CN110601087A CN201910790232.4A CN201910790232A CN110601087A CN 110601087 A CN110601087 A CN 110601087A CN 201910790232 A CN201910790232 A CN 201910790232A CN 110601087 A CN110601087 A CN 110601087A
Authority
CN
China
Prior art keywords
cable
laying
bridge
tractor
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910790232.4A
Other languages
Chinese (zh)
Inventor
王龙
田福军
赵运乐
刘中南
韩冷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
CCCC First Harbor Installation Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
CCCC First Harbor Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, CCCC First Harbor Installation Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201910790232.4A priority Critical patent/CN110601087A/en
Publication of CN110601087A publication Critical patent/CN110601087A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • H02G1/08Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling
    • H02G1/081Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling using pulling means at cable ends, e.g. pulling eyes or anchors

Abstract

The invention relates to a cable laying method convenient for protecting cables and quick in laying, which comprises the following steps: pre-designing a laying path of a cable; establishing a cable channel model database; acquiring a bridge type; rotatably mounting the cable drum on a loading vehicle; a pulley is arranged at an entrance of the cable into the bridge, and a corner protector is arranged at the corner; the cable reel is arranged on the paying-off machine, and the cable winding and unwinding speed is consistent with that of the tractor; and starting the tractor to run according to the cable laying line. According to the invention, the cable channel model database is established and matched with the bridge type in the cable channel model database, and the tractor and the laying vehicle are matched, so that the condition that the bridge laying information is manually collected is avoided, the problem of high manpower resource demand is solved, the protection of cables is enhanced by installing the pulleys at the inlet of the bridge and installing the corner protectors at the corners, the re-laying is not needed, the unnecessary investment waste is avoided, the project progress is accelerated, and the use requirements of people at present are further met.

Description

Cable laying method convenient for protecting cable and fast in laying
Technical Field
The invention relates to the technical field of electromechanical professional cable laying, in particular to a cable laying method convenient for protecting cables and fast in laying.
Background
The cable laying refers to an installation mode of connecting a cable from one place to another place, and can be divided into several laying modes of overhead, underground, water bottom, wall and tunnel according to the use occasions, the long-distance communication cable generally adopts a direct-buried laying mode to ensure the safety and reliability of communication, the main cable in the city generally adopts a pipeline laying mode, the distribution cable in the city can adopt an overhead and wall laying mode, and the cable laying mode is usually selected according to factors such as engineering conditions, environmental characteristics, cable types and quantity, construction cost and the like. With the development of modern city construction, the requirement for cable laying is higher and higher.
However, the existing cable laying is that the information of laying the bridge frame is manually collected, the requirement on human resources is large, the problem of low cable laying efficiency exists, the cable is often laid again due to poor cable protection effect, the investment waste and the engineering progress are caused, and the use requirements of current people cannot be met.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides a cable laying method which is convenient to protect cables and quick to lay.
In order to achieve the purpose, the invention adopts the following technical scheme:
a cable laying method convenient for protecting cables and fast in laying is characterized by comprising the following steps:
(1) pre-designing a laying path of a cable;
(2) carrying out three-dimensional modeling on the cable channel, setting related parameters of cable laying, and establishing a cable channel model database;
(3) matching the bridge number in the bridge information with the bridge type in the cable channel model database according to the bridge position information and the bridge type information in the bridge information to obtain the bridge type corresponding to the bridge number in the bridge information;
(4) the cable reel is rotatably arranged on the loading vehicle, and the end of the cable extends out of the cable reel, penetrates through the cable guide frame and then is connected to the tractor;
(5) a pulley is arranged at an entrance of the cable into the bridge, and a corner protector is arranged at the corner;
(6) the cable reel is arranged on the paying-off machine, the cable winding and unwinding speed is consistent with that of the tractor, the cable winding and unwinding speed is controlled to be 80-150m/min, and the traction force of the tractor is controlled to be 40-70 KN;
(7) and starting the tractor to run according to the cable laying line, and finishing cable laying through the laying vehicle.
Preferably, the loading vehicle in the step (4) is a four-way forklift.
Preferably, the tractor in the step (4) is an electric tractor.
Preferably, the pulley in the step (5) is mounted by a snap-in mounting method.
Preferably, the paying-off machine in the step (6) is a box type paying-off machine.
The invention has the beneficial effects that: the invention provides a cable laying method convenient for protecting cables and fast in laying, compared with the prior art, the method has the advantages that a cable channel model database is established, bridge numbers in bridge information are matched with bridge types in the cable channel model database according to bridge position information and bridge type information in the bridge information, a tractor and a laying vehicle are matched, manual bridge laying information collection is avoided, the problem of high human resource demand is solved, pulleys are installed at an inlet of a bridge, and corner protectors are installed at corners, so that the protection of the cables is enhanced, re-laying is not needed, unnecessary investment waste is avoided, the project progress is accelerated, and the use requirements of current people are met.
Detailed Description
The invention is further illustrated by the following examples:
a cable laying method convenient for protecting cables and fast in laying is characterized by comprising the following steps:
(1) pre-designing a laying path of a cable;
(2) carrying out three-dimensional modeling on the cable channel, setting related parameters of cable laying, and establishing a cable channel model database;
(3) matching the bridge number in the bridge information with the bridge type in the cable channel model database according to the bridge position information and the bridge type information in the bridge information to obtain the bridge type corresponding to the bridge number in the bridge information;
(4) the cable reel is rotatably arranged on the loading vehicle, and the end of the cable extends out of the cable reel, penetrates through the cable guide frame and then is connected to the tractor;
(5) a pulley is arranged at an entrance of the cable into the bridge, and a corner protector is arranged at the corner;
(6) the cable reel is arranged on the paying-off machine, the cable winding and unwinding speed is consistent with that of the tractor, the cable winding and unwinding speed is controlled to be 80-150m/min, and the traction force of the tractor is controlled to be 40-70 KN;
(7) and starting the tractor to run according to the cable laying line, and finishing cable laying through the laying vehicle.
Preferably, the loading vehicle in the step (4) is a four-way forklift.
Preferably, the tractor in the step (4) is an electric tractor.
Preferably, the pulley in the step (5) is mounted by a snap-in mounting method.
Preferably, the paying-off machine in the step (6) is a box type paying-off machine.
Example 1
A cable laying method convenient for protecting cables and fast in laying comprises the following steps:
(1) pre-designing a laying path of a cable;
(2) carrying out three-dimensional modeling on the cable channel, setting related parameters of cable laying, and establishing a cable channel model database;
(3) matching the bridge number in the bridge information with the bridge type in the cable channel model database according to the bridge position information and the bridge type information in the bridge information to obtain the bridge type corresponding to the bridge number in the bridge information;
(4) the cable reel is rotatably arranged on a four-way fork type loading vehicle, and the end of a cable extends out of the cable reel, penetrates through a cable guide frame and then is connected to an electric tractor;
(5) a pulley is arranged at an entrance of the cable into the bridge, the pulley adopts a buckle type installation mode, and corner protectors are arranged at corners;
(6) the cable reel is installed on the box type paying-off machine, the cable winding and unwinding speed is consistent with that of an electric tractor, the cable winding and unwinding speed is 80m/min, and the traction force of the tractor is 40 KN;
(7) and starting the electric tractor to run according to the cable laying line, and finishing cable laying through the laying vehicle.
Example 2
A cable laying method convenient for protecting cables and fast in laying comprises the following steps:
(1) pre-designing a laying path of a cable;
(2) carrying out three-dimensional modeling on the cable channel, setting related parameters of cable laying, and establishing a cable channel model database;
(3) matching the bridge number in the bridge information with the bridge type in the cable channel model database according to the bridge position information and the bridge type information in the bridge information to obtain the bridge type corresponding to the bridge number in the bridge information;
(4) the cable reel is rotatably arranged on a four-way fork type loading vehicle, and the end of a cable extends out of the cable reel, penetrates through a cable guide frame and then is connected to an electric tractor;
(5) a pulley is arranged at an entrance of the cable into the bridge, the pulley adopts a buckle type installation mode, and corner protectors are arranged at corners;
(6) the cable reel is installed on the box type paying-off machine, the cable winding and unwinding speed is consistent with that of the electric tractor, the cable winding and unwinding speed is 150m/min, and the traction force of the electric tractor is 70 KN;
(7) and starting the electric tractor to run according to the cable laying line, and finishing cable laying through the laying vehicle.
Example 3
A cable laying method convenient for protecting cables and fast in laying comprises the following steps:
(1) pre-designing a laying path of a cable;
(2) carrying out three-dimensional modeling on the cable channel, setting related parameters of cable laying, and establishing a cable channel model database;
(3) matching the bridge number in the bridge information with the bridge type in the cable channel model database according to the bridge position information and the bridge type information in the bridge information to obtain the bridge type corresponding to the bridge number in the bridge information;
(4) the cable reel is rotatably arranged on a four-way fork type loading vehicle, and the end of a cable extends out of the cable reel, penetrates through a cable guide frame and then is connected to an electric tractor;
(5) a pulley is arranged at an entrance of the cable into the bridge, the pulley adopts a buckle type installation mode, and corner protectors are arranged at corners;
(6) the cable reel is installed on the box type paying-off machine, the cable winding and unwinding speed is consistent with that of the electric tractor, the cable winding and unwinding speed is 100m/min, and the traction force of the electric tractor is 50 KN;
(7) and starting the electric tractor to run according to the cable laying line, and finishing cable laying through the laying vehicle.
Example 4
A cable laying method convenient for protecting cables and fast in laying comprises the following steps:
(1) pre-designing a laying path of a cable;
(2) carrying out three-dimensional modeling on the cable channel, setting related parameters of cable laying, and establishing a cable channel model database;
(3) matching the bridge number in the bridge information with the bridge type in the cable channel model database according to the bridge position information and the bridge type information in the bridge information to obtain the bridge type corresponding to the bridge number in the bridge information;
(4) the cable reel is rotatably arranged on a four-way fork type loading vehicle, and the end of a cable extends out of the cable reel, penetrates through a cable guide frame and then is connected to an electric tractor;
(5) a pulley is arranged at an entrance of the cable into the bridge, the pulley adopts a buckle type installation mode, and corner protectors are arranged at corners;
(6) the cable reel is installed on the box type paying-off machine, the cable winding and unwinding speed is consistent with that of an electric tractor, the cable winding and unwinding speed is 120m/min, and the traction force of the tractor is 60 KN;
(7) and starting the electric tractor to run according to the cable laying line, and finishing cable laying through the laying vehicle.
The invention has been described in an illustrative manner, and it is to be understood that the invention is not limited to the specific embodiments described above, but is intended to cover various modifications, which may be made by the methods and technical solutions of the invention, or may be applied to other applications without modification.

Claims (5)

1. A cable laying method convenient for protecting cables and fast in laying is characterized by comprising the following steps:
(1) pre-designing a laying path of a cable;
(2) carrying out three-dimensional modeling on the cable channel, setting related parameters of cable laying, and establishing a cable channel model database;
(3) matching the bridge number in the bridge information with the bridge type in the cable channel model database according to the bridge position information and the bridge type information in the bridge information to obtain the bridge type corresponding to the bridge number in the bridge information;
(4) the cable reel is rotatably arranged on the loading vehicle, and the end of the cable extends out of the cable reel, penetrates through the cable guide frame and then is connected to the tractor;
(5) a pulley is arranged at an entrance of the cable into the bridge, and a corner protector is arranged at the corner;
(6) the cable reel is arranged on the paying-off machine, the cable winding and unwinding speed is consistent with that of the tractor, the cable winding and unwinding speed is controlled to be 80-150m/min, and the traction force of the tractor is controlled to be 40-70 KN;
(7) and starting the tractor to run according to the cable laying line, and finishing cable laying through the laying vehicle.
2. The cable laying method convenient for protecting cables and fast in laying according to claim 1, wherein the loading vehicle in the step (4) is a four-way forklift truck.
3. The method for conveniently and quickly laying the cables as claimed in claim 1, wherein the tractor in the step (4) is an electric tractor.
4. The method for conveniently protecting and quickly laying the cable as claimed in claim 1, wherein the pulley in the step (5) is installed in a snap-in manner.
5. The method for laying the cable conveniently and quickly for protecting the cable according to claim 1, wherein the paying-off machine in the step (6) is a box type paying-off machine.
CN201910790232.4A 2019-08-26 2019-08-26 Cable laying method convenient for protecting cable and fast in laying Pending CN110601087A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910790232.4A CN110601087A (en) 2019-08-26 2019-08-26 Cable laying method convenient for protecting cable and fast in laying

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910790232.4A CN110601087A (en) 2019-08-26 2019-08-26 Cable laying method convenient for protecting cable and fast in laying

Publications (1)

Publication Number Publication Date
CN110601087A true CN110601087A (en) 2019-12-20

Family

ID=68855645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910790232.4A Pending CN110601087A (en) 2019-08-26 2019-08-26 Cable laying method convenient for protecting cable and fast in laying

Country Status (1)

Country Link
CN (1) CN110601087A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011068292A1 (en) * 2009-12-01 2011-06-09 프로몰엔지니어링 주식회사 Apparatus and method for carrying cables for an underwater pipeline
CN105226574A (en) * 2015-11-05 2016-01-06 山西省工业设备安装有限公司 Cable laying method and lay part
CN106021758A (en) * 2016-05-26 2016-10-12 中国能源建设集团广东省电力设计研究院有限公司 Design method for cable laying and cable laying system
CN109460595A (en) * 2018-10-26 2019-03-12 江苏宏鹏电气科技有限公司 A kind of power cable laying design method
CN109713613A (en) * 2018-12-20 2019-05-03 中国华冶科工集团有限公司 Rail roadway cable laying method and device
CN209184119U (en) * 2019-01-24 2019-07-30 布晓明 A kind of power cable tapping equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011068292A1 (en) * 2009-12-01 2011-06-09 프로몰엔지니어링 주식회사 Apparatus and method for carrying cables for an underwater pipeline
CN105226574A (en) * 2015-11-05 2016-01-06 山西省工业设备安装有限公司 Cable laying method and lay part
CN106021758A (en) * 2016-05-26 2016-10-12 中国能源建设集团广东省电力设计研究院有限公司 Design method for cable laying and cable laying system
CN109460595A (en) * 2018-10-26 2019-03-12 江苏宏鹏电气科技有限公司 A kind of power cable laying design method
CN109713613A (en) * 2018-12-20 2019-05-03 中国华冶科工集团有限公司 Rail roadway cable laying method and device
CN209184119U (en) * 2019-01-24 2019-07-30 布晓明 A kind of power cable tapping equipment

Similar Documents

Publication Publication Date Title
CN100440660C (en) Mechanical laying method for overlength large section cable
CN105576596B (en) A kind of novel cable transition joint explosion-protection equipment
CN205049795U (en) Integration optical cable draws device down in transformer substation
CN110601087A (en) Cable laying method convenient for protecting cable and fast in laying
CN203688889U (en) Common optical cable electrical laying apparatus
CN110518498B (en) Construction method for programmed laying of cable in bridge
KR101116665B1 (en) Cable install method of underground cable duct
CN204205436U (en) Horizontal crane span structure inner cable laying apparatu
CN209150657U (en) A kind of cable protection pipeline
CN207908769U (en) A kind of optical cable skirt device
KR101647116B1 (en) cable installation method of corrugate pipe using compartment tool
CN105575503A (en) New type air guide cable
CN203849485U (en) Rubber-insulated fiber cable threading and laying device
CN205719558U (en) The track that a kind of dummy of traction moves
CN104089090A (en) Cable tray installation requirements
CN204117657U (en) A kind of marking type cable armouring steel band
CN204216552U (en) Stage power wire protection device
CN112290457A (en) Construction method of carbon fiber composite core wire
CN202997477U (en) A cable fixing device used for laying cables in a well
CN209401276U (en) A kind of transformer substation communication optical cable markstone and its system
CN217362472U (en) Novel pre-buried line box of pipeline
CN202393957U (en) Butterfly-shaped introduced optical cable for pipeline
CN205750025U (en) A kind of optical fiber terminal box reason coil holder
CN202948181U (en) Device for fixing and protecting layout of outdoor long-distance lead-in rubber-covered optical cable
CN206211413U (en) Narrow cable duct inner cable, fiber cable laying instrument

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191220