CN110701766B - Air pipe for building heating and ventilation system - Google Patents

Air pipe for building heating and ventilation system Download PDF

Info

Publication number
CN110701766B
CN110701766B CN201911088566.3A CN201911088566A CN110701766B CN 110701766 B CN110701766 B CN 110701766B CN 201911088566 A CN201911088566 A CN 201911088566A CN 110701766 B CN110701766 B CN 110701766B
Authority
CN
China
Prior art keywords
air pipe
pipe
flange
rod
pull rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911088566.3A
Other languages
Chinese (zh)
Other versions
CN110701766A (en
Inventor
朱东伟
常志忠
刘爱玲
赖敏刚
魏成日
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Provincial Erjian Construction Group Installation Co ltd
Original Assignee
Zhejiang Provincial Erjian Construction Group Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Provincial Erjian Construction Group Installation Co ltd filed Critical Zhejiang Provincial Erjian Construction Group Installation Co ltd
Priority to CN201911088566.3A priority Critical patent/CN110701766B/en
Publication of CN110701766A publication Critical patent/CN110701766A/en
Application granted granted Critical
Publication of CN110701766B publication Critical patent/CN110701766B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • F24F13/0254Ducting arrangements characterised by their mounting means, e.g. supports
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening

Abstract

The invention discloses an air pipe for a building heating and ventilation system, which relates to the field of installation of heating and ventilation pipes and comprises a middle pull rod and a plurality of side pull rods distributed on two sides of the middle pull rod, wherein a middle air pipe and a side air pipe are respectively arranged below the middle pull rod and the side pull rods, and a middle mounting seat and a side mounting block are arranged at the lower end of the middle pull rod and the side pull rods; the side air pipe is provided with a side mounting seat, the side mounting seat is provided with a side groove for embedding the side mounting block, and a pair of side mounting grooves which are respectively communicated with the two ends of the side groove and used for embedding the side mounting block in a sliding manner; the middle air pipe is provided with a middle mounting seat, and the middle mounting seat is provided with a middle groove for embedding the middle mounting block, a middle mounting groove communicated with the side wall of the middle groove and used for sliding and embedding the middle mounting block. The invention has the following advantages and effects: through the side installation piece and the side mount pad that set up the joint that slides, the cooperation of middle installation piece and middle mount pad, realize hanging in midair the installation fast of side tuber pipe and middle tuber pipe, and then make the installation fixed process of warm ventilation pipe light more convenient.

Description

Air pipe for building heating and ventilation system
Technical Field
The invention relates to the field of installation of heating and ventilation pipes, in particular to a building heating and ventilation system air pipe.
Background
The heating ventilation pipe is a pipe made of various metal materials and is an important component in an air conditioner and a ventilation system.
Chinese patent CN203477680U discloses a novel air duct system of heating ventilation air conditioner, and this air duct system includes a plurality of galvanized air ducts and a plurality of angle steel flanges, and a plurality of angle steel flanges locate a plurality of galvanized air ducts's both ends through the punching press of not riveting, and two liang of adjacent galvanized air ducts pass through the angle steel flange connection at both ends, pass through bolted connection between the adjacent angle steel flanges.
When the air pipe is applied to a building room, a plurality of pull rods are usually fixed on a ceiling, then the air pipe is hooped by using the hoop, and after the hoop is fixed on the pull rods, the adjacent angle steel flanges are fixed by using bolts. The hoisting and fixing process of the air pipe is complicated, so that the installation process of the air pipe is inconvenient and needs to be improved.
Disclosure of Invention
The invention aims to provide an air pipe for a building heating and ventilation system, which has the effect of convenient installation.
The technical purpose of the invention is realized by the following technical scheme: the air pipe for the building heating and ventilation system comprises a vertically arranged middle pull rod, wherein a plurality of side pull rods are vertically distributed on two sides of the middle pull rod at intervals, a middle air pipe is horizontally arranged below the middle pull rod, side air pipes are horizontally arranged below the side pull rods, and the ends of the middle air pipe and the side air pipes are sequentially abutted; the lower end of the side pull rod is horizontally provided with a dovetail-shaped side installation block, the upper end surface of the side air pipe is horizontally provided with a side installation seat, the upper end surface of the side installation seat is provided with a side groove for the side installation block to be embedded, and a pair of side installation grooves which are respectively communicated with the two ends of the side groove and are used for the side installation block to be embedded in a sliding manner; the lower end of the middle pull rod is horizontally provided with a dovetail-shaped middle mounting block, the upper end surface of the middle air pipe is horizontally provided with a middle mounting seat, and the upper end surface of the middle mounting seat is provided with a middle groove for the middle mounting block to be embedded in and a middle mounting groove communicated with the side wall of the middle groove and used for the middle mounting block to be embedded in a sliding manner; the air duct comprises a middle air duct body, side flanges and fixing parts, wherein the middle flanges are arranged at two ends of the middle air duct body, the side flanges are arranged at two ends of each side air duct body, the fixing parts are arranged between every two adjacent side flanges and used for fixing the side flanges mutually, and locking parts used for locking the side flanges mutually are arranged between the middle flanges and the side flanges.
Through adopting above-mentioned technical scheme, when the warm ventilation pipe of installation use above-mentioned, earlier be fixed in the ceiling with middle pull rod and side pull rod to make a plurality of side pull rod distribute in the both sides of middle pull rod. And then taking out the side air pipe, and enabling the side mounting seat on the side air pipe to face upwards. And then the side air pipe is driven to move upwards, so that the side air pipe is driven to be far away from the side pull rod after the side mounting block at the lower end of the side pull rod is embedded into the side groove on the side mounting seat. At the moment, the side mounting block gradually slides into the side mounting groove, so that the side air pipe is hoisted. And after the side air pipes are completely hoisted, the side flanges at the end parts of the side air pipes positioned at the two sides of the middle pull rod are mutually abutted, and a gap for mounting the middle air pipe is left below the middle pull rod. And then, fixing two adjacent side flanges by using the fixing parts to realize the installation and fixation between the side flanges. And then taking out the middle air pipe, enabling the middle mounting seat to face upwards, driving the middle air pipe to move upwards, and embedding a middle mounting block at the lower end of the middle pull rod into a middle groove on the middle mounting seat after the middle air pipe is positioned in the reserved gap. And then, driving the middle air pipe to horizontally slide, and after the middle mounting block is embedded into the middle mounting groove, completely aligning the middle air pipe and the side air pipe, and enabling the middle flange to be mutually abutted against the side flange. And finally, after the middle flange and the side flanges are fixed by the locking part, the whole heating ventilation pipe is installed and fixed. Therefore, the side mounting blocks and the side mounting seats which are connected in a sliding mode are arranged, the middle mounting blocks and the middle mounting seats are matched, the side air pipes and the middle air pipes are mounted in a hanging mode fast, and accordingly the mounting and fixing process of the heating ventilation pipe is easier and more convenient.
The invention is further provided with: the fixed part includes the dead lever that a plurality of levels set up, the dead lever is located the side tuber pipe is kept away from middle tuber pipe on the side flange, the dead lever deviates from the one end threaded connection of side flange has the screw rod, the screw rod deviates from the one end of dead lever is provided with the fixed block of rectangular shape, the side tuber pipe is close to middle tuber pipe run through on the side flange and be equipped with the confession the fixed orifices that the fixed block wore to establish, and the fixed block wore to establish fixed orifices and rotatory back compresses tightly the outer wall of side flange.
Through adopting above-mentioned technical scheme, when the installation side tuber pipe, fixed block and dead lever wear to establish the fixed orifices gradually, and until a pair of side flange back of supporting each other, the fixed block breaks away from the fixed orifices completely. The fixed block of screwing this moment, the fixed block drives screw rod synchronous revolution afterwards, compresses tightly fixedly after the fixed block compresses tightly side flange outer wall, realizes the locking of fixed part promptly. The structure of fixed part is succinct to the use is light convenient, consequently makes the fixed process of side flange more convenient.
The invention is further provided with: the middle flange is provided with a locking hole communicated with the fixing hole in a penetrating manner, the locking part comprises a locking rod which is inserted into the locking hole and the fixing hole, one end of the locking rod is provided with a baffle plate used for pressing the side wall of the middle flange, and the other end of the locking rod is provided with a pair of elastic clamping hooks used for pressing the side wall of the side flange.
By adopting the technical scheme, when the middle flange and the side flange are locked, the elastic clamping hook is embedded into the locking hole, and then the driving baffle plate drives the locking rod and the elastic clamping hook to slide along the locking hole and the inner wall of the fixing hole. Until the baffle plate is abutted against the side wall of the middle flange, the elastic clamping hook is separated from the fixing hole and elastically unbuckles the side wall of the side flange, so that the middle flange and the side flange are locked. The locking part is simple in structure and easy and convenient to use, so that the locking process of the middle flange and the side flange is quicker and more convenient.
The invention is further provided with: the locking lever includes the confession the fixed body of rod of elasticity pothook, the body of rod deviates from the one end of elasticity pothook is rotated and is connected with the regulation pole, it has the regulation hole to run through on the baffle, adjust pole threaded connection in adjust the hole, and adjust the pole and deviate from the one end of the body of rod is provided with the handle.
Through adopting above-mentioned technical scheme, behind the lateral wall of elastic pothook hookup side flange, the rotating handle drives the synchronous revolution of regulation pole, makes the regulation pole pulling body of rod be close to the baffle, and the body of rod drives elastic pothook synchronous motion this moment to increase the packing force of elastic pothook to side flange, increase the stability when locking portion uses promptly.
The invention is further provided with: the middle air pipe comprises a pair of pipe bodies, a rubber pipe is arranged between the pair of pipe bodies, and the two ends of the middle mounting seat are connected with the upper end faces of the pair of pipe bodies in a sliding mode.
Through adopting above-mentioned technical scheme, constitute middle tuber pipe jointly through setting up a pair of body and rubber tube, the fine setting of tuber pipe length in the middle of realizing, the error of producing when overcoming installation error and production avoids appearing the card and dies or the dislocation phenomenon for the installation of whole warm ventilation pipe is more convenient.
The invention is further provided with: the side air pipe is far away from the middle air pipe, a circle of sealing ring is arranged on the side flange, and the other side of the sealing ring is provided with a sealing groove for embedding the sealing ring, and a rubber gasket is arranged between the middle flange and the side flange.
Through adopting above-mentioned technical scheme, through the cooperation that sets up sealing washer and seal groove, realize the ladder between side flange and the side flange and seal, simultaneously through setting up the rubber packing ring, realize sealing between intermediate flange and the side flange, and then increase the leakproofness of whole warm ventilation pipe.
The invention is further provided with: the middle air pipe and the lower end face of the side air pipe are provided with storage boxes communicated with the interior of the middle air pipe and the side air pipe.
Through adopting above-mentioned technical scheme, collect the dust in middle tuber pipe and the side air pipe through setting up the receiver, avoid the dust to influence the normal work of middle tuber pipe and side air pipe.
The invention is further provided with: the outer wall of the lower end of the storage box is provided with a drawer, and a compressing rod used for compressing the drawer is rotationally arranged on the storage box.
Through adopting above-mentioned technical scheme, when collecting the dust, the dust drops to in the drawer, and the rotating compresses tightly the pole afterwards and breaks away from behind the drawer, pulls out the drawer, can realize empting and the clearance of dust to make the clearance process of dust light convenient more.
The invention is further provided with: the inner wall of the drawer is provided with wet cleaning paper.
Through adopting above-mentioned technical scheme, in time adsorb the collection through setting up moist cleaning paper to the dust, avoid appearing the flying dust phenomenon. Simultaneously when the dust in the clearance drawer, directly take out the cleaning paper, utilize the cleaning paper to take the dust out, can realize the clearance of dust, keep the clean degree of drawer simultaneously for the clearance process of dust is lighter convenient more.
In conclusion, the invention has the following beneficial effects:
1. the side mounting blocks and the side mounting seats which are arranged in a sliding and clamping manner are matched with the middle mounting blocks and the middle mounting seat, so that the side air pipes and the middle air pipes are quickly suspended and mounted, and the mounting and fixing process of the heating ventilation pipe is easier and more convenient;
2. the fixing and locking processes of the side flanges and the middle flange and the side flanges are more rapid and convenient by arranging the fixing part and the locking part which are simple in structure and easy and convenient to use;
3. the middle air pipe with the length capable of being finely adjusted is arranged, so that the mounting error and the error generated in production are overcome, the phenomenon of blocking or dislocation is avoided, and the whole heating and ventilating pipe is more convenient to mount;
4. through setting up the receiver and collecting the dust in middle tuber pipe and the side air duct, accomodate the dust through setting up the drawer simultaneously for the clearance process of dust is light convenient more.
Drawings
FIG. 1 is a schematic structural view of an embodiment;
FIG. 2 is a schematic structural diagram of a side air duct of the embodiment;
FIG. 3 is a schematic structural view of an intermediate air duct of the embodiment;
FIG. 4 is a schematic diagram of the connection relationship of the embodiment;
fig. 5 is a partial enlarged view at a in fig. 2;
fig. 6 is a schematic structural view of a locking portion of the embodiment.
Reference numerals: 1. a middle pull rod; 11. a middle mounting block; 2. a side pull rod; 21. a side mounting block; 3. a middle air duct; 31. a middle mounting base; 32. a middle groove; 33. a middle mounting groove; 34. a pipe body; 35. a rubber tube; 4. a side air duct; 41. a side mount; 42. a side groove; 43. a side mounting groove; 5. a storage box; 51. a drawer; 52. cleaning the paper; 53. a hold down bar; 6. a middle flange; 61. a rubber gasket; 62. a locking hole; 7. a side flange; 71. a seal ring; 72. a sealing groove; 73. a fixing hole; 8. a fixed part; 81. fixing the rod; 82. a screw; 83. a fixed block; 9. a locking portion; 91. a locking lever; 92. a baffle plate; 93. an elastic hook; 94. a rod body; 95. adjusting a rod; 96. an adjustment hole; 97. a handle.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1, the air duct for the building heating and ventilation system comprises a middle pull rod 1 which is vertically arranged, wherein a plurality of side pull rods 2 are vertically arranged on two sides of the middle pull rod 1 at intervals. The lower part of the middle pull rod 1 is horizontally provided with a middle air pipe 3, the lower part of the side pull rod 2 is horizontally provided with a side air pipe 4, and the end parts of the middle air pipe 3 and the side air pipe 4 are sequentially abutted and fixed together.
When the heating ventilation pipe is installed and used, the upper ends of the middle pull rod 1 and the side pull rods 2 are fixed on a ceiling, and the side pull rods 2 are distributed on two sides of the middle pull rod 1 at intervals. Then, the side air duct 4 is fixed below the side pull rod 2, and the middle air duct 3 is fixed below the middle pull rod 1. And finally, fixing the end parts of the middle air pipe 3 and the side air pipes 4 together to realize the installation and fixation of the whole heating ventilation pipe.
As shown in fig. 2 and 3, storage boxes 5 communicating with the inside of both the intermediate duct 3 and the side duct 4 are provided on the lower end surfaces thereof, and a drawer 51 is provided on the outer wall of the lower end of each storage box 5. The inner wall of the drawer 51 is provided with wet cleaning paper 52, and a pressing lever 53 for pressing the drawer 51 is rotatably provided on the storage case 5.
When warm ventilation pipe uses, the dust in middle tuber pipe 3 and the side air pipe 4 drops to in the drawer 51 of receiver 5 below, is adsorbed the collection back by moist cleaning paper 52 afterwards, realizes the stable collection of dust. When cleaning up the collected dust, the pressing lever 53 is rotated to disengage the drawer 51, and then the drawer 51 is pulled out. Then the cleaning paper 52 is directly taken out, and the dust is taken out by the cleaning paper 52, so that the dust can be cleaned.
After the dust is cleaned, after new cleaning paper 52 is laid in the drawer 51, the cleaning paper 52 is wetted, and then the drawer 51 is reinserted into the storage case 5. Finally, the pressing rod 53 is rotated to press the outer wall of the drawer 51, so that the drawer 51 is installed and fixed.
As shown in fig. 2 and 4, a dovetail-shaped side mounting block 21 is horizontally provided at the lower end of the side tie bar 2, a side mounting seat 41 is horizontally provided at the upper end surface of the side duct 4, a side groove 42 into which the side mounting block 21 is fitted, and a pair of side mounting grooves 43 communicating with both ends of the side groove 42 and into which the side mounting block 21 is slidably fitted are provided at the upper end surface of the side mounting seat 41.
As shown in fig. 3 and 4, a dovetail-shaped middle mounting block 11 is horizontally arranged at the lower end of the middle pull rod 1, a middle mounting seat 31 is horizontally arranged on the upper end surface of the middle air duct 3, a middle groove 32 for the middle mounting block 11 to be embedded in and a middle mounting groove 33 which is communicated with the side wall of the middle groove 32 and for the middle mounting block 11 to be slidably embedded in are arranged on the upper end surface of the middle mounting seat 31.
As shown in fig. 4, both ends of the intermediate air duct 3 are provided with intermediate flanges 6, both ends of the side air ducts 4 are provided with side flanges 7, a fixing portion 8 for mutual fixation is provided between two adjacent side flanges 7, and a locking portion 9 for mutual locking is provided between the intermediate flanges 6 and the side flanges 7.
When the heating ventilation pipe is installed, the side air pipe 4 is taken out firstly, and the side installation seat 41 on the side air pipe 4 faces upwards. Then the side air duct 4 is driven to move upwards, so that the side mounting block 21 at the lower end of the side pull rod 2 is embedded into the side groove 42 on the side mounting seat 41, and then the side air duct 4 is driven to be far away from the side pull rod 2. At this time, the side mounting block 21 gradually slides into the side mounting groove 43, thereby realizing the hoisting of the side air duct 4.
And after the side air pipes 4 are completely hoisted, the side flanges 7 at the end parts of the side air pipes 4 positioned at the two sides of the middle pull rod 1 are mutually butted. And then, the two adjacent side flanges 7 are fixed by the fixing parts 8, so that the installation and the fixation between the side flanges 7, namely the fixation of the plurality of side air ducts 4, are realized.
Meanwhile, a gap for installing the middle air duct 3 is left below the middle pull rod 1, and the length of the gap is the same as that of the middle air duct 3. The intermediate air duct 3 is then removed with the intermediate mounting seat 31 on the intermediate air duct 3 facing upwards.
Then the middle air duct 3 is driven to move upwards, so that the middle mounting block 11 at the lower end of the middle pull rod 1 is embedded into the middle groove 32 on the middle mounting seat 31 after the middle air duct 3 is positioned in the reserved gap. Then the middle air duct 3 is driven to horizontally slide, after the middle mounting block 11 is embedded into the middle mounting groove 33, the middle air duct 3 is completely aligned with the side air duct 4, and the middle flange 6 is abutted against the side flange 7. And finally, after the middle flange 6 and the side flanges 7 are fixed by the locking part 9, the whole heating ventilation pipe is installed and fixed.
As shown in fig. 4, a ring of sealing ring 71 is disposed on the side flange 7 of the side air duct 4 away from the intermediate air duct 3, a sealing groove 72 for embedding the sealing ring 71 is disposed on the other flange, and a rubber gasket 61 is disposed between the intermediate flange 6 and the side flange 7.
When the side air duct 4 is installed, the stepped sealing between the side flange 7 and the side flange 7 is realized by the matching of the sealing ring 71 and the sealing groove 72, and the sealing performance between the side air duct 4 and the side air duct 4 is increased. Simultaneously through setting up rubber packing ring 61, realize sealed between intermediate flange 6 and the side flange 7, the leakproofness between tuber pipe 3 and the side air pipe 4 in the middle of the increase to the leakproofness of whole warm ventilation pipe of increase.
As shown in fig. 3, the intermediate duct 3 includes a pair of tube bodies 34, a rubber tube 35 is provided between the pair of tube bodies 34, and both ends of the rubber tube 35 are fixed to the end portions of the tube bodies 34. And both ends of the intermediate mounting seat 31 are slidably connected to the upper end surfaces of the pair of pipe bodies 34.
When the middle air duct 3 and the side air duct 4 are produced, production errors are avoided, and when the middle air duct 3 and the side air duct 4 are installed, installation errors also exist. Therefore, the pair of tube bodies 34 and the rubber tube 35 are arranged to jointly form the intermediate air duct 3, so that the fine adjustment of the length of the intermediate air duct 3 is realized. Thereby effectual overcoming installation error and production error, avoiding appearing the dead or dislocation phenomenon of card, realize the quick installation and the easy to assemble of whole warm ventilation pipe.
As shown in fig. 2 and 4, the fixing portion 8 includes a plurality of horizontally disposed fixing rods 81, the fixing rods 81 are located on the side flanges 7 of the side air ducts 4 far away from the middle air duct 3, and the plurality of fixing rods 81 are distributed around the side flanges 7.
As shown in fig. 2 and 4, a screw 82 is connected to one end of the fixing rod 81 away from the side flange 7 in a threaded manner, and an elongated fixing block 83 is disposed at one end of the screw 82 away from the fixing rod 81.
As shown in fig. 2 and 4, a fixing hole 73 for the fixing block 83 to pass through is formed in the side flange 7 of the side duct 4 close to the intermediate duct 3, and the fixing block 83 passes through the fixing hole 73 and rotates to press the outer wall of the side flange 7.
When the side air duct 4 is installed, the fixing block 83 and the fixing rod 81 gradually penetrate through the fixing hole 73 until the pair of side flanges 7 are abutted against each other, and the fixing block 83 is completely separated from the fixing hole 73. At this time, the fixing block 83 is screwed, and then the fixing block 83 drives the screw rod 82 to rotate synchronously. After the fixed block 83 compresses tightly the outer wall of the side flange 7, the pair of side flanges 7 are compressed and fixed, and therefore the fixed portion 8 is locked and fixed.
As shown in fig. 3 and 6, a locking hole 62 communicating with the fixing hole 73 (see fig. 2) is formed through the intermediate flange 6, and the locking portion 9 includes a locking lever 91 inserted into the locking hole 62 and the fixing hole 73. One end of the locking lever 91 is provided with a stopper 92 for pressing the side wall of the intermediate flange 6, and the other end is provided with a pair of elastic hooks 93 for pressing the side wall of the side flange 7.
As shown in fig. 6, the locking lever 91 includes a rod 94 for fixing the elastic hook 93, and an end of the rod 94 opposite to the elastic hook 93 is rotatably connected with an adjusting lever 95. An adjusting hole 96 penetrates through the baffle 92, the adjusting rod 95 is in threaded connection with the adjusting hole 96, and a handle 97 is arranged at one end of the adjusting rod 95, which is far away from the rod body 94.
When the middle flange 6 and the side flange 7 (see fig. 2) are locked, the elastic hook 93 is inserted into the locking hole 62, and then the driving baffle 92 drives the locking lever 91 and the elastic hook 93 to slide along the inner walls of the locking hole 62 and the fixing hole 73. Until the baffle 92 abuts against the side wall of the intermediate flange 6, the elastic hooks 93 are disengaged from the fixing holes 73 and spring open the side wall of the fastening side flange 7.
Then, the handle 97 is rotated to drive the adjusting rod 95 to rotate synchronously, so that the rod 94 is pulled by the adjusting rod 95 to approach the baffle 92, and at this time, the rod 94 drives the elastic hook 93 to move synchronously. Until the elastic hook 93 presses the side wall of the side flange 7, the locking of the middle flange 6 and the side flange 7 is realized, and the locking and fixing of the locking part 9 are realized at the same time.
The working principle is as follows: when the heating ventilation pipe is installed, the upper ends of the middle pull rod 1 and the side pull rods 2 are fixed on a ceiling, and the side pull rods 2 are distributed on two sides of the middle pull rod 1 at intervals. Then, the side air duct 4 is fixed below the side pull rod 2, and the middle air duct 3 is fixed below the middle pull rod 1. And finally, fixing the side flanges 7 at the two ends of the side air pipes 4 by using the fixing parts 8, and fixing the middle flanges 6 at the two ends of the middle air pipe 3 and the side flanges 7 at the end parts of the side air pipes 4 by using the locking parts 9, so that the whole heating and ventilating air pipe can be installed and fixed.
The specific embodiments are only for explaining the present invention, and the present invention is not limited thereto, and those skilled in the art can make modifications without inventive contribution to the present embodiments as needed after reading the present specification, but all of them are protected by patent law within the scope of the claims of the present invention.

Claims (9)

1. The air pipe for the building heating and ventilation system comprises a vertically arranged middle pull rod (1), wherein a plurality of side pull rods (2) are vertically arranged on two sides of the middle pull rod (1) at intervals, a middle air pipe (3) is horizontally arranged below the middle pull rod (1), a side air pipe (4) is horizontally arranged below the side pull rod (2), and the end parts of the middle air pipe (3) and the side air pipe (4) are sequentially abutted;
the method is characterized in that: the lower end of the side pull rod (2) is horizontally provided with a dovetail-shaped side mounting block (21), the upper end surface of the side air pipe (4) is horizontally provided with a side mounting seat (41), the upper end surface of the side mounting seat (41) is provided with a side groove (42) for the side mounting block (21) to be embedded in, and a pair of side mounting grooves (43) which are respectively communicated with the two ends of the side groove (42) and are used for the side mounting block (21) to be embedded in a sliding manner;
a dovetail-shaped middle mounting block (11) is horizontally arranged at the lower end of the middle pull rod (1), a middle mounting seat (31) is horizontally arranged on the upper end surface of the middle air pipe (3), a middle groove (32) for the middle mounting block (11) to be embedded in and a middle mounting groove (33) which is communicated with the side wall of the middle groove (32) and is used for the middle mounting block (11) to be embedded in a sliding manner are arranged on the upper end surface of the middle mounting seat (31);
the two ends of the middle air pipe (3) are provided with middle flanges (6), the two ends of the side air pipes (4) are provided with side flanges (7), adjacent two fixing parts (8) used for fixing the side flanges (7) are arranged between the side flanges, and locking parts (9) used for locking the side flanges (7) are arranged between the middle flanges (6) and the side flanges (7).
2. The air duct for building heating and ventilating system according to claim 1, wherein: fixed part (8) are including dead lever (81) that a plurality of levels set up, dead lever (81) are located lateral air pipe (4) are kept away from middle tuber pipe (3) on lateral flange (7), dead lever (81) deviate from the one end threaded connection of lateral flange (7) has screw rod (82), screw rod (82) deviate from the one end of dead lever (81) is provided with fixed block (83) of rectangular shape, lateral air pipe (4) are close to middle tuber pipe (3) run through on lateral flange (7) and are equipped with the confession fixed orifices (73) that fixed block (83) were worn to establish, and fixed block (83) are worn to establish fixed orifices (73) and rotatory back, compress tightly the outer wall of lateral flange (7).
3. The air duct for building heating and ventilation system according to claim 2, wherein: the middle flange (6) is provided with a locking hole (62) communicated with the fixing hole (73) in a penetrating manner, the locking part (9) comprises a locking rod (91) which is inserted into the locking hole (62) and the fixing hole (73), one end of the locking rod (91) is provided with a baffle (92) used for pressing the side wall of the middle flange (6), and the other end of the locking rod is provided with a pair of elastic clamping hooks (93) used for pressing the side wall of the side flange (7).
4. The air duct for building heating and ventilation system according to claim 3, wherein: locking lever (91) is including supplying the fixed body of rod (94) of elasticity pothook (93), the body of rod (94) deviates from the one end rotation of elasticity pothook (93) is connected with adjusts pole (95), it has regulation hole (96) to run through on baffle (92), adjust pole (95) threaded connection in adjust hole (96), and adjust pole (95) and deviate from the one end of the body of rod (94) is provided with handle (97).
5. The air duct for building heating and ventilating system according to claim 1, wherein: the middle air pipe (3) comprises a pair of pipe bodies (34), a rubber pipe (35) is arranged between the pair of pipe bodies (34), and two ends of the middle mounting seat (31) are connected with the upper end faces of the pair of pipe bodies (34) in a sliding mode.
6. The air duct for building heating and ventilating system according to claim 1, wherein: the side air pipe (4) is far away from the middle air pipe (3), a circle of sealing ring (71) is arranged on the side flange (7), the flange plate is provided with a sealing groove (72) for embedding the sealing ring (71), and a rubber gasket (61) is arranged between the middle flange (6) and the side flange (7).
7. The air duct for building heating and ventilating system according to claim 1, wherein: the lower end faces of the middle air pipe (3) and the side air pipes (4) are provided with storage boxes (5) communicated with the middle air pipe and the side air pipes.
8. The air duct for building heating and ventilation system according to claim 7, wherein: the storage box is characterized in that a drawer (51) is arranged on the outer wall of the lower end of the storage box (5), and a pressing rod (53) used for pressing the drawer (51) is rotatably arranged on the storage box (5).
9. The air duct for building heating and ventilating system according to claim 8, wherein: the inner wall of the drawer (51) is provided with wet cleaning paper (52).
CN201911088566.3A 2019-11-08 2019-11-08 Air pipe for building heating and ventilation system Active CN110701766B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911088566.3A CN110701766B (en) 2019-11-08 2019-11-08 Air pipe for building heating and ventilation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911088566.3A CN110701766B (en) 2019-11-08 2019-11-08 Air pipe for building heating and ventilation system

Publications (2)

Publication Number Publication Date
CN110701766A CN110701766A (en) 2020-01-17
CN110701766B true CN110701766B (en) 2021-02-19

Family

ID=69205542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911088566.3A Active CN110701766B (en) 2019-11-08 2019-11-08 Air pipe for building heating and ventilation system

Country Status (1)

Country Link
CN (1) CN110701766B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115095940A (en) * 2022-07-06 2022-09-23 安徽天诚环保机械有限公司 Workshop environmental protection production is with ventilation dust device

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5429330A (en) * 1994-02-23 1995-07-04 Refrigeration Specialists, Inc. Duct system and method for assembling same
US6056021A (en) * 1996-05-14 2000-05-02 Jam Kabushiki Kaisha Duct joint structure, assembly tool, duct assembly method and hanger
US8484916B2 (en) * 2001-03-22 2013-07-16 F. Aziz Farag Panel-sealing and securing system
GB2523395A (en) * 2014-02-25 2015-08-26 Cosaf Environments Ltd Duct system
KR101471451B1 (en) * 2014-07-18 2014-12-15 주식회사 수성공조 Slab mounting duct connection sleeve of the building
CN204231176U (en) * 2014-11-11 2015-03-25 广州智光电机有限公司 A kind of integral structure compact high-voltage variable frequency device
CN205448028U (en) * 2016-03-28 2016-08-10 广东美的制冷设备有限公司 Air conditioner indoor unit and air conditioner
CN206246693U (en) * 2016-12-16 2017-06-13 广州市皇佳机电设备有限公司 Airfoil type multipage is to valve opening
CN108895640B (en) * 2018-05-23 2020-05-05 深圳通利机电工程有限公司 Mounting structure and mounting method of central air-conditioning pipeline

Also Published As

Publication number Publication date
CN110701766A (en) 2020-01-17

Similar Documents

Publication Publication Date Title
CN110701766B (en) Air pipe for building heating and ventilation system
CN110409635B (en) Outer wall expansion joint structure and installation method thereof
CN208586849U (en) A kind of precast floor structure
CN107228473A (en) Air filter frame and its control method, air cleaner assembly and air conditioner
CN214019713U (en) Closed air purification device based on oxidation reaction
CN202519835U (en) Temporary fixing device for replaced glass of curtain wall
CN108591653A (en) A kind of flexible walls air pipeline and connection improvement device with interior expansion
CN210950223U (en) Adjustable anti-seismic support
CN219796348U (en) Heating and ventilation pipeline noise reduction installation structure
CN207831509U (en) A kind of fan coil mounting structure
CN208635237U (en) A kind of air-conditioner air outlet removes formaldehyde filter
CN206626768U (en) The permanent building air-conditioning passage of automatically cleaning four
CN220524338U (en) Auxiliary support for installing ventilating duct for negative pressure ward
CN218237640U (en) Central air conditioner air port
CN214469246U (en) Air conditioner vent fixing device
CN220623115U (en) Warm ventilation pipe with butt joint gap seal structure
CN109986930B (en) Water heating heater convenient to dismantle and maintain for pure electric bus
CN217153014U (en) Valve assembly for pipeline connection of civil aircraft
CN216790430U (en) Clean factory building air conditioner device that takes a breath
CN104906960B (en) A kind of continuous newer dynamic film component
CN217434615U (en) Concrete prefabricated component curing means
CN215173035U (en) Fireproof and heat-insulation composite air pipe
CN219062027U (en) Quick mounting structure of warm ventilation blower
CN218955088U (en) Exhaust apparatus with air purification function
CN220852446U (en) Toxin filtering ventilating duct structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant