CN110563396A - 一种钢板桩围堰引孔回填材料、制备方法以及回填方法 - Google Patents
一种钢板桩围堰引孔回填材料、制备方法以及回填方法 Download PDFInfo
- Publication number
- CN110563396A CN110563396A CN201910873084.2A CN201910873084A CN110563396A CN 110563396 A CN110563396 A CN 110563396A CN 201910873084 A CN201910873084 A CN 201910873084A CN 110563396 A CN110563396 A CN 110563396A
- Authority
- CN
- China
- Prior art keywords
- steel sheet
- sheet pile
- hole
- backfill material
- backfill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/18—Making embankments, e.g. dikes, dams
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B2111/00—Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
- C04B2111/00474—Uses not provided for elsewhere in C04B2111/00
- C04B2111/00724—Uses not provided for elsewhere in C04B2111/00 in mining operations, e.g. for backfilling; in making tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/0023—Slurry
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Chemical & Material Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Paleontology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Ceramic Engineering (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Inorganic Chemistry (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910873084.2A CN110563396A (zh) | 2019-09-16 | 2019-09-16 | 一种钢板桩围堰引孔回填材料、制备方法以及回填方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910873084.2A CN110563396A (zh) | 2019-09-16 | 2019-09-16 | 一种钢板桩围堰引孔回填材料、制备方法以及回填方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110563396A true CN110563396A (zh) | 2019-12-13 |
Family
ID=68780279
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910873084.2A Pending CN110563396A (zh) | 2019-09-16 | 2019-09-16 | 一种钢板桩围堰引孔回填材料、制备方法以及回填方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110563396A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115233642A (zh) * | 2022-08-25 | 2022-10-25 | 中交一公局集团有限公司 | 一种围堰引孔回填料渗水检测方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205399446U (zh) * | 2016-03-23 | 2016-07-27 | 广西大学 | 一种新型锁扣钢管围堰结构 |
CN108457283A (zh) * | 2017-04-24 | 2018-08-28 | 中交公局厦门工程有限公司 | 深水硬岩钢板桩围堰引孔开槽注浆施工方法 |
CN110158624A (zh) * | 2019-05-29 | 2019-08-23 | 中铁大桥局第七工程有限公司 | 一种钢板桩围堰施工方法 |
-
2019
- 2019-09-16 CN CN201910873084.2A patent/CN110563396A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205399446U (zh) * | 2016-03-23 | 2016-07-27 | 广西大学 | 一种新型锁扣钢管围堰结构 |
CN108457283A (zh) * | 2017-04-24 | 2018-08-28 | 中交公局厦门工程有限公司 | 深水硬岩钢板桩围堰引孔开槽注浆施工方法 |
CN110158624A (zh) * | 2019-05-29 | 2019-08-23 | 中铁大桥局第七工程有限公司 | 一种钢板桩围堰施工方法 |
Non-Patent Citations (1)
Title |
---|
史如平: "《土木工程地质学》", 31 August 1994, 江西高校出版社 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115233642A (zh) * | 2022-08-25 | 2022-10-25 | 中交一公局集团有限公司 | 一种围堰引孔回填料渗水检测方法 |
CN115233642B (zh) * | 2022-08-25 | 2024-06-11 | 中交一公局集团有限公司 | 一种围堰引孔回填料渗水检测方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110230309B (zh) | 岩溶区桥梁溶洞桩基施工方法 | |
CN101806059B (zh) | 高速公路下伏采空区地表钻孔注浆投沙工艺 | |
CN104929114A (zh) | 一种高压旋喷桩止水帷幕施工装置及其方法 | |
CN106759297A (zh) | 一种支护桩与三管高压旋喷桩深基坑的施工方法 | |
CN101525881B (zh) | 岩溶地层桩孔护壁构造及桩孔施工方法 | |
CN105736004A (zh) | 盾构用衡盾泥气压开仓保压护壁施工方法 | |
CN101560764B (zh) | 间隔式高压旋喷注浆封堵勘察孔的方法 | |
CN204753574U (zh) | 一种高压旋喷桩止水帷幕施工装置 | |
CN101270576A (zh) | 微型桩二次分段注浆方法 | |
CN104612134A (zh) | 一种用于浇筑施工的钻孔灌注桩后注浆施工方法 | |
CN111119940A (zh) | 一种注浆施工处理方法 | |
CN110965595A (zh) | 一种腐蚀性地质环境下筏板基础建筑抬升加固结构及方法 | |
CN110747848A (zh) | 砂砾层地基深层水泥土搅拌桩防渗墙施工方法 | |
CN102174818A (zh) | 第四系强透水性地层的可控防渗堵漏挤入灌浆止水工艺 | |
CN110241837A (zh) | 一种高承压水地质条件下防止地下室底板开裂的施工方法 | |
CN117107749A (zh) | 填海造陆区域海水渗流影响下大直径冲孔灌注桩施工方法 | |
CN113089655A (zh) | 动水环境三管旋喷桩坑内施工方法 | |
CN110563396A (zh) | 一种钢板桩围堰引孔回填材料、制备方法以及回填方法 | |
CN112523170A (zh) | 一种水库深埋岩溶渗漏通道防渗处理的方法 | |
CN111455976A (zh) | 挖槽法自凝灰浆防渗墙施工方法 | |
CN110792077A (zh) | 一种适用于淤泥质软土中的支盘桩装置及其施工工艺 | |
CN108035357B (zh) | 灌注桩施工方案及其漏斗 | |
CN109881696A (zh) | 一种hppg封底施工方法 | |
US11598065B2 (en) | Method for stabilizing and lifting channel boards by underwater grouting | |
CN114183170A (zh) | 一种岩溶注浆施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Renxu Inventor after: Lei Zhiqiang Inventor after: Wang Gang Inventor after: Tian Le Inventor after: Nan Qingtao Inventor after: Mo Zhaohui Inventor after: Xiong Zhiyong Inventor before: Mao Jingquan Inventor before: Lei Zhiqiang Inventor before: Wang Gang Inventor before: Tian Le Inventor before: Nan Qingtao Inventor before: Mo Zhaohui Inventor before: Xiong Zhiyong |
|
CB03 | Change of inventor or designer information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20211118 Address after: 100000 zhoujiajing, Guanzhuang, Chaoyang District, Beijing Applicant after: CCCC FIRST HIGHWAY ENGINEERING GROUP Co.,Ltd. Applicant after: BRIDGE & TUNNEL ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. Address before: 472000 room 503, building 20, Chang'an Yuefu, Jianxi District, Lingbao City, Sanmenxia City, Henan Province Applicant before: Mao Jingquan |
|
TA01 | Transfer of patent application right | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191213 |
|
RJ01 | Rejection of invention patent application after publication |