CN110528619A - Middle large-tonnage electric loader fluid pressure line work system - Google Patents

Middle large-tonnage electric loader fluid pressure line work system Download PDF

Info

Publication number
CN110528619A
CN110528619A CN201910846019.0A CN201910846019A CN110528619A CN 110528619 A CN110528619 A CN 110528619A CN 201910846019 A CN201910846019 A CN 201910846019A CN 110528619 A CN110528619 A CN 110528619A
Authority
CN
China
Prior art keywords
gear pump
valve
outlet end
electric loader
fluid pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910846019.0A
Other languages
Chinese (zh)
Other versions
CN110528619B (en
Inventor
季全亮
王国村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhongcha Heavy Industry Machinery Co Ltd
Original Assignee
Shandong Zhongcha Heavy Industry Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhongcha Heavy Industry Machinery Co Ltd filed Critical Shandong Zhongcha Heavy Industry Machinery Co Ltd
Priority to CN201910846019.0A priority Critical patent/CN110528619B/en
Publication of CN110528619A publication Critical patent/CN110528619A/en
Application granted granted Critical
Publication of CN110528619B publication Critical patent/CN110528619B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2203Arrangements for controlling the attitude of actuators, e.g. speed, floating function
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2264Arrangements or adaptations of elements for hydraulic drives
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2264Arrangements or adaptations of elements for hydraulic drives
    • E02F9/2267Valves or distributors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2289Closed circuit
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2292Systems with two or more pumps
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Operation Control Of Excavators (AREA)
  • Fluid-Pressure Circuits (AREA)

Abstract

The present invention is suitable for electric loader technical field, provides a kind of middle large-tonnage electric loader fluid pressure line work system, including oil supply structure, and oil supply structure includes the first gear pump, second gear pump and third gear pump being connected to the motor respectively;The arrival end of first gear pump connects gearbox, and outlet end is separately connected speed change valve, unloading valve and pilot valve, and pilot valve connects operating valve;The arrival end of second gear pump and third gear pump is all connected with hydraulic oil container, the outlet end of second gear pump connects pressure-gradient control valve, the outlet end connection diverter and operating valve of pressure-gradient control valve, the outlet end connection of diverter turns oil cylinder, the outlet end of third gear pump connects dump ram, elevating ram and hydraulic oil container through operating valve.Whereby, the present invention can be pumped directly by motor-driven gear and complete work, reduced noise, improved the comfort of working environment;Energy can be saved simultaneously, and can reduce environmental.

Description

Middle large-tonnage electric loader fluid pressure line work system
Technical field
The present invention relates to electric loader technical field more particularly to a kind of middle large-tonnage electric loader fluid pressure line works Make system.
Background technique
The key operation mode of loading machine has spading operation and loading operation, and for high-efficient homework, loading machine needs to carry out Bucket, lifting, discharging and decline are continually received, these movements are all by HYDRAULIC CONTROL SYSTEM and to realize.
Fluid pressure line work system in the prior art mostly uses internal combustion engine, the power drive system technology of which at Ripe, engine is generally based on diesel engine, but engine fuel consumption is big, and the energy transmission of mechanical system wastes energy Source, and pollute environment.
Electric loader is energy saving to be driven by electricity, and environmental is low.But in the prior art about electronic The research of loader hydraulic line work system is relatively fewer.
In summary, the existing technology has inconveniences and defects in actual use, so it is necessary to be improved.
Summary of the invention
For above-mentioned defect, the purpose of the present invention is to provide a kind of middle large-tonnage electric loader fluid pressure lines to work System directly pumps the work for completing the hydraulic plumbing system of electric loader by motor-driven gear, reduces noise, improves The comfort of working environment;Internal combustion engine is replaced with motor simultaneously, the electric energy conversion efficiency between electric elements is higher than mechanical system Energy transmission, energy can be saved, and can reduce environmental.
To achieve the goals above, the present invention provides a kind of middle large-tonnage electric loader fluid pressure line work system, packet Oil supply structure is included, the oil supply structure includes the first gear pump, second gear pump and third gear pump being connected to the motor respectively.
First gear pump three oil circuits of connection, first oil circuit include the first gear pump of closed loop connection, become Fast valve and gearbox;Article 2 oil circuit includes first gear pump, unloading valve and the gearbox of closed loop connection;Article 3 In oil circuit, the arrival end of the first gear pump connects the gearbox, and the outlet end of the first gear pump is sequentially connected elder generation Pilot valve and operating valve.
The arrival end of the second gear pump connects hydraulic oil container, and the outlet end of the second gear pump is sequentially connected preferentially Valve and diverter, the diverter control left steering cylinder and right steering cylinder;The outlet end of the pressure-gradient control valve is also connected with third gear The outlet end of pump, the outlet end of the third gear pump connect operating valve, and the outlet end of the operating valve connects the hydraulic oil Case, operating valve control tipping bucket cylinder, the first load lifting cylinder and the second load lifting cylinder, described in the arrival end connection of the third gear pump Hydraulic oil container.
Middle large-tonnage electric loader fluid pressure line work system according to the present invention, it is hydraulic in the Article 2 oil circuit The pressure of oil is 1.5~2.5Mpa.
Middle large-tonnage electric loader fluid pressure line work system according to the present invention, it is described in the Article 2 oil circuit The first radiator is also connected between unloading valve and the gearbox.
Middle large-tonnage electric loader fluid pressure line work system according to the present invention, the outlet end of the first gear pump It is also connected with the first entrance end of pressure selection valve, the outlet end of the pressure selection valve connects the pilot valve.
Middle large-tonnage electric loader fluid pressure line work system according to the present invention, the operating valve and the hydraulic oil The second radiator and filter are also connected between case.
Middle large-tonnage electric loader fluid pressure line work system according to the present invention, the second of the pressure selection valve enter Mouth end is also connected with the cavity of resorption oil circuit of first load lifting cylinder or second load lifting cylinder.
Middle large-tonnage electric loader fluid pressure line work system according to the present invention, the first gear pump, the second tooth The model of wheel pump and third gear pump is respectively: 2020,2063 and 2100.
It is straight by motor the purpose of the present invention is to provide a kind of middle large-tonnage electric loader fluid pressure line work system Connect driving first gear pump, second gear pump and third gear pump;The outlet end of first gear pump is separately connected speed change valve, off-load Valve and pilot valve, pilot valve connect operating valve, and the hydraulic oil of first gear pump output controls the elder generation in entire hydraulic system Pilot valve and operating valve are acted;Second gear pump outlet end connect pressure-gradient control valve, pressure-gradient control valve outlet end connection diverter and Operating valve, the outlet end connection of diverter turn oil cylinder, and the outlet end of third gear pump is through operating valve connection dump ram, lifting oil Cylinder and hydraulic oil container, preferentially for diverter, the hydraulic oil of residual flow collaborates second gear pump with the hydraulic oil of third gear pump Realize that executive component tipping bucket cylinder, load lifting cylinder in oil circuit work by operating valve;Third gear pump by operating valve come Realize that the executive component tipping bucket cylinder in oil circuit, load lifting cylinder work.In conclusion the beneficial effects of the present invention are: directly logical The work that motor-driven gear pump completes the hydraulic plumbing system of electric loader is crossed, noise is reduced, improves relaxing for working environment Adaptive;Internal combustion engine is replaced with motor simultaneously, the electric energy conversion efficiency between electric elements is higher than the energy transmission of mechanical system, i.e., Energy can be saved, and can reduce environmental.
Detailed description of the invention
Fig. 1 is fluid pressure line work system structural schematic diagram of the present invention;
In figure: 1- first gear pump, 11- gearbox, 12- unloading valve, 13- speed change valve, 14- pressure selection valve, 15- are first Pilot valve, the first radiator of 16-;2- second gear pump, 21- hydraulic oil container, 22- pressure-gradient control valve, 23- diverter, 24- left steering cylinder, 25- right steering cylinder;3- third gear pump, 4- motor, 5- operating valve, 51- tipping bucket cylinder, the first load lifting cylinder of 52-, 53- second are lifted Cylinder, 54- radiator, 55- filter, the first three-position four-way valve of 56-, the second three-position four-way valve of 57-.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing, to the present invention into Row is further described.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to limit The fixed present invention.
Referring to Fig. 1, the present invention provides a kind of middle large-tonnage electric loader fluid pressure line work systems, including fuel feeding knot Structure, oil supply structure include the first gear pump 1, second gear pump 2 and third gear pump 3 being connected respectively with motor 4.
First gear pump 1 is pioneer pump, connects three oil circuits, first oil circuit include closed loop connection first gear pump 1, Speed change valve 13 and gearbox 11, wherein the arrival end of first gear pump 1 connects gearbox 11, and outlet end connects speed change valve 13, becomes Fast valve 13 connects gearbox 11;The main function of speed change valve 13 is the shift that gearbox 11 is realized by hydraulic power;First tooth Wheel pump 1 extracts hydraulic oil from the bottom of gearbox 11, and hydraulic oil enters in speed change valve 13, when the shift for carrying out gearbox 11 When, speed change valve 13 is opened, and pushes clutch open by the pressure of hydraulic oil, while the engagement of gear being pushed to shift gears, then hydraulic Oil flows back into gearbox 11.
Article 2 oil circuit includes first gear pump 1, unloading valve 12 and the gearbox 11 of closed loop connection, wherein first gear The arrival end of pump 1 connects gearbox 11, and outlet end connects unloading valve 12, and unloading valve 12 connects gearbox 11 through the first radiator; The effect of unloading valve 12 mainly controls the pressure of fluid pressure line, by adjusting the pressure adjustment bolt on unloading valve 12, realizes The size of hydraulic line pressure adjusts;In the present invention, the pressure of fluid pressure line is 1.5~2.5Mpa.Due to 80% in gearbox Therefore above oil, as a preferred solution, is also connected with all in Article 2 oil circuit between unloading valve 12 and gearbox 11 First radiator 16, the first radiator 16 can reduce the temperature of hydraulic oil and associated workpiece, and that improves associated workpiece uses the longevity Life, improves the working performance and working efficiency of electric loader.
In Article 3 oil circuit, the arrival end of first gear pump 1 connects gearbox 11, and the outlet end of first gear pump 1 is successively Connect pilot valve 15 and operating valve 5;First gear pump 1 extracts hydraulic oil from the bottom of gearbox 11, and hydraulic oil enters guide In valve 15, pilot valve 15 is manually operated by staff, is divided into four movements all around, and under normal circumstances, left and right is one group It acts, a1 the and b1 interface in corresponding diagram 1, front and back is set, a2 the and b2 interface in corresponding diagram 1, when staff puts The handle of dynamic pilot valve 15 controls the size that pilot valve 15 is opened according to the size of swing, and the size that pilot valve 15 is opened determines The size of output pressure, the size of output pressure determine that operating valve 5 opens the size of logical hydraulic fluid port, and the size decision for leading to hydraulic fluid port is fuel-displaced The size of amount, the size of oil pump capacity determine the work speed of tipping bucket cylinder 51.As a preferred solution, first gear pump 1 Outlet end be also connected with the first entrance end of pressure selection valve 14, the outlet end of pressure selection valve 14 connects pilot valve 15;Pressure The main function of selector valve 14 be the pressure of hydraulic oil is further constant, to be supplied to the more constant pressure of pilot valve 15, Accurate manipulation for electric loader.
Second gear pump 2 is steering pump, and the arrival end of second gear pump 2 connects hydraulic oil container 21, and second gear pump 2 goes out Mouth end is sequentially connected pressure-gradient control valve 22 and diverter 23, and diverter 23 controls left steering cylinder 24 and right steering cylinder 25, pressure-gradient control valve 22 The outlet end of outlet end connection third gear pump 3;Third gear pump 3 is main pump, and the arrival end of third gear pump 3 connects hydraulic oil Case 21, the outlet end of third gear pump 3 connect operating valve 5, and the outlet end of operating valve 5 connects hydraulic oil container 21, hydraulic oil container 21 Closed loop oil circuit is formed with third gear pump 3, operating valve 5;Operating valve 5 controls tipping bucket cylinder 51, the first load lifting cylinder 52 and the second lifting Cylinder 53.
The effect of pressure-gradient control valve 22 is to guarantee hydraulic oil in the case where there is steering, and priority of supply diverter 23 is divided into three kinds Operating condition: 1, when electric loader spin to it is very fast when, the hydraulic oil of second gear pump 2 by pressure-gradient control valve 22 all supplies of CF mouth Enter in diverter 23, and from the P of diverter 23 mouth, is transported to left steering cylinder 24 and right steering cylinder 25 by A mouthfuls or B mouthfuls In, so that electric loader is turned to;2, when electric loader suitably spin to when, pressure-gradient control valve 22 is a certain amount of from CF mouthfuls of outputs Hydraulic oil, guarantee the requirement that electric loader turns to, remaining hydraulic oil by EF mouthfuls and third gear pump 3 hydraulic oil Interflow supply operating valve 5 carries out electric loader to control tipping bucket cylinder 51, the first load lifting cylinder 52 and the second load lifting cylinder 53 Tipping bucket and lifting, then hydraulic oil is flowed back into again in hydraulic oil container 21;3, when electric loader do not spin to when, hydraulic oil is whole Collaborated by the EF mouth of pressure-gradient control valve 22 and the hydraulic oil of third gear pump 3, operating valve 5 is supplied, to control tipping bucket cylinder 51, first Load lifting cylinder 52 and the second load lifting cylinder 53 make electric loader carry out tipping bucket and lifting, and then hydraulic oil flows back into hydraulic oil container again In 21.
As a preferred solution, the second radiator 54 and filter are also connected between operating valve 5 and hydraulic oil container 21 55, the second radiator 54 can reduce the temperature of hydraulic oil and associated workpiece in fluid pressure line, improve the use of associated workpiece Service life improves the working performance and working efficiency of electric loader;Filter can effectively filter hydraulic oil, improve The reliability of loader hydraulic system, reduces failure rate, saves the cost of changing oil of user.
In the present invention, the second entrance end P2 of pressure selection valve 14 is also connected with the first load lifting cylinder 52 or the second load lifting cylinder 53 Cavity of resorption oil circuit;In the present invention, which is the arrival end A2 of operating valve 5, this route is spare oil circuit, main to make Be electric loader large arm lifting after, if there is failure, the oil circuit can be connected, pass through the oil in load lifting cylinder cavity of resorption The effect of pressure selection valve 14 makes pilot valve 15 control operating valve 5 and is overhauled so that electric loader large arm be made to fall.
In the present invention, the model of first gear pump 1, second gear pump 2 and third gear pump 3 is respectively: 2020,2063 and 2100, certainly, those skilled in the art can also select the gear pump of other models according to actual needs.
Here is two embodiments of the course of work of the present invention:
For an embodiment, when staff swings the handle of pilot valve 15 to the left manually, a1 mouthfuls of connections at this time, hydraulic oil leads to A1 mouthfuls are crossed into the first three-position four-way valve 56 in operating valve 5, spool is opened, it is hydraulic in other two gear pump P2 and P3 Oil passes through from open spool, enters in 51 back cavity of tipping bucket cylinder by A1 mouthfuls, realizes and receives bucket movement, ante-chamber in tipping bucket cylinder 51 Hydraulic oil by operating valve B1 mouthful reflux, by the oil return opening of operating valve 5 through radiator 54 and filter 55 to hydraulic oil container In 21.
Another embodiment, when staff swings forward the handle of pilot valve 15 manually, b2 mouthfuls of connections at this time, hydraulic oil leads to B2 mouthfuls are crossed into the second three-position four-way valve 57 in operating valve 5, spool is opened, it is hydraulic in other two gear pump P2 and P3 Oil passes through from open spool, enters in 52 ante-chamber of the first load lifting cylinder by B2 mouthfuls, realization lowering action, in load lifting cylinder 52 The hydraulic oil of back cavity arrives by operating valve A2 mouthful reflux, by the oil return opening of operating valve 5 through radiator 54 and filter 53 hydraulic In fuel tank 21.
In conclusion the present invention passes through motor direct-drive first gear pump, second gear pump and third gear pump;First The outlet end of gear pump is separately connected speed change valve, unloading valve and pilot valve, and pilot valve connects operating valve, first gear pump output Hydraulic oil controls pilot valve in entire hydraulic system and operating valve is acted;The outlet end connection of second gear pump is excellent First valve, the outlet end connection diverter and operating valve of pressure-gradient control valve, the outlet end connection of diverter turn oil cylinder, and third gear pump goes out Mouthful end through operating valve connection dump ram, elevating ram and hydraulic oil container, second gear pump preferentially for diverter, residual flow Hydraulic oil collaborate to realize by operating valve with the hydraulic oil of third gear pump executive component tipping bucket cylinder in oil circuit, load lifting cylinder into Row work;Third gear pump realizes that executive component tipping bucket cylinder, load lifting cylinder in oil circuit work by operating valve.To sum up institute It states, the beneficial effects of the present invention are: directly pumping the work for completing the hydraulic plumbing system of electric loader by motor-driven gear Make, reduces noise, improve the comfort of working environment;Internal combustion engine is replaced with motor simultaneously, the electric energy conversion between electric elements Efficiency is higher than the energy transmission of mechanical system, can save energy, and can reduce environmental.
Certainly, the present invention can also have other various embodiments, without deviating from the spirit and substance of the present invention, ripe It knows those skilled in the art and makes various corresponding changes and modifications, but these corresponding changes and change in accordance with the present invention Shape all should fall within the scope of protection of the appended claims of the present invention.

Claims (7)

1. a kind of middle large-tonnage electric loader fluid pressure line work system, which is characterized in that including oil supply structure, the fuel feeding Structure includes the first gear pump, second gear pump and third gear pump being connected to the motor respectively;
First gear pump three oil circuits of connection, first oil circuit include first gear pump, the speed change valve of closed loop connection And gearbox;Article 2 oil circuit includes first gear pump, unloading valve radiator and the gearbox of closed loop connection;Third In oil circuit, the arrival end of the first gear pump connects the gearbox, and the outlet end of the first gear pump is sequentially connected Pilot valve and operating valve;
The arrival end of second gear pump connects hydraulic oil container, the outlet end of the second gear pump be sequentially connected pressure-gradient control valve and Diverter, the diverter control left steering cylinder and right steering cylinder;The outlet end of the pressure-gradient control valve is also connected with third gear pump Outlet end, the outlet end of the third gear pump connect operating valve, and the outlet end of the operating valve connects the hydraulic oil container, institute Operating valve control tipping bucket cylinder, the first load lifting cylinder and the second load lifting cylinder are stated, the arrival end connection of the third gear pump is described hydraulic Fuel tank.
2. middle large-tonnage electric loader fluid pressure line work system according to claim 1, which is characterized in that described In two oil circuits, the pressure of hydraulic oil is 1.5~2.5Mpa.
3. middle large-tonnage electric loader fluid pressure line work system according to claim 2, which is characterized in that described In two oil circuits, the first radiator is also connected between the unloading valve and the gearbox.
4. middle large-tonnage electric loader fluid pressure line work system according to claim 1, which is characterized in that described The outlet end of one gear pump is also connected with the first entrance end of pressure selection valve, and the outlet end of the pressure selection valve connects the elder generation Pilot valve.
5. middle large-tonnage electric loader fluid pressure line work system according to claim 1, which is characterized in that the work Make to be also connected with the second radiator and filter between valve and the hydraulic oil container.
6. middle large-tonnage electric loader fluid pressure line work system according to claim 1, which is characterized in that the pressure The second entrance end of power selector valve connects the cavity of resorption oil circuit of first load lifting cylinder or second load lifting cylinder.
7. middle large-tonnage electric loader fluid pressure line work system according to claim 1, which is characterized in that described The model of one gear pump, second gear pump and third gear pump is respectively: 2020,2063 and 2100.
CN201910846019.0A 2019-09-09 2019-09-09 Hydraulic pipeline working system of medium-large tonnage electric loader Active CN110528619B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910846019.0A CN110528619B (en) 2019-09-09 2019-09-09 Hydraulic pipeline working system of medium-large tonnage electric loader

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910846019.0A CN110528619B (en) 2019-09-09 2019-09-09 Hydraulic pipeline working system of medium-large tonnage electric loader

Publications (2)

Publication Number Publication Date
CN110528619A true CN110528619A (en) 2019-12-03
CN110528619B CN110528619B (en) 2023-07-04

Family

ID=68667766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910846019.0A Active CN110528619B (en) 2019-09-09 2019-09-09 Hydraulic pipeline working system of medium-large tonnage electric loader

Country Status (1)

Country Link
CN (1) CN110528619B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016085959A1 (en) * 2014-11-24 2016-06-02 Parker-Hannifin Corporation System architectures for steering and work functions in a wheel loader
CN205742338U (en) * 2016-05-06 2016-11-30 厦门厦工机械股份有限公司 The hydraulic system of wheel loader
JP2017180809A (en) * 2016-03-31 2017-10-05 株式会社クボタ Hydraulic system for work machine
CN107268703A (en) * 2017-07-06 2017-10-20 山东临工工程机械有限公司 Loader hydraulic system
CN210857346U (en) * 2019-09-09 2020-06-26 山东中叉重工机械有限公司 Hydraulic pipeline working system of medium-large tonnage electric loader

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016085959A1 (en) * 2014-11-24 2016-06-02 Parker-Hannifin Corporation System architectures for steering and work functions in a wheel loader
JP2017180809A (en) * 2016-03-31 2017-10-05 株式会社クボタ Hydraulic system for work machine
CN205742338U (en) * 2016-05-06 2016-11-30 厦门厦工机械股份有限公司 The hydraulic system of wheel loader
CN107268703A (en) * 2017-07-06 2017-10-20 山东临工工程机械有限公司 Loader hydraulic system
CN210857346U (en) * 2019-09-09 2020-06-26 山东中叉重工机械有限公司 Hydraulic pipeline working system of medium-large tonnage electric loader

Also Published As

Publication number Publication date
CN110528619B (en) 2023-07-04

Similar Documents

Publication Publication Date Title
CN108502816B (en) Bypass type energy regeneration forklift hydraulic system
CN201309504Y (en) System for lifting and steering a rigid mine self-dumping truck
CN103882897A (en) Loader hydraulic system
CN205136180U (en) Hydraulic system of big indisputable fill compression dustbin compression material loading simultaneous working
CN106049593B (en) A kind of auto idle speed system and control method based on more hydraulic accumulators
CN104452868B (en) Double-hydraulic-cylinder mixed drive control system
CN105350598A (en) Hydraulic control system for improving energy saving performance of loader and control method of hydraulic control system
CN201660015U (en) Energy-saving hydraulic system for storage battery forklifts
CN107882792A (en) Unloading electromagnetic valve and loader dual-pump combining hydraulic system
CN201902384U (en) Multi-way reversing valve of multifunctional fork truck
CN103031957B (en) Control system and method for concrete machine
CN101367347B (en) Lifting and steering control method and system of self-discharging vehicle for rigid mining
CN205035044U (en) Energy -saving fork truck hydraulic system in double pump confluence
CN207421033U (en) A kind of secondary pressure adjusts hydraulic system
CN211398540U (en) Hydraulic system of automatic transmission
CN110528619A (en) Middle large-tonnage electric loader fluid pressure line work system
CN203130636U (en) Engineering machinery equipment and hydraulic control loop thereof
CN201050076Y (en) Lead operation valve oil supplying system
CN102674210B (en) Lift converging multiway valve
CN201437601U (en) Loading machine quantitative hydraulic load sensing device
CN210857346U (en) Hydraulic pipeline working system of medium-large tonnage electric loader
CN104555772B (en) Crane hoisting hydraulic system and crane
WO2022227621A1 (en) Hybrid power hydraulic system and aerial platform truck
CN203641137U (en) Motor energy-saving system for open hydraulic system
CN202545396U (en) Large-tonnage combined multi-way valve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant