CN110529112A - Rock mass waterpower is without acoustic bearing crushing device - Google Patents

Rock mass waterpower is without acoustic bearing crushing device Download PDF

Info

Publication number
CN110529112A
CN110529112A CN201910841318.5A CN201910841318A CN110529112A CN 110529112 A CN110529112 A CN 110529112A CN 201910841318 A CN201910841318 A CN 201910841318A CN 110529112 A CN110529112 A CN 110529112A
Authority
CN
China
Prior art keywords
pressure
rock
fluid
rubber plug
eyelet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910841318.5A
Other languages
Chinese (zh)
Other versions
CN110529112B (en
Inventor
赵健
张贵才
田宗正
徐依吉
蔺爱国
刘新亮
尹海亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum East China
Original Assignee
China University of Petroleum East China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum East China filed Critical China University of Petroleum East China
Priority to CN201910841318.5A priority Critical patent/CN110529112B/en
Publication of CN110529112A publication Critical patent/CN110529112A/en
Application granted granted Critical
Publication of CN110529112B publication Critical patent/CN110529112B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/06Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole
    • E21C37/08Devices with pistons, plungers, or the like, pressed locally against the wall of the borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/06Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole
    • E21C37/12Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole by injecting into the borehole a liquid, either initially at high pressure or subsequently subjected to high pressure, e.g. by pulses, by explosive cartridges acting on the liquid

Abstract

The invention belongs to mines, road construction field, in particular to a kind of rock mass waterpower is without acoustic bearing crushing device, including lorry, filter, diesel engine, high-pressure pump, limited block, clamp nut, dedicated wedge-type seal block, upper connecting rod, pressure-bearing pipe, diversion pipe, rubber plug, spacer, upper piston, lower piston, sphenoid, cutting ferrule etc., cooperate dedicated eyelet sealing structure by high-pressure pump hydraulic pressurization, realize that rock mass is noiseless, orientation, large volume is broken, vibration will not be generated in work progress, slungshot, dust, the problems such as noise, it is applicable not only to the hard brittle rock of various intensity, various sizes eyelet, it applies also for hole rock mass or there is certain elastic rock mass, rock crushing direction is controllable, effectively improve rock-breaking efficiency, reduce construction cost.

Description

Rock mass waterpower is without acoustic bearing crushing device
Technical field
The present invention relates to a kind of rock mass waterpower without acoustic bearing crushing device, belongs to mine, road construction field.
Background technique
It during mining, constructing tunnel, needs to be crushed rock mass, common method is quick-fried using explosive Broken, there are the safety and environmental protections such as vibration, slungshot, dust, noise in explosive blasting, and explosive blasting can not in the construction process Control rock crushing direction.Gradually attention with people to safety and environmental protection problem, and need to control rock mass in special circumstances When splitting scope, the limitation of explosive blasting technology is more highlighted, therefore explosive blasting technology answering in rock crushing construction With being subject to certain restrictions.
Voiceless demolition technology is a kind of novel fast and efficiently static rock crushing operation mode, and technology construction will not The problems such as generating vibration, slungshot, dust, noise, non-pollution safety environmental protection has been widely used in city tunnel, building is applied Each field that the discomfort such as work, house breaking, mining is blown up with dynamite, the technology can effectively control explosion range.At present The method that common voiceless demolition technology uses filled by expanded agent, is drilled on rock mass with drilling machine first, is then injected in hole Swelling agent, swelling agent constantly react expansion, rock mass spalling are crushed, but this method also has limitation, it is necessary first to a large amount of swollen It is swollen dose, at high cost, the swelling agent being finished the problem of there is also processing, secondly because be using swelling agent expansion by rock spalling, The limited deformation of swelling agent, it is larger (or softer) if there is macrovoid or rock mass elasticity, expected expansion is often not achieved Effect, and the reaction of swelling agent needs certain time (more than a few houres), and generally efficiency is also lacking.
Hydraulic fracturing technology is the important technique measure of oilfield stimulation augmented injection, especially in shale gas, fine and close oil-gas mining Aspect has been obtained and is widely applied, and hydraulic fracturing technology is by being pumped fracturing fluid by tubing string using fracturing pump on ground It send into stratum, with being constantly pumped into for fluid, gradually builds the pressure near the borehole wall of shaft bottom, when the ground that pressure is higher than near the borehole wall is answered After power and the tensile strength of rock, formation rock starts to rupture, and gradually cracks, and with the continuous injection of fracturing fluid, splits Line gradually extends, and the proppant in fracturing fluid progresses into formation fracture, just will form in the earth formation in this way sufficient length and The sand packed fracture of width, the crack can effectively improve the percolation ability of formation fluid, can smoothly enter into oil gas in pit shaft, effectively Improve stratum production capacity.
It is noiseless fixed to propose a kind of novel rock mass waterpower for the technical advantage of present invention combination voiceless demolition and hydraulic fracturing To crushing device, which pressurizes to water by high-pressure pump, and high pressure water is delivered to sealing device special by high pressure line, seals Device is used for the drilling eyelet of rock mass, and with the continuous injection of high pressure water, hole intraocular pressure is gradually increased, when pressure is more than in hole After the fracture pressure of rock, rock interior starts to crack, and with the continuous injection of high pressure water, and crackle keeps expansion Exhibition by control eyelet depth, eyelet quantity and arrangement, can effectively control rock mass until rock mass occurs large volume and is crushed Broken direction.The method that the technology is crushed by hydraulic pressurization can effectively realize the broken without acoustic bearing of rock mass, in work progress Vibration, slungshot, dust, noise etc. will not be generated, it can be achieved that the large volume of rock mass is broken, crushing efficiency is high, and hydraulic pressurization is in rock After body cracks, crackle can be made constantly to extend expansion, it is firmly crisp to be suitable for varying strength by continuing to pump fluid application Rock is also applied for having hole in rock mass or has the case where elastic (softer), and various sizes barrel hole size can also control The broken direction of rock mass, the range of application is wide, and crushing efficiency is high, and easily-consumed products consumption is few, at low cost, before wide application Scape.
Summary of the invention
It is crushed, applies the technical problem to be solved by the present invention is providing one kind and can be realized noiseless rock mass, orientation, large volume The safety and environmental protections such as vibration, slungshot, dust, noise will not be led to the problem of during work, are applicable not only to the hard crisp rock of various intensity Stone, various sizes barrel hole size apply also for hole rock mass or have certain elastic rock mass, and rock crushing direction is controllable, breaks Broken high-efficient, rock mass waterpower at low cost is without acoustic bearing crushing device.
Rock mass waterpower of the present invention is without acoustic bearing crushing device, including water pot, centrifugal pump, rotary hose, lorry, filtering Device, diesel engine, gearbox, high-pressure pump, high-pressure pump pressure gauge, high-pressure hose, protective case, squeezed seal structure high pressure valve, Squeezed seal structure pressure gauge, limited block, clamp nut, compression bar, dedicated wedge-type seal block, upper connecting rod, o type circle, pressure-bearing pipe, Rock, hydraulic type sealing structure high pressure valve, hydraulic type sealing structure pressure gauge, diversion pipe, briquetting, rubber plug, spacer, upper work Plug, deflector hole, lower piston, sphenoid, supporting block, cutting ferrule, eyelet composition.Water pot is arranged on the ground, broken for storing waterpower The water that broken operation needs, centrifugal pump setting are defeated by rotary hose after centrifugal pump can pressurize the water in water pot in water pot exit The filter to lorry is sent, lorry can realize that the good mobility of hydraulic fracture job execution can if necessary to crushing operation Lorry is directly opened to design position, so that it may carry out hydraulic fracture operation, there is mobility, convenient and efficient, filter is set It sets on lorry, filter, which is arranged two, has filter cloth bag to realize double-filtration in filter, filter is low into height Out, it can realize that effective filtering of impurity in fluid removes by double-filtration and low in and high out, diesel engine is arranged on lorry, bavin Oil machine provides high pressure pump power, and diesel engine speed is adjustable, and gearbox is arranged between diesel engine and high-pressure pump, and gearbox has gear The input speed of the adjustable high-pressure pump in position, and then adjusting high-pressure pump output displacement, high-pressure pump are arranged on lorry, realize to fluid Pressurization, the exit of high-pressure pump is arranged in high-pressure pump pressure gauge, can measure the outlet pressure of high-pressure pump, filters by filter Water entered by high pressure pump inlet, after high-pressure pump pressurizes, high-pressure hose is delivered to by high pressure pump outlet, high-pressure hose is used for Conveying high-pressure fluid, protective case are wrapped in outside high-pressure hose, for protecting inner high-pressure hose, while preventing high-pressure hose from piercing Harm will not be generated to personnel equipment after leakage, protective case can be steel and colloid.
When the cracking pressure of rock mass is not high, high-pressure fluid passes through high-pressure hose, flows through squeezed seal structure high pressure valve Pressure-bearing pipe is transported to after door and squeezed seal structure pressure gauge, squeezed seal structure pressure gauge is used to measure pressure-bearing pipe Inlet pressure, squeezed seal structure high pressure valve enter pressure-bearing pipe for controlling high-pressure fluid, and clamp nut is arranged in rock On surface, the outside of upper connecting rod, and connect by screw thread with upper connecting rod, limited block is arranged inside upper connecting rod, and limited block is used to The pressure-bearing pipe of limitation lower part moves upwards, and o type sealing ring is arranged between pressure-bearing pipe and upper connecting rod, o type sealing ring setting three, Realize the high pressure sealing between pressure-bearing pipe and upper connecting rod, compression bar is arranged between clamp nut and dedicated wedge-type seal block, works as pressure When tight nut is rotated down movement, compression bar is used to push down the dedicated wedge-type seal block of lower part, prevents dedicated wedge-type seal block from moving up, It is when construction, squeezed seal structure insertion rock pore is intraocular, constantly rotatably compress nut, upper connecting rod under screw action on It moves, the lozenges of upper connecting rod starts to compress and dedicated wedge-type seal block is pulled to move up, and compression bar compresses downwards dedicated wedge simultaneously Shape sealing block, dedicated wedge-type seal block start to expand and compress rock under the collective effect of tension and compression, realize drawing and pressing type sealing knot The fixation of structure and rock, after high-pressure fluid enters pressure-bearing pipe, under the effect of the pressure, pressure-bearing pipe moves up trend, and limited block Pressure-bearing pipe can be limited to move up, high-pressure fluid constantly enters in eyelet, and eyelet Fluid pressure constantly increases, when the pressure of fluid is more than After the fracture pressure of rock, rock interior is cracked, and with the continuous injection of fluid, crackle gradually extends extension, realizes The large volume of rock ruptures, and subsequent fluid continues to inject, and crackle can further extend, and improve the crushing efficiency of rock, rock After crushing operation, the reuse of compression type sealing structure unit can be taken off.
When the cracking pressure of rock mass is higher, high-pressure fluid passes through high-pressure hose, flows through hydraulic type sealing structure high pressure valve Diversion pipe is transported to after door and hydraulic type sealing structure pressure gauge, hydraulic type sealing structure pressure gauge is used to measure diversion pipe Inlet pressure, hydraulic type sealing structure high pressure valve enter diversion pipe for controlling high-pressure fluid, and briquetting is arranged outside diversion pipe Portion, briquetting are fixedly connected with diversion pipe, and briquetting is used to push down the rubber plug of lower part, and the lower part of briquetting is arranged in rubber plug, diversion pipe Outside after rubber plug is under pressure, can be arranged twice, deflector hole, high pressure are arranged between rubber plug and diversion pipe with deformation expansion, rubber plug Fluid can enter the inner surface of rubber plug by deflector hole, and spacer is arranged between rubber plug, and spacer can be moved freely along diversion pipe, Upper piston is arranged in spacer lower part, and upper piston can move up under the promotion of pressure, and then pushes spacer and rubber plug movement, under Piston setting can move down under pressure promotion in upper piston lower part, lower piston, and setting is led among upper piston and lower piston Discharge orifice, high-pressure fluid enter annular space among upper piston and lower piston by deflector hole, and lower piston lower part connects sphenoid, and sphenoid exists Lower piston can move downward under pushing, and cutting ferrule is connect with sphenoid, and cutting ferrule outer profile is zigzag, be fastened in the effect of sphenoid Under can move out, and rock clamping, supporting block is arranged in cutting ferrule lower part, top cutting ferrule is used to support, when high-pressure fluid enters After diversion pipe, annular space between upper piston and lower piston is entered by deflector hole, upper piston pushes top under high-pressure fluid promotion Spacer moves upwards, and then compresses rubber plug, and rubber plug expansion is gradually adjacent to the intraocular rock wall face in hole, while high-pressure fluid can be by leading Discharge orifice enters rubber plug inner surface, and for rubber plug under high pressure fluid effect, expansion is adjacent to rock wall surface, pushed by upper piston and High-pressure fluid double action, realizes high pressure sealing between the intraocular rock wall face in hole and rubber plug, and lower piston is made in high-pressure fluid Under, sphenoid is pushed to move downward, sphenoid pushes cutting ferrule to be adjacent to rock wall surface outward, and the sawtooth outside cutting ferrule snaps into rock On wall surface, the fixation of hydraulic type sealing structure is effectively realized, with the continuous injection of high-pressure fluid, when the pressure of fluid is more than After the fracture pressure of rock, rock interior is cracked, and with the continuous injection of fluid, crackle gradually extends extension, realizes The large volume of rock ruptures, and continues to inject with fluid, crackle can further extend, can after catalase operation Hydraulic type sealing structure unit is taken out to reuse.
The long L of rock mass, width W, high H are designed from the direction W center fractured rock, and eyelet is set up between two parties in the side W, and eyelet is in L On direction, apart from rock mass outer surface distance l=(1/4-1/5) L, distance d is equal and uniformly distributed between eyelet, if rock mass is thicker, The eyelet that can more arrange the direction a few row L, on the direction H, hole eye distance rock bottom surface distance h=(1/3-1/5) H.Of the invention has Beneficial effect is:
It is broken to the hydraulic pressurization of rock mass by, without acoustic bearing crushing device, being efficiently accomplished using rock mass waterpower, realize rock Body is noiseless, orient, large volume is crushed, and the safety and environmental protections such as vibration, slungshot, dust, noise will not be led to the problem of in work progress, no It is only applicable to the hard brittle rock of various intensity, various sizes barrel hole size applies also for hole rock mass or has certain elasticity Rock mass, rock crushing direction is controllable, effectively improves rock-breaking efficiency, reduces construction cost.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the eyelet arragement construction top view of rock.
Fig. 3 is the eyelet arragement construction front view of rock.
In figure: 1, water pot 2, centrifugal pump 3, rotary hose 4, lorry 5, filter 6, diesel engine 7, gearbox 8, high-pressure pump 9, height Press pump pressure gauge 10, high-pressure hose 11, protective case 12, squeezed seal structure high pressure valve 13, squeezed seal structure pressure Table 14, limited block 15, clamp nut 16, compression bar 17, dedicated wedge-type seal block 18, upper connecting rod 19, o type circle 20, pressure-bearing pipe 21, rock Stone 22, hydraulic type sealing structure high pressure valve 23, hydraulic type sealing structure pressure gauge 24, diversion pipe 25, briquetting 26, rubber plug 27, Spacer 28, upper piston 29, deflector hole 30, lower piston 31, sphenoid 32, supporting block 33, cutting ferrule 34, eyelet.
Specific embodiment
The present invention is described further with reference to the accompanying drawing:
As shown in Figure 1, rock mass waterpower of the present invention is without acoustic bearing crushing device, including water pot 1, centrifugal pump 2, the fire hose Band 3, lorry 4, filter 5, diesel engine 6, gearbox 7, high-pressure pump 8, high-pressure pump pressure gauge 9, high-pressure hose 10, protective case 11, Squeezed seal structure high pressure valve 12, squeezed seal structure pressure gauge 13, limited block 14, clamp nut 15, compression bar 16, specially With wedge-type seal block 17, upper connecting rod 18, o type circle 19, pressure-bearing pipe 20, rock 21, hydraulic type sealing structure high pressure valve 22, hydraulic pressure Formula sealing structure pressure gauge 23, diversion pipe 24, briquetting 25, rubber plug 26, spacer 27, upper piston 28, deflector hole 29, lower piston 30, Sphenoid 31, supporting block 32, cutting ferrule 33, eyelet 34.Water pot 1 is arranged on the ground, for storing hydraulic fracture operation needs Water, the setting of centrifugal pump 2 are delivered to goods by rotary hose 3 after centrifugal pump 2 can pressurize the water in water pot 1 in 1 exit of water pot Filter 5 on vehicle 4, lorry 4 can realize the good mobility of hydraulic fracture job execution, if necessary to crushing operation, can incite somebody to action Lorry 4 is directly opened to design position, so that it may carry out hydraulic fracture operation, have mobility, convenient and efficient, filter 5 is set Set on lorry 4, filter 5, which is arranged two, has a filter cloth bag to realize double-filtration in filter 5, filter 5 be it is low into It is higher by, can realize that effective filtering of impurity in fluid removes by double-filtration and low in and high out, diesel engine 6 is arranged in lorry 4 On, diesel engine 6 provides 8 power of high-pressure pump, and 6 revolving speed of diesel engine is adjustable, and gearbox 7 is arranged between diesel engine 6 and high-pressure pump 8, The input speed that there is gearbox 7 gear high-pressure pump 8 is adjusted, and then 8 output displacement of adjusting high-pressure pump, the setting of high-pressure pump 8 exist On lorry 4, the pressurization to fluid is realized, the exit of high-pressure pump 8 is arranged in high-pressure pump pressure gauge 9, can measure going out for high-pressure pump 8 Mouth pressure is entered by the water that filter 5 filters by 8 entrance of high-pressure pump, after the pressurization of high-pressure pump 8, is exported by high-pressure pump 8 defeated It send to high-pressure hose 10, high-pressure hose 10 is used for conveying high-pressure fluid, and protective case 11 is wrapped in outside high-pressure hose 10, for protecting Inner high-pressure hose 10 is protected, while harm will not be generated to personnel equipment after preventing the thorn leakage of high-pressure hose 10, protective case 11 can be Steel and colloid.When the cracking pressure of rock mass is not high, high-pressure fluid passes through high-pressure hose 10, flows through squeezed seal structure height Pressure-bearing pipe 20 is transported to after pressure valve 12 and squeezed seal structure pressure gauge 13, squeezed seal structure pressure gauge 13 is used to The inlet pressure of pressure-bearing pipe 20 is measured, squeezed seal structure high pressure valve 12 enters pressure-bearing pipe 20 for controlling high-pressure fluid, Clamp nut 15 is arranged on 21 surface of rock, the outside of upper connecting rod 18, and is connect by screw thread with upper connecting rod 18, and limited block is set 14 set inside upper connecting rod 18, and the pressure-bearing pipe 20 that limited block 14 is used to limit lower part moves upwards, and the setting of O-ring seal 19 is being held Between pressure pipe 20 and upper connecting rod 18, the high densification between pressure-bearing pipe 20 and upper connecting rod 18 is realized in the setting of o type sealing ring 19 three Envelope, compression bar 16 is arranged between clamp nut 15 and dedicated wedge-type seal block 17, when clamp nut 15 is rotated down movement, pressure Bar 16 is used to push down the dedicated wedge-type seal block 17 of lower part, prevents dedicated wedge-type seal block 17 from moving up, when construction, squash type is close Seal structure is inserted into the eyelet 34 of rock 21, constantly rotatably compresses nut 15, upper connecting rod 18 moves up under screw action, upper connecting rod 18 lozenges starts to compress and dedicated wedge-type seal block 17 is pulled to move up, and to compress dedicated wedge shape downwards close for compression bar 16 simultaneously Block 17 is sealed, dedicated wedge-type seal block 17 starts to expand and compress rock 21 under the collective effect of tension and compression, realizes drawing and pressing type sealing The fixation of structure and rock 21, after high-pressure fluid enters pressure-bearing pipe 20, under the effect of the pressure, pressure-bearing pipe 20 moves up trend, And limited block 14 can limit pressure-bearing pipe 20 and move up, high-pressure fluid constantly enters in eyelet 34, and 34 Fluid pressure of eyelet constantly increases, After the pressure of fluid is more than the fracture pressure of rock 21, cracked inside rock 21, with the continuous injection of fluid, crackle Gradually extend extension, realize the large volume rupture of rock 21, subsequent fluid continues to inject, and crackle can further extend, and mention The crushing efficiency of high rock 21 after 21 crushing operation of rock, can be taken off the reuse of compression type sealing structure unit.Work as rock When the cracking pressure of body is higher, high-pressure fluid passes through high-pressure hose 10, flows through hydraulic type sealing structure high pressure valve 22 and hydraulic pressure Diversion pipe 24 is transported to after formula sealing structure pressure gauge 23, hydraulic type sealing structure pressure gauge 23 is used to measure diversion pipe 24 Inlet pressure, hydraulic type sealing structure high pressure valve 22 enter diversion pipe 24 for controlling high-pressure fluid, and the setting of briquetting 25 is being led Outside flow tube 24, briquetting 25 is fixedly connected with diversion pipe 24, and briquetting 25 is used to push down the rubber plug 26 of lower part, and the setting of rubber plug 26 is being pressed After rubber plug 26 is under pressure, twice, rubber plug 26 can be arranged with deformation expansion, rubber plug 26 in the lower part of block 25, the outside of diversion pipe 24 Deflector hole 29 is set between diversion pipe 24, and high-pressure fluid can enter the inner surface of rubber plug 26, rubber plug 26 by deflector hole 29 Between spacer 27 is set, spacer 27 can move freely along diversion pipe 24, and upper piston 28 is arranged in 27 lower part of spacer, and upper piston 28 exists It can be moved up under the promotion of pressure, and then spacer 27 and rubber plug 26 is pushed to move, lower piston 30 is arranged under upper piston 28 Portion, lower piston 30 can move down under pressure promotion, and deflector hole 29, high-pressure spray are arranged among upper piston 28 and lower piston 30 Body enters upper piston 28 and the intermediate annular space of lower piston 30 by deflector hole 29, and 30 lower part of lower piston connects sphenoid 31, sphenoid 31 It can be moved downward under the promotion of lower piston 30, cutting ferrule 33 is connect with sphenoid 31, and 33 outer profile of cutting ferrule is zigzag, and cutting ferrule 33 exists It can be moved out under the action of sphenoid 31, with 21 clamping of rock, supporting block 32 is arranged in 33 lower part of cutting ferrule, is used to support top Cutting ferrule 33 enters annular space between upper piston 28 and lower piston 29 by deflector hole 29 after high-pressure fluid enters diversion pipe 24, on Piston 28 pushes top spacer 27 to move upwards under high-pressure fluid promotion, and then compresses rubber plug 26, and the expansion of rubber plug 26 is gradually pasted 21 wall surface of rock in tieholen eye 34, while high-pressure fluid can enter 26 inner surface of rubber plug by deflector hole 29, rubber plug 26 is in high pressure Under Fluid pressure effect, expansion is adjacent to 21 wall surface of rock, by the promotion of upper piston 28 and high-pressure fluid double action, realizes hole High pressure sealing between 21 wall surface of rock and rubber plug 26 in eye 34, lower piston 30 push sphenoid 31 under high-pressure fluid effect It moves downward, sphenoid 31 pushes cutting ferrule 33 to be adjacent to 21 wall surface of rock outward, and the sawtooth outside cutting ferrule 33 snaps into 21 wall surface of rock On, the fixation of hydraulic type sealing structure is effectively realized, with the continuous injection of high-pressure fluid, when the pressure of fluid is more than rock It after 21 fracture pressure, is cracked inside rock 21, with the continuous injection of fluid, crackle gradually extends extension, realizes The large volume of rock 21 ruptures, and continues to inject with fluid, crackle can further extend, and 21 crushing operation of rock finishes Afterwards, it can be taken off the reuse of hydraulic type sealing structure unit.
As shown in figures 2-3, the eyelet arragement construction of rock, the long L of rock mass, width W, high H are designed from the direction W center kata-rocks Stone 21, eyelet 34 are set up between two parties in the side W, eyelet 34 in the l-direction, apart from rock mass outer surface distance l=(1/4-1/5) L, Distance d is equal and uniformly distributed between eyelet 34, if rock mass is thicker, can arrange the eyelet 34 in the direction a few row L, on the direction H, hole more Eye 34 is away from rock 21 bottom surface distance h=(1/3-1/5) H.

Claims (4)

1. a kind of rock mass waterpower is without acoustic bearing crushing device, including water pot (1), centrifugal pump (2), rotary hose (3), lorry (4), mistake Filter (5), diesel engine (6), gearbox (7), high-pressure pump (8), high-pressure pump pressure gauge (9), high-pressure hose (10), protective case (11), squeezed seal structure high pressure valve (12), squeezed seal structure pressure gauge (13), limited block (14), clamp nut (15), compression bar (16), dedicated wedge-type seal block (17), upper connecting rod (18), o type circle (19), pressure-bearing pipe (20), rock (21), water Pressure type sealing structure high pressure valve (22), hydraulic type sealing structure pressure gauge (23), diversion pipe (24), briquetting (25), rubber plug (26), spacer (27), upper piston (28), deflector hole (29), lower piston (30), sphenoid (31), supporting block (32), cutting ferrule (33), eyelet (34), water pot (1) is arranged on the ground, for storing water, centrifugal pump (2) setting in water pot (1) exit, from After heart pump (2) can pressurize the water in water pot (1), the filter (5) on lorry (4), diesel engine are delivered to by rotary hose (3) (6) it is arranged on lorry (4), diesel engine (6) provides high-pressure pump (8) power, and diesel engine (6) revolving speed is adjustable, gearbox (7) setting Between diesel engine (6) and high-pressure pump (8), the input speed that there is gearbox (7) gear high-pressure pump (8) are adjusted, and then adjust High-pressure pump (8) output displacement is saved, high-pressure pump (8) is arranged on lorry (4), realizes the pressurization to fluid, high-pressure pump pressure gauge (9) Exit in high-pressure pump (8) is set, can measure the outlet pressure of high-pressure pump (8), the water by filter (5) filtering is by high pressure It pumps (8) entrance to enter, after high-pressure pump (8) pressurization, high-pressure hose (10), high-pressure hose is delivered to by high-pressure pump (8) outlet (10) it is used for conveying high-pressure fluid, protective case (11) is wrapped in high-pressure hose (10) outside, when the cracking pressure of rock mass is not high, High-pressure fluid passes through high-pressure hose (10), flows through squeezed seal structure high pressure valve (12) and squeezed seal structure pressure gauge (13) it is transported to after pressure-bearing pipe (20), squeezed seal structure pressure gauge (13) is used to measure the entrance pressure of pressure-bearing pipe (20) Power, squeezed seal structure high pressure valve (12) enter pressure-bearing pipe (20) for controlling high-pressure fluid, clamp nut (15) setting On rock (21) surface, the outside of upper connecting rod (18), and connect by screw thread with upper connecting rod (18), limited block sets (14) and sets Upper connecting rod (18) is internal, and the pressure-bearing pipe (20) that limited block (14) is used to limit lower part moves upwards, and o type sealing ring (19) setting exists Between pressure-bearing pipe (20) and upper connecting rod (18), compression bar (16) setting clamp nut (15) and dedicated wedge-type seal block (17) it Between, when clamp nut (15) is rotated down movement, compression bar (16) is used to push down the dedicated wedge-type seal block (17) of lower part, prevents Dedicated wedge-type seal block (17) moves up, and when construction, by the eyelet (34) of squeezed seal structure insertion rock (21), constantly revolves Turn clamp nut (15), upper connecting rod (18) moves up under screw action, and the lozenges of upper connecting rod (18) starts to compress and pull specially It is moved up with wedge-type seal block (17), and compression bar (16) compresses downwards dedicated wedge-type seal block (17), dedicated wedge-type seal simultaneously Block (17) starts to expand and compress rock (21) under the collective effect of tension and compression, realizes drawing and pressing type sealing structure and rock (21) Fixation, after high-pressure fluid enters pressure-bearing pipe (20), under the effect of the pressure, pressure-bearing pipe (20) moves up trend, and limited block (14) pressure-bearing pipe (20) can be limited to move up, when the cracking pressure of rock mass is higher, high-pressure fluid passes through high-pressure hose (10), flows through Diversion pipe (24), hydraulic pressure are transported to after hydraulic type sealing structure high pressure valve (22) and hydraulic type sealing structure pressure gauge (23) Formula sealing structure pressure gauge (23) is used to measure the inlet pressure of diversion pipe (24), and hydraulic type sealing structure high pressure valve (22) is used Enter diversion pipe (24) in control high-pressure fluid, briquetting (25) setting is external in diversion pipe (24), briquetting (25) and diversion pipe (24) it is fixedly connected, briquetting (25) is used to push down the rubber plug (26) of lower part, and rubber plug (26) is arranged in the lower part of briquetting (25), water conservancy diversion After rubber plug (26) is under pressure, twice, rubber plug (26) and water conservancy diversion can be arranged with deformation expansion, rubber plug (26) in the outside for managing (24) It manages and deflector hole (29) is set between (24), high-pressure fluid can enter the inner surface of rubber plug (26), rubber plug by deflector hole (29) (26) spacer (27) are set between, spacer (27) can be moved freely along diversion pipe (24), and upper piston is arranged in spacer (27) lower part (28), upper piston (28) can move up under the promotion of pressure, and then push spacer (27) and rubber plug (26) movement, lower work Fill in (30) setting in upper piston (28) lower part, lower piston (30) can move down under pressure promotion, upper piston (28) and under Deflector hole (29) are set among piston (30), high-pressure fluid enters upper piston (28) by deflector hole (29) and lower piston (30) is intermediate Annular space, lower piston (30) lower part connect sphenoid (31), and sphenoid (31) can be moved downward in the case where lower piston (30) push, cutting ferrule (33) it is connect with sphenoid (31), cutting ferrule (33) outer profile is zigzag, and cutting ferrule (33) can be under the action of sphenoid (31) Outer movement, with rock (21) clamping, supporting block (32) is arranged in cutting ferrule (33) lower part, is used to support top cutting ferrule (33), works as height After pressure fluid enters diversion pipe (24), enter annular space, upper work between upper piston (28) and lower piston (29) by deflector hole (29) Fill in (28) pushes top spacer (27) to move upwards under high-pressure fluid promotion, and then compresses rubber plug (26), rubber plug (26) expansion It is gradually adjacent to eyelet (34) interior rock (21) wall surface, while high-pressure fluid can enter rubber plug (26) interior table by deflector hole (29) Face, for rubber plug (26) under high pressure fluid effect, expansion is adjacent to rock (21) wall surface, passes through upper piston (28) promotion and high pressure Fluid double action realizes high pressure sealing between eyelet (34) interior rock (21) wall surface and rubber plug (26), lower piston (30) Under high-pressure fluid effect, sphenoid (31) is pushed to move downward, sphenoid (31) pushes cutting ferrule (33) to be adjacent to rock outward (21) wall surface, the external sawtooth of cutting ferrule (33) snap on rock (21) wall surface, effectively realize the fixation of hydraulic type sealing structure.
2. a kind of rock mass waterpower according to claim 1 is without acoustic bearing crushing device, it is characterised in that: lorry (4) can be real The existing good mobility of hydraulic fracture job execution can directly open lorry (4) to design position if necessary to crushing operation, It can be carried out hydraulic fracture operation, there is mobility, convenient and efficient, filter (5) is arranged on lorry (4), filter (5) it is arranged two to realize double-filtration, has filter cloth bag in filter (5), filter (5) is low in and high out, passes through two Grade filtering and low in and high out can realize effective filtering removal of impurity in fluid, and protective case (11) is for protecting inner high-pressure hose (10), while after preventing the leakage of high-pressure hose (10) thorn harm will not be generated to personnel equipment, protective case (11) can be steel and glue Matter;O type sealing ring (19) setting three, realizes the high pressure sealing between pressure-bearing pipe (20) and upper connecting rod (18).
3. a kind of rock mass waterpower according to claim 1 is without acoustic bearing crushing device, it is characterised in that: high-pressure fluid is continuous Into in eyelet (34), eyelet (34) Fluid pressure is constantly increased, after the pressure of fluid is more than the fracture pressure of rock (21), It is cracked inside rock (21), with the continuous injection of fluid, crackle gradually extends extension, realizes rock (21) substantially Product rupture, subsequent fluid continue to inject, and crackle can further extend, and improve the crushing efficiency of rock (21), and rock (21) is broken After broken operation, it can be taken off compression type sealing structure unit and hydraulic type sealing structure unit reused.
4. a kind of rock mass waterpower according to claim 1 is without acoustic bearing crushing device, it is characterised in that: the long L of rock mass, width W, High H, design from the direction W center fractured rock (21), eyelet (34) is set up between two parties in the side W, eyelet (34) in the l-direction, Apart from rock mass outer surface distance l=(1/4-1/5) L, distance d is equal and uniformly distributed between eyelet (34), can be more if rock mass is thicker The eyelet (34) for arranging the direction a few row L, on the direction H, eyelet (34) is away from rock (21) bottom surface distance h=(1/3-1/5) H.
CN201910841318.5A 2019-09-06 2019-09-06 Hydraulic soundless directional breaker for rock mass Active CN110529112B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910841318.5A CN110529112B (en) 2019-09-06 2019-09-06 Hydraulic soundless directional breaker for rock mass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910841318.5A CN110529112B (en) 2019-09-06 2019-09-06 Hydraulic soundless directional breaker for rock mass

Publications (2)

Publication Number Publication Date
CN110529112A true CN110529112A (en) 2019-12-03
CN110529112B CN110529112B (en) 2020-12-01

Family

ID=68667386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910841318.5A Active CN110529112B (en) 2019-09-06 2019-09-06 Hydraulic soundless directional breaker for rock mass

Country Status (1)

Country Link
CN (1) CN110529112B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113090262A (en) * 2021-04-14 2021-07-09 中钢集团马鞍山矿山研究总院股份有限公司 Movable tensile-shear stress rock breaking equipment system
CN113090261A (en) * 2021-04-14 2021-07-09 中钢集团马鞍山矿山研究总院股份有限公司 Novel method for mechanical rock breaking based on tensile and shear stress
CN113818878A (en) * 2021-10-28 2021-12-21 烟台杰瑞石油装备技术有限公司 Hydraulic fracturing rock breaking method and system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2062381U (en) * 1990-03-26 1990-09-19 王长伦 Hydraulic splitting machine
CN1208810A (en) * 1997-08-18 1999-02-24 中国地质大学(北京) Equipment for blasting rock type materials
CN2325754Y (en) * 1997-06-11 1999-06-23 中国地质大学(北京) Equipment for breaking medium using blasting produced high pressure water
CN102887669A (en) * 2011-07-18 2013-01-23 邵付报 Soundless cracking agent and production process thereof
CN203531830U (en) * 2013-09-10 2014-04-09 湖南省煤炭科学研究所 Expansion type anti-spraying hole sealing device
CN108318345A (en) * 2018-04-25 2018-07-24 中国石油大学(北京) Angles of azimuth wellbore fracture pressure test device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2062381U (en) * 1990-03-26 1990-09-19 王长伦 Hydraulic splitting machine
CN2325754Y (en) * 1997-06-11 1999-06-23 中国地质大学(北京) Equipment for breaking medium using blasting produced high pressure water
CN1208810A (en) * 1997-08-18 1999-02-24 中国地质大学(北京) Equipment for blasting rock type materials
CN102887669A (en) * 2011-07-18 2013-01-23 邵付报 Soundless cracking agent and production process thereof
CN203531830U (en) * 2013-09-10 2014-04-09 湖南省煤炭科学研究所 Expansion type anti-spraying hole sealing device
CN108318345A (en) * 2018-04-25 2018-07-24 中国石油大学(北京) Angles of azimuth wellbore fracture pressure test device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113090262A (en) * 2021-04-14 2021-07-09 中钢集团马鞍山矿山研究总院股份有限公司 Movable tensile-shear stress rock breaking equipment system
CN113090261A (en) * 2021-04-14 2021-07-09 中钢集团马鞍山矿山研究总院股份有限公司 Novel method for mechanical rock breaking based on tensile and shear stress
CN113090261B (en) * 2021-04-14 2022-03-15 中钢集团马鞍山矿山研究总院股份有限公司 Novel method for mechanical rock breaking based on tensile and shear stress
CN113090262B (en) * 2021-04-14 2022-03-15 中钢集团马鞍山矿山研究总院股份有限公司 Movable tensile-shear stress rock breaking equipment system
CN113818878A (en) * 2021-10-28 2021-12-21 烟台杰瑞石油装备技术有限公司 Hydraulic fracturing rock breaking method and system

Also Published As

Publication number Publication date
CN110529112B (en) 2020-12-01

Similar Documents

Publication Publication Date Title
CN110529112A (en) Rock mass waterpower is without acoustic bearing crushing device
US4718493A (en) Well treating method and system for stimulating recovery of fluids
CN104533452B (en) A kind of underground coal mine crushes coal body stagewise grouting strengthening method
US10865630B2 (en) Fracturing utilizing an air/fuel mixture
RU2460876C1 (en) Method for performing pulse hydraulic fracturing of carbonate formation
CN106285681A (en) A kind of hard coal seam top board fracturing device and method
CN101539028B (en) Apparatus for preventing and controlling coal or rock dynamic disaster by high-pressure pulse water injection
RU2011129976A (en) METHOD FOR INCREASING EFFICIENCY OF PUMPING AND INTENSIFICATION OF OIL AND GAS PRODUCTION
RU98047U1 (en) HEAT AND GAS GENERATOR FOR IMPROVEMENT OF FILTRATION OF THE LAYER IN ITS NEARBORING ZONE
RU2419723C1 (en) Degasation method of developed coal beds
CN101942986A (en) Abrasive jet injection multiple fracturing device
CN112647944B (en) Equipment and method for controlling underground ore limestone top plate through acidizing and fracturing
CN208330329U (en) A kind of oil/gas well combustion type ultra-positive pressure seam auxiliary device
US11346198B2 (en) Fracturing of a wet well utilizing an air/fuel mixture
CN113175316A (en) New method for plugging underground or underground old crack
CN107191218A (en) A kind of outstanding slag waterinfusion blasting is anti-reflection and the method for mash gas extraction
JPS5927091A (en) Method and device for disintegrating and/or mining raw material, particulaly, coal layer, by using compressed air type mining head
CN214247323U (en) Water-sand-gunpowder coupling blasting permeability increasing device for coal mine
US11761319B2 (en) Fracturing of a deep or wet well utilizing an air/fuel mixture and multiple stage restriction orifice assembly
RU2191259C2 (en) Method of well productivity increasing
CN114645700B (en) Method for filling high-pressure water fracturing fractured rock mass by strong plastic material
WO2022132523A1 (en) Fracturing of a wet well utilizing an air/fuel mixture and multiple plate orifice assembly
RU2084616C1 (en) Shaped-charge implosive mechanism
SU1749482A1 (en) Method for working productive strata
CN112412454A (en) Coal mine water-sand-gunpowder coupling blasting permeability increasing device and using method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant