CN110592389A CN201911023295.3A CN201911023295A CN110592389A CN 110592389 A CN110592389 A CN 110592389A CN 201911023295 A CN201911023295 A CN 201911023295A CN 110592389 A CN110592389 A CN 110592389A
Authority
CN
China
Prior art keywords
rope
clamping
smelting furnace
controlling
ingot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911023295.3A
Other languages
Chinese (zh)
Other versions
CN110592389B (en
Inventor
罗小峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Advanced Metal Materials Industry Technology Research Institute Co Ltd
Original Assignee
Chengdu Advanced Metal Materials Industry Technology Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Advanced Metal Materials Industry Technology Research Institute Co Ltd filed Critical Chengdu Advanced Metal Materials Industry Technology Research Institute Co Ltd
Priority to CN201911023295.3A priority Critical patent/CN110592389B/en
Publication of CN110592389A publication Critical patent/CN110592389A/en
Application granted granted Critical
Publication of CN110592389B publication Critical patent/CN110592389B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B9/00General processes of refining or remelting of metals; Apparatus for electroslag or arc remelting of metals
    • C22B9/16Remelting metals
    • C22B9/20Arc remelting

Abstract

The invention discloses a device and a method for controlling a VAR smelting furnace ingot charging gap, relates to the field of metallurgy, and solves the problems of high labor intensity and long time of controlling the VAR smelting furnace ingot charging gap according to the existing mode. The technical scheme adopted by the invention is as follows: the device for controlling the cast ingot charging gap of the VAR smelting furnace comprises ropes, clamping plates, cushion blocks and rope containers, wherein the clamping plates are arranged on the ropes in a penetrating mode, clamping grooves are formed between bottom plates and side plates of the clamping plates, and the cushion blocks are placed in the clamping grooves; the rope container includes a reel, one end of the rope is wound and connected to the reel, and the other end of the rope can be connected to the rope container to form a ring shape and fastened. According to the method for controlling the charging gap of the cast ingot of the VAR smelting furnace, the process of adjusting the gap between the cast ingot and the copper crystallizer is advanced to the process of placing the cast ingot on the base, the mounting speed is high, the charging efficiency is improved, the labor intensity of workers is reduced, and the uniformity of the gap between the periphery of the cast ingot and the copper crystallizer can be ensured.

Description

Device and method for controlling cast ingot charging gap of VAR smelting furnace
Technical Field
The invention relates to the field of metallurgy, in particular to a device and a method for controlling a furnace charging gap of a VAR smelting furnace ingot.
Background
The charging of the ingot is one of the intermediate procedures of VAR smelting, and the conventional charging sequence of the ingot is as follows: firstly, hoisting a smelting electrode to a base by using a travelling crane; then hoisting the copper crystallizer to be sleeved outside the ingot, screwing down the base and the connecting bolt of the copper crystallizer, and hoisting the copper crystallizer to the VAR hearth by using a crane; and then manually adopting a long iron rod, such as a steel chisel, adjusting the gap between the ingot and the copper crystallizer, placing the wooden cushion block fixed at the end of the long iron rod at the gap, and repeatedly placing three to four cushion blocks around the ingot and the copper crystallizer.
The cast ingot has large mass and height, and the labor intensity is high and more time is needed to be consumed when the gap between the cast ingot and the copper crystallizer is manually adjusted by adopting the long iron bar.
Disclosure of Invention
The invention firstly provides a device for controlling the charging gap of an ingot of a VAR smelting furnace, which solves the problems of high labor intensity and long time of controlling the charging gap of the ingot of the VAR smelting furnace according to the existing mode.
The technical scheme adopted by the invention for solving the technical problems is as follows: the device for controlling the cast ingot charging gap of the VAR smelting furnace comprises a rope, clamping plates, cushion blocks and a rope container, wherein at least three clamping plates are arranged on the rope in a penetrating mode, each clamping plate comprises a bottom plate and side plates connected to two sides of the bottom plate respectively, a clamping groove is formed between the bottom plate and the two side plates, and the cushion blocks are placed in the clamping grooves; the rope container includes a winding wheel, one end of the rope is wound and connected to the winding wheel, the other end of the rope is a free end, and the free end of the rope can be tightly connected with the rope container and forms a ring shape.
Further, the method comprises the following steps: the outer side of the bottom plate of the clamping plate is arc-shaped.
Further, the method comprises the following steps: the clamping plate is further provided with a locking structure for fastening the cushion block in the clamping groove.
Specifically, the method comprises the following steps: the locking structure is as follows: threaded holes are formed in the side plates of the clamping plates, and locking bolts pointing to the clamping grooves are arranged in the threaded holes.
More specifically: the clamping plate is made of a steel plate through bending, two side plates of the clamping plate are perpendicular to the bottom plate, threading holes are respectively formed in the positions, close to the bottom plate, of the two side plates of the clamping plate, and a rope penetrates through the two threading holes; any one side plate of the clamping plate is provided with two threaded holes.
Specifically, the method comprises the following steps: the rope is a steel wire rope with the diameter of phi 2mm, the cushion block is a wood block, four clamping plates penetrate through the rope, the size of a bottom plate of each clamping plate is (80-100) mmX (70-80) mmX 5mm, and the size of a side plate of each clamping plate is (80-100) mmX (35-40) mmX 5 mm.
Specifically, the method comprises the following steps: the rope container comprises a frame body, a reel is arranged in the frame body, a handle connected with a rotating shaft of the reel is arranged on the outer side of the frame body, and a reel locking buckle is further arranged between the frame body and the reel; one side of the frame body is provided with a hanging ring, the free end of the rope is connected with a hook matched with the hanging ring, and the hook is provided with a limiting elastic sheet; or one side of the rope container is provided with a thread end clamping groove, the thread end clamping groove is also provided with a pressing plate, and the free end of the rope can be placed in the thread end clamping groove and fastened through the pressing plate.
The second subject of the invention is: the method for controlling the charging gap of the cast ingot of the VAR smelting furnace adjusts the gap between the cast ingot and the copper crystallizer by the device for controlling the charging gap of the cast ingot of the VAR smelting furnace, and comprises the following steps:
s1, horizontally placing the cast ingot and marking the installation position on the cast ingot;
s2, winding the free end of the rope around the ingot for a circle, and connecting the free end with the rope container to form a ring;
s3, adjusting the distance between the clamping plates to enable the clamping plates to be uniformly distributed on the outer side of the ingot, wherein the outer side of the bottom plate of the clamping plate is in direct contact with the ingot; the rope is tightened and clamped and fixed through the rope container; placing a cushion block in the clamping groove of the clamping plate and fastening the cushion block;
s4, repeating steps S2 and S3 at each mounting position;
s5, hoisting the cast ingot to a preset position on a base of the copper crystallizer, hoisting and sleeving the copper crystallizer outside the cast ingot, and screwing bolts between the base and the copper crystallizer after the cast ingot is in place;
s6, hoisting the whole copper crystallizer and the base into a hearth of the VAR smelting furnace, sealing the furnace body, vacuumizing to a preset value, filling Ar gas to a set air pressure after the leakage detection is qualified, carrying out smelting auxiliary electrode welding, opening the furnace after cooling, checking the welding quality, and taking down the device for controlling the charging gap of the cast ingot of the VAR smelting furnace after the leakage detection is qualified.
The device and the method for controlling the ingot casting charging gap of the VAR smelting furnace have the beneficial effects that: the process of adjusting the gap between the ingot and the copper crystallizer is advanced to the process of placing the ingot on the base, the installation speed is high, the charging efficiency is improved, the labor intensity of workers is reduced, and the uniformity of the gap between the periphery of the ingot and the copper crystallizer can be ensured. The device has the advantages of low cost, simple structure, small volume, convenient assembly, easy purchase and manufacture of used materials and parts, and high practicability.
The cushion blocks with different thicknesses can be placed in the clamping grooves of the clamping plates, and the requirements for adjusting different gaps are met. The outer side of the bottom plate of the clamping plate is arc-shaped, so that the bottom plate and the cast ingot can be attached conveniently. The locking structure of splint does benefit to and fastens the cushion in the draw-in groove, and locking structure is bolt and screw hole, and easy preparation and fastening are effectual.
Drawings
FIG. 1 is a schematic diagram of an embodiment of the device for controlling the charging gap of the cast ingot of the VAR smelting furnace.
Fig. 2 is a schematic view of one side plate of the clamping plate of fig. 1.
Fig. 3 is a schematic view of the rope holder of fig. 1.
FIG. 4 is another structure of the free end of the rope in the device for controlling the charging gap of the VAR smelting furnace ingot.
Parts, positions and numbers in the drawings: the rope locking device comprises a rope 1, a clamping plate 2, a threaded hole 21, a threading hole 22, a rope container 3, a reel 31, a thread end clamping groove 32, a frame 33, a twisting handle 34, a thread wheel locking buckle 35, a hook 4 and a limiting elastic sheet 5.
Detailed Description
The invention will be further explained with reference to the drawings.
Referring to fig. 1, the device for controlling the charging gap of the VAR smelting furnace ingot comprises a rope 1, clamping plates 2, a cushion block and a rope container 3, wherein at least three clamping plates 2 are arranged on the rope 1 in a penetrating manner, for example, in fig. 1, four clamping plates 2 are arranged on the rope 1 in a penetrating manner. The rope 1 can be a steel wire rope, and in order to ensure the strength, the rope 1 is a steel wire rope with the diameter phi of 2 mm. In addition, the rope 1 can also be made of other materials meeting the strength requirement.
Each clamping plate 2 comprises a bottom plate and side plates connected to two sides of the bottom plate respectively, a clamping groove is formed between the bottom plate and the two side plates, and a cushion block is placed in the clamping groove. The outer side of the bottom plate of the clamping plate 2 is preferably arc-shaped, so that the bottom plate can be in full contact with the cast ingot conveniently. For example, as shown in fig. 1, the chucking plate 2 is formed by bending a steel plate. Specifically, the method comprises the following steps: the clamping plate 2 is made by bending a common steel plate material with the thickness of (140-160) mm multiplied by (80-100) mm multiplied by 5mm, the included angle between the two side plates and the bottom plate is 90 degrees, the size of the bottom plate is (80-100) mm multiplied by (70-80) mm multiplied by 5mm, and the size of the side plates is (80-100) mm multiplied by (35-40) mm multiplied by 5 mm. As shown in fig. 2, threading holes 22 are respectively formed at positions of the two side plates of the clamping plate 2 close to the bottom plate, and the rope 1 passes through the two threading holes 22. For example, two small holes with the diameter of phi 2.2mm are symmetrically processed at the positions, which are 3mm close to the bottom plate, of the two side plates of the clamping plate 2 to form threading holes 22, and the steel wire rope penetrates through the two threading holes 22 to be used for connecting the clamping plate 2. The clamp plate 2 is further provided with a locking structure which fastens the cushion block in the clamping groove and prevents the cushion block from sliding out of the clamping groove. For example, the locking structure is: any one side plate of the clamping plate 2 is provided with two threaded holes 21, and locking bolts pointing to the clamping grooves are arranged in the threaded holes 21. Specifically, the method comprises the following steps: two threaded holes 21 with the diameter phi of 8mm are respectively formed in the positions, away from the plate edge 1/3, of the center line of the side plate, and the threaded holes 21 are provided with locking bolts with the diameter phi of 8 mm. In addition, the clamping plate 2 and the cushion block can be locked through other modes, for example, the clamping groove is in a dovetail groove shape, and the part of the cushion block placed in the clamping groove is in a matched dovetail groove shape.
The spacer is placed and fixed in the clamping groove of the clamping plate 2 for ensuring a proper gap. The cushion block can be made of wood blocks or other wear-resistant and pressure-resistant materials, and the specific size of the cushion block is determined according to the use requirement. For example, the cushion block is a cuboid, the specific size is 100mm x (70-80) mm x (35-60) mm, the cushion block can be made into a plurality of specifications, and the corresponding cushion block is selected according to the required gap during furnace charging, placed in the clamping groove of the clamping plate 2 and fixed through the locking structure.
The rope container 3 includes a reel 31, and the rope container 3 is used for accommodating and fixing the rope 1 so that the rope 1 forms a ring shape with a fixed circumference. One end of the rope 1 is wound around the reel 31, the rope 1 is wound around the reel 31 and can be unwound and unwound, and the other end of the rope 1 is a free end. For example, the rope container 3 further includes a thread end slot 32, a pressing plate is further disposed at the thread end slot 32, and the free end of the rope 1 can be placed in the thread end slot 32 and fastened by the pressing plate, so that the rope 1 forms a loop. The reel 31 is adjusted to adjust the size of the loop formed by the rope 1. For example, as shown in fig. 3, the rope container 3 includes a housing 33, a reel 31 is provided in the housing 33, a handle 34 connected to a rotation shaft of the reel 31 is provided outside the housing 33, and the handle 34 is used to manually rotate the reel 31 to receive and fix the rope 1. A reel dead lock catch 35 is further provided between the frame 33 and the reel 31, and the reel dead lock catch 35 is used for locking the reel 31 with respect to the frame 33. The other side of the frame body 33 is provided with a thread end clamping groove 32 and a pressing plate.
Alternatively, the thread end clamping groove 32 and the pressing plate are replaced by the following structures: set up the link in the framework 33 of rope container 3, the couple 4 with the link adaptation is connected to the free end of rope 1, sets up spacing shell fragment 5 on the couple 4, and couple 4 is connected firmly with the free end of rope 1, is connected the couple on 4 and the framework 33 to avoid the roll-off through spacing shell fragment 5, realize firm the connection, and be convenient for unpack apart, as shown in fig. 4.
The second subject of the invention is: method for controlling charging gap of VAR smelting furnace ingot casting, adjusting gap between ingot casting and copper crystallizer by the 'device for controlling charging gap of VAR smelting furnace ingot casting', for example, the external dimension isThe method comprises the following steps of charging cast ingots with the weight of 3030Kg into a furnace:
and S1, placing the cast ingot on the support by using a travelling crane, and marking the installation position on the cast ingot. The mounting position, i.e. the position where the first subject is mounted on the outer side of the ingot, may be one or more turns.
And S2, winding the free end of the rope 1 around the ingot for one circle, and connecting the free end of the rope 1 with the rope container 3. For example, the free end of the rope 1 is connected with a hook and is connected with a hanging ring on the rope container 3; or the free end of the rope 1 is placed in the thread end clamping groove 32 and fastened through the pressing plate.
In operation, the reel locking buckle 35 on the rope container 3 is opened, so that the reel 31 can rotate; then, the worker pulls the free end of the rope 1 to wind the ingot for a circle; finally, the free end is connected to the rope container 3.
S3, adjusting the distance between the clamping plates 2 on the rope 1 to ensure that the clamping plates 2 are uniformly distributed on the outer side of the cast ingot, and the outer side of the bottom plate of the clamping plate 2 is in direct contact with the cast ingot. The arc shape of the outer side of the bottom plate is preferably consistent with the arc shape of the outer wall of the cast ingot so as to be fully attached. Meanwhile, the rope 1 is adjusted to the installation position, the rope 1 is tightened through the rope container 3 and clamped and fixed, the rope 1 is attached to the outer side of the ingot, and then the cushion block is placed in the clamping groove of the clamping plate 2 and fastened. For example, when four clamping plates 2 are provided on the rope 1, the intervals between the clamping plates 2 are adjusted so that the clamping plates 2 are uniformly and symmetrically arranged around the ingot on a horizontal plane of the ingot. The twisting handle 34 is rotated to tighten the steel wire rope, so that the bottom surface of the clamping plate 2 is tightly attached to the surface of the cast ingot, and then the steel wire rope is clamped and fixed, and the whole device is stably fixed at a preset position of the cast ingot. And finally, selecting four wooden cushion blocks with the size of 100mm multiplied by 70mm multiplied by 40mm according to the charging clearance, respectively installing the wooden cushion blocks in the clamping grooves of the clamping plates 2 and tightly pressing the wooden cushion blocks by two locking bolts on the side plates.
And S4, repeating the steps S2 and S3 at each mounting position until all mounting positions outside the ingot are provided with the device for controlling the charging gap of the VAR smelting furnace ingot.
S5, hoisting the cast ingot to a preset position on a base of the copper crystallizer by using a travelling crane, hoisting and sleeving the cleaned copper crystallizer outside the cast ingot by using the travelling crane, and screwing a bolt between the base and the copper crystallizer after the cast ingot is in place; the bolts need to be tightly connected, so that compactness is guaranteed, and the requirement of follow-up vacuumizing is met.
S6, hoisting the whole copper crystallizer and the base into a hearth of the VAR smelting furnace by a travelling crane, sealing the furnace body, vacuumizing to a preset value, filling Ar gas to set air pressure after the leakage detection is qualified, carrying out smelting auxiliary electrode welding, opening the furnace after cooling, checking the welding quality, and taking down the device for controlling the charging gap of the cast ingot of the VAR smelting furnace after the leakage detection is qualified.

Claims (8)

1. Device of control VAR smelting furnace ingot casting dress stove clearance, its characterized in that: the rope fixing device comprises a rope (1), clamping plates (2), cushion blocks and a rope container (3), wherein at least three clamping plates (2) penetrate through the rope (1), each clamping plate (2) comprises a bottom plate and side plates connected to two sides of the bottom plate respectively, a clamping groove is formed between the bottom plate and the two side plates, and the cushion blocks are placed in the clamping grooves; the rope container (3) comprises a winding wheel (31), one end of the rope (1) is wound and connected to the winding wheel (31), the other end of the rope (1) is a free end, and the free end of the rope (1) can be tightly connected with the rope container (3) and is formed into a ring shape.
2. The device for controlling the charging gap of the VAR smelting furnace ingot casting according to claim 1, characterized in that: the outer side of the bottom plate of the clamping plate (2) is arc-shaped.
3. The device for controlling the charging gap of the VAR smelting furnace ingot casting according to claim 1, characterized in that: the clamping plate (2) is also provided with a locking structure for fastening the cushion block in the clamping groove.
4. The device for controlling the charging gap of the VAR smelting furnace ingot casting according to the claim 3, characterized in that: the locking structure is as follows: threaded holes (21) are formed in the side plates of the clamping plates (2), and locking bolts pointing to the clamping grooves are arranged in the threaded holes (21).
5. The device for controlling the charging gap of the VAR smelting furnace ingot casting according to claim 4, characterized in that: the clamping plate (2) is made of a steel plate through bending, two side plates of the clamping plate (2) are perpendicular to the bottom plate, threading holes (22) are respectively formed in the positions, close to the bottom plate, of the two side plates of the clamping plate (2), and the rope (1) penetrates through the two threading holes (22); any one side plate of the clamping plate (2) is provided with two threaded holes (21).
6. The device for controlling the charging gap of the VAR smelting furnace ingot casting according to any one of claims 1 to 5, characterized in that: the rope (1) is a steel wire rope with the diameter of phi 2mm, the cushion block is a wood block, four clamping plates (2) penetrate through the rope (1), the size of a bottom plate of each clamping plate (2) is 80-100 mm multiplied by (70-80) mm multiplied by 5mm, and the size of a side plate of each clamping plate is 80-100 mm multiplied by (35-40) mm multiplied by 5 mm.
7. The device for controlling the charging gap of the VAR smelting furnace ingot casting according to any one of claims 1 to 5, characterized in that: the rope container (3) comprises a frame body (33), a reel (31) is arranged in the frame body (33), a handle (34) connected with a rotating shaft of the reel (31) is arranged on the outer side of the frame body (33), and a reel locking buckle (35) is arranged between the frame body (33) and the reel (31);
a hanging ring is arranged on one side of the frame body (33), the free end of the rope (1) is connected with a hook (4) matched with the hanging ring, and a limiting elastic sheet (5) is arranged on the hook (4); or one side of the rope container (3) is provided with a thread end clamping groove (32), a pressing plate is further arranged at the thread end clamping groove (32), and the free end of the rope (1) can be placed in the thread end clamping groove (32) and fastened through the pressing plate.
8. The method for controlling the ingot casting charging gap of the VAR smelting furnace is characterized by comprising the following steps of: the device for controlling the charging gap of the VAR smelting furnace ingot casting adjusts the gap between the ingot casting and the copper crystallizer by the device for controlling the charging gap of the VAR smelting furnace ingot casting as claimed in any one of the claims 1 to 7, and comprises the following steps:
s1, horizontally placing the cast ingot and marking the installation position on the cast ingot;
s2, winding the free end of the rope (1) around the ingot for a circle, and connecting the free end with the rope container (3) to form a ring;
s3, adjusting the distance between the clamping plates (2) to enable the clamping plates (2) to be uniformly distributed on the outer side of the cast ingot, and enabling the outer side of the bottom plate of the clamping plate (2) to be in direct contact with the cast ingot; the rope (1) is tightened and clamped and fixed through the rope container (3); a cushion block is placed in the clamping groove of the clamping plate (2) and is fastened;
s4, repeating steps S2 and S3 at each mounting position;
s5, hoisting the cast ingot to a preset position on a base of the copper crystallizer, hoisting and sleeving the copper crystallizer outside the cast ingot, and screwing bolts between the base and the copper crystallizer after the cast ingot is in place;
s6, hoisting the whole copper crystallizer and the base into a hearth of the VAR smelting furnace, sealing the furnace body, vacuumizing to a preset value, filling Ar gas to a set air pressure after the leakage detection is qualified, carrying out smelting auxiliary electrode welding, opening the furnace after cooling, checking the welding quality, and taking down the device for controlling the charging gap of the cast ingot of the VAR smelting furnace after the leakage detection is qualified.
CN201911023295.3A 2019-10-25 2019-10-25 Device and method for controlling cast ingot charging gap of VAR smelting furnace Active CN110592389B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911023295.3A CN110592389B (en) 2019-10-25 2019-10-25 Device and method for controlling cast ingot charging gap of VAR smelting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911023295.3A CN110592389B (en) 2019-10-25 2019-10-25 Device and method for controlling cast ingot charging gap of VAR smelting furnace

Publications (2)

Publication Number Publication Date
CN110592389A true CN110592389A (en) 2019-12-20
CN110592389B CN110592389B (en) 2021-06-04

Family

ID=68850491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911023295.3A Active CN110592389B (en) 2019-10-25 2019-10-25 Device and method for controlling cast ingot charging gap of VAR smelting furnace

Country Status (1)

Country Link
CN (1) CN110592389B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070011873A1 (en) * 2005-07-14 2007-01-18 Teale David W Methods for producing even wall down-hole power sections
RU2008138287A (en) * 2008-09-25 2010-03-27 Закрытое акционерное общество "НАУЧНО-ПРОИЗВОДСТВЕННОЕ ПРЕДПРИЯТИЕ ЭЛЕКТРОПЛАЗМЕННОГО ОБОРУДОВАНИЯ И СИСТЕМ ЭПОС" (RU) METHOD FOR CONDUCTING Smelting And A DEVICE FOR ITS IMPLEMENTATION
CN102776381A (en) * 2012-08-01 2012-11-14 攀钢集团江油长城特殊钢有限公司 Arc restarting process after outages in vacuum consumable melting process of titanium and titanium alloys
CN104692233A (en) * 2015-03-19 2015-06-10 山东钢铁股份有限公司 Round object hoisting anti-slip fixture
CN206901589U (en) * 2017-04-16 2018-01-19 广州蓝磁新材料科技有限公司 A kind of magnetically soft alloy melting, which feeds intake, uses fastening clips
CN209210193U (en) * 2018-12-25 2019-08-06 四川阳光坚端铝业有限公司 A kind of aluminium alloy round cast ingot suspender

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070011873A1 (en) * 2005-07-14 2007-01-18 Teale David W Methods for producing even wall down-hole power sections
RU2008138287A (en) * 2008-09-25 2010-03-27 Закрытое акционерное общество "НАУЧНО-ПРОИЗВОДСТВЕННОЕ ПРЕДПРИЯТИЕ ЭЛЕКТРОПЛАЗМЕННОГО ОБОРУДОВАНИЯ И СИСТЕМ ЭПОС" (RU) METHOD FOR CONDUCTING Smelting And A DEVICE FOR ITS IMPLEMENTATION
CN102776381A (en) * 2012-08-01 2012-11-14 攀钢集团江油长城特殊钢有限公司 Arc restarting process after outages in vacuum consumable melting process of titanium and titanium alloys
CN104692233A (en) * 2015-03-19 2015-06-10 山东钢铁股份有限公司 Round object hoisting anti-slip fixture
CN206901589U (en) * 2017-04-16 2018-01-19 广州蓝磁新材料科技有限公司 A kind of magnetically soft alloy melting, which feeds intake, uses fastening clips
CN209210193U (en) * 2018-12-25 2019-08-06 四川阳光坚端铝业有限公司 A kind of aluminium alloy round cast ingot suspender

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杜科选: "《铝电解和铝合金铸造生产与安全》", 31 May 2012 *

Also Published As

Publication number Publication date
CN110592389B (en) 2021-06-04

Similar Documents

Publication Publication Date Title
EP2976185B1 (en) Cover alignment tool
KR20130052349A (en) Pipe attachment jig for magnetic drilling machine
CN110592389B (en) Device and method for controlling cast ingot charging gap of VAR smelting furnace
CN211073334U (en) Clamping device is used in processing of metallic structure spare
CN210034947U (en) Angle-adjustable connecting device
CN108406152B (en) Method for manufacturing cell shell of large prebaked anode electrolytic cell
CN211812991U (en) Lifting beam capable of adjusting self balance
CN207775367U (en) A kind of interim through-flow bus structure for aluminium cell stern notch
CN211338520U (en) Stator stone tongs
CN208787930U (en) A kind of tightening device with monitoring and equilibrium reaction function
CN210731265U (en) Clamping mechanism of aluminum profile tapping machine
CN215249042U (en) Live-line lifting device on column
CN110449937A (en) A kind of clamp for machining of automobile engine oil Pump rotor mold
CN215762722U (en) Portable nut
CN211004187U (en) Lifting appliance
CN215249085U (en) Lifting lug with detachable and adjustable structure
CN216945847U (en) Special lifting appliance for electroslag false electrode
CN214780582U (en) Fixing device for mixing barrel
CN218860154U (en) Pole stone tongs
CN211545649U (en) Hoist and mount girder steel balancing unit
CN217253873U (en) Preheating device for steel structure welding
CN213304941U (en) Single groove splint and suspension wire staple bolt assembly body
CN211102417U (en) Accessory processingequipment that stability is good
CN217055484U (en) Cabin transportation tool
CN112059985B (en) Use method of pulley assembly installation and adjustment tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 610306 Chengdu City, Chengdu, Sichuan, China (Sichuan) free trade test zone, Chengdu City, Qingbaijiang District, xiangdao Boulevard, Chengxiang Town, No. 1509 (room 13, A District, railway port mansion), room 1319

Patentee after: Chengdu advanced metal material industry technology Research Institute Co.,Ltd.

Address before: 610306 Chengdu City, Chengdu, Sichuan, China (Sichuan) free trade test zone, Chengdu City, Qingbaijiang District, xiangdao Boulevard, Chengxiang Town, No. 1509 (room 13, A District, railway port mansion), room 1319

Patentee before: CHENGDU ADVANCED METAL MATERIAL INDUSTRIAL TECHNOLOGY RESEARCH INSTITUTE Co.,Ltd.

CP01 Change in the name or title of a patent holder