CN110523718A - The long range blowing method of sled sled racing track ammonia refrigeration pipeline - Google Patents

The long range blowing method of sled sled racing track ammonia refrigeration pipeline Download PDF

Info

Publication number
CN110523718A
CN110523718A CN201910819766.5A CN201910819766A CN110523718A CN 110523718 A CN110523718 A CN 110523718A CN 201910819766 A CN201910819766 A CN 201910819766A CN 110523718 A CN110523718 A CN 110523718A
Authority
CN
China
Prior art keywords
pipeline
sled
pressure
inlet end
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910819766.5A
Other languages
Chinese (zh)
Inventor
任重远
林剑锋
付红伟
陈新兵
王凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201910819766.5A priority Critical patent/CN110523718A/en
Publication of CN110523718A publication Critical patent/CN110523718A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/032Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing
    • B08B9/0321Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing using pressurised, pulsating or purging fluid
    • B08B9/0325Control mechanisms therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/032Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing
    • B08B9/0321Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing using pressurised, pulsating or purging fluid
    • B08B9/0328Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing using pressurised, pulsating or purging fluid by purging the pipe with a gas or a mixture of gas and liquid

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Cleaning In General (AREA)
  • Pipeline Systems (AREA)

Abstract

The present invention relates to the long range blowing method of specifically a kind of sled sled racing track ammonia refrigeration pipeline;It is characterized in that: including selection compressed air unit, individual volume is prepared greater than 2m3 air accumulator, determines pipeline inlet end and discharge end;Since sled sled racing track refrigeration piping entirety absolute altitude is characterized in a kind of arrangement from high in the end, in the selection of inlet end and discharge end aloft inlet end setting, discharge end is arranged in lower, is conducive to the discharge of dirt in this way;A whole set of purge system is connect with pipeline inlet end;It opens air-pressure equipment constantly to pressurize in closed system, purge out;Pipeline inner wall is checked using high definition pipe monitoring device, examines purging quality.This cleaning method utilizes the difference of height advantage of pipeline oneself height, it is equipped with the pipeline strong to environment-adapting ability, it is aided with large capacity gas source and pressure and video monitoring system again, the pipeline of Large Diameter Pipeline, long range is cleaned back and forth, to realizes quickly and effectively pipeline purging means.

Description

The long range blowing method of sled sled racing track ammonia refrigeration pipeline
Technical field
The present invention relates to pipeline construction field, the long range purging side of specifically a kind of sled sled racing track ammonia refrigeration pipeline Method.
Background technique
The overall length of sled sled racing track refrigeration supervisor is up to 5090 meters, maximum caliber 457.2mm.Since pipeline is long, and manage Line internal request cleannes are very high.The spy that such caliber is big in this way, traditional the methods of pressure wash is not applied for, pipeline is long Different pipeline, thus, effective method is lacked at present for the cleaning of such pipeline.
Summary of the invention
It is an object of the invention to overcome drawbacks described above, provide a kind of suitable for major diameter, the high cleaning of long-distance pipe Spend cleaning method.
In order to achieve the above object, the present invention is implemented as follows:
A kind of long range blowing method of sled sled racing track ammonia refrigeration pipeline, including
Step 1, selection compressed air unit, it is desirable that the equipment carries drying, filtration system, and capacity is big, specified maximum exhaust Pressure is greater than 1MPa.Air-pressure equipment overall dimension is small, is readily transported and has bad luck;
Step 2 prepares individual volume greater than 2m3 air accumulator, and effect is the more compressed airs of reserve, increases single compressed air The time of blow line;
Step 3 determines pipeline inlet end and discharge end.Due to sled sled racing track refrigeration piping entirety absolute altitude be characterized in it is a kind of from High arrangement on earth, in the selection of inlet end and discharge end aloft inlet end setting, discharge end are arranged in lower, Be conducive to the discharge of dirt in this way;
Step 4 connects air-pressure equipment, air accumulator, is arranged in the gas outlet of air accumulator for the valve of opening and closing and one piece in school Test the pressure gauge in the phase, the connection of air accumulator and pipeline is connected using high-pressure hose, the length of hose guarantee 20m ~ 30m it Between, selection can both reduce the configuration amount of interim pipeline using such hose, also facilitate the environment for being applicable in various landform;
A whole set of purge system is connect by step 5 with pipeline inlet end, and high pressure inflated rubber leather bag is arranged in discharge end pipeline It blocks, pipeline is formed into a confined space;
Step 6, unlatching air-pressure equipment constantly pressurize in closed system, guarantee that system pressure is not less than 0.8MPa, discharge End rubbery human body is purged out by moment, drives the dirt discharge line in pipeline;
Step 7 repeats to clean step 4 ~ 5 time and checks pipeline inner wall using high definition pipe monitoring device, purging quality is examined, if not Qualification repeats to purge work.
This cleaning method is equipped with using the difference of height advantage of pipeline oneself height to environment-adapting ability using above-mentioned design Strong pipeline, then be aided with large capacity gas source and pressure and video monitoring system, back and forth to the pipeline of Large Diameter Pipeline, long range into Row cleans, to realize high cleanliness, quickly and effectively pipeline purging means.
Detailed description of the invention
Fig. 1: the purging main component and type of attachment of equipment.
Fig. 2: setting main points, the method for entire purge system connect the signal of completion.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Figure 1 and Figure 2, a kind of long range blowing method of sled sled racing track ammonia refrigeration pipeline, including
Step 1, selection compressed air unit, it is desirable that the equipment carries drying, filtration system, and capacity is big, specified maximum exhaust Pressure is greater than 1MPa.Air-pressure equipment overall dimension is small, is readily transported and has bad luck;
Step 2 prepares individual volume greater than 2m3 air accumulator, and effect is the more compressed airs of reserve, increases single compressed air The time of blow line;
Step 3 determines pipeline inlet end and discharge end.Due to sled sled racing track refrigeration piping entirety absolute altitude be characterized in it is a kind of from High arrangement on earth, in the selection of inlet end and discharge end aloft inlet end setting, discharge end are arranged in lower, Be conducive to the discharge of dirt in this way;
Step 4 connects air-pressure equipment, air accumulator, is arranged in the gas outlet of air accumulator for the valve of opening and closing and one piece in school Test the pressure gauge in the phase, the connection of air accumulator and pipeline is connected using high-pressure hose, the length of hose guarantee 20m ~ 30m it Between, selection can both reduce the configuration amount of interim pipeline using such hose, also facilitate the environment for being applicable in various landform;
A whole set of purge system is connect by step 5 with pipeline inlet end, and high pressure inflated rubber leather bag is arranged in discharge end pipeline It blocks, pipeline is formed into a confined space;
Step 6, unlatching air-pressure equipment constantly pressurize in closed system, guarantee that system pressure is not less than 0.8MPa, discharge End rubbery human body is purged out by moment, drives the dirt discharge line in pipeline;
Step 7 repeats to clean step 4 ~ 5 time and checks pipeline inner wall using high definition pipe monitoring device, purging quality is examined, if not Qualification repeats to purge work.
This cleaning method is equipped with using the difference of height advantage of pipeline oneself height to environment-adapting ability using above-mentioned design Strong pipeline, then be aided with large capacity gas source and pressure and video monitoring system, back and forth to the pipeline of Large Diameter Pipeline, long range into Row cleans, to realize high cleanliness, quickly and effectively pipeline purging means.

Claims (1)

1. a kind of long range blowing method of sled sled racing track ammonia refrigeration pipeline, it is characterized in that: including
Step 1, selection compressed air unit, it is desirable that the equipment carries drying, filtration system, and capacity is big, specified maximum exhaust Pressure is greater than 1Mpa;Air-pressure equipment overall dimension is small, is readily transported and has bad luck;
Step 2 prepares individual volume greater than 2m3 air accumulator, and effect is the more compressed airs of reserve, increases single compressed air The time of blow line;
Step 3 determines pipeline inlet end and discharge end, due to sled sled racing track refrigeration piping entirety absolute altitude be characterized in it is a kind of from High arrangement on earth, in the selection of inlet end and discharge end aloft inlet end setting, discharge end are arranged in lower, Be conducive to the discharge of dirt in this way;
Step 4 connects air-pressure equipment, air accumulator, is arranged in the gas outlet of air accumulator for the valve of opening and closing and one piece in school Test the pressure gauge in the phase, the connection of air accumulator and pipeline is connected using high-pressure hose, the length of hose guarantee 20m ~ 30m it Between, selection can both reduce the configuration amount of interim pipeline using such hose, also facilitate the environment for being applicable in various landform;
A whole set of purge system is connect by step 5 with pipeline inlet end, and high pressure inflated rubber leather bag is arranged in discharge end pipeline It blocks, pipeline is formed into a confined space;
Step 6, unlatching air-pressure equipment constantly pressurize in closed system, guarantee that system pressure is not less than 0.8MPa, discharge End rubbery human body is purged out by moment, drives the dirt discharge line in pipeline;
Step 7 repeats to clean step 4 ~ 5 time and checks pipeline inner wall using high definition pipe monitoring device, purging quality is examined, if not Qualification repeats to purge work.
CN201910819766.5A 2019-08-31 2019-08-31 The long range blowing method of sled sled racing track ammonia refrigeration pipeline Pending CN110523718A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910819766.5A CN110523718A (en) 2019-08-31 2019-08-31 The long range blowing method of sled sled racing track ammonia refrigeration pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910819766.5A CN110523718A (en) 2019-08-31 2019-08-31 The long range blowing method of sled sled racing track ammonia refrigeration pipeline

Publications (1)

Publication Number Publication Date
CN110523718A true CN110523718A (en) 2019-12-03

Family

ID=68665873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910819766.5A Pending CN110523718A (en) 2019-08-31 2019-08-31 The long range blowing method of sled sled racing track ammonia refrigeration pipeline

Country Status (1)

Country Link
CN (1) CN110523718A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112729716A (en) * 2020-12-04 2021-04-30 上海宝冶集团有限公司 Integral pressure test method for long-distance pipeline of refrigeration system for snowmobile ski track
CN114682580A (en) * 2021-10-29 2022-07-01 中国石油天然气股份有限公司 Integrated continuous pipe hydraulic purging device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050118921A (en) * 2004-06-15 2005-12-20 삼성전자주식회사 Apparatus for removing byproduct in exhaust line
CN101637769A (en) * 2009-08-26 2010-02-03 中冶集团华冶资源开发有限责任公司 Blowing method of pipeline
CN106475368A (en) * 2015-08-31 2017-03-08 黄鸣 Device for blowing pipeline
CN106475369A (en) * 2015-08-31 2017-03-08 黄鸣 The blowing method of pipeline to source of the gas requirement can be reduced
CN106475372A (en) * 2015-08-31 2017-03-08 黄鸣 Blowing method of pipeline
CN207628847U (en) * 2017-09-25 2018-07-20 国家电投集团科学技术研究院有限公司 Gas purging device
CN108655119A (en) * 2017-03-27 2018-10-16 中国二十冶集团有限公司 Hydraulic plumbing system bidirectional pulse purges precleaning system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050118921A (en) * 2004-06-15 2005-12-20 삼성전자주식회사 Apparatus for removing byproduct in exhaust line
CN101637769A (en) * 2009-08-26 2010-02-03 中冶集团华冶资源开发有限责任公司 Blowing method of pipeline
CN106475368A (en) * 2015-08-31 2017-03-08 黄鸣 Device for blowing pipeline
CN106475369A (en) * 2015-08-31 2017-03-08 黄鸣 The blowing method of pipeline to source of the gas requirement can be reduced
CN106475372A (en) * 2015-08-31 2017-03-08 黄鸣 Blowing method of pipeline
CN108655119A (en) * 2017-03-27 2018-10-16 中国二十冶集团有限公司 Hydraulic plumbing system bidirectional pulse purges precleaning system
CN207628847U (en) * 2017-09-25 2018-07-20 国家电投集团科学技术研究院有限公司 Gas purging device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112729716A (en) * 2020-12-04 2021-04-30 上海宝冶集团有限公司 Integral pressure test method for long-distance pipeline of refrigeration system for snowmobile ski track
CN114682580A (en) * 2021-10-29 2022-07-01 中国石油天然气股份有限公司 Integrated continuous pipe hydraulic purging device

Similar Documents

Publication Publication Date Title
CN110523718A (en) The long range blowing method of sled sled racing track ammonia refrigeration pipeline
CN108655119B (en) Bidirectional pulse purging pre-cleaning system for hydraulic pipeline system
CN101327488A (en) Method for cleaning hydraulic tubing
CN102430550A (en) Reciprocating washer for water supply pipeline
CN203725451U (en) Sweeping system for submarine delivery pipelines
CN210172133U (en) Pressure balancing device for gas transmission pipeline receiving and dispatching ball barrel
CN108980626B (en) Filling recovery method of helium detection sealing device
CN112197165B (en) Portable oil filling riser system for LNG loading pry and using method thereof
CN207357724U (en) A kind of pigging sledge
CN106089533B (en) A kind of cleaning of fuel gas injection valve and gas leakage detection device and detection method
CN206905409U (en) It is dried in vacuo cooling device
CN110031649A (en) A kind of capacity checking apparatus and its detection method of air velocity
CN210847527U (en) Multi-framework spherical pig with vibration reduction function
CN204879455U (en) Atmospheric pressure drain
CN211707616U (en) Device for accelerating purging of high-temperature and high-pressure steam pipeline by using low-pressure steam
CN208537101U (en) A kind of multi-functional air pressure and hydraulic pressure bulk testing device
CN111473185A (en) Cleaning method of process pipeline
CN207882080U (en) A kind of device for the nuclear power plant voltage stabilizer pressure release case water pressure test
CN106475368A (en) Device for blowing pipeline
CN112267868B (en) Impurity removal system and impurity removal method for shale gas well
CA2639600A1 (en) Testing apparatus and method for valves
CN207810322U (en) One kind being convenient for clean oil storage jar structure
CN207493382U (en) Three-level backwashing system
CN206996141U (en) Dust collecting device of shot blasting machine
JP4525606B2 (en) Pipeline cleaning method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191203

RJ01 Rejection of invention patent application after publication