semiconductor temperature control device
CN110717669B (en) Method and device for calculating demand of index type universal spare parts
CN110909917A (en) Data mining and process model based optimization scheduling method, system, medium and equipment
CN110704884B (en) Method and device for calculating demand quantity of log-normal general spare parts
CN110727902A (en) Weibull general part spare part demand calculation method and device
JP4971074B2 (en) Production support program for industrial products
CN115760251A (en) Auxiliary bid quotation method and system based on Monte Carlo simulation
CN109583017B (en) Method for calculating loss quantity of normal unit spare parts
JP5103321B2 (en) Crosstalk noise determination method and program
JP5113023B2 (en) Work plan creation device
CN114048010A (en) Method, device, equipment and storage medium for controlling service timeout time
CN110705102B (en) Spare part guarantee probability calculation method and device for mechanical universal parts
CN107527238A (en) Determine the method, apparatus and electronic equipment of user behavior decline tendency
CN106571934B (en) A kind of worksheet processing method and apparatus based on regression analysis
JP5123592B2 (en) Safety stock quantity calculation system and safety stock quantity calculation program
US10504137B1 (en) System, method, and computer program product for monitoring and responding to the performance of an ad
CN117829820B (en) Method for calculating repair timely response degree
CN111861058A (en) Stock removing speed measuring method and device
CN113569127B (en) Recommendation object determining method, device, equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant