CN110515998A - Hydroenergy storage station change working optimization method and system - Google Patents

Hydroenergy storage station change working optimization method and system Download PDF

Info

Publication number
CN110515998A
CN110515998A CN201910793360.4A CN201910793360A CN110515998A CN 110515998 A CN110515998 A CN 110515998A CN 201910793360 A CN201910793360 A CN 201910793360A CN 110515998 A CN110515998 A CN 110515998A
Authority
CN
China
Prior art keywords
change working
optimization
timing snapshot
timing
power stations
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910793360.4A
Other languages
Chinese (zh)
Inventor
李书明
庞敏
韩兵
孙永红
李金阳
倪维东
卓四明
单良
邱超
孙朝霞
赖新芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING HEHAI NANZI HYDROPOWER AUTOMATION CO Ltd
Original Assignee
NANJING HEHAI NANZI HYDROPOWER AUTOMATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING HEHAI NANZI HYDROPOWER AUTOMATION CO Ltd filed Critical NANJING HEHAI NANZI HYDROPOWER AUTOMATION CO Ltd
Priority to CN201910793360.4A priority Critical patent/CN110515998A/en
Publication of CN110515998A publication Critical patent/CN110515998A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1446Point-in-time backing up or restoration of persistent data
    • G06F11/1448Management of the data involved in backup or backup restore
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • G06F16/258Data format conversion from or to a database
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Databases & Information Systems (AREA)
  • General Business, Economics & Management (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Operations Research (AREA)
  • General Engineering & Computer Science (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of hydroenergy storage station change working optimization methods, including are based on timing snapshot and not timing snapshot change working data;It is abnormal in response to the Pumped Storage Power Stations after change working, the change working data of backup are extracted, anomaly analysis are carried out, according to anomaly analysis results modification change working step;It is normal in response to the Pumped Storage Power Stations after change working and be not optimal state, the change working data of backup are extracted, analysis is optimized, according to optimization analysis results modification change working step.Also disclose corresponding system.The method that the present invention uses timing snapshot and not timing snapshot to combine, the device parameter changed during standby system change working carries out abnormal and optimization analysis according to device parameter, change working step is modified based on the analysis results, finally obtains optimal switch process.

Description

Hydroenergy storage station change working optimization method and system
Technical field
The present invention relates to a kind of hydroenergy storage station change working optimization method and systems, belong to pumped-storage power station neck Domain.
Background technique
The main function of hydroenergy storage station is the peak-clipping and valley-filling that power load is carried out to power grid, to alleviate peak-valley difference institute band The electricity consumption contradiction come.
Compared with conventional hydropower station, one maximum feature of hydroenergy storage station is exactly to have power generation and irreversible fortune of drawing water Capable feature, therefore unit change working is very frequent.In change working, each Step Time length and speed etc. all can be right Change working success or not has an impact, and in the past in order to obtain the optimal step to tally with the actual situation, needs by with each Experiment, low efficiency, heavy workload.
Summary of the invention
The present invention provides a kind of hydroenergy storage station change working optimization method and systems, solve in background technique and drape over one's shoulders The problem of dew.
In order to solve the above-mentioned technical problem, the technical scheme adopted by the invention is that:
Hydroenergy storage station change working optimization method, including,
Based on timing snapshot and not timing snapshot change working data;
It is abnormal in response to the Pumped Storage Power Stations after change working, the change working data of backup are extracted, carry out abnormal point Analysis, according to anomaly analysis results modification change working step;
Normal in response to the Pumped Storage Power Stations after change working and be not optimal state, the operating condition for extracting backup turns Data are changed, analysis is optimized, results modification change working step is analyzed according to optimization.
Timing snapshot change working data: according to the preset time interval, periodically change to during change working Each device parameter backed up;
Not timing snapshot change working data: according to the period set in real time, during change working in the period Each device parameter of variation is backed up.
The period of not timing snapshot is between adjacent timing Snapshot time section.
Pumped Storage Power Stations operational efficiency after change working reaches maximum, then determines at Pumped Storage Power Stations In optimum state.
Hydroenergy storage station change working optimization system, including,
Backup module: timing snapshot and not timing snapshot change working data are based on;
Abnormal modified module: it is abnormal in response to the Pumped Storage Power Stations after change working, extract the change working number of backup According to progress anomaly analysis, according to anomaly analysis results modification change working step;
Optimization modified module: it is normal in response to the Pumped Storage Power Stations after change working and be not optimal state, it mentions The change working data for taking backup, optimize analysis, analyze results modification change working step according to optimization.
Backup module includes timing snapshot module and not timing snapshot module;
Timing snapshot module: according to the preset time interval, periodically to each device parameter changed during change working It is backed up;
Not timing snapshot module: each to what is changed during change working in the period according to the period set in real time Device parameter is backed up.
The period of not timing snapshot is between adjacent timing Snapshot time section.
Pumped Storage Power Stations operational efficiency after change working reaches maximum, and optimization modified module determines water-storage Electric power station system is in optimum state.
A kind of computer readable storage medium storing one or more programs, one or more of programs include referring to Enable, described instruction when executed by a computing apparatus so that the calculatings equipment execution hydroenergy storage station change working optimization side Method.
A kind of calculating equipment, including one or more processors, memory and one or more program, one of them or Multiple programs store in the memory and are configured as being executed by one or more of processors, one or more of Program includes the instruction for executing hydroenergy storage station change working optimization method.
Advantageous effects of the invention: the method that the present invention uses timing snapshot and not timing snapshot to combine, standby The device parameter changed in part system condition conversion process carries out abnormal and optimization and analyzes, tied according to analysis according to device parameter Fruit modifies change working step, finally obtains optimal switch process.
Detailed description of the invention
Fig. 1 is flow chart of the invention.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.Following embodiment is only used for clearly illustrating the present invention Technical solution, and not intended to limit the protection scope of the present invention.
As shown in Figure 1, hydroenergy storage station change working optimization method, comprising the following steps:
Step 1, timing snapshot and not timing snapshot change working data are based on.
Timing snapshot change working data: according to the preset time interval, periodically change to during change working Each device parameter backed up;Not timing snapshot change working data: according to period (the i.e. operator set in real time Member according to the actual situation, input time section in real time manually), to each device parameter changed during change working in the period into Row backup;The period of not timing snapshot, not timing snapshot was the benefit of timing snapshot between adjacent timing Snapshot time section It fills, in order not to data needed for omitting subsequent analysis.
The data of backup can be based on temporal characteristics based on the storage of redis memory technology in the database convenient for subsequent analysis, Extract corresponding data.
Step 2, if the Pumped Storage Power Stations after change working are abnormal, the change working data of backup are extracted, into Row anomaly analysis, according to anomaly analysis results modification change working step;
Pumped Storage Power Stations abnormal conditions usually have following several: bearing temperature exception, main fransformer oil Abnormal Chromatography, machine Group vibration and throw is abnormal, unit is overrun, and abnormal water hammer, high-pressure water conveyance system are operating abnormally water burst etc..
After there are these abnormal conditions in system, may trigger protection device carry out system protection, such as tripping, shut down Deng causing system out of service;Or monitoring has abnormal data, abnormal sound etc., may need artificial shut down at this time.
According to the device parameter of variation, analyze the variation of each equipment working condition state, analysis cause abnormal main influence because Element obtains the abnormal step in switch process, to modify to it.
Step 3, normal in response to the Pumped Storage Power Stations after change working and be not optimal state, it extracts standby The change working data of part, optimize analysis, analyze results modification change working step according to optimization.
In the case where considering situation known to the external conditions such as pump-storage generator head and pumping, shampoo amount, in conjunction with water pump, water wheels The efficiency of machine and generator determines hydroenergy storage station in economic pump-out/generated energy of day part, to obtain operational efficiency The maximum method of operation.
Whether Pumped Storage Power Stations are optimal state, are up to target with operational efficiency and carry out judgment basis, i.e., Pumped Storage Power Stations operational efficiency after change working reaches maximum, then determines that Pumped Storage Power Stations are in optimal shape State.
The method that the above method uses timing snapshot and not timing snapshot to combine, standby system change working become in the process The device parameter of change carries out abnormal and optimization analysis, modifies change working step based on the analysis results, most according to device parameter Optimal switch process is obtained eventually.
Hydroenergy storage station change working optimization system, comprising:
Backup module: timing snapshot and not timing snapshot change working data are based on.
Abnormal modified module: abnormal in response to the Pumped Storage Power Stations after change working, the operating condition for extracting backup turns Data are changed, anomaly analysis are carried out, according to anomaly analysis results modification change working step.
Optimization modified module: normal in response to the Pumped Storage Power Stations after change working and be not optimal shape State extracts the change working data of backup, optimizes analysis, analyzes results modification change working step according to optimization.
Backup module includes timing snapshot module and not timing snapshot module;Timing snapshot module: it presses According to preset time interval, periodically each device parameter changed during change working is backed up;Not timing snapshot Module: according to the period set in real time, each device parameter changed during change working in the period is backed up.
The period of not timing snapshot is between adjacent timing Snapshot time section.
Pumped Storage Power Stations operational efficiency after change working reaches maximum, and optimization modified module determines water-storage Electric power station system is in optimum state.
A kind of computer readable storage medium storing one or more programs, one or more of programs include referring to Enable, described instruction when executed by a computing apparatus so that the calculating equipment hydroenergy storage station change working optimization method.
A kind of calculating equipment, including one or more processors, memory and one or more program, one of them or Multiple programs store in the memory and are configured as being executed by one or more of processors, one or more of Program includes the instruction for executing hydroenergy storage station change working optimization method.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
The above is only the embodiment of the present invention, are not intended to restrict the invention, all in the spirit and principles in the present invention Within, any modification, equivalent substitution, improvement and etc. done, be all contained in apply pending scope of the presently claimed invention it It is interior.

Claims (10)

1. hydroenergy storage station change working optimization method, it is characterised in that: including,
Based on timing snapshot and not timing snapshot change working data;
It is abnormal in response to the Pumped Storage Power Stations after change working, the change working data of backup are extracted, carry out abnormal point Analysis, according to anomaly analysis results modification change working step;
Normal in response to the Pumped Storage Power Stations after change working and be not optimal state, the operating condition for extracting backup turns Data are changed, analysis is optimized, results modification change working step is analyzed according to optimization.
2. hydroenergy storage station change working optimization method according to claim 1, it is characterised in that:
Timing snapshot change working data: according to the preset time interval, periodically each to what is changed during change working Device parameter is backed up;
Not timing snapshot change working data: according to the period set in real time, during change working in the period Each device parameter of variation is backed up.
3. hydroenergy storage station change working optimization method according to claim 1 or 2, it is characterised in that: not timing is fast According to period between adjacent timing Snapshot time section.
4. hydroenergy storage station change working optimization method according to claim 1, it is characterised in that: after change working Pumped Storage Power Stations operational efficiency reaches maximum, then determines that Pumped Storage Power Stations are in optimum state.
5. hydroenergy storage station change working optimization system, it is characterised in that: including,
Backup module: timing snapshot and not timing snapshot change working data are based on;
Abnormal modified module: it is abnormal in response to the Pumped Storage Power Stations after change working, extract the change working number of backup According to progress anomaly analysis, according to anomaly analysis results modification change working step;
Optimization modified module: it is normal in response to the Pumped Storage Power Stations after change working and be not optimal state, it mentions The change working data for taking backup, optimize analysis, analyze results modification change working step according to optimization.
6. hydroenergy storage station change working optimization system according to claim 5, it is characterised in that: backup module includes Timing snapshot module and not timing snapshot module;
Timing snapshot module: according to the preset time interval, periodically to each device parameter changed during change working It is backed up;
Not timing snapshot module: each to what is changed during change working in the period according to the period set in real time Device parameter is backed up.
7. hydroenergy storage station change working optimization system according to claim 5 or 6, it is characterised in that: not timing is fast According to period between adjacent timing Snapshot time section.
8. hydroenergy storage station change working optimization system according to claim 5, it is characterised in that: after change working Pumped Storage Power Stations operational efficiency reaches maximum, and optimization modified module determines that Pumped Storage Power Stations are in optimal shape State.
9. a kind of computer readable storage medium for storing one or more programs, it is characterised in that: one or more of journeys Sequence include instruction, described instruction when executed by a computing apparatus so that the calculatings equipment execution according to claim 1 to 4 institutes Method either in the method stated.
10. a kind of calculating equipment, it is characterised in that: including,
One or more processors, memory and one or more programs, wherein one or more programs are stored in described deposit It in reservoir and is configured as being executed by one or more of processors, one or more of programs include for executing basis The instruction of method either in method described in Claims 1-4.
CN201910793360.4A 2019-08-27 2019-08-27 Hydroenergy storage station change working optimization method and system Pending CN110515998A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910793360.4A CN110515998A (en) 2019-08-27 2019-08-27 Hydroenergy storage station change working optimization method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910793360.4A CN110515998A (en) 2019-08-27 2019-08-27 Hydroenergy storage station change working optimization method and system

Publications (1)

Publication Number Publication Date
CN110515998A true CN110515998A (en) 2019-11-29

Family

ID=68628014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910793360.4A Pending CN110515998A (en) 2019-08-27 2019-08-27 Hydroenergy storage station change working optimization method and system

Country Status (1)

Country Link
CN (1) CN110515998A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111581191A (en) * 2020-04-10 2020-08-25 岭东核电有限公司 Nuclear safety data verification method and device, computer equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204085911U (en) * 2014-03-18 2015-01-07 上海电机学院 The fault diagnosis system of wind power generating set
CN106610617A (en) * 2017-01-16 2017-05-03 广东蓄能发电有限公司 Pumped storage unit fault analysis system and pumped storage unit fault analysis method
CN107577798A (en) * 2017-09-20 2018-01-12 郑州云海信息技术有限公司 A kind of snapshot creation method, device and computer-readable recording medium
US20180196456A1 (en) * 2017-01-12 2018-07-12 Johnson Controls Technology Company Building energy storage system with peak load contribution cost optimization

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204085911U (en) * 2014-03-18 2015-01-07 上海电机学院 The fault diagnosis system of wind power generating set
US20180196456A1 (en) * 2017-01-12 2018-07-12 Johnson Controls Technology Company Building energy storage system with peak load contribution cost optimization
CN106610617A (en) * 2017-01-16 2017-05-03 广东蓄能发电有限公司 Pumped storage unit fault analysis system and pumped storage unit fault analysis method
CN107577798A (en) * 2017-09-20 2018-01-12 郑州云海信息技术有限公司 A kind of snapshot creation method, device and computer-readable recording medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111581191A (en) * 2020-04-10 2020-08-25 岭东核电有限公司 Nuclear safety data verification method and device, computer equipment and storage medium
CN111581191B (en) * 2020-04-10 2023-10-13 岭东核电有限公司 Nuclear safety data verification method, device, computer equipment and storage medium

Similar Documents

Publication Publication Date Title
Cohen et al. Optimizing post-combustion CO2 capture in response to volatile electricity prices
US20200301384A1 (en) Online multi-period power dispatch with renewable uncertainty and storage
Zhong et al. Dynamic economic dispatch considering transmission losses using quadratically constrained quadratic program method
US9020800B2 (en) Method and apparatus for controlling energy services based on market data
Eldali et al. Employing ARIMA models to improve wind power forecasts: A case study in ERCOT
Abiri-Jahromi et al. Optimized midterm preventive maintenance outage scheduling of thermal generating units
Madrigal et al. An interior-point/cutting-plane method to solve unit commitment problems
Ruiz-Castro Preventive maintenance of a multi-state device subject to internal failure and damage due to external shocks
CN108334997B (en) Standby optimization method and device based on support fault event constraint unit combination
CA2757885A1 (en) Methods and systems involving power system grid management
CN115293057B (en) Wind driven generator fault prediction method based on multi-source heterogeneous data
Xiong et al. An adjustable robust optimization approach for unit commitment under outage contingencies
CN110513241A (en) Pumping energy storage machine unit speed regulating device change working method
CN111046319A (en) Power utilization abnormity analysis method and system for large power users
CN102157949A (en) Small-signal stability prediction and decision support method
Beldiceanu et al. Describing and generating solutions for the EDF unit commitment problem with the ModelSeeker
CN116169794B (en) Prompting device and prompting method for power system
CN110515998A (en) Hydroenergy storage station change working optimization method and system
CN105158608A (en) On-line monitoring method of on-line monitoring system in power station
CN106097137A (en) A kind of anti-electricity-theft monitoring system of differentiation based on power information acquisition system
Liu et al. Online short-term reliability evaluation using a fast sorting technique
CN102855533A (en) Method and device for outputting power distribution network maintenance plan based on load sharing algorithm
CN111080487A (en) Electricity sales market electricity quantity prediction method and device
CN113723869A (en) Power grid infrastructure project post-evaluation method, device, equipment and medium
Zhou et al. The static security analysis in power system based on Spark Cloud Computing platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191129

RJ01 Rejection of invention patent application after publication