CN110531144A CN201910737936.5A CN201910737936A CN110531144A CN 110531144 A CN110531144 A CN 110531144A CN 201910737936 A CN201910737936 A CN 201910737936A CN 110531144 A CN110531144 A CN 110531144A
Authority
CN
China
Prior art keywords
switching operation
disconnecting switch
grid switching
signal
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910737936.5A
Other languages
Chinese (zh)
Inventor
郑永强
林丹敏
黄小荣
李肖莎
李崇仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUHAI WATT ELECTRICAL EQUIPMENT CO Ltd
Original Assignee
ZHUHAI WATT ELECTRICAL EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUHAI WATT ELECTRICAL EQUIPMENT CO Ltd filed Critical ZHUHAI WATT ELECTRICAL EQUIPMENT CO Ltd
Priority to CN201910737936.5A priority Critical patent/CN110531144A/en
Publication of CN110531144A publication Critical patent/CN110531144A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/165Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values
    • G01R19/16533Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values characterised by the application
    • G01R19/16538Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values characterised by the application in AC or DC supplies

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

It includes processing unit, current acquisition unit, voltage acquisition unit, state acquisition unit, function selection unit and prompt unit that the present invention, which discloses a kind of grid switching operation guide device and method, the device,;Current acquisition unit is for acquiring the current signal for flowing through disconnecting switch;State acquisition unit is used to acquire the on off operating mode signal of the auxiliary contact of disconnecting switch;Voltage acquisition unit is used to acquire the voltage signal of charger and battery group;Processing unit is used to judge according to current signal, on off operating mode signal and voltage signal the correctness of grid switching operation, and the acousto-optic hint of grid switching operation is carried out by prompt unit.The present invention realizes the acousto-optic hint of grid switching operation through the processing unit and judges the correctness of grid switching operation according to current signal, on off operating mode signal and voltage signal, it can guarantee the correctness of grid switching operation, and avoid all-sidedly and accurately judging and identify potential potential faults because the difference of technology level of operator is larger.

Description

A kind of grid switching operation guide device and method
Technical field
The present invention relates to electrical equipment technical fields, and in particular to a kind of grid switching operation guide device and method.
Background technique
In power plant and substation, DC power system is relay protection, control loop, monitoring and communication equipment in standing The equal reliable working power of offers plays very important effect to power infrastructures safe and stable operation.
According to electric system to the related regulation of DC power system, hold to verify the battery group of DC power system Amount, Ying Jinhang checking discharging test, to determine whether battery meets the service requirement of DC power system.Battery group exists Before carrying out checking discharging test, needs to carry out many and diverse grid switching operation, battery group is completely disengaged with load, and must protect It demonstrate,proves in operating process, the load of DC power system not decompression, therefore, it is necessary to move back related isolation according to the throwing of correct operating process Switch, and must also restore as former state after core holds.
Please refer to Fig. 1, DC power system generallys use duplicate system retrofit, independent there are two sets in same station factory DC power system, every set DC power system include the battery group connecting with bus and fill with what battery group was connect Motor, wherein first set DC power system includes that charger I and battery group I, charger I pass through disconnecting switch ZK1 and I Section bus connection, battery group I are connect by disconnecting switch ZK2 with I sections of buses, and second set of DC power system includes charger II and battery group II, charger II are connect by disconnecting switch ZK3 with II sections of buses, and battery group II passes through disconnecting switch ZK4 is connect with II sections of buses, is connected with disconnecting switch ZK5 between I sections of buses and II sections of buses, wherein each disconnecting switch (ZK1 ~ZK5) it include the main contacts and auxiliary contact to link.If wherein a set of failure needs to overhaul, need to pass through This section of load is transferred to another set of DC power system by grid switching operation, manages whole loads by a set of DC power system, and After this maintenance completion, respective autonomous working is reverted to.
At this stage, every power equipment operation in power plant or substation, almost requires manual operation to complete, It can guarantee the stability of work operation.Therefore, during every electric power operation, these operator's oneself factors play non- Normal important role.Some operators, may be because of the scarce capacity of itself during operation, can not be according to stringent Standard operation program work, thus the phenomenon that occurring as soon as operation error.In addition to this, in operation, mainly It relies on operator and artificial judgment and identification is carried out to the method for operation, equipment state etc., since the technical level of operator is poor It is different larger, cannot all-sidedly and accurately judge and identify potential potential faults, to operating result and system reliability of operation without Method is guaranteed.
Summary of the invention
In view of the deficiencies of the prior art, it is an object of the invention at least solve the technical problems existing in the prior art it One, a kind of grid switching operation guide device is provided, for solving there is peace by artificial grid switching operation and manual identified equipment state The problem of full hidden danger.
The contents of the present invention are as follows:
A kind of grid switching operation guide device, the current acquisition being connect including processing unit and respectively with the processing unit Unit, voltage acquisition unit, state acquisition unit, function selection unit and prompt unit;
The current signal is sent to by the current acquisition unit for acquiring the current signal for flowing through disconnecting switch The processing unit;
The state acquisition unit is used to acquire the on off operating mode signal of the auxiliary contact of disconnecting switch, and by the on-off Status signal is sent to the processing unit;
The voltage acquisition unit is used to acquire the voltage signal of charger and battery group, and the voltage signal is sent out Give the processing unit;
The processing unit is used to be fallen according to the judgement of the current signal, the on off operating mode signal and the voltage signal The correctness of lock operation, and pass through the acousto-optic hint of prompt unit progress grid switching operation.
Preferably, the prompt unit includes state simulation figure, and the shape there are two types of color is arranged on the state simulation figure State indicator light, the status indicator lamp of the first color are used to indicate operation correctly, and the status indicator lamp of second of color is for referring to Show operating mistake.
Preferably, the prompt unit further includes display and/or audio alert unit.
Preferably, the processing unit includes the analog to digital conversion circuit and comparator circuit to link together, the modulus The input terminal of conversion circuit connects with the current acquisition unit, the voltage acquisition unit and the state acquisition unit respectively It connects, the output end of the comparator circuit is connect with the prompt unit.
Preferably, the processing unit is also connected with clock synchronization unit.
The present invention also provides a kind of grid switching operation bootstrap techniques, set for solving by artificial grid switching operation and manual identified There is security risk in standby state.
A kind of grid switching operation bootstrap technique, based on above-mentioned grid switching operation guide device, comprising the following steps:
S1. selection needs the DC power system section of grid switching operation;
S2. initialization detection is carried out to the disconnecting switch of the DC power system section;
S3. grid switching operation guidance is carried out according to preset grid switching operation process, and detects the current signal, the on-off Status signal and the voltage signal;
S4. current grid switching operation is judged according to the current signal, the on off operating mode signal and the voltage signal It is whether correct, if so, continuing grid switching operation guidance, otherwise, issue alarm.
Preferably, preset grid switching operation process includes back brake start-up operation and back brake recovery operation in step S3;Wherein,
The following steps are included: when the section of DC power system is I sections, disconnecting switch ZK5 closes a floodgate for back brake start-up operation, Disconnecting switch ZK2 separating brake, disconnecting switch ZK1 separating brake;When the section of DC power system is II, disconnecting switch ZK5 closes a floodgate, every It leaves and closes ZK4 separating brake, disconnecting switch ZK3 separating brake;
The following steps are included: when the section of DC power system is I sections, disconnecting switch ZK1 closes a floodgate for back brake recovery operation, Disconnecting switch ZK2 closes a floodgate, disconnecting switch ZK5 separating brake;When the section of DC power system is II, disconnecting switch ZK3 closes a floodgate, every It leaves and closes ZK4 combined floodgate, disconnecting switch ZK5 separating brake.
Preferably, worked as in step S4 according to the judgement of the current signal, the on off operating mode signal and the voltage signal The whether correct method of preceding grid switching operation includes,
The judgment method of disconnecting switch closing operation correctness: if the current signal is greater than current threshold, and described logical Disconnected status signal is closed state, then disconnecting switch closing operation is correct, otherwise disconnecting switch closing operation mistake;
The judgment method of disconnecting switch sub-switching operation correctness: if the voltage signal is greater than voltage threshold, and described logical Disconnected status signal is off-state, then disconnecting switch sub-switching operation is correct, otherwise disconnecting switch sub-switching operation mistake.
The invention has the benefit that the present invention realizes the acousto-optic hint of grid switching operation and through the processing unit according to institute State the correctness that current signal, the on off operating mode signal and the voltage signal judge grid switching operation, it is ensured that back brake behaviour The correctness of work, and avoid all-sidedly and accurately judging and identify to dive because the difference of technology level of operator is larger Potential faults.
Detailed description of the invention
Fig. 1 show the schematic diagram of DC power system in the prior art;
Fig. 2 show the functional block diagram of grid switching operation guide device embodiment of the present invention;
Fig. 3 show the schematic diagram of the operation panel of the embodiment of the present invention.
Specific embodiment
The above description is only an overview of the technical scheme of the present invention, in order to better understand the technical means of the present invention, And it can be implemented in accordance with the contents of the specification, and in order to allow above and other objects, features and advantages of the invention can It is clearer and more comprehensible, it is special below to lift preferred embodiment, and cooperate attached drawing, detailed description are as follows.
Please refer to Fig. 1-2, a kind of grid switching operation guide device disclosed in the present embodiment, including processing unit 1 and difference It the current acquisition unit 2 that is connect with processing unit 1, voltage acquisition unit 3, state acquisition unit 4, function selection unit 5 and mentions Show unit 6;
Current acquisition unit 2 sends current signal for acquiring the current signal for flowing through disconnecting switch ZK1~ZK5 To processing unit 1;
Each disconnecting switch includes main contacts and auxiliary contact, and main contacts and auxiliary contact are linkages, and are flowed through auxiliary Help the electric current of contact small, without taking arc extinguishing measure that can obtain the switch state of disconnecting switch ZK1~ZK5, state acquisition list The on off operating mode signal of auxiliary contact of the member 4 for acquiring disconnecting switch ZK1~ZK5, and on off operating mode signal is sent to place Manage unit 1;
Voltage acquisition unit 3 is used to acquire the voltage signal of charger and battery group, and voltage signal is sent to place Unit 1 is managed, wherein charger includes charger I and charger II, and battery group includes battery group I and battery group II;
Processing unit 1 is used to judge according to current signal, on off operating mode signal and voltage signal the correctness of grid switching operation, And the acousto-optic hint of grid switching operation is carried out by prompt unit 6.
In the present embodiment, existing circuit is can be used in current acquisition unit 2 and voltage acquisition unit 3, and wherein electric current is adopted The input terminal of collection unit 2 is connect with the auxiliary contact of disconnecting switch ZK1~ZK5 respectively, the input terminal difference of voltage acquisition unit 3 It is connect with the auxiliary contact of disconnecting switch ZK1~ZK5.The present embodiment through the processing unit 1 realize grid switching operation acousto-optic hint And the whether correct of grid switching operation is judged according to current signal, on off operating mode signal and voltage signal, it is ensured that back brake behaviour The correctness of work, and avoid all-sidedly and accurately judging and identify to dive because the difference of technology level of operator is larger Potential faults.
Referring to figure 3., prompt unit 6 includes state simulation Figure 61, and there are two types of the shapes of color for setting on state simulation Figure 61 State indicator light 62, the status indicator lamp of the first color are used to indicate operation correctly, and the status indicator lamp of second of color is used for It indicates operating mistake, current operation and equipment relevant to current operation can be intuitively shown by state simulation Figure 61 Title for operator insufficient for experience, can quickly identify the equipment for leading to failure because of operation error, guarantee work Make the stability run, and use the status indicator lamp of two kinds of colors, can intuitively show whether current operation is correct.
Prompt unit 6 further includes that display 63 and/or audio alert unit (not shown) are mentioned according to needs of production Show that unit 6 can configure at least one of display 63 and audio alert unit, display 63 is displayed for operate Information, the audio alert unit such as function, the process of grid switching operation and result can be used for carrying out voice prompting and alarm, operate Personnel improve grid switching operation without often checking display 63 or state simulation Figure 61 it can be learnt that whether current operation is correct Convenience.
Further, function selection unit 5, state simulation Figure 61, display 63 and audio alert unit can integrate and set It sets on operation panel 8, further, display 63 can use touching-type monitor, advantageously reduce operation button, make The input of information and more facilitating for display.
State acquisition unit 4 is led to by detecting whether that electric current flows through disconnecting switch ZK1~ZK5 come what detection and isolation switched Disconnected state, if there is electric current to flow through disconnecting switch ZK1~ZK5, disconnecting switch ZK1~ZK5 is in closed state, otherwise keeps apart Pass is in an off state, such as: if there is electric current to flow through disconnecting switch ZK1, disconnecting switch ZK1 is in closed state, otherwise every Pass is left to be in an off state.State acquisition unit 4 includes sequentially connected filter circuit, signal amplification circuit and trigger electricity Road, wherein the input terminal of filter circuit and the auxiliary contact of disconnecting switch connect, and filter circuit can filter out disconnecting switch on-off When the peak voltage that generates, guarantee the safety of circuit;Signal amplification circuit is for putting the lesser signal of signal strength Greatly, guarantee that signal strength meets circuit requirement;The output end of flip-flop circuit is connect with processing unit 1, and flip-flop circuit can be with Using the memory function of trigger, signal is maintained at stable state.
Processing unit 1 includes the analog to digital conversion circuit and comparator circuit to link together, the input of analog to digital conversion circuit End connect respectively with current acquisition unit 2, voltage acquisition unit 3 and state acquisition unit 4, the output end of comparator circuit with mention Show that unit 6 connects, processing unit 1 is using the chip or circuit with logical process function, it is preferred that processing unit 1 uses type It number is the single-chip computer and its peripheral circuit of STM32 series, processing unit 1 is by built-in analog to digital conversion circuit by analog signal turn It is changed to digital signal, convenient for the operation of logic, comparator circuit is compared for realizing digital signal with preset threshold value, is sentenced Whether current operation of breaking is correct.
Processing unit 1 is also connected with clock synchronization unit 7, and clock synchronization unit 7 uses GPS time setting circuit, the clock synchronization of GPS time setting circuit Error can record operation, operation and alert data in real time, be conducive to subsequent analysis and diagnosis less than 1 millisecond.
The present embodiment also provides a kind of grid switching operation bootstrap technique, based on above-mentioned grid switching operation guide device, including with Lower step:
S1. selection needs the DC power system section of grid switching operation, and the section of DC power system includes I sections and II Section;
S2. initialization detection is carried out to the disconnecting switch of DC power system section, it can be determined that disconnecting switch is current Whether state meets preset requirement, if so, thening follow the steps S3, otherwise, issues alarm;
S3. grid switching operation guidance, and sensed current signal, on off operating mode signal are carried out according to preset grid switching operation process And voltage signal;
S4. judge whether current grid switching operation is correct according to current signal, on off operating mode signal and voltage signal, if It is then to continue grid switching operation guidance, otherwise, issues alarm.
The monitoring and guidance of the grid switching operation bootstrap technique of the present embodiment 1 pair of grid switching operation process through the processing unit, can To guarantee the specification of grid switching operation, the probability of operation error is reduced;Through the processing unit 1 come to the method for operation, equipment state into Row judgement, can be larger due to the difference of technology level of operator in solution, cannot all-sidedly and accurately judge and identify potential Potential faults the problem of, be conducive to improve operating result and system reliability of operation.
Specifically, preset grid switching operation process includes back brake start-up operation and back brake recovery operation in step S3;Wherein,
The following steps are included: when the section of DC power system is I sections, disconnecting switch ZK5 closes a floodgate for back brake start-up operation, Disconnecting switch ZK2 separating brake, disconnecting switch ZK1 separating brake;When the section of DC power system is II, disconnecting switch ZK5 closes a floodgate, every It leaves and closes ZK4 separating brake, disconnecting switch ZK3 separating brake;
The following steps are included: when the section of DC power system is I sections, disconnecting switch ZK1 closes a floodgate for back brake recovery operation, Disconnecting switch ZK2 closes a floodgate, disconnecting switch ZK5 separating brake;When the section of DC power system is II, disconnecting switch ZK3 closes a floodgate, every It leaves and closes ZK4 combined floodgate, disconnecting switch ZK5 separating brake.
Judge whether current grid switching operation is correct according to current signal, on off operating mode signal and voltage signal in step S4 Method include,
The judgment method of disconnecting switch closing operation correctness: if current signal is greater than current threshold, and on off operating mode is believed Number be closed state, then disconnecting switch closing operation is correct, otherwise disconnecting switch closing operation mistake;
The judgment method of disconnecting switch sub-switching operation correctness: if voltage signal is greater than voltage threshold, and on off operating mode is believed Number be off-state, then disconnecting switch sub-switching operation is correct, otherwise disconnecting switch sub-switching operation mistake.
The decision logic of the present embodiment is as shown in table 1, wherein IThreshold valueFor the current threshold for flowing through disconnecting switch, UThreshold valueKeep apart The voltage threshold of pass:
Table 1
Keeping apart for the present embodiment close/and separating brake judges whether operation is correct by two kinds of signals, it can be to avoid list Unstable, the reliability of guarantee grid switching operation guidance of one signal.
The above, only presently preferred embodiments of the present invention, the invention is not limited to above embodiment, as long as It reaches technical effect of the invention with identical means, all should belong to protection scope of the present invention.In protection model of the invention Its technical solution and/or embodiment can have a variety of different modifications and variations in enclosing.

Claims (8)

1. a kind of grid switching operation guide device, it is characterised in that: including processing unit (1) and respectively with the processing unit (1) the current acquisition unit (2) that connects, state acquisition unit (4), function selection unit (5) and mentions voltage acquisition unit (3) Show unit (6);
The current acquisition unit (2) is for acquiring the current signal for flowing through disconnecting switch (ZK1~ZK5), and by the electric current Signal is sent to the processing unit (1);
The state acquisition unit (4) is used to acquire the on off operating mode signal of the auxiliary contact of disconnecting switch (ZK1~ZK5), and The on off operating mode signal is sent to the processing unit (1);
The voltage acquisition unit (3) is used to acquire the voltage signal of charger and battery group, and the voltage signal is sent out Give the processing unit (1);
The processing unit (1) is used to be fallen according to the judgement of the current signal, the on off operating mode signal and the voltage signal The correctness of lock operation, and pass through the acousto-optic hint of the prompt unit (6) progress grid switching operation.
2. grid switching operation guide device as described in claim 1, it is characterised in that: the prompt unit (6) includes state mould Quasi- to scheme (61), there are two types of the status indicator lamp (62) of color, the states of the first color for setting on the state simulation figure (61) Indicator light is used to indicate operation correctly, and the status indicator lamp of second of color is used to indicate operating mistake.
3. grid switching operation guide device as claimed in claim 2, it is characterised in that: the prompt unit (6) further includes display Device (63) and/or audio alert unit.
4. grid switching operation guide device as described in claim 1, it is characterised in that: the processing unit (1) includes being connected to Analog to digital conversion circuit and comparator circuit together, the input terminal of analog-digital conversion circuit as described respectively with the current acquisition unit (2), the voltage acquisition unit (3) and the state acquisition unit (4) connection, the output end of the comparator circuit with it is described Prompt unit (6) connection.
5. grid switching operation guide device as described in claim 1, it is characterised in that: the processing unit (1) is also connected with pair Shi Danyuan (7).
6. a kind of grid switching operation bootstrap technique, which is characterized in that drawn based on grid switching operation described in claim 1-5 any one Lead device, comprising the following steps:
S1. selection needs the DC power system section of grid switching operation;
S2. initialization detection is carried out to the disconnecting switch of the DC power system section;
S3. grid switching operation guidance is carried out according to preset grid switching operation process, and detects the current signal, the on off operating mode Signal and the voltage signal;
S4. whether current grid switching operation is judged according to the current signal, the on off operating mode signal and the voltage signal Correctly, if so, continuing grid switching operation guidance, otherwise, alarm is issued.
7. grid switching operation bootstrap technique as claimed in claim 6, which is characterized in that preset grid switching operation process in step S3 Including back brake start-up operation and back brake recovery operation;Wherein,
The following steps are included: when the section of DC power system is I sections, disconnecting switch ZK5 closes a floodgate for back brake start-up operation, isolation Switch ZK2 separating brake, disconnecting switch ZK1 separating brake;When the section of DC power system is II, disconnecting switch ZK5 closes a floodgate, and keeps apart Close ZK4 separating brake, disconnecting switch ZK3 separating brake;
The following steps are included: when the section of DC power system is I sections, disconnecting switch ZK1 closes a floodgate for back brake recovery operation, isolation Switch ZK2 closes a floodgate, disconnecting switch ZK5 separating brake;When the section of DC power system is II, disconnecting switch ZK3 closes a floodgate, and keeps apart It closes ZK4 to close a floodgate, disconnecting switch ZK5 separating brake.
8. grid switching operation bootstrap technique as claimed in claim 6, which is characterized in that in step S4 according to the current signal, The on off operating mode signal and the voltage signal judge that the whether correct method of current grid switching operation includes,
The judgment method of disconnecting switch closing operation correctness: if the current signal is greater than current threshold, and the on-off shape State signal is closed state, then disconnecting switch closing operation is correct, otherwise disconnecting switch closing operation mistake;
The judgment method of disconnecting switch sub-switching operation correctness: if the voltage signal is greater than voltage threshold, and the on-off shape State signal is off-state, then disconnecting switch sub-switching operation is correct, otherwise disconnecting switch sub-switching operation mistake.
CN201910737936.5A 2019-08-12 2019-08-12 A kind of grid switching operation guide device and method Pending CN110531144A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910737936.5A CN110531144A (en) 2019-08-12 2019-08-12 A kind of grid switching operation guide device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910737936.5A CN110531144A (en) 2019-08-12 2019-08-12 A kind of grid switching operation guide device and method

Publications (1)

Publication Number Publication Date
CN110531144A true CN110531144A (en) 2019-12-03

Family

ID=68662922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910737936.5A Pending CN110531144A (en) 2019-08-12 2019-08-12 A kind of grid switching operation guide device and method

Country Status (1)

Country Link
CN (1) CN110531144A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106571688A (en) * 2016-11-11 2017-04-19 广东电网有限责任公司揭阳供电局 Method for monitoring operation mode of direct-current system and operation states of disconnecting switches
CN109596880A (en) * 2018-11-28 2019-04-09 国家电网有限公司 One kind being based on substation's alternating current-direct current down Monitor Unit system and monitoring method
CN109888765A (en) * 2019-03-29 2019-06-14 国网湖北省电力有限公司宜昌供电公司 Two electricity two of 220KV fills direct current system and does not have a power failure replacing options
CN209044025U (en) * 2018-09-12 2019-06-28 深圳供电局有限公司 A kind of dual power supply direct current system bus connection switch combined floodgate self-checking unit
CN210835055U (en) * 2019-08-12 2020-06-23 珠海瓦特电力设备有限公司 Switching operation guiding device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106571688A (en) * 2016-11-11 2017-04-19 广东电网有限责任公司揭阳供电局 Method for monitoring operation mode of direct-current system and operation states of disconnecting switches
CN209044025U (en) * 2018-09-12 2019-06-28 深圳供电局有限公司 A kind of dual power supply direct current system bus connection switch combined floodgate self-checking unit
CN109596880A (en) * 2018-11-28 2019-04-09 国家电网有限公司 One kind being based on substation's alternating current-direct current down Monitor Unit system and monitoring method
CN109888765A (en) * 2019-03-29 2019-06-14 国网湖北省电力有限公司宜昌供电公司 Two electricity two of 220KV fills direct current system and does not have a power failure replacing options
CN210835055U (en) * 2019-08-12 2020-06-23 珠海瓦特电力设备有限公司 Switching operation guiding device

Similar Documents

Publication Publication Date Title
CN106451794B (en) Monitoring and alarming device and method for separating storage battery from direct current bus
CN106680634B (en) A kind of intelligent early-warning method of intelligent substation relay protection safety measure
CN105470555B (en) A kind of power battery pack structure and its management method
CN104518530A (en) Lithium battery pack management system
CN107290676A (en) A kind of batteries main fuse fusing and open circuit detection method and device
CN105158647A (en) Single station end fault diagnosis and auxiliary decisionmaking method based on power supply monitoring system
CN105098995B (en) On off state supervising device in a kind of transformer station's cabinet
CN204065352U (en) Multiplex relay rapid verification platform
CN203481887U (en) Lithium battery set management system
CN205811520U (en) The open phase protection that multiple redundancy Intelligent live amount shows
CN108063491B (en) Cooling control system of forced oil circulation air-cooled transformer
CN110531144A (en) A kind of grid switching operation guide device and method
CN111775706A (en) Power battery low-voltage manual maintenance switch control system and vehicle
CN208569006U (en) Industrial direct current 24V uninterruption power source
CN210835055U (en) Switching operation guiding device
CN214376006U (en) Fill electric pile main control unit's test system
CN204760767U (en) A PT parallels device for transformer substation
CN205017100U (en) Switch condition monitoring device in transformer substation's cabinet
CN209673880U (en) A kind of observation circuit in direct current output circuit
CN203894338U (en) Three-phase failure power-off independent alarm device
CN106841862B (en) Pacify river frequency converter UV method for diagnosing faults and its automatic detection device
CN111880105A (en) Detection isolation system for direct-current storage battery pack of transformer substation and isolation method thereof
CN205159233U (en) But circuit breaker of hot plugging controller
CN206922500U (en) A kind of emergency power generation automatic switching system
CN109358294A (en) Cell batteries open circuit online monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination