CN110648423A - Two-dimensional code inspection system for power equipment - Google Patents

Two-dimensional code inspection system for power equipment Download PDF

Info

Publication number
CN110648423A
CN110648423A CN201910999682.4A CN201910999682A CN110648423A CN 110648423 A CN110648423 A CN 110648423A CN 201910999682 A CN201910999682 A CN 201910999682A CN 110648423 A CN110648423 A CN 110648423A
Authority
CN
China
Prior art keywords
information
equipment
dimensional code
inspection
database
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910999682.4A
Other languages
Chinese (zh)
Inventor
邹策策
周涛
李建庭
李晟
冯芳梅
王理
郝雅玄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangquan Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Original Assignee
Yangquan Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangquan Power Supply Co of State Grid Shanxi Electric Power Co Ltd filed Critical Yangquan Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority to CN201910999682.4A priority Critical patent/CN110648423A/en
Publication of CN110648423A publication Critical patent/CN110648423A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C3/00Registering or indicating the condition or the working of machines or other apparatus, other than vehicles
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K7/00Methods or arrangements for sensing record carriers, e.g. for reading patterns
    • G06K7/10Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation
    • G06K7/10544Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation by scanning of the records by radiation in the optical part of the electromagnetic spectrum
    • G06K7/10821Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation by scanning of the records by radiation in the optical part of the electromagnetic spectrum further details of bar or optical code scanning devices

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

The invention relates to the technical field of power equipment, in particular to a two-dimensional code inspection system for power equipment, and aims to solve the technical problems of inconvenience in information query, complicated inspection items, inaccurate inspection record and easiness in missed inspection of the conventional power equipment inspection system. The following technical scheme is adopted: including information management system, information database, two-dimensional code generator and mobile scanning equipment, information management system types equipment relevant information and synchronous to the information database, and the address information that the two-dimensional code generator will record every equipment information generates independent two-dimensional code live code and pastes on corresponding equipment, mobile scanning equipment integration has the information acquisition system, patrols and examines information input system and display device, information acquisition system scans the two-dimensional code and obtains corresponding equipment information and give display device demonstration from the information database through wireless network, it types information and examines and examine information and synchronize to the information database through wireless network to patrol and examine information input system.

Description

Two-dimensional code inspection system for power equipment
Technical Field
The invention relates to the technical field of power equipment, in particular to a two-dimensional code inspection system for power equipment.
Background
Safety production is the important factor of all work of power supply enterprises, and 'zero accident' of power production is the work target pursued by all power supply enterprises. In recent years, the establishment of a large number of intelligent substations brings more pressure and challenges to power transformation operation and maintenance professionals. How to ensure that the operation and maintenance work of the power transformation is all the more in the large environment of the vigorous development of the power grid is a goal that each power transformation operation and maintenance personnel always pursues.
The existing power equipment inspection system has the following defects: 1) outdoor electrical equipment is blown by wind and is exposed to the sun all the year round, the nameplate is extremely easy to rust, and workers need to inquire various data when acquiring basic information of the equipment, so that a large amount of time and energy are wasted; 2) when a transport and maintenance worker discovers equipment abnormity or processes equipment failure, the transport and maintenance worker can timely acquire recent maintenance, test and defect records of the equipment and can assist the worker to quickly find out the reason of the equipment failure, but the worker can only look up paper records or a computer to inquire the information at an office place, so that the time limit for processing the equipment failure is prolonged, and the best opportunity for processing the equipment failure is lost; 3) when an operation and maintenance person patrols equipment, if the equipment problem is found, the found problem can be recorded only by means of character description or dictation of the worker, and the operation and maintenance person is not clear and definite enough and is easy to generate misdiagnosis; 4) the transformer substation power equipment is large in quantity, multiple in type and wide in distribution, and the condition of missing equipment or missing inspection items is easy to occur in the inspection process.
Disclosure of Invention
The invention aims to solve the technical problems of inconvenient equipment information query, complicated inspection items, inaccurate inspection record and easy omission of the conventional power equipment inspection system. Therefore, the invention provides a two-dimensional code inspection system for electrical equipment.
The technical scheme adopted by the invention for solving the technical problems is as follows:
a two-dimensional code inspection system for power equipment comprises an information management system, an information database, a two-dimensional code generator and a mobile scanning device, wherein the information management system inputs relevant information (relevant information is basic machine account information, equipment maintenance and test record and defect information) of the equipment and synchronizes the relevant information to the information database, the two-dimensional code generator generates independent two-dimensional code live codes for recording address information of each piece of equipment information and pastes the two-dimensional code live codes on corresponding equipment, the mobile scanning device is integrated with an information acquisition system, an inspection information input system and a display device, the information acquisition system scans the two-dimensional codes, acquires the corresponding equipment information from the information database through a wireless network and transmits the corresponding equipment information to the display device for display, and the inspection information input system inputs inspection information and synchronizes the inspection information to the information database through the wireless network.
When the device is used for the first time, the related information of the device is input through the information management system and is synchronized to the information database, then the address information for recording the information of each device is generated into an independent two-dimensional code live code through the two-dimensional code generator, and the two-dimensional code live code is pasted on the corresponding device. When the mobile scanning device is used later, an operator holds the mobile scanning device to scan the two-dimensional code live code, information integrated by the two-dimensional code live code is scanned through the information acquisition system, and then the information is transmitted to the display device to be displayed for the operator to check; meanwhile, the inspection personnel can input the pictures or characters of the inspection record through the inspection information input system and then synchronize the pictures or characters to the information database through the wireless network, and because the two-dimensional code alive code is attached to the equipment and the information storage address represents the two-dimensional code alive code, the change of the represented information can be realized on the premise that the two-dimensional code is not changed. In addition, if the equipment is maintained, the operator can input maintenance information through the information management system and synchronize the maintenance information to the information database.
The invention has the beneficial effects that:
1) basic parameter information of the equipment is obtained by scanning codes through the mobile scanning equipment, and the problem that the basic parameter information cannot be obtained in real time due to corrosion of an equipment nameplate or too high position is solved.
2) The equipment maintenance, test and defect record in nearly three years is obtained by scanning codes through the mobile scanning tool, so that the information sharing of relevant personnel such as operation and maintenance, maintenance and the like is achieved, powerful help is provided for the personnel such as operation and maintenance, maintenance and the like to quickly find out the reason of the equipment fault, the query time is saved, and the time limit of equipment fault treatment is shortened.
3) The inspection finds the equipment problem, and the inspection information input system of the mobile scanning tool uploads the site picture and the character description of the equipment with the problem to the information database in real time, so that the inspection is clear and definite, and the misdiagnosis phenomenon is avoided.
(4) Every time when the operation and maintenance personnel inspect the equipment, the record is automatically generated in the system, and after all the inspections are finished, all the equipment are inspected in place by one key, so that the condition that the equipment is omitted in the inspection process due to large quantity, multiple types and wide distribution of the power equipment is avoided.
Drawings
FIG. 1 is a flow chart of the two-dimensional code inspection system of the present invention; .
Detailed Description
Referring to fig. 1, the two-dimensional code inspection system for the power equipment comprises an information management system, an information database, a two-dimensional code generator and a mobile scanning device, wherein the information management system inputs relevant information of the equipment and synchronizes the relevant information to the information database, the two-dimensional code generator generates independent two-dimensional code live codes for recording address information of each piece of equipment and pastes the two-dimensional code live codes on corresponding equipment, the mobile scanning device is integrated with an information acquisition system, an inspection information input system and a display device, the information acquisition system scans the two-dimensional codes to acquire corresponding equipment information from the information database through a wireless network and transmits the corresponding equipment information to the display device for display, and the inspection information input system inputs inspection information and synchronizes the inspection information to the information database through the wireless network. When the device is used for the first time, the related information of the device is input through the information management system and is synchronized to the information database, then the address information for recording the information of each device is generated into an independent two-dimensional code live code through the two-dimensional code generator, and the two-dimensional code live code is pasted on the corresponding device. When the mobile scanning device is used later, an operator holds the mobile scanning device to scan the two-dimensional code live code, information integrated by the two-dimensional code live code is scanned through the information acquisition system, and then the information is transmitted to the display device to be displayed for the operator to check; meanwhile, the inspection personnel can input the pictures or characters of the inspection record through the inspection information input system and then synchronize the pictures or characters to the information database through the wireless network, and because the two-dimensional code alive code is attached to the equipment and the information storage address represents the two-dimensional code alive code, the change of the represented information can be realized on the premise that the two-dimensional code is not changed. In addition, if the equipment is maintained, the operator can input maintenance information through the information management system and synchronize the maintenance information to the information database.
Here, the entry of the device-related information includes two parts:
1) and acquiring basic machine account information of the equipment. The method comprises the steps of manually inquiring a transformer substation device specification and device data records in a PMS2.0 system, pointedly acquiring corresponding information, manufacturing a transformer substation device information database, simply and clearly displaying the information of the device in a form, and then inputting the information through an information management system. 2) Equipment maintenance, test history and defect information acquisition. And (4) arranging the maintenance, test and defect records of the equipment in nearly three years by inquiring the working records of the equipment, and then recording the records by an information management system.
In the using process, the patrol condition of each part of the equipment by the patrol personnel and the record of each maintenance of the maintenance personnel can be input by the information management system.
Furthermore, an information encryption module is embedded in the information management system, and an information decryption module is embedded in the mobile scanning device. Only the inside personnel can enter and check the relevant information of the equipment, and the confidentiality is strong.

Claims (2)

1. Electric power equipment two-dimensional code system of patrolling and examining, its characterized in that: including information management system, information database, two-dimensional code generator and mobile scanning equipment, information management system types equipment relevant information and synchronous to the information database, and the address information that the two-dimensional code generator will record every equipment information generates independent two-dimensional code live code and pastes on corresponding equipment, mobile scanning equipment integration has the information acquisition system, patrols and examines information input system and display device, information acquisition system scans the two-dimensional code and obtains corresponding equipment information and give display device demonstration from the information database through wireless network, it types information and examines and examine information and synchronize to the information database through wireless network to patrol and examine information input system.
2. The two-dimensional code inspection system for electrical equipment according to claim 1, characterized in that: the information management system is embedded with an information encryption module, and the mobile scanning equipment is embedded with an information decryption module.
CN201910999682.4A 2019-10-21 2019-10-21 Two-dimensional code inspection system for power equipment Pending CN110648423A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910999682.4A CN110648423A (en) 2019-10-21 2019-10-21 Two-dimensional code inspection system for power equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910999682.4A CN110648423A (en) 2019-10-21 2019-10-21 Two-dimensional code inspection system for power equipment

Publications (1)

Publication Number Publication Date
CN110648423A true CN110648423A (en) 2020-01-03

Family

ID=69013159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910999682.4A Pending CN110648423A (en) 2019-10-21 2019-10-21 Two-dimensional code inspection system for power equipment

Country Status (1)

Country Link
CN (1) CN110648423A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112364956A (en) * 2020-11-11 2021-02-12 通号通信信息集团有限公司 Method and system for acquiring railway communication equipment information by scanning codes
CN114373244A (en) * 2021-12-06 2022-04-19 中国能源建设集团广东省电力设计研究院有限公司 Electrical equipment management method and device based on code scanning technology
CN115512454A (en) * 2022-06-09 2022-12-23 苏州协鑫新能源运营科技有限公司 Method for manufacturing power station equipment inspection two-dimensional code

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103035041A (en) * 2012-09-29 2013-04-10 万向钱潮股份有限公司 Novel field device inspection system and inspection method thereof
CN104299286A (en) * 2014-08-28 2015-01-21 广东建邦计算机软件有限公司 Attendance method and system for public security inspection tour
CN204926205U (en) * 2015-09-22 2015-12-30 中油阳光物业管理有限公司北京分公司 Removal system of patrolling and examining
CN105809765A (en) * 2016-03-16 2016-07-27 国网福建省电力有限公司 Quick power enterprise operation and maintenance inspection system based on two-dimensional code and mobile phone encryption
CN106384208A (en) * 2016-10-12 2017-02-08 国网江苏省电力公司徐州供电公司 Interactive inspection system and method based on two-dimensional code technology
CN206133688U (en) * 2016-07-05 2017-04-26 华润电力(常熟)有限公司 Equipment inspection two -dimensional code system of power plant

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103035041A (en) * 2012-09-29 2013-04-10 万向钱潮股份有限公司 Novel field device inspection system and inspection method thereof
CN104299286A (en) * 2014-08-28 2015-01-21 广东建邦计算机软件有限公司 Attendance method and system for public security inspection tour
CN204926205U (en) * 2015-09-22 2015-12-30 中油阳光物业管理有限公司北京分公司 Removal system of patrolling and examining
CN105809765A (en) * 2016-03-16 2016-07-27 国网福建省电力有限公司 Quick power enterprise operation and maintenance inspection system based on two-dimensional code and mobile phone encryption
CN206133688U (en) * 2016-07-05 2017-04-26 华润电力(常熟)有限公司 Equipment inspection two -dimensional code system of power plant
CN106384208A (en) * 2016-10-12 2017-02-08 国网江苏省电力公司徐州供电公司 Interactive inspection system and method based on two-dimensional code technology

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112364956A (en) * 2020-11-11 2021-02-12 通号通信信息集团有限公司 Method and system for acquiring railway communication equipment information by scanning codes
CN114373244A (en) * 2021-12-06 2022-04-19 中国能源建设集团广东省电力设计研究院有限公司 Electrical equipment management method and device based on code scanning technology
CN115512454A (en) * 2022-06-09 2022-12-23 苏州协鑫新能源运营科技有限公司 Method for manufacturing power station equipment inspection two-dimensional code

Similar Documents

Publication Publication Date Title
CN110648423A (en) Two-dimensional code inspection system for power equipment
CN107169546A (en) A kind of power construction managing security tools and instruments management method and system based on Quick Response Code
CN110865917A (en) AR technology-based electric power machine room inspection operation method, system and application
CN110108955B (en) New energy grid-connected performance automatic test analysis platform and detection method
CN107481349A (en) A kind of station method for inspecting and its cruising inspection system
CN110648422A (en) Standardized inspection method, system and platform
CN110390372B (en) Circuit inspection method and system based on dynamic random two-dimensional code and holographic projection technology
CN111612646A (en) Networked intelligent secondary operation and maintenance system
CN203217621U (en) On-site comprehensive maintenance system of electrical equipment for distribution network
CN111062504A (en) AR technology-based intelligent power distribution station operation and maintenance system and method
CN104376495A (en) Wireless monitoring system and method for coal mine electromechanical device overhauling
CN111027874A (en) Intelligent management system and method for substation tools
CN110796754A (en) Machine room inspection method based on image processing technology
CN111625735A (en) Method for displaying active operation and inspection in moving direction visualization mode by using secondary equipment of intelligent substation
CN204069172U (en) Live detection integrated system
CN103065213A (en) Converting station standardization inspection and acceptance auxiliary method based on workflow engine
CN107818607A (en) A kind of intelligent inspection system based on NFC Handheld data collectors
CN114274143A (en) Intelligent identification method for centralized control operation defect image of intelligent robot group in thermal power plant
CN206975693U (en) A kind of equipment management system
CN109165753B (en) Transformer substation defect management method based on mobile platform
CN115880803A (en) Intelligent inspection system and method
CN114049697B (en) Inspection auxiliary system
CN214475165U (en) Intelligent inspection system of thermal power plant equipment
CN114913421A (en) Image identification method and device for remote inspection application of intelligent power distribution room and storage medium
CN210042026U (en) Electric power safety inspection monitoring tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200103