CN110717648A CN201910842357.7A CN201910842357A CN110717648A CN 110717648 A CN110717648 A CN 110717648A CN 201910842357 A CN201910842357 A CN 201910842357A CN 110717648 A CN110717648 A CN 110717648A
Authority
CN
China
Prior art keywords
project
information
node
restaurant
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910842357.7A
Other languages
Chinese (zh)
Inventor
胡翠冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Chuangyihui Culture Communication Co Ltd
Original Assignee
Beijing Chuangyihui Culture Communication Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Chuangyihui Culture Communication Co Ltd filed Critical Beijing Chuangyihui Culture Communication Co Ltd
Priority to CN201910842357.7A priority Critical patent/CN110717648A/en
Publication of CN110717648A publication Critical patent/CN110717648A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides an online process monitoring method for a restaurant design project, which comprises the following steps: receiving information of a project node; matching the project nodes with workers; sending the matching information of the project node and the worker to a demand side; generating the starting time and the time to be completed of the project node; receiving an instruction of a worker for processing a project node; and recording and updating the time when the worker processes the project node last time. In addition, the invention also provides an online process monitoring system for the restaurant store design project, which can apply the method. The online process monitoring method and the online process monitoring system for the design project of the restaurant enable a demand party to collect the work progress information of the project node more intuitively, can remind the staff of the urgency degree of the project, provide guarantee for smooth promotion of the project node, and avoid unilateral disputes caused by an intermediate link with unknown process by means of online system recording and determining.

Description

Online process monitoring method and system for catering store design project
The technical field is as follows:
the invention relates to the field of restaurant store construction systems, in particular to an online process monitoring method and system for restaurant store design items.
Background art:
with the rapid development of the economy of China and the improvement of the living standard of the China, the market puts greater demands on the dining experience of the restaurant. Restaurant design and decoration becomes very important as an important component of the dining experience, and thus the restaurant invites a professional design team to design as a whole for the mainstream in the field.
In the actual design of restaurant stores, the flows of earlier investigation, catering VI plane design, restaurant plane function design, restaurant decoration design, construction of each block and the like are included, even each stage can include a plurality of construction blocks and construction nodes, and the multiple groups of teams cooperate to complete, so that the internal management of a project receiver is difficult, meanwhile, a project requester of the project hardly tracks the progress of the project, the project propulsion efficiency is low, and the project is delayed or even stranded.
Therefore, there is a need in the art for a method for monitoring the progress of restaurant design projects to monitor the restaurant design projects and the overall construction process, so as to ensure that the projects are performed smoothly as expected.
The invention content is as follows:
the present invention has been made to solve at least one of the problems occurring in the prior art.
Specifically, the invention provides an online process monitoring method for a restaurant design project, which comprises the following steps:
receiving information of a project node;
matching the project nodes with workers;
sending the matching information of the project node and the worker to a demand side;
generating the starting time and the time to be completed of the project node;
receiving an instruction of a worker for processing a project node;
and recording and updating the time when the worker processes the project node last time.
By adopting the technical scheme, the time for starting and finishing the project node information can be marked, and the time for operating the project node by a worker for the last time is recorded, so that the demander can collect the work progress information of the project node more visually, and meanwhile, the worker can be reminded of the urgency degree of the project, and the guarantee is provided for the smooth propulsion of the project node.
Preferably, the online process monitoring method for the restaurant design project further comprises the following steps: receiving the setting information of the demander on the warning time; and when the time interval between the current time and the time of the latest processing project node is greater than or equal to the warning time, sending warning information to the staff and/or the demander.
Preferably, the online process monitoring method for the restaurant design project further comprises the following steps: completion information for the project node is received.
Preferably, the online process monitoring method for the restaurant design project further comprises the following steps: receiving setting information of a demand party on a reminding time point; and when the reminding time point is reached and the completion information of the project node is not received, sending the reminding information to a demand party and/or a worker.
Preferably, the restaurant design project node determination method further includes the steps of: and receiving a deferred application of the project node.
Preferably, the restaurant design project node determination method further includes the steps of: and receiving audit confirmation information of the project node deferred application. More preferably, the audit comprises a preliminary audit and a final audit.
Preferably, the online process monitoring method for the restaurant design project further comprises the following steps: and receiving a project pause instruction of the demand side to the project node.
Preferably, the online process monitoring method for the restaurant design project further comprises the following steps: and receiving the application of the replacement worker of the project node.
Preferably, the restaurant design project node determination method further includes the steps of: and receiving audit confirmation information applied by the project node replacement staff. More preferably, the audit comprises a preliminary audit and a final audit.
Preferably, the online process monitoring method for the restaurant design project further comprises the following steps: and receiving final audit passing information of the project node.
Preferably, the restaurant design project node determination method further includes the steps of: and receiving the uploaded information of the files related to the project nodes.
Preferably, the restaurant design project node determination method further includes the steps of: and receiving login information of the demand party.
Preferably, the restaurant design project node determination method further includes the steps of: and receiving the design project entry information and generating a project number uniquely corresponding to the project.
Preferably, the catering store design project node determination method records filling and determination of demander cooperation information, payment information and evaluation information according to the whole process, records the cooperation work node and uploading node of each link worker, completes communication, modifies information, extracts satisfaction and the like, and comprehensively records integrity and capability of each participant and performs background statistics.
In another aspect of the present invention, an apparatus is provided, which includes a memory, a processor, and a computer program stored in the memory and executable on the processor, and the processor executes the computer program to implement the restaurant design item node determination method.
In another aspect of the present invention, a computer-readable storage medium is provided, on which a computer program is stored, which when executed by a processor, implements the above restaurant design project node determination method.
In another aspect of the invention, an online process monitoring system for a design project of a restaurant is provided, the system comprises a database server and a data terminal, the database server comprises an information acquisition module, a data processing module, an information sending module and a data storage module, and the data terminal comprises a demander terminal and a work terminal; the data storage module is respectively connected with the information acquisition module and the data processing module, and receives and stores the data of the information acquisition module and the data processing module; the information acquisition module is respectively in communication connection with the demander terminal and the working terminal, is used for acquiring information and transmitting the acquired information to the data processing module for data processing; the information sending module is respectively in communication connection with the demander terminal, the working terminal, the auditing terminal and the data processing module, and is used for receiving the data processed by the data processing module and sending the data to the data terminal for display.
Preferably, the catering store design project node determination system further comprises an audit terminal which is in communication connection with the information sending module and the information acquisition module respectively and uploads or receives data required by auditors of the receiving party.
Preferably, the information sending module comprises a to-be-audited information sending submodule, and the to-be-audited information sending submodule is in communication connection with the demander terminal and the audit terminal and sends the to-be-audited information to the demander terminal and the audit terminal for auditing.
Preferably, the database server further comprises a working time recording module, and the working time recording module is connected with the data processing module and the data storage module and is used for recording the time when the worker processes the project node last time.
In conclusion, the invention has the following beneficial effects:
1. according to the online process monitoring method for the catering store design project, provided by the invention, through recording the time when the worker operates the project node last time, the demander can more intuitively collect the work progress information of the project node, and meanwhile, the worker can be reminded of the urgency degree of the project, so that the smooth promotion of the project node is ensured.
2. The online process monitoring method for the catering store design project, provided by the invention, adapts to the actual situation of the whole project through reasonable delay of certain nodes, and is favorable for better project management.
3. According to the online process monitoring method for the design project of the restaurant, the process file can be filed and traced by uploading the information of the related file of the project node.
4. The online process monitoring method for the design project of the restaurant provides platform support for realizing the design project management method, so that the implementation is simpler and more convenient and more efficient.
5. The catering design and the method for linking the blocks of the overall construction system provided by the invention realize the overall landing of the construction system, so that the implementation is simpler and more convenient and more efficient.
Drawings
FIG. 1 is a flow chart of a preferred embodiment of a restaurant design project node determination method of the present invention;
FIG. 2 is a block diagram of a preferred embodiment of a restaurant design project node determination system of the present invention;
the specific implementation mode is as follows:
the exemplary embodiments will be described herein in detail, and the embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present invention. Rather, they are merely examples of apparatus and methods consistent with certain aspects of the invention, as detailed in the appended claims.
The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used in this specification and the appended claims, the singular forms "a", "an", and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. It should also be understood that the term "and/or" as used herein refers to and encompasses any and all possible combinations of one or more of the associated listed items.
The present invention will be described in detail below by way of examples.
The embodiment of the application provides a catering store design project on-line process monitoring method, equipment, a computer readable storage medium and a design project management system, solves at least one technical problem in the prior art, and ensures that design projects are carried out more orderly and controllably.
In order to solve the technical problems, the general idea of the embodiment of the application is as follows:
the online process monitoring method for the restaurant design project comprises the following steps:
receiving information of a project node;
matching the project nodes with workers;
sending the matching information of the project node and the worker to a demand side;
generating the starting time and the time to be completed of the project node;
receiving an instruction of a worker for processing a project node;
and recording and updating the time when the worker processes the project node last time.
In order to better understand the technical solution, the technical solution will be described in detail with reference to the drawings and the specific embodiments.
Referring to fig. 1, the invention provides a restaurant design project node determination method, which includes the following steps:
s201, receiving information of a project node;
in the specific implementation process, the whole construction project is split, the construction project is divided into at least one project node, and node information is input into the system. The splitting mode can be automatic generation according to the project type, manual splitting and the like. Taking a restaurant design construction project as an example, before the project is implemented, the whole project is divided into modules such as earlier investigation, restaurant design, restaurant construction, after-sales service and the like, and each module is divided into specific project nodes, wherein the earlier investigation comprises project nodes such as restaurant peripheral business district investigation, restaurant size measurement, restaurant culture determination, decoration style investigation and the like, the restaurant design comprises project nodes such as logo design, internal plane design, decoration design and display board design, the restaurant construction comprises project nodes such as water and electricity running construction, floor installation, wallpaper pasting and furniture installation debugging, the after-sales service comprises project nodes such as detail adjustment, arrangement updating and decoration effect feedback, and the nodes are recorded into the system.
S301, matching the project nodes with workers;
in the specific implementation process, after the project node is matched with the worker, the picking confirmation of the related personnel is obtained. The staff can be staff of the project receiver and can also be personnel for temporarily hiring the project receiver, and the staff need to perform identity registration to become users in the system. The project receiver matches the project node with the worker who is responsible for the task, and at the moment, the worker can check the project information, such as whether the project progresses to the node which the worker needs to participate in.
S401, sending the matching information of the project node and the worker to a demand side;
in the specific implementation process, after the project nodes are matched with corresponding workers, the matching information is sent to a demand side. The demander can see the staff responsible for each node through the matching information, so that the project can be conveniently tracked.
S501: generating the starting time and the time to be completed of the project node;
in a specific implementation process, the start time and the completion time are not limited to the to-be-completed node, and may also include the start time and the completion time of the later node. Further, the starting time and the finishing time may be a time point, such as 7/1/2019, or a time period, such as 7/1/2019-7/10/2019. When the completion time of a certain node to be completed is approaching (the remaining time is less than 1/3 of the total time), the system sends a prompt or warning message to the staff, and the prompt or warning message can be sent for multiple times according to the length of the remaining time (for example, a work prompt is sent when the remaining time is less than 1/3 of the total time, a work warning is sent when the remaining time is less than 1/10 of the total time, etc.). And when the time to be completed is over and a certain node to be completed does not pass the audit, the system takes the node as a fault node and records the fault node. The control of time is very important for project promotion, the project node is set with the starting time and the time to be completed, so that the time control of project progress is facilitated, the recording of a fault node is facilitated, whether a project is successful or not is better summarized in the project or after the project is ended, and meanwhile, the method can also be used as a basis for the right of maintenance of a demand side, such as refund request, default fund request and the like.
S601, receiving an instruction of a worker for processing a project node;
in the specific implementation process, when the staff processes the project node, the staff triggers the instruction for processing the project node and sends the instruction to the system. The triggering mode may be that the worker actively sends an instruction for processing the project node, for example, "process the work today" for the project node record, or that the system automatically recognizes and records the action when the worker clicks the project node.
S701, recording and updating the time for the worker to process the project node last time;
in the specific implementation process, the system records the time of the worker for processing the project node and displays the latest time so as to mark the processing efficiency of the worker on the project node. Therefore, the demander can see the time when the worker works last time, and the demander can conveniently master the working state of the worker.
In a preferred embodiment of the present invention, the method for monitoring the online process of the restaurant design project further includes step S511, receiving the setting information of the alarm time from the demander; and when the time interval between the current time and the time of the latest processing project node is greater than or equal to the warning time, sending warning information to the staff and/or the demander.
In the specific implementation process, the demander can set a warning time, for example, 5 days, when the worker does not process the project node information for more than 5 days, the system can send warning information to the demander, and can also send warning information to the worker at the same time so as to remind the worker of the working condition of the project node.
In a preferred embodiment of the present invention, the method for monitoring the online process of the restaurant design project further includes step S801 of receiving completion information of the project node.
In the specific implementation process, after the work of the node is completed, the work content is confirmed, that is, the completion information is obtained. Taking the investigation of the decoration style as an example, the working node needs the staff to communicate with the demand party in the same plane to confirm the decoration style, after the staff communicates with the demand party in the same plane, the work of the project node is completed, and at the moment, the staff uploads a confirmation application for completing the communication in the same plane, which is the completion information of the project node; taking logo design as an example, the working node requires a worker to request a demand party to confirm the content after the logo design is finished, and after the logo design is finished, the worker uploads the logo to the system to wait for the confirmation of the demand party, which is the completion information of the project node.
In a preferred embodiment of the present invention, the method for monitoring the online process of the design project of the restaurant further includes step S521, receiving setting information of a reminding time point from a demander; and when the reminding time point is reached and the completion information of the project node is not received, sending the reminding information to a demand party and/or a worker.
In the specific implementation process, the demander sets a time point between the starting time and the time to be finished as the reminding time, and when the worker does not finish the work at the time, the system sends reminding information to the demander so as to prompt the demander and the demander to accelerate the work progress. If no processing system is available in time delay, the processing result is automatically processed according to the set standard and is sent to corresponding personnel of each party.
In a preferred embodiment of the present invention, the construction project management method further includes step S531: and receiving a deferred application of the project node.
In the specific implementation process, due to the emergency in the actual work, the project node can have a delay condition, and the reasonable delay of some nodes at the moment accords with the actual condition of the whole project, thereby being beneficial to better project management. Specifically, both the worker and the demander can send a deferred application for the project node and can send a deferred reason at the same time.
In a preferred embodiment of the present invention, the construction project management method further includes step S532: and receiving audit confirmation information of the project node deferred application.
In the specific implementation process, the deferred application sent by the staff needs to be audited, wherein the audit can be performed once, namely the audit of the demander, or can be performed twice, namely the audit of the receiver is performed first, and the audit of the demander is performed; the deferred application proposed by the demander is not audited but is pushed to the staff at the same time. The delay application needs to be checked, so that the number of unnecessary delays can be reduced, and the smooth promotion of projects is ensured.
In a preferred embodiment of the present invention, the method for monitoring the online process of the restaurant design project further includes step S541: and receiving a project pause instruction of the demand side to the project node.
In practice, items may temporarily stop advancing for a variety of reasons, and items in suspension do not need to be reminded. And the pause instruction of the project can reduce the error reminding of the system to the demander or the staff.
In a preferred embodiment of the present invention, the method for monitoring the online progress of the restaurant design project further includes step S551: the online process monitoring method for the restaurant design project further comprises the following steps: and receiving the application of the replacement worker of the project node.
In a preferred embodiment of the present invention, the method for monitoring the online progress of the restaurant design project further includes step S552: receiving audit confirmation information applied by the project node replacement workers, and modifying matching information of the project node and the workers.
In the specific implementation process, the worker may leave the work of the project node due to various principles, and at this time, it is necessary to replace the project worker and change the matching information in the system, so as to ensure the accuracy of the system data and the pertinence of the project reminding.
In a preferred embodiment of the present invention, the method for monitoring the online process of the restaurant design project further includes step S811 of receiving final audit pass information of the project node.
In the specific implementation process, after receiving or actively checking the completion information of the project node, the demand side evaluates the completion information, if the evaluation is passed, the final audit is passed information, and if the evaluation is not passed, the project node continuously keeps the state of the node to be completed. The demander has final decision right on whether the project node passes or not, and the working quality of workers and the satisfaction degree of the demander can be guaranteed. Further, after the project node passes the audit, the work of other unfinished project nodes is continuously processed.
In a preferred embodiment of the present invention, the method for monitoring the online process of the restaurant design project further includes step S801 of receiving the uploaded information of the project node-related file.
In a preferred embodiment of the present invention, the construction project management method further includes step S101: and receiving login information of the demand party.
In the specific implementation process, before the demander uses the system, the demander can register an account number by inputting personal information, other software authorization and other modes, and log in by a password or a mobile phone verification code and other modes, and can check the business or other information related to the demander after logging in.
In a preferred embodiment of the present invention, the construction project management method further includes step S111: and receiving the construction project entry information and generating a project number uniquely corresponding to the project.
In the specific implementation process, the information of the construction project is input into the system, and the system automatically generates a unique number corresponding to the project, wherein the number can be in the forms of numbers, character strings, bar codes, two-dimensional codes and the like. The construction project information comprises consignor information, so that after the construction project information is input into the system, the system associates the construction project with the demander, and the demander can check the corresponding construction project information.
According to the catering store design project node determination method, the filling and determination of the demander cooperation information, the payment information and the evaluation information are recorded according to the whole process, meanwhile, the records of the cooperation of working nodes and uploading nodes of working personnel in each link, the completion of communication, the modification of information, the extraction of satisfaction and the like are recorded, and the integrity and the capability of each participant are comprehensively recorded and subjected to background statistics.
By adopting the online process monitoring method for catering design, not only can catering design be realized, but also all blocks of the system can be integrally built for catering halls, so that the online process monitoring to the smooth completion of the overall process can be completed.
Further, the present invention also provides a computer-readable storage medium on which a computer program is stored, which, when executed by a processor, implements the restaurant design item node determination method in the above embodiments. The computer storage medium may be various media capable of storing program codes, such as a usb disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk, or an optical disk.
Further, the present invention also provides an apparatus, including a memory, a processor, and a computer program stored on the memory and operable on the processor, where the processor executes the program to implement the restaurant design item node determination method in the foregoing embodiment. Specifically, the device may be a terminal integrated with the terminal, such as a mobile phone, a tablet computer, and a PC, which can implement the construction project management method in the above embodiments, and the integrated form may be a mobile phone applet, a mobile phone APP, computer software, and the like.
Further, referring to fig. 2, the invention further provides an online process monitoring system for a restaurant store design project, the system comprises a database server and a data terminal, the database server comprises an information acquisition module, a data processing module, an information sending module and a data storage module, and the data terminal comprises a demander terminal and a work terminal; the data storage module is respectively connected with the information acquisition module and the data processing module, and receives and stores the data of the information acquisition module and the data processing module; the information acquisition module is respectively in communication connection with the demander terminal and the working terminal, is used for acquiring information and transmitting the acquired information to the data processing module for data processing; the information sending module is respectively in communication connection with the demander terminal, the working terminal, the auditing terminal and the data processing module, and is used for receiving the data processed by the data processing module and sending the data to the data terminal for display.
In particular implementations, the system may be used by one or more project recipients. The demander terminal and the working terminal can be specific terminal equipment or general terminal equipment such as a mobile phone, a tablet personal computer and the like, and different terminals are formed in an account login mode.
In a preferred embodiment of the present invention, the restaurant design project node determination system further includes an audit terminal, which is in communication connection with the information sending module and the information collecting module, respectively, and uploads or receives data required by an auditor of a receiving party.
In the specific implementation process, the auditing terminal can be a specific terminal device, or can be a general terminal device such as a mobile phone, a tablet computer and the like, and the formation of the terminal is realized by the account login of the auditor of the receiver.
In a preferred embodiment of the present invention, the information sending module includes a to-be-audited information sending submodule, and the to-be-audited information sending submodule is in communication connection with the demander terminal and the audit terminal, and sends the to-be-audited information to the demander terminal and the audit terminal for auditing.
In the specific implementation process, the information to be audited can be divided into two types of information which needs to be audited initially and information which does not need to be audited initially, namely the information to be audited needs to be audited inside a receiver first, such as deferred application. Therefore, the information to be audited, which needs to be initially audited, is sent to the auditing terminal through the information sending submodule to be audited, and if the information sending submodule to be audited receives the information that is passed through the audit, the information to be audited is sent to the terminal of the demander; the information to be audited which does not need to be audited is directly sent to the terminal of the demand party through the information sending submodule to be audited.
In a preferred embodiment of the present invention, the database server further includes a working time recording module, and the working time recording module is connected to the data processing module and the data storage module, and is configured to record the time when a worker processes a project node last time.
In the several embodiments provided in the present application, it should be understood that the disclosed system, apparatus and method may be implemented in other ways. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, devices or units, and may be in an electrical, mechanical or other form.
The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit.
It should be understood that the technical problems can be solved by combining and combining the features of the embodiments from the claims.
The functions, if implemented in the form of software functional units and sold or used as a stand-alone product, may be stored in a computer readable storage medium. Based on such understanding, the technical solution of the present invention may be embodied in the form of a software product, which is stored in a storage medium and includes instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method according to the embodiments of the present invention.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (10)

1. A method for monitoring the online process of a design project of a restaurant comprises the following steps:
receiving information of a project node;
matching the project nodes with workers;
sending the matching information of the project node and the worker to a demand side;
generating the starting time and the time to be completed of the project node;
receiving an instruction of a worker for processing a project node;
and recording and updating the time when the worker processes the project node last time.
2. The on-line process monitoring method for restaurant design projects according to claim 1, wherein: the online process monitoring method for the restaurant design project further comprises the following steps: receiving the setting information of the demander on the warning time; and when the time interval between the current time and the time of the latest processing project node is greater than or equal to the warning time, sending warning information to the staff and/or the demander.
3. The on-line process monitoring method for restaurant design projects according to claim 1, wherein: the online process monitoring method for the restaurant design project further comprises the following steps: completion information for the project node is received.
4. The on-line process monitoring method for restaurant design projects according to claim 1 or 2, wherein: the online process monitoring method for the restaurant design project further comprises the following steps: receiving setting information of a demand party on a reminding time point; and when the reminding time point is reached and the completion information of the project node is not received, sending the reminding information to a demand party and/or a worker.
5. The on-line process monitoring method for restaurant design projects according to claim 1 or 2, wherein: the restaurant design project node determining method further comprises the following steps: and receiving a deferred application of the project node.
6. The restaurant store design project online process monitoring method as claimed in claim 5, wherein: the restaurant design project node determining method further comprises the following steps: and receiving audit confirmation information of the project node deferred application.
7. The on-line process monitoring method for restaurant design projects according to claim 1, wherein: the online process monitoring method for the restaurant design project further comprises the following steps: and receiving a project pause instruction of the demand side to the project node.
8. The on-line process monitoring method for restaurant design projects according to claim 3, wherein: the online process monitoring method for the restaurant design project further comprises the following steps: and receiving final audit passing information of the project node.
9. An online process monitoring system for a design project of a restaurant comprises a database server and a data terminal, wherein the database server comprises an information acquisition module, a data processing module, an information sending module and a data storage module, and the data terminal comprises a demander terminal and a working terminal; the data storage module is respectively connected with the information acquisition module and the data processing module, and receives and stores the data of the information acquisition module and the data processing module; the information acquisition module is respectively in communication connection with the demander terminal and the working terminal, is used for acquiring information and transmitting the acquired information to the data processing module for data processing; the information sending module is respectively in communication connection with the demander terminal, the working terminal, the auditing terminal and the data processing module, and is used for receiving the data processed by the data processing module and sending the data to the data terminal for display.
10. The on-line process monitoring system for restaurant design projects as recited in claim 9, wherein: the database server also comprises a working time recording module, and the working time recording module is connected with the data processing module and the data storage module and is used for recording the time when a worker processes the project node last time.
CN201910842357.7A 2019-09-06 2019-09-06 Online process monitoring method and system for catering store design project Pending CN110717648A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910842357.7A CN110717648A (en) 2019-09-06 2019-09-06 Online process monitoring method and system for catering store design project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910842357.7A CN110717648A (en) 2019-09-06 2019-09-06 Online process monitoring method and system for catering store design project

Publications (1)

Publication Number Publication Date
CN110717648A true CN110717648A (en) 2020-01-21

Family

ID=69210327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910842357.7A Pending CN110717648A (en) 2019-09-06 2019-09-06 Online process monitoring method and system for catering store design project

Country Status (1)

Country Link
CN (1) CN110717648A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116050869A (en) * 2023-04-03 2023-05-02 南京庞特软件科技有限公司 Store full life cycle management method and store management system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107480882A (en) * 2017-08-11 2017-12-15 陕西合友网络科技有限公司 A kind of system and method for generating BPM
CN107506977A (en) * 2017-08-21 2017-12-22 太原重工股份有限公司 Business Process Management system and method
CN109711690A (en) * 2018-12-17 2019-05-03 广州天越电子科技有限公司 The method and system of management scene control project process real-time update
CN109960488A (en) * 2019-01-28 2019-07-02 平安科技(深圳)有限公司 APP complete period monitoring method, device, computer equipment and storage medium
CN110175885A (en) * 2019-04-26 2019-08-27 武汉欧铭达科技有限公司 A kind of project Real-Time Sharing trading platform system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107480882A (en) * 2017-08-11 2017-12-15 陕西合友网络科技有限公司 A kind of system and method for generating BPM
CN107506977A (en) * 2017-08-21 2017-12-22 太原重工股份有限公司 Business Process Management system and method
CN109711690A (en) * 2018-12-17 2019-05-03 广州天越电子科技有限公司 The method and system of management scene control project process real-time update
CN109960488A (en) * 2019-01-28 2019-07-02 平安科技(深圳)有限公司 APP complete period monitoring method, device, computer equipment and storage medium
CN110175885A (en) * 2019-04-26 2019-08-27 武汉欧铭达科技有限公司 A kind of project Real-Time Sharing trading platform system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116050869A (en) * 2023-04-03 2023-05-02 南京庞特软件科技有限公司 Store full life cycle management method and store management system

Similar Documents

Publication Publication Date Title
US20220360547A1 (en) Personalized chatbots for inmates
CN108470485B (en) Scene-based training method and device, computer equipment and storage medium
CN108629558B (en) Software development management system
CN107888397A (en) The method and apparatus for determining fault type
CN111185014B (en) Object matching method, device and computer-readable storage medium
CN114061047B (en) Method and device for controlling air conditioner and air conditioner
US20170014713A1 (en) Substitution of game commands with different replacement commands at client devices using substitution reference sets
CN106960290A (en) A kind of 4 S auto shop team sales service quality evaluation system and evaluation method
CN110717648A (en) Online process monitoring method and system for catering store design project
CN111652659A (en) VR product evaluation system based on big data
CN109087006B (en) Method and device for processing power equipment monitoring information
CN110738391A (en) design project management method and system
CN106682945B (en) Free gift management method and device
CN106161490A (en) A kind of user's online behavior state update method, Apparatus and system
CN111401723A (en) Construction post safety management method with labor real-name system and BIM technology fused and applied
CN116431929A (en) Information recommendation method, device, equipment and medium based on privacy calculation
KR101589169B1 (en) Server and method for processing virtual traiming data file
CN109460967A (en) A kind of fire-fighting inspection System and method for
CN115346643A (en) Online psychological assessment system based on data visualization
WO2023129250A1 (en) Meeting inclusion and hybrid workplace insights
CN115409663A (en) Training system for improving enterprise employee quality
CN110738456A (en) design project node determination method and system
CN114416223A (en) Application program linkage method and device, computer equipment and storage medium
CN114266066A (en) Data processing method, device, terminal equipment and storage medium
US20150286699A1 (en) Information processing system, information processing apparatus, server, storage medium having stored therein information processing program, and information processing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination