CN110533551A - Method for the auxiliary tone data processing of battalion, power supply station - Google Patents

Method for the auxiliary tone data processing of battalion, power supply station Download PDF

Info

Publication number
CN110533551A
CN110533551A CN201910849139.6A CN201910849139A CN110533551A CN 110533551 A CN110533551 A CN 110533551A CN 201910849139 A CN201910849139 A CN 201910849139A CN 110533551 A CN110533551 A CN 110533551A
Authority
CN
China
Prior art keywords
data
model
power supply
supply station
relevant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910849139.6A
Other languages
Chinese (zh)
Inventor
郑厚清
柳占杰
贾德香
刘威
孙艺新
王激华
仇钧
唐晓岚
王松林
黄文江
王程
王智敏
于灏
陈�光
陈睿欣
王玓
刘素蔚
崔维平
高洪达
李心达
石杰
邓博雅
白杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National Grid Energy Research Institute Co Ltd
State Grid Zhejiang Electric Power Co Ltd
State Grid Energy Research Institute Co Ltd
NARI Group Corp
Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
National Grid Energy Research Institute Co Ltd
State Grid Zhejiang Electric Power Co Ltd
NARI Group Corp
Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National Grid Energy Research Institute Co Ltd, State Grid Zhejiang Electric Power Co Ltd, NARI Group Corp, Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical National Grid Energy Research Institute Co Ltd
Priority to CN201910849139.6A priority Critical patent/CN110533551A/en
Publication of CN110533551A publication Critical patent/CN110533551A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a kind of methods for the auxiliary tone data processing of battalion, power supply station, which comprises S1: according to data relevant to the power supply station, establishes the first model.S2: according to second model of the first model foundation, the data mapping mode between first model and second model is determined.S3: analysis and second model relevant data obtain third model.S4: the data analysis mode of the data destroying mode of the third model, the data communication mode of the third model and the third model is set.It solves that Township Merging type of business is many and diverse, is related to the typical problems such as information system is more, operating process is many and diverse, shortcoming business support system function with strong points, seeks auxiliary tone data information to realizing, information fusion, the raising quality of data is promoted to be of great significance.

Description

Method for the auxiliary tone data processing of battalion, power supply station
Technical field
The invention belongs to electrical engineerings and information processing field of engineering technology, and in particular to one kind seeks auxiliary tone for power supply station The method of data processing.
Background technique
Currently, scheduling, fortune inspection, each operation system model of marketing be mostly privately owned model, business integration and it is shared when need It does a large amount of interface exploitation and to work, there are models not to dock, data correspond to the problems such as inconsistent, heavy workload and tight Weight traffic affecting interconnects.
How to design power supply station's integrated business fused data model is current urgent problem to be solved.
The business datum support power distribution rush-repair of Township Merging, acquisition O&M, service request, market mobile operation and line The development of the everyday tasks such as road tour, as new rural village energy mode diversification bring services quantitation, business datum amount It will increase, business datum has the following characteristics that structuring and non-structured mixed type data, different number systems or platform Discretization data, data volume is big and the quality of data is irregular.Therefore, how a large amount of multi-source heterogeneous data are integrated It is also current problem.
With generalization, the precision of the Almightiness type Township Merging business under new rural village situation, so that Township Merging Running environment it is also more complicated.At this stage due to power supply station's data safety management in terms of technology it is relatively deficient, meanwhile, including The data integration of the operation systems such as marketing, fortune inspection needs corresponding data safety guard technology.To improve Township Merging Data safety management system and specification.
Summary of the invention
For the defects in the prior art, the embodiment of the present invention provides a kind of side for the auxiliary tone data processing of battalion, power supply station Method, solve Township Merging type of business it is many and diverse, be related to information system is more, operating process is many and diverse, be short of business support specific aim The typical problems such as strong system function seek auxiliary tone data information to realizing, promote information fusion, the raising quality of data to have important Meaning.
Against the above technical problems, the embodiment of the invention provides a kind of sides for the auxiliary tone data processing of battalion, power supply station Method, which comprises
S1: according to data relevant to the power supply station, the first model is established.
S2: it according to second model of the first model foundation, determines between first model and second model Data mapping mode.
S3: analysis and second model relevant data obtain third model.
S4: the data destroying mode of the third model, the data communication mode of the third model and described are set The data analysis mode of three models.
According to one embodiment of present invention, data relevant to first model include: and the confession in the S1 The relevant data of electric institute's business work order.
According to one embodiment of present invention, the first model described in the S1 includes: the first business model, the first data Model.
According to one embodiment of present invention, the data mapping mode in the S2 includes: in first model The data in conversion, first model with the installations and facilities coding in second model and the number in second model It is decomposed according to the data in polymerization, first model and the data in second model.
According to one embodiment of present invention, in the S3 analysis with second model relevant data include: analysis with The generating mode of the relevant data of the power supply station, analysis data storage relevant to the power supply station, analysis and the power supply The relevant data management of institute, analysis data sharing relevant to the power supply station, analysis data relevant with the power supply station are answered Use mode.
According to one embodiment of present invention, the data storage relevant to the power supply station includes: and the power supply Institute's relevant first data storage and the second data relevant to power supply station storage, described relevant to the power supply station the One data include the storage of transformer data, ammeter data, customer data and work order data;Relevant to the power supply station second Data include photo site data, video data, voice data and power information acquisition data.
According to one embodiment of present invention, the data management relevant to the power supply station includes: and the power supply The relevant data lifecycle management of institute, comprising: the management of on-line storage data, the management of Historical archiving data, history are returned The management of the online technique again of file data and the management of offline access data.
According to one embodiment of present invention, the data sharing relevant to the power supply station includes: the power supply station Data sharing, power supply station's data and the data of electric service command system of data and power grid supplying power for outside service platform are total to It enjoys, the data sharing of power supply station's data and Production Managementsystem For Electricpower Network.
According to one embodiment of present invention, third model data communication mode described in the S4 includes the third mould The communication mode between the communication mode of data and the external world, the data of the third model in type.
According to one embodiment of present invention, the communication mode between the data in the third model includes the power supply station Communication mode between individual application data and power supply station's enterprise application data.
The technical effect that the present invention reaches are as follows: the present invention combs number from support Township Merging items business development According to demand, tracing information system source constructs the mapping relations of " business-data-information system ", researchs and proposes soft based on data Property integrated model business datum Integrated Optimization Model, solve the multi-source heterogeneous problem of data integration of Township Merging, realize pair Power supply station's business datum is generated, storage, maintenance, is shared, the full link management of application and safety, so that data are in support Almightiness type It plays a significant role in the construction of Township Merging.Solve Township Merging type of business is many and diverse, it is more to be related to information system, behaviour Make the typical problems such as the system function that process is many and diverse, shortcoming business support is with strong points, seeks auxiliary tone data information to realizing, promote Information fusion, the raising quality of data are of great significance.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the system flexibility integrated model mapping schematic diagram of the embodiment of the present invention;
Fig. 2 is the data mixing storage scheme schematic diagram of the embodiment of the present invention;
Fig. 3 is the flexible sharing distribution model schematic of the embodiment of the present invention;
Fig. 4 is the security sandbox schematic diagram of the embodiment of the present invention;
Fig. 5 is the credible platform module block diagram of the embodiment of the present invention;
Fig. 6 is the method flow diagram for the auxiliary tone data processing of battalion, power supply station of the embodiment of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art Every other embodiment obtained without making creative work belongs to the model of protection of the embodiment of the present invention It encloses.
Embodiment one:
The present invention from support business developments of Township Merging items, combing data requirements, tracing information system source, It is integrated to research and propose the business datum based on data fusion technique integrated model for the mapping relations for constructing " business-data-information system " Optimized model, solves the multi-source heterogeneous problem of data integration of Township Merging, realize power supply station's business datum is generated, storage, Maintenance, shared, application and safety full link management, so that data play weight in the construction of support Almightiness type Township Merging It acts on.
That present invention aim to address Township Merging types of business is many and diverse, be related to information system is more, operating process is many and diverse, The typical problems such as business support system function with strong points are short of, seek auxiliary tone data information to realizing, promotes information fusion, mention The high quality of data is of great significance.
The technical problem to be solved by the present invention is building power supply station's integrated business fused data model, integrates power supply station Multi-source heterogeneous data improve power supply station's data safety.
The present invention specifically uses following technical scheme:
Method for battalion, power supply station auxiliary tone data assessment, comprising the following steps:
S1: the data requirements of analysis power supply station's integrated business mode constructs power supply station's business model, it is each to specify power supply station The mapping relations of item business datum;
S2: full-service chain is covered in the generation of research power supply station's business datum, storage, management, shared and application mode, foundation " Almightiness type " power supply station Data integration optimization model of item;
S3: research ensures the Technology On Data Encryption of power supply station's data integration application, proposes data protection measure.
Step S1 the following steps are included:
S11: the data requirements of analysis power supply station's integrated business mode;
S12: building power supply station's business model;
S13: the mapping relations of power supply station's items business datum;
The step S2: the following steps are included:
S21: power supply station's business datum is generated, it is characterised in that: be based on power supply station's business model, pass through neutral data model The bi-directional conversion for realizing integrated data, including various kinds of equipment facility code conversion, the polymerizations of small grain size data, big granularity data Decomposition and combination etc. generates the Various types of data of support " Almightiness type " Township Merging.
S22: storage power supply station's business datum, it is characterised in that: research is based on relationship, non-relational database and concentration The application mode of formula, distributed data storage technology in the storage of power supply station's data, studies vertical cutting (longitudinal direction) and level Blended data storage and distribution technology, the simultaneous techniques of data of cutting (transverse direction) form and are directed to what different business used Different types of Data Storage Solution, and verified.
S23: management power supply station's data, it is characterised in that: research power supply station's data lifecycle management technology, to reduce Data redundancy improves data service efficiency, guarantees that data can obtain efficient use in Life cycle.Data is complete Life cycle management is related to the management of data validity interval, level-one on-line storage, second level on-line storage, Historical archiving, Historical archiving The online technique again and offline access technology of data.
S24: shared power supply station's data, it is characterised in that: it is served as theme with " work order ", series devices machine account information, equipment fortune The Various types of data such as row information, personal information, information of vehicles, status information, research power supply station's data refer to 95598, electric service Wave the data sharing relationship of the systems such as system, power grid production management.From support power supply station's business carry out, promote it is multi-specialized fusion, It gets through business whole process, promotes user service interaction etc., data is in the application mode of power supply station and at other The sharing mode of system.
Step S3 the following steps are included:
S31: research mobile security sandbox technology improves the data safety of " Almightiness type " Township Merging application, feature Be: research demarcates the storage region of enterprise's application different in equipment using security sandbox as independent memory space, Each communicating with each other using number formulary evidence is limited, to reinforce the Information Security of " Almightiness type " Township Merging application;
S32: studying credible mobile terminal technology, improves the safety of terminal system data, it is characterised in that: research is hard Introducing on part platform has secure storage and encryption function and can resist the credible platform module distorted, provided by peace Global function makes illegal user that can not change interior data, ensures that the safety of authentication and data encryption, improves The safety of terminal system.
The present invention analyzes as desired, business model analysis, information model building, System Integration Model component, data are deposited Storage solution formulation, the building of data sharing Issuance model, service application design, gradually carry out using the thinking that data safety designs, The research of links is interdepended, is mutually supported, and forms the Township Merging integrated model optimization system of completion.
Firstly, carrying out the analysis of Township Merging business model based on sufficient requirement investigation to promote battalion with business Terminal fusion establishes gridding electric service mode, and compound employee is cultivated in the setting of optimization teams and groups, and support new business is promoted, The service front-end of quick response is constructed, the operation of construction business cooperation, personnel are good at many things and expert in one, service " Almightiness type " township of one-time-reach-place Overall goal carried out by the power supply of town carries out the analysis of Township Merging business model around gridding electric service mode.
Secondly, constructing Almightiness type Township Merging information model based on SG-CIM3.0.
To solve, Almightiness type Township Merging data source is more, expression way difference is big, safeguards low with application efficiency etc. ask Topic effectively supports " Almightiness type " Township Merging application, constructs a set of national grid for following SG-CIM3.0 standard and unifies small towns Power supply station's model criteria.
By building Almightiness type Township Merging model center, Township Merging model criteria is managed, matches for support battalion and melts Polynary isomeric data is closed, for the shared platform of providing uniform services of Almightiness type Township Merging data exchange, unified small towns is provided and is supplied Electric institute's model data service, sufficiently potential value of the battalion with fusion basic information fundamentally solve power supply station's system and marketing industry Business system, fortune inspection operation system Information Interoperability problem, lay solid for the intelligentized sustainable development of Almightiness type Township Merging Basis.
Again, system flexibility integrated model constructs.
System Integration Model includes data field definition, information and definition and correlation map relationship, the definition packet of data field Include the definition of data source, data item, data manipulation collection;The definition of information field includes that information source, item of information, information operation set are determined Justice;The definition of data field to information field include data source to the mapping definition of information source, data item to item of information mapping definition, Mapping definition of the data manipulation collection to information operation set.
As shown in Figure 1, the mapping function for being mapping through flexible control platform of data field and information field is realized, meet integrated Transparent data visiting demand between system.A variety of integrated mapping schemes can be configured by flexible control platform, each is reflected Any combination of one-to-one mapping, many-one mapping, one-to-many mapping can be respectively adopted in the scheme of penetrating, when integrated data cannot Mapping scheme or newly-built mapping scheme can be modified when meet demand, realize that the flexibility of system is flexibly integrated.
Again, about data storage implementation scheme.
In the application scenarios of some complexity of " Almightiness type " Township Merging, centralized database framework cannot all be fully met Using various need at the storage management of power supply station's structuring and unstructured data, complicated analysis, correlation inquiry, real-time It wants, therefore different framework database mixed deployments are applied as the selection for meeting power supply station's complicated applications.Scheme uses relationship type Memory module is mixed with non-relational.It can be good at solving to be able to solve Almightiness type Township Merging to magnanimity structuring and non- The demand that structural data carries out storage and quickly handles.Relevant database is responsible for high value density structure number in the application According to storage and affairs type processing, such as: transformer, ammeter, client, work order, non-relational in the application be responsible for storage and sea Non-structured data and low value density structure data are measured, such as: photo site, video, voice, power information acquisition.
As shown in Fig. 2, the complementation of structuring and unstructured mode in the application of Almightiness type Township Merging embodies , relevant database compensate for non-relational database it is complicated be associated with operation in terms of deficiency, non-relational database is more Defect of the relevant database in terms of mass data storage and unstructured data processing is mended.
Diversity, complexity and relationship type, the non-relational database framework of " Almightiness type " Township Merging application are each From possessed benefit and limitation, cause the database of any framework that cannot all fully meet application demand, therefore not It is used in mixed way with framework database, to make up the deficiency of other frameworks.It is adopted according to " Almightiness type " Township Merging application scenarios The characteristics of being combined collocation with different framework databases, given full play to every kind of framework database and advantage, and with other Structure database forms complementation, is fully contemplated by application demand, guarantees the optimum use of data resource
About data fusion technique sharing distribution model.
As shown in figure 3, release quickly is realized by flexible redundant robot theory and technology, pass through the metadata in configuration database Realize the lateral screening and ordinate screening of data.Not having to modification source code by modification configuration just can adapt to the various of enterprise Changes in demand.This Flexible software design theory can increase the flexibility of entire model from transverse direction, allow model to be no longer in order to It realizes a single function and designs, but solve the problems, such as a kind of.
In terms of release quickly is mainly reflected in following two:
In a first aspect, Issuance model is configurable.Issuance model can be all created before carrying out data publication, in a model may be used To configure the tables of data of publication, issued again after can also being screened to tables of data, it can be quick by modification Issuance model It issues a variety of data, and does not have to the case where developer is by modifying source code and get off meet demand, entire configuration process is opposite It is quickly, to be also achieved that the release quickly of data for modification source code.
Second aspect, security strategy are configurable.Externally issue data by standardized service, carry out data publication it Before will create security strategy, by security strategy configure interface access authority, realize service interface permission fine granularity management, The flexible change of interface authority may be implemented by modifying security strategy.
Again, carry out all kinds of service applications of power supply station around " work order ".
Carry out the centralized management of power supply station's task by " plan pond ", is hand using workform management based on this Section is connected " equipment, people, service ", realizes whole process supervision and the management of power supply station's work in every, and by implementation procedure result For data in conjunction with performance management, the efficiency and quality that the plan of being promoted executes promote user satisfaction.
Then, power supply station's mobile data safety scheme based on security sandbox.
As shown in figure 4, security sandbox is actually to establish a logical partition in storage, the enterprise in equipment is applied And storage region and personal application and storage region are separated.Between data between limitation individual application and enterprise's application mutually It communicates, to strengthen the Information Security of enterprise's application.When device losses, labor turnover, leakage or data are being generated not In legal authorization can with progress remotely erase.
In storage level: if equipment screen protection is not provided with, iOS device is after being escaped from prison, Android device is carrying out Root will directly access storing data later.And although data are stored in security sandbox and can be read, data are through excessively high The encryption of intensity, interceptor can not crack file content.Thus efficiently prevent issuable security risk.It is encrypting Layer uses aes256 high strength encrypting, is encrypted in cipher key layer using double factor cipher mode, guarantees the storage peace of each terminal Entirely.
In application: the application from other business is cannot to store in security sandbox.For answering for enterprises Safe APP is converted into can integrate the SDK that management platform provides.Application in security sandbox can be with the bursting tube of enterprise The slightly effective cooperation of control, can carry out long-range destruction.
In communication level: the data in security sandbox have carried out efficient cryptographic in storage section, if in network layer transport Process captures packet by attacker and carries out radix-minus-one complement, that is also unsafe in entire safe link.Platform is managed in application and service End layer establishes class VPN secure tunnel.The connector of this secure tunnel establishes the APP of some equipment and the encryption tunnel of security gateway Road.Not needing similar system VPN makes to establish VPN in whole equipment layer, does not need switching VPN by hand in user's operation layer and goes even to look forward to Industry application.
In terms of data parsing: by the way of file decryption, reading, deletion, by the SDK with integrated producer to file It is read out, prevents software from separately depositing and sandbox data are revealed;Also document is supported be parsed into picture in visitor in server-side The preview of family end carries out the leakage-preventing DLP control system of multi-faceted data in conjunction with the control of the screenshotss strategy of MDM.
Finally, with regard to credible platform module security mechanism.
Credible platform module is usually the chip with crypto-operation ability and storage capacity, be capable of providing key generate and The functions such as public key signature, and it is internal with nonvolatile memory, it being capable of persistence subscriber identity information or secret information. Structure is as shown in the figure.
In Fig. 5, I/O component is responsible for managing communication bus, completes coding and the decoding of agreement, executes the safety of operation TPM Strategy;Password coprocessor is responsible for the realization of RSA operation, executes encryption, decryption, signature and signature verification function, internal real Existing symmetric cryptography;Key generator is responsible for generating the key of symmetric cryptography and the key pair of asymmetric cryptography operation, and TPM can nothing Limitation ground generates key;HMAC engine provides HMAC calculation function;Randomizer is dissipated by internal state machine and unidirectionally The generation of random number needed for array function completes TPM;SHA-1 engine provides SHA-1 calculation function, and HASH interface can be direct It calls;The power supply status of power detecting component management TPM and platform must be able to detect all power source change situations;Choosing Item control provides the mechanism opened and closed to TPM function, must be in the case where the TPM owner authorizes to the setting of TPM It carries out;Execution unit is responsible for executing the order for sending TPM to by I/O, should firmly believe order performing environment before executing order It is isolation and safety;Nonvolatile memory is for storing the significant datas such as key, certificate and mark.
Embodiment two:
The embodiment of the present invention provides a kind of method for the auxiliary tone data processing of battalion, power supply station, solves Township Merging business Broad categories are related to the typical cases such as information system is more, operating process is many and diverse, shortcoming business support system function with strong points and ask It inscribes, seeks auxiliary tone data information to realizing, information fusion, the raising quality of data is promoted to be of great significance.
Against the above technical problems, the embodiment of the invention provides a kind of sides for the auxiliary tone data processing of battalion, power supply station Method, the method, as shown in Figure 6, comprising:
S1: according to data relevant to the power supply station, the first model is established.
S2: it according to second model of the first model foundation, determines between first model and second model Data mapping mode.
S3: analysis and second model relevant data obtain third model.
S4: the data destroying mode of the third model, the data communication mode of the third model and described are set The data analysis mode of three models.
According to one embodiment of present invention, data relevant to first model include: and the confession in the S1 The relevant data of electric institute's business work order.
According to one embodiment of present invention, the first model described in the S1 includes: the first business model, the first data Model.
According to one embodiment of present invention, the data mapping mode in the S2 includes: in first model The data in conversion, first model with the installations and facilities coding in second model and the number in second model It is decomposed according to the data in polymerization, first model and the data in second model.
According to one embodiment of present invention, in the S3 analysis with second model relevant data include: analysis with The generating mode of the relevant data of the power supply station, analysis data storage relevant to the power supply station, analysis and the power supply The relevant data management of institute, analysis data sharing relevant to the power supply station, analysis data relevant with the power supply station are answered Use mode.
According to one embodiment of present invention, the data storage relevant to the power supply station includes: and the power supply Institute's relevant first data storage and the second data relevant to power supply station storage, described relevant to the power supply station the One data include the storage of transformer data, ammeter data, customer data and work order data;Relevant to the power supply station second Data include photo site data, video data, voice data and power information acquisition data.
According to one embodiment of present invention, the data management relevant to the power supply station includes: and the power supply The relevant data lifecycle management of institute, comprising: the management of on-line storage data, the management of Historical archiving data, history are returned The management of the online technique again of file data and the management of offline access data.
According to one embodiment of present invention, the data sharing relevant to the power supply station includes: the power supply station Data sharing, power supply station's data and the data of electric service command system of data and power grid supplying power for outside service platform are total to It enjoys, the data sharing of power supply station's data and Production Managementsystem For Electricpower Network.
According to one embodiment of present invention, third model data communication mode described in the S4 includes the third mould The communication mode between the communication mode of data and the external world, the data of the third model in type.
According to one embodiment of present invention, the communication mode between the data in the third model includes the power supply station Communication mode between individual application data and power supply station's enterprise application data.
The technical effect that the present invention reaches are as follows: the present invention combs number from support Township Merging items business development According to demand, tracing information system source constructs the mapping relations of " business-data-information system ", researchs and proposes soft based on data Property integrated model business datum Integrated Optimization Model, solve the multi-source heterogeneous problem of data integration of Township Merging, realize pair Power supply station's business datum is generated, storage, maintenance, is shared, the full link management of application and safety, so that data are in support Almightiness type It plays a significant role in the construction of Township Merging.Solve Township Merging type of business is many and diverse, it is more to be related to information system, behaviour Make the typical problems such as the system function that process is many and diverse, shortcoming business support is with strong points, seeks auxiliary tone data information to realizing, promote Information fusion, the raising quality of data are of great significance.
Those of ordinary skill in the art will appreciate that: realize that all or part of the steps of above method embodiment can pass through The relevant hardware of program instruction is completed, and program above-mentioned can be stored in a computer readable storage medium, the program When being executed, step including the steps of the foregoing method embodiments is executed;And storage medium above-mentioned includes: ROM, RAM, magnetic disk or light The various media that can store program code such as disk.
The embodiments such as electronic equipment described above are only schematical, wherein it is described as illustrated by the separation member Unit may or may not be physically separated, and component shown as a unit may or may not be object Manage unit, it can it is in one place, or may be distributed over multiple network units.It can select according to the actual needs Some or all of the modules therein is selected to achieve the purpose of the solution of this embodiment.Those of ordinary skill in the art are not paying wound In the case where the labour for the property made, it can understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can It realizes by means of software and necessary general hardware platform, naturally it is also possible to pass through hardware.Based on this understanding, on Stating technical solution, substantially the part that contributes to existing technology can be embodied in the form of software products in other words, should Computer software product may be stored in a computer readable storage medium, such as ROM/RAM, magnetic disk, CD, including several fingers It enables and using so that a computer equipment (can be personal computer, server or the network equipment etc.) executes each implementation Method described in certain parts of example or embodiment.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the embodiment of the present invention, rather than it is right It is limited;Although the embodiment of the present invention is described in detail referring to foregoing embodiments, the ordinary skill of this field Personnel are it is understood that it is still possible to modify the technical solutions described in the foregoing embodiments, or to part Or all technical features are equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution The range of each embodiment technical solution of the embodiment of the present invention.

Claims (10)

1. the method for the auxiliary tone data processing of battalion, power supply station, which is characterized in that the described method includes:
S1: according to data relevant to the power supply station, the first model is established;
S2: according to second model of the first model foundation, the data between first model and second model are determined Mapping mode;
S3: analysis and second model relevant data obtain third model;
S4: the data destroying mode of the third model, the data communication mode of the third model and the third mould are set The data analysis mode of type.
2. the method according to claim 1, wherein data packet relevant to first model in the S1 It includes: data relevant to power supply station's business work order.
3. the method according to claim 1, wherein the first model described in the S1 includes: the first business mould Type, the first data model.
4. the method according to claim 1, wherein the data mapping mode in the S2 includes: described In first model with the conversion of the installations and facilities coding in second model, the data and described second in first model The data in data aggregate, first model in model and the data in second model are decomposed.
5. the method according to claim 1, wherein analysis and the second model relevant data packet in the S3 Include: the generating mode of relevant to the power supply station data of analysis, analysis data storage relevant with the power supply station, analyze and The relevant data management of the power supply station, analysis data sharing relevant to the power supply station, analyze it is related with the power supply station Data application mode.
6. method according to claim 1 or 5, which is characterized in that the data storage packet relevant to the power supply station Include: the storage of relevant to the power supply station the first data and the second data relevant with power supply station storage, it is described with it is described Relevant first data of power supply station include the storage of transformer data, ammeter data, customer data and work order data;With the confession Electric relevant second data include photo site data, video data, voice data and power information acquisition data.
7. method according to claim 1 or 5, which is characterized in that the data management packet relevant to the power supply station It includes: data lifecycle management relevant to the power supply station, comprising: the management of on-line storage data, Historical archiving data Management, Historical archiving data online technique again management and offline access data management.
8. method according to claim 1 or 5, which is characterized in that the data sharing packet relevant to the power supply station Include: power supply station's data and data sharing, power supply station's data and the electric service of power grid supplying power for outside service platform refer to Wave the data sharing of system, the data sharing of power supply station's data and Production Managementsystem For Electricpower Network.
9. the method according to claim 1, wherein third model data communication mode described in the S4 includes The communication mode between the communication mode of data and the external world, the data of the third model in the third model.
10. according to the method described in claim 9, it is characterized in that, communication mode packet between data in the third model Include the communication mode between power supply station's individual application data and power supply station's enterprise application data.
CN201910849139.6A 2019-09-09 2019-09-09 Method for the auxiliary tone data processing of battalion, power supply station Pending CN110533551A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910849139.6A CN110533551A (en) 2019-09-09 2019-09-09 Method for the auxiliary tone data processing of battalion, power supply station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910849139.6A CN110533551A (en) 2019-09-09 2019-09-09 Method for the auxiliary tone data processing of battalion, power supply station

Publications (1)

Publication Number Publication Date
CN110533551A true CN110533551A (en) 2019-12-03

Family

ID=68667775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910849139.6A Pending CN110533551A (en) 2019-09-09 2019-09-09 Method for the auxiliary tone data processing of battalion, power supply station

Country Status (1)

Country Link
CN (1) CN110533551A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102385739A (en) * 2011-11-15 2012-03-21 中国电力科学研究院 Integrated information management platform for county-level power supply enterprises
CN106203890A (en) * 2016-07-27 2016-12-07 国网河南省电力公司电力科学研究院 Battalion based on CIM auxiliary tone integration data modeling method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102385739A (en) * 2011-11-15 2012-03-21 中国电力科学研究院 Integrated information management platform for county-level power supply enterprises
CN106203890A (en) * 2016-07-27 2016-12-07 国网河南省电力公司电力科学研究院 Battalion based on CIM auxiliary tone integration data modeling method

Similar Documents

Publication Publication Date Title
Wang et al. Integrating blockchain technology into the energy sector—from theory of blockchain to research and application of energy blockchain
CN111526200B (en) Data storage access method and system based on blockchain and cloud platform
CN109492991B (en) Intelligent integrated management system for power distribution project construction
CN111444277B (en) Anti-terrorism information cooperative sharing platform and method based on blockchain technology
CN105893593A (en) Data fusion method
CN110580148B (en) Integration-oriented EPC project management platform
CN113821564A (en) Heterogeneous parallel block chain and on-chain data and under-chain contract cooperation method thereof
CN113660327A (en) Block chain system, block chain link point adding method and transaction method
Jiang et al. A cross-chain solution to integration of iot tangle for data access management
Miao et al. Smart Micro-GaS: A cognitive micro natural gas industrial ecosystem based on mixed blockchain and edge computing
Yang et al. Application of blockchain in internet of things
Alam IBchain: Internet of things and blockchain integration approach for secure communication in smart cities
Qiang et al. Mine consortium blockchain: the application research of coal mine safety production based on blockchain
Qi et al. Research of energy consumption monitoring system based on iot and blockchain technology
Ali et al. Internet of Things Assisted Blockchain based Secured Cloud Data Maintenance Scheme
ZhuanSun et al. The mechanism of evolution and balance for e-commerce ecosystem under blockchain
Wen et al. Application of blockchain technology in data management: advantages and solutions
CN112927079A (en) Block chain-based digital asset management of power industry
CN109474706B (en) data security centralized service method and system
CN110533551A (en) Method for the auxiliary tone data processing of battalion, power supply station
CN114119278A (en) Multi-station fusion power resource management system based on block chain technology
Zhang et al. Blockchain-based power digital asset security management framework
Liu Research on university book sharing cloud platform based on blockchain
CN113469554A (en) Community security task supervision method based on alliance chain management
Wu et al. Development of smart cities in Taiwan from the perspective of cloud computing security

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191203

RJ01 Rejection of invention patent application after publication