CN110576322A - ITER first-wall narrow-pitch linear array tube cutting tool - Google Patents

ITER first-wall narrow-pitch linear array tube cutting tool Download PDF

Info

Publication number
CN110576322A
CN110576322A CN201910905365.1A CN201910905365A CN110576322A CN 110576322 A CN110576322 A CN 110576322A CN 201910905365 A CN201910905365 A CN 201910905365A CN 110576322 A CN110576322 A CN 110576322A
Authority
CN
China
Prior art keywords
semicircular
cutting
cutting knife
bearing
bearing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910905365.1A
Other languages
Chinese (zh)
Inventor
李永刚
万东海
洪大钧
唐海平
贾达永
宋晓军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Aerospace Xinli Casting and Forging Co Ltd
Original Assignee
Guizhou Aerospace Xinli Casting and Forging Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Aerospace Xinli Casting and Forging Co Ltd filed Critical Guizhou Aerospace Xinli Casting and Forging Co Ltd
Priority to CN201910905365.1A priority Critical patent/CN110576322A/en
Publication of CN110576322A publication Critical patent/CN110576322A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q1/00Members which are comprised in the general build-up of a form of machine, particularly relatively large fixed members
    • B23Q1/25Movable or adjustable work or tool supports
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q3/00Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Turning (AREA)

Abstract

The ITER first-wall narrow-distance linear array pipe cutting tool comprises a semicircular bearing frame, a positioning bearing, a semicircular tool rest, a cutting knife, a hinge pin shaft, a screw and a stress application hole; the positioning bearing is placed on a processing groove on the semicircular bearing frame, the cutting knife is placed on the processing groove on the semicircular knife rest, the positioning bearing and the cutting knife can be in externally tangent contact with the cooling pipe before cutting, and the positioning bearing and the cutting knife freely rotate along with the self-assembly shaft; the semicircular bearing frame and the semicircular tool rest are locked by the screw and are connected into a concentric ring through the hinge pin shaft; stress application holes capable of being inserted with stress application rods are formed in the semicircular bearing frame and the semicircular tool rest. The invention designs a locating bearing on a semicircular bearing frame, designs a cutting knife on a semicircular knife rest, connects the semicircular bearing frame and the semicircular knife rest into a concentric ring by a pin shaft through a hinge, and enables the locating bearing and the cutting knife to be in circumscribed contact with a pipe; the cutting of the cooling pipe can be completed in a narrow space, and the welding repair engineering manufacturing of the cooling pipe of the ITER first wall component is realized.

Description

ITER first-wall narrow-pitch linear array tube cutting tool
Technical Field
The invention belongs to the field of machinery, and relates to a narrow-distance array tube cutting tool, in particular to a narrow-distance array tube cutting tool when fingers and a center beam of a first wall of an international thermonuclear fusion experimental reactor (ITER for short) are welded, assembled and repaired.
background
The ITER project, commonly known as "artificial sun", is the first international controlled nuclear fusion tokamak experimental facility constructed by the seven parties co-investing in china, the european union, india, japan, korea, russia and the usa. An ITER plan is implemented to research the feasibility of the application of the controllable nuclear fusion technical engineering, and a new way is opened for providing infinite, clean and safe new energy for human beings.
The first wall component in the international thermonuclear fusion experimental reactor will bear high thermal load and strong neutron wall load from fusion combustion plasma, and the average neutron load is 0.5MW. m-2. Currently, in the design of an ITER shielding cladding, a first wall mainly comprises beryllium, CuCrZr alloy and structural material stainless steel, and plays a role in shielding high thermal load, and the highest thermal load reaches 4.7MW.m < -2 >. The first wall is more demanding to manufacture because it operates at higher temperatures and thermal stress pulse fatigue.
After the cooling pipes of the fingers and the central beam in the first wall part are welded and assembled in sequence, the whole part is subjected to vacuum helium leak detection, and due to high welding and manufacturing requirements, quality problems such as unqualified vacuum helium leak detection and the like possibly exist, the welding part of the cooling pipe needs to be cut off, the end face is machined, and welding and leak detection are carried out again. Because the cooling pipes are arranged in a narrow-distance linear mode, the pipe distance is only 50mm, the pipe length is 40mm, the cooling pipes which are unqualified in helium leakage detection are only cut in the repairing process, and the rest cooling pipes which are qualified in welding are still connected into a whole. The first wall part is complex in structure and relates to special material parts such as beryllium, and the cooling pipe to be repaired cannot be machined and cut on the whole by a machine tool; and no special pipe cutting machine or pipe cutting tool with limited space can be purchased in the market.
Disclosure of Invention
The invention aims to solve the problems, and provides a narrow-distance linear arrangement pipe cutting tool for repairing an ITER first wall member cooling pipe, which can cut the cooling pipe in a narrow space and realize feasibility of repairing engineering and manufacturing the ITER first wall member cooling pipe.
The ITER first-wall narrow-distance linear array tube cutting tool comprises a semicircular bearing frame 1, a positioning bearing 2, a semicircular tool rest 3, a cutting knife 4, a hinge pin shaft 5, a screw 6 and a stress application hole 7; the positioning bearing 2 is placed on a processing groove on the semicircular bearing frame 1, the cutting knife 4 is placed on a processing groove on the semicircular knife rest 3, the positioning bearing 2 and the cutting knife 4 can be in externally tangent contact with the cooling pipe 8 before cutting, and the positioning bearing 2 and the cutting knife 4 freely rotate along with the self-assembly shaft; the screw 6 locks the semicircular bearing frame 1 and the semicircular tool rest 3, and the semicircular bearing frame and the semicircular tool rest are hinged into a concentric ring through a hinge pin shaft 5; and stress application holes 7 capable of being inserted into stress application rods are formed in the semicircular bearing frame 1 and the semicircular tool rest 3.
Adopt above-mentioned technical scheme's beneficial effect:
The invention determines the maximum rotational diameter and thickness of the cutting tool based on the tube spacing, tube length dimension and tube diameter. A positioning bearing is designed on the semicircular bearing frame, a cutting knife is designed on the semicircular knife rest, the semicircular bearing frame and the semicircular knife rest are connected into a concentric ring by a hinge pin, and the positioning bearing and the cutting knife are in circumscribed contact with the pipe; the cutting of the cooling pipe can be completed in a narrow space, and the welding repair engineering manufacturing of the cooling pipe of the ITER first wall component is realized.
Drawings
FIG. 1 is a block diagram of the narrow pitch linear array tube cutting tool of the present invention.
In the figure: 1-semicircular bearing frame, 2-positioning bearing, 3-semicircular tool rest, 4-cutting knife, 5-hinge pin shaft, 6-screw, 7-stress application hole and 8-cooling pipe.
Detailed Description
As shown in fig. 1, the TER first-wall narrow-distance linear array tube cutting tool comprises a semicircular bearing frame 1, a positioning bearing 2, a semicircular tool rest 3, a cutting knife 4, a hinge pin shaft 5, a screw 6 and a stress application hole 7; the cutting tool is designed according to the pipe spacing, the pipe length and the pipe diameter of a cooling pipe 8, and the inner and outer diameter sizes of a semicircular bearing frame 1 and a semicircular cutter rest 3 are designed; and the cutting pipe is hinged into a concentric ring through a hinge pin shaft 5, so that the cutting pipe does not interfere when rotating.
Processing groove places location bearing 2 on semicircle bearing frame 1, and processing groove places cutting knife 4 on semicircle cutter holder 3 to make location bearing 2 and cutting knife 4, can contact by external tangent with cooling tube 8 before the cutting, and location bearing 2 and cutting knife 4 can be along with self assembly axle free rotation. The semicircular bearing frame 1 and the semicircular tool rest 3 are locked by the screw 6, the stress application rod is inserted into the stress application hole 7 to rotate, and the screw 6 is screwed continuously, so that the cutting knife 4 is rotated to cut into the cooling pipe 8.
The use method of the invention comprises the following steps: when the cooling pipe 8 is cut, the semicircular bearing frame 1 and the semicircular tool rest 3 are firstly opened through the hinge pin shaft 5, and the positioning bearing 2 is sleeved on the cooling pipe 8; rotating the semicircular bearing frame 1, sleeving a cutting knife 4 on the semicircular knife rest 3 on a cooling pipe 8 through a hinge pin shaft 5, and locking the cutting knife 4 by using a screw 6; the stress application rod is inserted into the stress application hole 7 to rotate and is locked by the screw 6 continuously, and the cutting knife 4 is enabled to rotate to cut into the cooling pipe 8 until the cooling pipe 8 is cut off.

Claims (1)

  1. An ITER first wall narrow pitch linear array tube cutting tool, characterized by: the cutting tool comprises a semicircular bearing frame (1), a positioning bearing (2), a semicircular tool rest (3), a cutting knife (4), a hinge pin shaft (5), a screw (6) and a stress application hole (7); the positioning bearing (2) is placed on a processing groove on the semicircular bearing frame (1), the cutting knife (4) is placed on the processing groove on the semicircular knife rest (3), the positioning bearing (2) and the cutting knife (4) can be in externally tangent contact with the cooling pipe (8) before cutting, and the positioning bearing (2) and the cutting knife (4) freely rotate along with an assembly shaft of the positioning bearing and the cutting knife; the semicircular bearing frame (1) and the semicircular tool rest (3) are locked by the screw (6) and are hinged into a concentric ring through a hinge pin shaft (5); and stress application holes (7) capable of being inserted into stress application rods are formed in the semicircular bearing frame (1) and the semicircular tool rest (3).
CN201910905365.1A 2019-09-24 2019-09-24 ITER first-wall narrow-pitch linear array tube cutting tool Pending CN110576322A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910905365.1A CN110576322A (en) 2019-09-24 2019-09-24 ITER first-wall narrow-pitch linear array tube cutting tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910905365.1A CN110576322A (en) 2019-09-24 2019-09-24 ITER first-wall narrow-pitch linear array tube cutting tool

Publications (1)

Publication Number Publication Date
CN110576322A true CN110576322A (en) 2019-12-17

Family

ID=68813492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910905365.1A Pending CN110576322A (en) 2019-09-24 2019-09-24 ITER first-wall narrow-pitch linear array tube cutting tool

Country Status (1)

Country Link
CN (1) CN110576322A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111618513A (en) * 2020-07-08 2020-09-04 贵州航天新力铸锻有限责任公司 ITER first wall edge finger welding clamp and using method thereof
FR3116455A1 (en) * 2020-11-26 2022-05-27 Rudy FERLIN Tube cutting device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2315132A1 (en) * 1973-03-27 1974-10-10 Puspas Metallwarenfabrik Egon Pipe cutter esp for plastics pipes - simultaneously forms chamfer on one end
CN101704128A (en) * 2009-10-30 2010-05-12 烟台鲁宝钢管有限责任公司 Rotary pipe cutter
CN202639482U (en) * 2012-05-30 2013-01-02 天津盛象塑料管业有限公司 Corrugated pipe end socket cutting device
CN104475857A (en) * 2014-12-15 2015-04-01 陈晨 Extrusion type steel pipe cutter and fabrication method thereof
CN105436599A (en) * 2016-01-04 2016-03-30 史中喜 Pipe cutter
CN105965085A (en) * 2016-07-20 2016-09-28 焦祥静 Manual pipe cutter

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2315132A1 (en) * 1973-03-27 1974-10-10 Puspas Metallwarenfabrik Egon Pipe cutter esp for plastics pipes - simultaneously forms chamfer on one end
CN101704128A (en) * 2009-10-30 2010-05-12 烟台鲁宝钢管有限责任公司 Rotary pipe cutter
CN202639482U (en) * 2012-05-30 2013-01-02 天津盛象塑料管业有限公司 Corrugated pipe end socket cutting device
CN104475857A (en) * 2014-12-15 2015-04-01 陈晨 Extrusion type steel pipe cutter and fabrication method thereof
CN105436599A (en) * 2016-01-04 2016-03-30 史中喜 Pipe cutter
CN105965085A (en) * 2016-07-20 2016-09-28 焦祥静 Manual pipe cutter

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111618513A (en) * 2020-07-08 2020-09-04 贵州航天新力铸锻有限责任公司 ITER first wall edge finger welding clamp and using method thereof
CN111618513B (en) * 2020-07-08 2021-10-22 贵州航天新力铸锻有限责任公司 ITER first wall edge finger welding clamp and using method thereof
FR3116455A1 (en) * 2020-11-26 2022-05-27 Rudy FERLIN Tube cutting device

Similar Documents

Publication Publication Date Title
CN110576322A (en) ITER first-wall narrow-pitch linear array tube cutting tool
Slobodyan Resistance, electron-and laser-beam welding of zirconium alloys for nuclear applications: a review
EP0859369B1 (en) Method for the manufacture of a thimble for a nuclear reactor fuel assembly, forming mandrel for such a thimble and thimble obtained by this method
CN108620809B (en) Online repair method for steam seal shaft neck of steam turbine rotor of 1000MW generator set
CN110695513B (en) Molybdenum alloy rotary friction welding gas protection device
CN104308399B (en) Nuclear power station CRDM pneumatic shell Ω seal weld weld defect repairing tool of automobile and method
CN109746633B (en) Manufacturing process of vacuum chamber support welding block assembly
Zhang et al. Diffusion bonding, brazing and resistance welding of zirconium alloys: a review
Kim et al. Effect of heat on the soundness of zircaloy-4 end cap closure using a resistance upset welding
CN109536945A (en) A method of repairing generator rotor shaft neck
Hayashi et al. Development of remote pipe cutting tool for divertor cassettes in JT-60SA
CN102239525A (en) Cladding tube for nuclear fuel rod, method and apparatus for manufacturing a cladding tube
CN105499803A (en) Technology used for assembling and welding irradiating supervision pipe
CN211101989U (en) Titanium alloy horizontal type electrolytic machining anode conducting device
CN113547194B (en) Connection method of tungsten copper module
CN104493201A (en) Internal expanded type facing machine for pipeline
GB2553090A (en) Method of manufacture
CN208507208U (en) A kind of heavy water reactor main pipeline branch pipe connection casing salvaging structure
WANG et al. Flow Field Design and Process Stability in Electrochemical Machining of Involute Internal Splines# br
FR2589535A1 (en) Screw-fastening device for nuclear fuel assembly and method for repairing the assembly using such a device
CN110277177B (en) Method for closing gap between fuel pellet and cladding in target
CN113972064B (en) Control process for magnetic permeability of superconducting magnet framework
CN111586955B (en) Plasma torch cathode assembly
RU2815842C2 (en) Method for manufacturing ball valve for fluid regulation, ball valve and welding tool for holding and manipulating valve parts
Chakin et al. Creep of beryllium pebbles after neutron irradiation to 6000 appm helium production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20191217