CN110639960B - Full-automatic hot rolling steel drawing method - Google Patents

Full-automatic hot rolling steel drawing method Download PDF

Info

Publication number
CN110639960B
CN110639960B CN201810678560.0A CN201810678560A CN110639960B CN 110639960 B CN110639960 B CN 110639960B CN 201810678560 A CN201810678560 A CN 201810678560A CN 110639960 B CN110639960 B CN 110639960B
Authority
CN
China
Prior art keywords
steel
finish rolling
time
rolling
acceleration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810678560.0A
Other languages
Chinese (zh)
Other versions
CN110639960A (en
Inventor
谭耘宇
董刚
赖森贞
周心富
陈晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Meishan Iron and Steel Co Ltd
Original Assignee
Shanghai Meishan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Meishan Iron and Steel Co Ltd filed Critical Shanghai Meishan Iron and Steel Co Ltd
Priority to CN201810678560.0A priority Critical patent/CN110639960B/en
Publication of CN110639960A publication Critical patent/CN110639960A/en
Application granted granted Critical
Publication of CN110639960B publication Critical patent/CN110639960B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B2201/00Special rolling modes
    • B21B2201/06Thermomechanical rolling

Abstract

The invention relates to a hot rolling full-automatic steel drawing method, and belongs to the technical field of strip steel rolling. The method comprises the steps of establishing a relation table corresponding to different strip steel specifications and finish rolling threading speed, finish rolling pure rolling time, finish rolling gap time and manual correction according to historical data, firstly searching whether data of strip steel with the same specification exist in the relation table, if so, directly controlling steel pumping rhythm by using historical data values in the relation table, otherwise, obtaining the finish rolling pure rolling time of the strip steel with the specification through calculation, controlling the steel pumping rhythm through preset finish rolling gap time and manual correction, and simultaneously storing the calculated steel pumping rhythm in the relation table. The invention can improve the precision of the control of the steel drawing rhythm and effectively prevent the influence on the rolling yield and the product quality due to the unstable rhythm.

Description

Full-automatic hot rolling steel drawing method
Technical Field
The invention relates to a hot rolling full-automatic steel drawing method, and belongs to the technical field of strip steel rolling.
Background
At present, in the large environment of intelligent manufacturing, domestic hot rolling systems strive to improve the respective automation level. In the aspect of hot rolling and steel drawing, a control method for fixing the steel drawing rhythm is mainly adopted at home and abroad. This method has the following problems: (1) the size of the slab varies in actual production, and the finish rolling time of the strip also varies. (2) In actual production, the tapping temperature of the plate blank is not fixed, and the finish rolling inlet temperature is changed, so that the finish rolling speed of the strip steel is changed, and the finish rolling time of the strip steel is changed. (3) In actual production, the process requirements of the same specification strip steel may also change, such as: and (4) finishing temperature. This also causes variations in the finish rolling speed, resulting in variations in the finish pure rolling time of the strip. Because the finish rolling time of the strip steel is changed, the rolling rhythm is also changed, and if the fixed rhythm control is adopted, the strip steel swings on a rolling line, so that the normal rolling of products and the product quality are influenced.
Through the search of the applicant, the Chinese invention patent with the patent number of CN201010209031.X discloses an equal-gap steel rolling control method, which is mainly characterized in that a heating furnace for next steel drawing is determined by adopting the minimum waiting time principle according to the actual interval time of two adjacent plate blanks reaching a rough rolling inlet rolling mill; the invention patent with the patent number CN201210565180.9 discloses a method for dynamically predicting the shortest in-furnace time of a plate blank in a hot rolling heating furnace model, which mainly calculates the residual in-furnace time; the invention discloses a steel drawing control method and device (CN201510869573.2) of a hot rolling production line, relates to a steel drawing control method and device of a hot rolling production line, and is used for acquiring the experience running time of each process flow on the hot rolling production line and preferably selecting the steel drawing time by monitoring a control signal of the hot rolling production line. However, the above methods cannot accurately control the steel drawing rhythm of the strip steel.
Disclosure of Invention
The invention aims to solve the technical problems that: the method for improving the precision of the steel drawing rhythm control and effectively preventing the influence on the rolling yield and the product quality due to the unstable rhythm is provided.
In order to solve the technical problems, the technical scheme provided by the invention is as follows: a hot rolling full-automatic steel extraction method is characterized in that a slab comprises five stages including a strip threading speed stage, a first acceleration stage, a second acceleration stage, a highest speed stage and a deceleration stage from steel biting of a finish rolling inlet rack to steel throwing of a strip steel of an outlet rack; the method comprises the following steps:
step one, establishing a relation table of relations between different strip steel specifications and a finish rolling threading speed, an artificial correction amount, finish rolling pure rolling time and finish rolling gap time by utilizing historical data according to the length, the strength, the thickness and the width of a plate blank and the target thickness and the target width of strip steel; the specification of the strip steel comprises the length, the strength, the thickness and the width of a plate blank, and the target thickness and the target width of the strip steel;
step two, according to the length L1, the strength, the thickness H1, the width W1 of the plate blank, the target thickness H and the target width W of the strip steel, the finish rolling pure rolling time T and the finish rolling gap time T corresponding to the specification of the strip steel are searched from a relation tableGIf the finish pure rolling time T and the finish rolling which correspond to the strip steel specification are foundSystem gap time TGAnd the manual correction amount TOPThen executing step eight;
otherwise, executing the step three;
step three, calculating the length L of a finish rolling outlet of the strip steel, (L1H 1W 1)/(H W);
the finish rolling threading speed and the outlet thickness H of each rack are set according to the strip steeliDetermining the speed S of each stand of the strip steel finish rollingiWherein i is 1, 2,. 7; and calculating the length L of the strip steel from the biting of the finish rolling inlet frame F1 to the biting of the finish rolling outlet frame F70
Figure BDA0001709869860000021
Wherein D0Is the distance between adjacent frames;
step four, calculating the time T from the steel biting of the rolling inlet frame F1 to the steel biting of the finish rolling outlet frame F70
Figure BDA0001709869860000022
Step five, obtaining a first acceleration A of the strip steel of the specification according to the finish rolling speed schedule and the finish rolling threading speed1A second acceleration A2Deceleration A3Maximum speed SmAnd the steel throwing speed StAnd respectively calculating the lengths of the threading speed section, the first acceleration section, the second acceleration section, the highest speed section and the deceleration section:
wherein the length of the threading speed section is fixed to LtThe length of the first acceleration zone is the fixed distance from the finish rolling outlet stand to the coiler and is defined as L1
Calculating the speed of the strip steel when the strip steel is coiled
Figure BDA0001709869860000023
Obtaining:
the second acceleration section has a length L2=(Sm 2-Sc 2)/(2*A2);
Length L of deceleration section3=(Sm 2-St 2)/(2*A3);
Length L of maximum speed segmentm=L-(Lt+L1+L2+L3);
Sixthly, according to the length L of the steel strip from the biting of the finish rolling inlet frame F1 to the biting of the finish rolling outlet frame F70Calculating the finish rolling pure rolling time T according to four conditions:
1) if (L)3-L0)>0 and Lm>0, after the strip is threaded in the finish rolling, firstly carrying out first acceleration to coiling and biting steel, then carrying out second acceleration to the highest speed, then decelerating to the steel throwing speed, and throwing steel at a finish rolling inlet rack of a deceleration section, wherein at the moment:
threading speed segment time Tt=Lt/S7
First acceleration period T1=(Sc-S7)/A1
Time T of the second acceleration period2=(Sm-Sc)/A2
Time T of maximum speed section3=Lm/SmAnd an
Time of deceleration section
Figure BDA0001709869860000024
Therefore, the finish rolling pure rolling time T is Tt+T0+T1+T2+T3+T4
2) Otherwise, if L- (L)0+Lt+L1+L2) If the speed is more than 0, after the strip is finished and threaded, firstly carrying out first acceleration to coiling and biting steel, then carrying out second acceleration to the highest speed or steel throwing speed, and throwing steel at a finish rolling inlet rack in the highest speed section or steel throwing speed section, wherein at the moment:
threading speed segment time Tt=Lt/S7
First acceleration period T1=(Sc-S7)/A1
Time T of the second acceleration period2=(Sm-Sc)/A2And an
Time T of maximum speed section3=(Lm-L0)/Sm
Therefore, the finish rolling pure rolling time T is Tt+T0+T1+T2+T3
3) Otherwise, if L- (L)0+Lt+L1) And if the speed is more than 0, after the strip is threaded in the finish rolling, firstly carrying out first acceleration to coiling and biting steel, then carrying out second acceleration to throwing steel speed, and throwing steel at a finish rolling inlet rack of a second acceleration section, wherein at the moment:
threading speed segment time Tt=Lt/S7
First acceleration period T1=(Sc-S7)/A1
Recalculating second acceleration segment length L2 ═ L- (L)t+L1),
Time of the second acceleration period
Figure BDA0001709869860000031
Therefore, the finish rolling pure rolling time T is Tt+T0+T1+T2
4) Otherwise, if L- (L)0+Lt) Greater than 0, then the finish rolling is worn to take the back, carries out first acceleration earlier to throwing steel speed, throws steel at first acceleration section finish rolling entry frame, this moment:
threading speed segment time Tt=Lt/S7
Recalculating the first acceleration segment length L1=L-Lt
First acceleration period
Figure BDA0001709869860000032
Therefore, the finish rolling pure rolling time T is Tt+T0+T1
Seventhly, matching the specification of the strip steel with the corresponding finish rolling threading speed, finish rolling pure rolling time T and finish rolling gap time TGAnd the manual correction amount TOPStoring in a relational table in which a finish rolling gap time TGAnd the manual correction amount TOPIs a preset value;
step eight, calculating the steel drawing rhythm TGAP=T+TG+TOPThen, the steel drawing action of the next piece of steel is determined according to the rhythm.
According to the invention, because the steel drawing rhythm of the strip steel is carried out according to the actual condition of the strip steel, different strip steel specifications, finish rolling threading speed, finish rolling pure rolling time T and finish rolling gap time T are established according to historical dataGAnd the manual correction amount TOPThe corresponding relation table is used for searching whether the data of the strip steel with the same specification exist or not from the relation table, if so, the historical data value in the relation table is directly used for controlling the steel drawing rhythm, otherwise, the finish rolling pure rolling time of the strip steel with the specification is obtained through calculation, and the preset finish rolling gap time T is passedGAnd the manual correction amount TOPAnd controlling the steel drawing rhythm, and storing the calculated steel drawing rhythm into a relation table. According to the invention, related equipment is not required to be added, and the steel drawing rhythm of the strip steel can be forecasted and controlled by accurately calculating the finish rolling pure rolling time in real time according to the data of the size, the speed and the like of the strip steel. Compared with a fixed rhythm, the invention greatly improves the precision of the control of the steel drawing rhythm and effectively prevents the influence on the rolling yield and the product quality due to the unstable rhythm.
The invention considers the intervention of operators in the calculation of the steel drawing rhythm, so that the steel drawing rhythm can more quickly approach the actual situation of the site. Of course, the manual correction T can be takenOPAnd (4) the process is 0, so that manual intervention is avoided, and the steel drawing rhythm can be automatically controlled.
In order to improve the precision of calculating the finish rolling pure rolling time, the technical scheme is further improved as follows: obtaining the steel biting time T of a finish rolling inlet frame according to the measurement of each strip steelF1ONAnd the steel throwing time T of the strip steel finish rolling outlet frameF1OFFAnd calculating the actual pure rolling time of the strip steel:
Ta=TF1OFF-TF1ON
actual pure rolling time TaAnd the deviation value delta T between the finish rolling pure rolling time T obtained by calculation in the step six is as follows:
ΔT=T-Ta
calculating the optimized value T of the finish rolling pure rolling time according to the deviation value delta TOFF
TOFF=ΔT*g,
Wherein g is a preset correction coefficient between 0 and 1.
In order to prevent the strip steel from swinging due to coiling and gear shifting, the technical scheme is further improved as follows: step eight, according to the current thickness H of the strip steelCThickness H of front piece strip steelPAnd shift thickness HDCCalculating whether a gear shift is required:
if ((H)P-HDC)*(HC-HDC) ) is greater than or equal to 0, no gear shift is required; otherwise, gear shifting is needed, and the steel clearance time T in the eight steps is adjusted at the momentGComprises the following steps:
TG=TG+TDC
wherein, TDCThe backlash compensation time for the crimp shift is a preset value.
Drawings
The invention will be further explained with reference to the drawings.
FIG. 1 is a schematic diagram of the complete process from steel biting of an inlet rack to steel throwing of an outlet rack in finish rolling.
FIG. 2 is a schematic diagram of a process from steel biting of a finish rolling inlet frame to steel throwing of an outlet frame in an embodiment of the invention.
FIG. 3 is a second schematic diagram of the process from the finish rolling inlet frame biting to the outlet frame throwing in the embodiment of the present invention.
FIG. 4 is a third schematic diagram of the process from steel biting of the finish rolling inlet frame to steel throwing of the outlet frame in the embodiment of the invention.
FIG. 5 is a fourth schematic diagram of the process from the steel biting of the finish rolling inlet frame to the steel throwing of the outlet frame in the embodiment of the invention.
Detailed Description
Examples
In the embodiment, the steel strip throwing from the steel biting of the finish rolling inlet frame to the steel strip throwing of the outlet frame comprises five stages as shown in figure 1, namely a strip threading speed stage, a first acceleration stage, a second acceleration stage, a highest speed stage and a deceleration stage.
The hot rolling full-automatic steel drawing method comprises the following steps:
step one, establishing a relation table of relations between different strip steel specifications and a finish rolling threading speed, an artificial correction amount, finish rolling pure rolling time and finish rolling gap time by utilizing historical data according to the length, the strength, the thickness and the width of a plate blank and the target thickness and the target width of strip steel; the specification of the strip steel comprises the length, the strength, the thickness and the width of a plate blank, and the target thickness and the target width of the strip steel;
step two, according to the length L1, the strength, the thickness H1, the width W1 of the plate blank, the target thickness H and the target width W of the strip steel, the finish rolling pure rolling time T and the finish rolling gap time T corresponding to the specification of the strip steel are searched from a relation tableGIf the finish rolling pure rolling time T and the finish rolling gap time T corresponding to the strip steel specification are foundGAnd the manual correction amount TOPThen executing step eight;
otherwise, executing the step three;
step three, calculating the length L of a finish rolling outlet of the strip steel, (L1H 1W 1)/(H W);
the finish rolling threading speed and the outlet thickness H of each rack are set according to the strip steeliDetermining the speed S of each stand of the strip steel finish rollingiWherein i is 1, 2,. 7; and calculating the length L of the strip steel from the biting of the finish rolling inlet frame F1 to the biting of the finish rolling outlet frame F70
Figure BDA0001709869860000051
Wherein D0Is the distance between adjacent frames;
step four, calculating the time T from the steel biting of the rolling inlet frame F1 to the steel biting of the finish rolling outlet frame F70
Figure BDA0001709869860000052
Step five, obtaining a first acceleration A of the strip steel of the specification according to the finish rolling speed schedule and the finish rolling threading speed1A second acceleration A2Deceleration A3Maximum speed SmAnd the steel throwing speed StAnd respectively calculating the lengths of the threading speed section, the first acceleration section, the second acceleration section, the highest speed section and the deceleration section:
wherein the length of the threading speed section is fixed to LtThe length of the first acceleration zone is the fixed distance from the finish rolling outlet stand to the coiler and is defined as L1
Calculating the speed of the strip steel when the strip steel is coiled
Figure BDA0001709869860000053
Obtaining:
the second acceleration section has a length L2=(Sm 2-Sc 2)/(2*A2);
Length L of deceleration section3=(Sm 2-St 2)/(2*A3);
Length L of maximum speed segmentm=L-(Lt+L1+L2+L3);
Sixthly, according to the length L of the steel strip from the biting of the finish rolling inlet frame F1 to the biting of the finish rolling outlet frame F70Calculating the finish rolling pure rolling time T according to four conditions:
1) if (L)3-L0)>0 and Lm>0, after finishing rolling threading, firstly performing a first acceleration to coiling and biting steel, then performing a second acceleration to a maximum speed, then decelerating to a steel throwing speed, and throwing steel at a finishing rolling inlet rack of a deceleration section as shown in fig. 2, wherein:
threading speed segment time Tt=Lt/S7
First acceleration period T1=(Sc-S7)/A1
Time T of the second acceleration period2=(Sm-Sc)/A2
Time T of maximum speed section3=Lm/SmAnd an
Time of deceleration section
Figure BDA0001709869860000061
Therefore, the finish rolling pure rolling time T is Tt+T0+T1+T2+T3+T4
2) Otherwise, if L- (L)0+Lt+L1+L2) If the speed is more than 0, after the strip is finish rolled, as shown in fig. 3, firstly carrying out a first acceleration to coiling and biting steel, then carrying out a second acceleration to a highest speed or a steel throwing speed, and throwing steel at a finish rolling inlet rack in a highest speed section or a steel throwing speed section, wherein:
threading speed segment time Tt=Lt/S7
First acceleration period T1=(Sc-S7)/A1
Time T of the second acceleration period2=(Sm-Sc)/A2And an
Time T of maximum speed section3=(Lm-L0)/Sm
Therefore, the finish rolling pure rolling time T is Tt+T0+T1+T2+T3
3) Otherwise, if L- (L)0+Lt+L1) If the speed is more than 0, after the strip is finish rolled, as shown in fig. 4, the first acceleration to coiling steel biting is firstly carried out, then the second acceleration to steel throwing speed is carried out, and steel throwing is carried out on a finish rolling inlet rack in a second acceleration section, wherein:
threading speed segment time Tt=Lt/S7
First acceleration period T1=(Sc-S7)/A1
Recalculating second acceleration segment length L2 ═ L- (L)t+L1),
Time of the second acceleration period
Figure BDA0001709869860000062
Therefore, the finish rolling pure rolling time T is Tt+T0+T1+T2
4) Otherwise, if L- (L)0+Lt) If the acceleration is more than 0, after the strip is finish rolled, as shown in fig. 5, the first acceleration is carried out to the steel throwing speed, and steel is thrown at the finish rolling inlet rack in the first acceleration section, at the moment:
threading speed segment time Tt=Lt/S7
Recalculating the first acceleration segment length L1=L-Lt
First acceleration period
Figure BDA0001709869860000071
Therefore, the finish rolling pure rolling time T is Tt+T0+T1
Seventhly, matching the specification of the strip steel with the corresponding finish rolling threading speed, finish rolling pure rolling time T and finish rolling gap time TGAnd the manual correction amount TOPStoring in a relational table in which a finish rolling gap time TGAnd the manual correction amount TOPIs a preset value;
step eight, calculating the steel drawing rhythm TGAP=T+TG+TOPThen, the steel drawing action of the next piece of steel is determined according to the rhythm.
The embodiment can be further modified as follows: (1) in order to improve the precision of calculating the finish rolling pure rolling time, the steel biting time T of a finish rolling inlet frame is measured according to each strip steelF1ONAnd the steel throwing time T of the strip steel finish rolling outlet frameF1OFFCalculating the bandActual pure rolling time of steel:
Ta=TF1OFF-TF1ON
actual pure rolling time TaAnd the deviation value delta T between the finish rolling pure rolling time T obtained by calculation in the step six is as follows:
ΔT=T-Ta
calculating the optimized value T of the finish rolling pure rolling time according to the deviation value delta TOFF
TOFF=ΔT*g,
Wherein g is a preset correction coefficient between 0 and 1.
(2) In order to prevent the strip steel from swinging due to coiling gear shifting, in step eight, according to the current thickness H of the strip steelCThickness H of front piece strip steelPAnd shift thickness HDCCalculating whether a gear shift is required:
if ((H)P-HDC)*(HC-HDC) ) is greater than or equal to 0, no gear shift is required; otherwise, gear shifting is needed, and the steel clearance time T in the eight steps is adjusted at the momentGComprises the following steps:
TG=TG+TDC
wherein, TDCThe backlash compensation time for the crimp shift is a preset value.
(3) And dynamically adjusting the finish rolling pure rolling time of the plate blank in the furnace according to the condition of the rolled strip steel.
And recording the finish rolling threading speed threeadspd 2 used by the current strip steel during steel loading. And reading the finish rolling threading speed threeadspd used by the steel strip specification stored in the relation table. Comparing the threadppd with the threadppd 2, if not, recalculating the finish pure rolling time of the strip steel, and updating the finish pure rolling time and the finish threading speed in the relation table.
The present invention is not limited to the above embodiments, and the technical solutions of the above embodiments of the present invention may be combined with each other in a crossing manner to form a new technical solution, and all technical solutions formed by adopting equivalent substitutions fall within the protection scope of the present invention.

Claims (3)

1. A hot rolling full-automatic steel extraction method is characterized in that a slab comprises five stages including a strip threading speed stage, a first acceleration stage, a second acceleration stage, a highest speed stage and a deceleration stage from steel biting of a finish rolling inlet rack to steel throwing of a strip steel of an outlet rack; characterized in that the method comprises the following steps:
step one, establishing a relation table of relations between different strip steel specifications and a finish rolling threading speed, an artificial correction amount, finish rolling pure rolling time and finish rolling gap time by utilizing historical data according to the length, the strength, the thickness and the width of a plate blank and the target thickness and the target width of strip steel;
step two, according to the length L1, the strength, the thickness H1, the width W1 of the plate blank, the target thickness H and the target width W of the strip steel, the finish rolling pure rolling time T and the finish rolling gap time T corresponding to the specification of the strip steel are searched from a relation tableGIf the finish rolling pure rolling time T and the finish rolling gap time T corresponding to the strip steel specification are foundGAnd the manual correction amount TOPThen executing step eight;
otherwise, executing the step three;
step three, calculating the length L of a finish rolling outlet of the strip steel, (L1H 1W 1)/(H W);
the finish rolling threading speed and the outlet thickness H of each rack are set according to the strip steeliDetermining the speed S of each stand of the strip steel finish rollingiWherein i is 1, 2,. 7; and calculating the length L of the strip steel from the biting of the finish rolling inlet frame F1 to the biting of the finish rolling outlet frame F70
Figure FDA0002668748010000011
Wherein D0Is the distance between adjacent frames;
step four, calculating the time T from the steel biting of the finish rolling inlet frame F1 to the steel biting of the finish rolling outlet frame F70
Figure FDA0002668748010000012
Step five, obtaining a first acceleration A of the strip steel with the current specification according to the finish rolling speed schedule and the finish rolling threading speed1A second acceleration A2Deceleration A3Maximum speed SmAnd the steel throwing speed StAnd calculating the lengths of the five stages:
wherein the length of the threading speed section is fixed to LtThe length of the first acceleration zone is the fixed distance from the finish rolling outlet stand to the coiler and is defined as L1
Calculating the speed of the strip steel when the strip steel is coiled
Figure FDA0002668748010000013
Obtaining:
the second acceleration section has a length L2=(Sm 2-Sc 2)/(2*A2);
Length L of deceleration section3=(Sm 2-St 2)/(2*A3);
Length L of maximum speed segmentm=L-(Lt+L1+L2+L3);
Sixthly, according to the length L of the steel strip from the biting of the finish rolling inlet frame F1 to the biting of the finish rolling outlet frame F70Calculating the finish rolling pure rolling time T according to four conditions:
1) if (L)3-L0)>0 and Lm>0, after the strip is threaded in the finish rolling, firstly carrying out first acceleration to coiling and biting steel, then carrying out second acceleration to the highest speed, then decelerating to the steel throwing speed, and throwing steel at a finish rolling inlet rack of a deceleration section, wherein at the moment:
threading speed segment time Tt=Lt/S7
First acceleration period T1=(Sc-S7)/A1
Time T of the second acceleration period2=(Sm-Sc)/A2
Time T of maximum speed section3=Lm/SmTo do so byAnd
time of deceleration section
Figure FDA0002668748010000021
Therefore, the finish rolling pure rolling time T is Tt+T0+T1+T2+T3+T4
2) Otherwise, if L- (L)0+Lt+L1+L2) If the speed is more than 0, after the strip is finished and threaded, firstly carrying out first acceleration to coiling and biting steel, then carrying out second acceleration to the highest speed or steel throwing speed, and throwing steel at a finish rolling inlet rack in the highest speed section or steel throwing speed section, wherein at the moment:
threading speed segment time Tt=Lt/S7
First acceleration period T1=(Sc-S7)/A1
Time T of the second acceleration period2=(Sm-Sc)/A2And an
Time T of maximum speed section3=(Lm-L0)/Sm
Therefore, the finish rolling pure rolling time T is Tt+T0+T1+T2+T3
3) Otherwise, if L- (L)0+Lt+L1) And if the speed is more than 0, after the strip is threaded in the finish rolling, firstly carrying out first acceleration to coiling and biting steel, then carrying out second acceleration to throwing steel speed, and throwing steel at a finish rolling inlet rack of a second acceleration section, wherein at the moment:
threading speed segment time Tt=Lt/S7
First acceleration period T1=(Sc-S7)/A1
Recalculating second acceleration segment length L2 ═ L- (L)t+L1),
Time of the second acceleration period
Figure FDA0002668748010000022
Therefore, the finish rolling pure rolling time T is Tt+T0+T1+T2
4) Otherwise, if L- (L)0+Lt) Greater than 0, then the finish rolling is worn to take the back, carries out first acceleration earlier to throwing steel speed, throws steel at first acceleration section finish rolling entry frame, this moment:
threading speed segment time Tt=Lt/S7
Recalculating the first acceleration segment length L1=L-Lt
First acceleration period
Figure FDA0002668748010000023
Therefore, the finish rolling pure rolling time T is Tt+T0+T1
Seventhly, matching the specification of the strip steel with the corresponding finish rolling threading speed, finish rolling pure rolling time T and finish rolling gap time TGAnd the manual correction amount TOPStored in a relational table in which the finish rolling gap time TGAnd the manual correction amount TOPIs a preset value;
step eight, calculating the steel drawing rhythm TGAP=T+TG+TOPThen, the steel drawing action of the next piece of steel is determined according to the rhythm.
2. The hot-rolled full-automatic steel drawing method according to claim 1, characterized in that: obtaining the steel biting time T of a finish rolling inlet frame according to the measurement of each strip steelF1ONAnd the steel throwing time T of the strip steel finish rolling outlet frameF1OFFAnd calculating the actual pure rolling time of the strip steel:
Ta=TF1OFF-TF1ON
actual pure rolling time TaAnd the deviation value delta T between the finish rolling pure rolling time T obtained by the calculation in the step six is as follows:
△T=T-Ta
calculating the optimized value T of finish rolling pure rolling time according to the deviation value delta TOFF
TOFF=△T*g,
Wherein g is a preset correction coefficient between 0 and 1;
in the sixth step, the value T is optimized according to the finish rolling pure rolling timeOFFTo optimize the finish rolling pure rolling time T, i.e. in the eighth step, the steel drawing rhythm TGAP=T+TG+TOFF
3. The hot-rolled full-automatic steel drawing method according to claim 1, characterized in that: step eight, according to the current thickness H of the strip steelCThickness H of front piece strip steelPAnd shift thickness HDCCalculating whether a gear shift is required:
if ((H)P-HDC)*(HC-HDC) ) is greater than or equal to 0, no gear shift is required; otherwise, gear shifting is needed, and the steel clearance time T in the eight steps is adjusted at the momentGComprises the following steps:
TG=TG+TDC
wherein, TDCThe backlash compensation time for the crimp shift is a preset value.
CN201810678560.0A 2018-06-27 2018-06-27 Full-automatic hot rolling steel drawing method Active CN110639960B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810678560.0A CN110639960B (en) 2018-06-27 2018-06-27 Full-automatic hot rolling steel drawing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810678560.0A CN110639960B (en) 2018-06-27 2018-06-27 Full-automatic hot rolling steel drawing method

Publications (2)

Publication Number Publication Date
CN110639960A CN110639960A (en) 2020-01-03
CN110639960B true CN110639960B (en) 2020-12-08

Family

ID=69009170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810678560.0A Active CN110639960B (en) 2018-06-27 2018-06-27 Full-automatic hot rolling steel drawing method

Country Status (1)

Country Link
CN (1) CN110639960B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113798320B (en) * 2021-08-19 2023-10-31 武汉钢铁有限公司 Strip steel finish rolling speed control method and system
CN114042764A (en) * 2021-11-16 2022-02-15 重庆钢铁股份有限公司 Method and system for estimating yield of hot rolling production line

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3341658B2 (en) * 1997-12-01 2002-11-05 住友金属工業株式会社 Control method of rolling mill
US6185972B1 (en) * 1999-03-11 2001-02-13 Morgan Construction Company Rolling mill finishing section
CN103170506B (en) * 2011-12-20 2015-04-22 上海梅山钢铁股份有限公司 Hot rolling and finish rolling multi-level threading speed control method
CN103882221B (en) * 2012-12-24 2016-04-13 上海梅山钢铁股份有限公司 The method of the shortest time inside furnace of dynamic prediction slab in hot-rolling heating furnace model
CN105396878B (en) * 2015-12-02 2017-05-10 张家港浦项不锈钢有限公司 Steel drawing control method and device for hot rolling production line
CN106925614B (en) * 2017-03-29 2018-12-14 首钢京唐钢铁联合有限责任公司 A kind of hot-strip finishing temperature control method adjusted based on speed

Also Published As

Publication number Publication date
CN110639960A (en) 2020-01-03

Similar Documents

Publication Publication Date Title
CN105728459B (en) A kind of method of conventional hot continuous rolling machine unit production TA18 Ti Alloy Strip volumes
CN105834225B (en) The method for controlling thickness and control system of cold continuous rolling dynamic variable specification rolling
CN110639960B (en) Full-automatic hot rolling steel drawing method
CN110434172B (en) Load distribution calculation method for continuous rolling of furnace coil and finishing mill group
CN109926453B (en) Method for determining acceleration and deceleration rolling efficiency coefficient of single-stand reversible cold rolling mill
CN104841701B (en) Method for controlling sheet coiling temperature during large-deceleration rolling of hot-rolled strip steel
CN107971351A (en) Process units and production method for steel pipe on-line cooling
CN111375636B (en) Automatic tapping identification method based on rolling process parameter analysis
CN109663815A (en) A kind of control method and system for taking out steel automatically during hot rolling
CN106914495A (en) A kind of hot-strip camber control method and system
CN113351651B (en) Hot-rolling line full-automatic heating furnace tapping control method based on big data analysis
US20080135203A1 (en) Continuous Casting and Rolling Installation For Producing a Steel Strip
US20230203612A1 (en) Method for the open-loop or closed-loop control of the temperature of a steel strip during hot working in a hot strip mill
CN113649411B (en) Rod wire material and heating-free direct rolling method and industrial control equipment thereof
CN108543814B (en) Control method for strip steel finish rolling temperature
RU2752518C1 (en) Method for operating the annealing furnace
KR20030053621A (en) Hot strip cooling control mothode for chage target temperature
CN107971344A (en) The Basic automation control system and control method of steel pipe on-line cooling
CN110508629B (en) Method for eliminating defects of landscape painting on surface of low-carbon aluminum killed steel after acid pickling
KR102045651B1 (en) Estimating apparatus for heat flux coefficient of run-out table based artificial intelligence
CN108405634B (en) Method for increasing temperature drop in slab process
KR102045652B1 (en) Determination apparatus for heat flux coefficient of run-out table based artificial intelligence
KR101050792B1 (en) Cooling Control Method Using Dynamic Reset
CN111558615A (en) Method for controlling finish rolling pressure of titanium plate on hot continuous rolling line
JPS5997705A (en) Continuous rolling method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant