CN110611286A - 一种海洋工程电力电缆系统及其布置方法 - Google Patents
一种海洋工程电力电缆系统及其布置方法 Download PDFInfo
- Publication number
- CN110611286A CN110611286A CN201911046147.3A CN201911046147A CN110611286A CN 110611286 A CN110611286 A CN 110611286A CN 201911046147 A CN201911046147 A CN 201911046147A CN 110611286 A CN110611286 A CN 110611286A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- power cable
- construction
- line
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G9/00—Installations of electric cables or lines in or on the ground or water
- H02G9/02—Installations of electric cables or lines in or on the ground or water laid directly in or on the ground, river-bed or sea-bottom; Coverings therefor, e.g. tile
Landscapes
- Pipeline Systems (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
本发明提供一种海洋工程电力电缆系统及其布置方法,涉及电力电缆布置技术领域。该海洋工程电力电缆系统及其布置方法,包括检测设备、安装设备、牵引设备、挖掘设备、施工管道、接线盒、分线盘,所述检测设备包括线路勘查装置、线路检测装置、密封性检查装置与电缆维护装置,所述安装设备包括管道托运装置、管道移动装置、管道焊接装置、管道固定装置与排水装置。通过将电力电缆设置在施工管道中,然后将施工管道填埋在海底并固定起来,保证了管道的稳定性,使得海洋中浅水区域的电力电缆不易受到渔船等海上作业设施破坏,并且电力电缆长期在海底不会受到腐蚀,而且也不会受到海底物体的碰撞干扰,保证了电力电缆的稳定传输。
Description
技术领域
本发明涉及电力电缆布置技术领域,具体为一种海洋工程电力电缆系统及其布置方法。
背景技术
电力电缆是用于传输和分配电能的电缆,电力电缆常用于城市地下电网、发电站引出线路、工矿企业内部供电及过江海水下输电线,在电力线路中,电缆所占比重正逐渐增加,电力电缆是在电力系统的主干线路中用以传输和分配大功率电能的电缆产品,包括1-500KV以及以上各种电压等级,各种绝缘的电力电缆,按电压等级可分为中、低压电力电缆(35千伏及以下)、高压电缆(110千伏以上)、超高压电缆(275~800千伏)以及特高压电缆(1000千伏及以上),此外,还可按电流制分为交流电缆和直流电缆。
目前,海洋工程电力电缆系统的铺设越来越多,电力电缆经过海洋铺设可以有效的缩短铺设距离,但同时在海洋中铺设电力电缆系统也存在着诸多的问题,海洋中浅水区域的电力电缆容易受到渔船等海上作业设施破坏,并且电力电缆长期在海底不仅容易受到腐蚀,而且还易受到海底物体的碰撞干扰,给电力电缆的稳定传输带来了不利影响。
发明内容
(一)解决的技术问题
针对现有技术的不足,本发明提供了一种海洋工程电力电缆系统及其布置方法,解决了海洋中浅水区域的电力电缆容易受到渔船等海上作业设施破坏,并且电力电缆长期在海底不仅容易受到腐蚀,而且还易受到海底物体的碰撞干扰,给电力电缆的稳定传输带来了不利影响的问题。
(二)技术方案
为实现以上目的,本发明通过以下技术方案予以实现:一种海洋工程电力电缆系统,包括检测设备、安装设备、牵引设备、挖掘设备、施工管道、接线盒、分线盘。
优选的,所述检测设备包括线路勘查装置、线路检测装置、密封性检查装置与电缆维护装置。
优选的,所述安装设备包括管道托运装置、管道移动装置、管道焊接装置、管道固定装置与排水装置。
优选的,所述挖掘设备包括挖坑装置与填坑装置。
一种海洋工程电力电缆系统的布置方法,包括以下步骤:
S1:首先设计确定的海底电缆、管道路由图和位置表以及起止点、中继点和总长度,然后利用线路勘查装置对设计的线路进行现场勘查,确实设计的线路是否可行,及时对电缆线路进行调整;
S2:根据最终规划的线路利用挖坑装置挖掘管道填埋坑,挖掘之前应当确认周围是否有其它管道线路,同时将挖掘之后的泥土置于填埋坑周围,泥土用于对填埋坑进行回填;
S3:利用管道托运装置将管道在水面上进行运输,然后再施工管道下放到填埋坑的旁边,下放管道的间隔根据施工管道的长度而定,施工管道全部下放之后,将电力电缆依次穿过所有的管道;
S4:利用管道移动装置将施工管道移动到填埋坑的内部,然后将施工管道的端部对齐并使用管道焊接装置将相邻的管道焊接起来,所有的施工管道全部焊接完毕之后,利用管道固定装置将每一根管道都固定在海底,管路的两端处于地面上;
S5:使用牵引设备将管道内部所有的电力电缆全部进行牵引调直,然后将管路内部的海水利用排水装置抽出,同时将管路的两端密封起来,利用密封性检查装置检测管路内部的密封性,观察管路是否存在漏水的情况;
S6:在管路的两端装上分线盘,分线盘表面开设有若干个与电缆对应的通孔,电力电缆依次穿过分线盘对应的通孔即可,然后将电力电缆与接线盒连接起来;
S7:电力电缆全部布置完毕之后,利用线路检测装置与电缆维护装置对电力电缆进行检测与维护,保证电缆的畅通工作。
(三)有益效果
本发明提供了一种海洋工程电力电缆系统及其布置方法。具备以下有益效果:
1、该海洋工程电力电缆系统及其布置方法,通过将电力电缆设置在施工管道中,然后将施工管道填埋在海底并固定起来,保证了管道的稳定性,使得海洋中浅水区域的电力电缆不易受到渔船等海上作业设施破坏,并且电力电缆长期在海底不会受到腐蚀,而且也不会受到海底物体的碰撞干扰,保证了电力电缆的稳定传输。
2、该海洋工程电力电缆系统及其布置方法,使得日后对电力电缆的检测与维护非常方便,省去了许多不必要的麻烦。
具体实施方式
下面将结合本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
实施例:
本发明实施例提供一种海洋工程电力电缆系统,包括检测设备、安装设备、牵引设备、挖掘设备、施工管道、接线盒、分线盘。
检测设备包括线路勘查装置、线路检测装置、密封性检查装置与电缆维护装置,安装设备包括管道托运装置、管道移动装置、管道焊接装置、管道固定装置与排水装置,挖掘设备包括挖坑装置与填坑装置。
一种海洋工程电力电缆系统的布置方法,包括以下步骤:
S1:首先设计确定的海底电缆、管道路由图和位置表以及起止点、中继点和总长度,然后利用线路勘查装置对设计的线路进行现场勘查,确实设计的线路是否可行,及时对电缆线路进行调整;
S2:根据最终规划的线路利用挖坑装置挖掘管道填埋坑,挖掘之前应当确认周围是否有其它管道线路,同时将挖掘之后的泥土置于填埋坑周围,泥土用于对填埋坑进行回填;
S3:利用管道托运装置将管道在水面上进行运输,然后再施工管道下放到填埋坑的旁边,下放管道的间隔根据施工管道的长度而定,施工管道全部下放之后,将电力电缆依次穿过所有的管道;
S4:利用管道移动装置将施工管道移动到填埋坑的内部,然后将施工管道的端部对齐并使用管道焊接装置将相邻的管道焊接起来,所有的施工管道全部焊接完毕之后,利用管道固定装置将每一根管道都固定在海底,管路的两端处于地面上;
S5:使用牵引设备将管道内部所有的电力电缆全部进行牵引调直,然后将管路内部的海水利用排水装置抽出,同时将管路的两端密封起来,利用密封性检查装置检测管路内部的密封性,观察管路是否存在漏水的情况;
S6:在管路的两端装上分线盘,分线盘表面开设有若干个与电缆对应的通孔,电力电缆依次穿过分线盘对应的通孔即可,然后将电力电缆与接线盒连接起来;
S7:电力电缆全部布置完毕之后,利用线路检测装置与电缆维护装置对电力电缆进行检测与维护,保证电缆的畅通工作。
通过将电力电缆设置在施工管道中,然后将施工管道填埋在海底并固定起来,保证了管道的稳定性,使得海洋中浅水区域的电力电缆不易受到渔船等海上作业设施破坏,并且电力电缆长期在海底不会受到腐蚀,而且也不会受到海底物体的碰撞干扰,保证了电力电缆的稳定传输。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。
Claims (5)
1.一种海洋工程电力电缆系统,其特征在于:包括检测设备、安装设备、牵引设备、挖掘设备、施工管道、接线盒、分线盘。
2.根据权利要求1所述的一种海洋工程电力电缆系统,其特征在于:所述检测设备包括线路勘查装置、线路检测装置、密封性检查装置与电缆维护装置。
3.根据权利要求1所述的一种海洋工程电力电缆系统,其特征在于:所述安装设备包括管道托运装置、管道移动装置、管道焊接装置、管道固定装置与排水装置。
4.根据权利要求1所述的一种海洋工程电力电缆系统,其特征在于:所述挖掘设备包括挖坑装置与填坑装置。
5.一种海洋工程电力电缆系统的布置方法,其特征在于:包括以下步骤:
S1:首先设计确定的海底电缆、管道路由图和位置表以及起止点、中继点和总长度,然后利用线路勘查装置对设计的线路进行现场勘查,确实设计的线路是否可行,及时对电缆线路进行调整;
S2:根据最终规划的线路利用挖坑装置挖掘管道填埋坑,挖掘之前应当确认周围是否有其它管道线路,同时将挖掘之后的泥土置于填埋坑周围,泥土用于对填埋坑进行回填;
S3:利用管道托运装置将管道在水面上进行运输,然后再施工管道下放到填埋坑的旁边,下放管道的间隔根据施工管道的长度而定,施工管道全部下放之后,将电力电缆依次穿过所有的管道;
S4:利用管道移动装置将施工管道移动到填埋坑的内部,然后将施工管道的端部对齐并使用管道焊接装置将相邻的管道焊接起来,所有的施工管道全部焊接完毕之后,利用管道固定装置将每一根管道都固定在海底,管路的两端处于地面上;
S5:使用牵引设备将管道内部所有的电力电缆全部进行牵引调直,然后将管路内部的海水利用排水装置抽出,同时将管路的两端密封起来,利用密封性检查装置检测管路内部的密封性,观察管路是否存在漏水的情况;
S6:在管路的两端装上分线盘,分线盘表面开设有若干个与电缆对应的通孔,电力电缆依次穿过分线盘对应的通孔即可,然后将电力电缆与接线盒连接起来;
S7:电力电缆全部布置完毕之后,利用线路检测装置与电缆维护装置对电力电缆进行检测与维护,保证电缆的畅通工作。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911046147.3A CN110611286A (zh) | 2019-10-30 | 2019-10-30 | 一种海洋工程电力电缆系统及其布置方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911046147.3A CN110611286A (zh) | 2019-10-30 | 2019-10-30 | 一种海洋工程电力电缆系统及其布置方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110611286A true CN110611286A (zh) | 2019-12-24 |
Family
ID=68895821
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911046147.3A Pending CN110611286A (zh) | 2019-10-30 | 2019-10-30 | 一种海洋工程电力电缆系统及其布置方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110611286A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111555235A (zh) * | 2020-05-28 | 2020-08-18 | 新昌县姝达电力科技有限公司 | 一种电力工程电缆沟用电缆支架 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1558129A (zh) * | 2004-01-30 | 2004-12-29 | 胜利油田胜利石油化工建设有限责任公 | 管道穿越河流施工方法 |
CN101265995A (zh) * | 2008-05-06 | 2008-09-17 | 江苏省交通工程集团有限公司 | 水下泵管及其施工方法及砼输送方法 |
CN104242191A (zh) * | 2013-06-20 | 2014-12-24 | 五冶集团上海有限公司 | 苯加氢工程仪表管线敷设方法 |
KR20150007224A (ko) * | 2013-07-10 | 2015-01-20 | 임용호 | 지중관로내 케이블지중하 포설방법 및 장치 |
CN104659712A (zh) * | 2013-11-26 | 2015-05-27 | 孙进 | 一种电气线路管道铺设方法 |
CN104802945A (zh) * | 2014-05-13 | 2015-07-29 | 烟台中集来福士海洋工程有限公司 | 一种海洋工程电力电缆系统及其布置方法 |
CN108086358A (zh) * | 2017-12-13 | 2018-05-29 | 中国二冶集团有限公司 | 大口径长距离多管同沟沉管施工方法 |
-
2019
- 2019-10-30 CN CN201911046147.3A patent/CN110611286A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1558129A (zh) * | 2004-01-30 | 2004-12-29 | 胜利油田胜利石油化工建设有限责任公 | 管道穿越河流施工方法 |
CN101265995A (zh) * | 2008-05-06 | 2008-09-17 | 江苏省交通工程集团有限公司 | 水下泵管及其施工方法及砼输送方法 |
CN104242191A (zh) * | 2013-06-20 | 2014-12-24 | 五冶集团上海有限公司 | 苯加氢工程仪表管线敷设方法 |
KR20150007224A (ko) * | 2013-07-10 | 2015-01-20 | 임용호 | 지중관로내 케이블지중하 포설방법 및 장치 |
CN104659712A (zh) * | 2013-11-26 | 2015-05-27 | 孙进 | 一种电气线路管道铺设方法 |
CN104802945A (zh) * | 2014-05-13 | 2015-07-29 | 烟台中集来福士海洋工程有限公司 | 一种海洋工程电力电缆系统及其布置方法 |
CN108086358A (zh) * | 2017-12-13 | 2018-05-29 | 中国二冶集团有限公司 | 大口径长距离多管同沟沉管施工方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111555235A (zh) * | 2020-05-28 | 2020-08-18 | 新昌县姝达电力科技有限公司 | 一种电力工程电缆沟用电缆支架 |
CN111555235B (zh) * | 2020-05-28 | 2021-04-02 | 湖南沪变电力技术有限公司 | 一种电力工程电缆沟用电缆支架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2019115011A1 (en) | Assembly and method for installing a submarine line | |
CN105552821A (zh) | 一种隔水式水下电缆连接方法 | |
CN110611286A (zh) | 一种海洋工程电力电缆系统及其布置方法 | |
Bascom III et al. | Underground power cable considerations: Alternatives to overhead | |
CN102315521B (zh) | 管道站场仪表设备接地装置 | |
Schachner | Power connections for offshore wind farms | |
Koch | Grid connection of offshore wind farms | |
Ebert et al. | Extruded XLPE DC underground-cable technology and experiences up to 525kV-a key building block for the German" Energiewende" | |
CN102611095B (zh) | 一种用于超/特高压直流输电系统的广域接地方法 | |
Attwood | Cable design for subsea power links | |
Gazzana-Priaroggia et al. | The Long Island sound submarine cable interconnection | |
Peabody et al. | The effects of high-voltage AC transmission lines on buried pipelines | |
CN213879134U (zh) | 一种悬挂式单轨环网电缆敷设装置 | |
Fieltsch et al. | Cathodic Protection Implications of Solar Facilities on Adjacent Pipeline Infrastructure | |
JP2012239365A (ja) | 岸壁給電システム | |
WO2002043214A2 (en) | Cable installation | |
RU2551422C1 (ru) | Способ прокладывания кабельной линии и кабельная камера | |
CN114992388B (zh) | 一种集装箱堆场立体管网系统及布局方法 | |
CN216083211U (zh) | 变电站通信光缆敷设系统 | |
CN218990261U (zh) | 强弱电合建叠拼式电缆井构造 | |
Arkell et al. | Design, manufacture and installation of 150 kV submarine cable system for the Java–Madura interconnection | |
Kirkpatrick | Electrical grounding case histories | |
Hillesund et al. | Land and Sea Cables for LCC and VSC HVDC Projects | |
Vakilian et al. | A method for evaluation and mitigation of AC induced voltage on buried gas pipelines | |
Galloway et al. | 150 kV Java-Madura submarine cable system interconnection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20191224 |
|
WD01 | Invention patent application deemed withdrawn after publication |