CN110515625A - Task construction method, device, equipment and computer readable storage medium - Google Patents

Task construction method, device, equipment and computer readable storage medium Download PDF

Info

Publication number
CN110515625A
CN110515625A CN201910711946.1A CN201910711946A CN110515625A CN 110515625 A CN110515625 A CN 110515625A CN 201910711946 A CN201910711946 A CN 201910711946A CN 110515625 A CN110515625 A CN 110515625A
Authority
CN
China
Prior art keywords
task
building
creation
module
name
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910711946.1A
Other languages
Chinese (zh)
Inventor
肖计伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Wave Intelligent Technology Co Ltd
Original Assignee
Suzhou Wave Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Wave Intelligent Technology Co Ltd filed Critical Suzhou Wave Intelligent Technology Co Ltd
Priority to CN201910711946.1A priority Critical patent/CN110515625A/en
Publication of CN110515625A publication Critical patent/CN110515625A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/40Transformation of program code
    • G06F8/41Compilation
    • G06F8/45Exploiting coarse grain parallelism in compilation, i.e. parallelism between groups of instructions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/40Transformation of program code
    • G06F8/41Compilation
    • G06F8/45Exploiting coarse grain parallelism in compilation, i.e. parallelism between groups of instructions
    • G06F8/456Parallelism detection

Abstract

The embodiment of the invention discloses a kind of task construction method, device, equipment and computer readable storage mediums.Wherein, method includes constructing machine installation Build User Vars Plugin plug-in unit, environmental variance of the configuration comprising creation version number and creation user name in advance for Jenkins;When the instruction for receiving multiple new task buildings, task module is created, and is the specified creation name of task module and configuration file;Name is created to contain multiple while running building task, configuration file is used in creation name generate new building task;Multiple new building tasks are triggered simultaneously in creation name, with the building task for executing relative users.The application realizes Jenkins building machine and Multi-task Concurrency is supported to execute, and improves Jenkins building machine task building efficiency, can effectively shorten program compilation time, improve working efficiency.

Description

Task construction method, device, equipment and computer readable storage medium
Technical field
The present embodiments relate to Jenkins to construct machine technical field, more particularly to a kind of task construction method, dress It sets, equipment and computer readable storage medium.
Background technique
Jenkins is an open source, expansible and based on web interface platform, is one kind based on Java exploitation Continuous integrating tool, such as can realize to the compiling of software/code, packing, deployment etc., it can be used for monitoring persistently duplicate work Make.
In based on such as application development process of linux platform or VxWorks platform, some module or function code are completed Machine can be constructed after writing by Jenkins to compile come completion code and export corresponding program alternate file or installation kit.But It is that the Jenkins building machine compiled code time is very long and a Jenkins building machine is in synchronization can only compile one A engineering, other engineerings for wanting compiling can only be waited in line.Due to program development Stage code modification, compiling frequency compared with Greatly, therefore, the mode efficiency that the Jenkins building machine serially executed using this single task carries out code compilation is very low.
Summary of the invention
The embodiment of the present disclosure provides a kind of task construction method, device, equipment and computer readable storage medium, realizes Jenkins building machine supports Multi-task Concurrency to execute, and improves Jenkins building machine task building efficiency, can effectively shorten Program compilation time improves working efficiency.
In order to solve the above technical problems, the embodiment of the present invention the following technical schemes are provided:
On the one hand the embodiment of the present invention provides a kind of task construction method, be applied to Jenkins and construct machine, comprising:
Machine being constructed for Jenkins in advance, Build User Vars Plugin plug-in unit being installed, configuration includes creation version number With the environmental variance of creation user name;
When the instruction for receiving multiple new task buildings, task module is created, and is the specified creation name of the task module And configuration file;The creation name is used for contain multiple while running building task, the configuration file described It creates and generates new building task in name;
Multiple new building tasks are triggered simultaneously in the creation name, with the building task for executing relative users.
Optionally, it is described trigger multiple new building tasks simultaneously in the creation name after, further includes:
When detecting new building task completion building, then completed new building task is deleted, and send to relative users The instruction that task building is completed.
Optionally, it is described trigger multiple new building tasks simultaneously in the creation name after, further includes:
It detects whether to receive the feedback for receiving task building and completing instruction that all users send within a preset period of time Instruction;
Judge whether the new building task for the target user for not receiving feedback command has deleted;
If the new building task for not receiving the target user of feedback command is not deleted, and the new building of the target user is appointed Building is completed in business, then sends the instruction that task building is completed to the target user again;
If the new building task for not receiving the target user of feedback command has been deleted, triggered in the creation name again One new building task.
Optionally, described when the instruction for receiving multiple new task buildings, creation task module includes:
Whether the sum for judging to construct new task is more than that task module single carrying task constructs the total upper limit;
If so, constructing total upper limit creation according to the sum of building new task and task module single carrying task Multiple tasks module.
Optionally, the creation name includes the creation version number, the creation user name and creation time.
On the other hand the embodiment of the present invention provides a kind of task construction device, be applied to Jenkins and construct machine, comprising:
Plug-in unit installs module, installs Build User Vars Plugin plug-in unit for constructing machine in advance for Jenkins;
Environmental variance configuration module includes creation version number and the environmental variance for creating user name for configuring;
Task module creation module, for creating task module, and be institute when the instruction for receiving multiple new task buildings State the specified creation name of task module and configuration file;The creation name is to contain multiple while running building task, institute Configuration file is stated for generating new building task in the creation name;
Multi-task parallel constructs module, for triggering multiple new building tasks simultaneously in the creation name, for holding The building task of row relative users.
It optionally, further include task removing module and task completion notice module;
The task removing module is used to then delete completed new building when detecting new building task completion building and appoint Business;
The task completion notice module is used to then send and appoint to relative users when detecting new building task completion building The instruction that business building is completed.
Optionally, the correction verification module, the correction verification module include:
Feedback command checks submodule, receives receiving for all users' transmissions for detecting whether within a preset period of time The feedback command of instruction is completed in task building;
Judging submodule, for judging whether the new building task for the target user for not receiving feedback command has deleted;
Command retransmission submodule, if the new building task of the target user for not receiving feedback command is not deleted, and institute Building is completed in the new building task for stating target user, then sends the instruction that task building is completed to the target user again;
Task reconfiguration builds submodule, if the new building task of the target user for not receiving feedback command has been deleted, Again a new building task is triggered in the creation name.
The embodiment of the invention also provides a kind of tasks to construct equipment, including processor, and the processor is deposited for executing It is realized when the computer program stored in reservoir as described in preceding any one the step of task construction method.
The embodiment of the present invention finally additionally provides a kind of computer readable storage medium, the computer readable storage medium On be stored with task construction procedures, when the task construction procedures are executed by processor realize as described in preceding any one task building The step of method.
The advantages of technical solution provided by the present application is, can only the Jenkins building that serially executes of single task currently Machine environmentally passes through installation user build vars plugin plug-in unit and modifies related environment configurations, creation supports more buildings to appoint The task module and the multiple building task executions of automatic trigger of business operation allow Jenkins building machine to support Multi-task Concurrency Compiler is constructed, the time of Jenkins building machine program compiling is effectively shortened, is particularly suitable for program development rank Section code revision, the compiling biggish application scenarios of frequency, can effectively improve working efficiency, practical.
In addition, the embodiment of the present invention provides corresponding realization device, equipment and computer also directed to task construction method Readable storage medium storing program for executing, further such that the method has more practicability, described device, equipment and computer readable storage medium Have the advantages that corresponding.
It should be understood that the above general description and the following detailed description are merely exemplary, this can not be limited It is open.
Detailed description of the invention
It, below will be to embodiment or correlation for the clearer technical solution for illustrating the embodiment of the present invention or the relevant technologies Attached drawing needed in technical description is briefly described, it should be apparent that, the accompanying drawings in the following description is only this hair Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Fig. 1 is a kind of flow diagram of task construction method provided in an embodiment of the present invention;
Fig. 2 is the flow diagram of another task construction method provided in an embodiment of the present invention;
Fig. 3 is a kind of specific embodiment structure chart of task construction device provided in an embodiment of the present invention;
Fig. 4 is another specific embodiment structure chart of task construction device provided in an embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, with reference to the accompanying drawings and detailed description The present invention is described in further detail.Obviously, described embodiments are only a part of the embodiments of the present invention, rather than Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, shall fall within the protection scope of the present invention.
The description and claims of this application and term " first ", " second ", " third " " in above-mentioned attached drawing Four " etc. be for distinguishing different objects, rather than for describing specific sequence.Furthermore term " includes " and " having " and Their any deformations, it is intended that cover and non-exclusive include.Such as contain a series of steps or units process, method, System, product or equipment are not limited to listed step or unit, but may include the step of not listing or unit.
After describing the technical solution of the embodiment of the present invention, the various non-limiting realities of detailed description below the application Apply mode.
Referring first to Fig. 1, Fig. 1 is a kind of flow diagram of task construction method provided in an embodiment of the present invention, application Machine is constructed in Jenkins, the embodiment of the present invention may include the following contents:
S101: machine is constructed for Jenkins in advance, Build User Vars Plugin plug-in unit is installed, configuration includes creation version This number and creation user name environmental variance.
It is understood that Build User Vars Plugin is user's correlated variables plug-in unit of jenkins, so that User's relating environment values can be used in building process.It the downloading of Build User Vars Plugin plug-in unit and installed Journey sees the realization process of the relevant technologies record, just repeats no more herein.It should be noted that Build User Vars It after Plugin plug-in unit is installed, needs to choose " Set Build Name " option, and BUILD_NUMBER and BUILD_ is set USER environmental variance, while also needing to choose " Set Jenkins user build variables " option content, wherein BUILD_NUMBER is creation version number, and BUILD_USER is creation user name.
S102: when the instruction for receiving multiple new task buildings, task module is created, and is the specified creation name of task module And configuration file.
Wherein, creation name can be used for comprising multiple while running building task, and configuration file can be used in creation name The middle new building task of generation.Creating name can be comprising creation version number, creation user name and creation time, according to creation name Directly learn which user the task module is in the module when created, certainly, creation name can be extended formatting, this equal not shadow Ring the realization of the application.A kind of specific embodiment can create task module according to following orders:
Curl-u admin:123456-X POST $ jenkins_url/createItem name=$ build_name- d@config.xml-H"Content-Type:text/xml"。
After S101 configuration surroundings variable, a config.xml template file, i.e. configuration file can be also created.And root Shell script is configured according to specific requirements, task call curl-u admin:123456 $ jenkins_ can be constructed in entrance Url/job/Build_Template/config.xml-o config.xml-v is to obtain template Build_Template's Config.xml, and the building field in config.xml is modified according to user demand.
S103: multiple new building tasks are triggered simultaneously in creation name, with the building task for executing relative users.
It is understood that a user can create multiple building tasks, a building task can also be created, in S103 In, it is that each building task of each user triggers new building task in creation name.As a kind of specific embodiment, It can be used and trigger the building of new building task to issue orders, downstream newly constructs task and oneself will run after triggering building:
curl-u admin:123456-X POST$jenkins_url/job/$build_name/build。
In technical solution provided in an embodiment of the present invention, currently can only single task serially execute Jenkins building Machine environmentally passes through installation user build vars plugin plug-in unit and modifies related environment configurations, creation supports more buildings to appoint The task module and the multiple building task executions of automatic trigger of business operation allow Jenkins building machine to support Multi-task Concurrency Compiler is constructed, the time of Jenkins building machine program compiling is effectively shortened, is particularly suitable for program development rank Section code revision, the compiling biggish application scenarios of frequency, can effectively improve working efficiency, practical.
In another embodiment, referring to Fig. 2, in order to reduce EMS memory occupation, and management role is facilitated to construct line Journey can be deleted after the completion of each new building task.That is, when Jenkins building machine examination measures new building task Building is completed, then deletes completed new building task, and send the instruction that task building is completed to relative users.It is constructed newly After task run is completed, it can be issued orders by calling and delete the new building task:
curl-u admin:123456-X POST$jenkins_url/job/$6/doDelete。
It is understood that system detects the practice condition of each new building task automatically, needs to expend vast resources, be Each task quickly and accurately is constructed for user, and finds constructing not successfully for task in time, system is completed times for user After business building, the notice that task building is completed can be sent to user, and user can receive after receiving the notice to system feedback To the instruction of task building completion notice.Based on this, may also include that
It detects whether to receive the feedback for receiving task building and completing instruction that all users send within a preset period of time Instruction.Preset time period herein is starting point when can construct new task from user is received, may be, for example, 1s in preset time period It is interior.That is, if not received all user feedbacks in the 1s of timing since receiving user and constructing new task The instruction that task building is completed is received, determines that not feeding back the task that received constructs completion from all users of S102 Target user in the user of instruction, the user namely subsequent content.Target user, which does not feed back, has received task building completion Instruction, including two kinds of situations, one is the notice that target user does not receive that the task building of system transmission is completed;Secondly being mesh Mark user is fed back to system, but since network or other reasons system do not receive.In consideration of it, also can determine whether not receive Whether the new building task to the target user of feedback command has deleted;If not receiving the new building of the target user of feedback command Task is not deleted, and building is completed in the new building task of target user, then sends task building to target user again and complete Instruction;If the new building task for not receiving the target user of feedback command has been deleted, one is triggered in creation name again New building task.If multiple such as 3 times repeat the above steps, target user's feedback information is not received yet, then is reported an error, so that Staff repairs as early as possible.
As a preferred embodiment, task module is on the basis for guaranteeing efficient, stable reliability service task building On, single carrying task building sum has certain limitations, and in order to improve system task building efficiency, can create multiple tasks simultaneously Module, each task module are performed simultaneously multi-task parallel building.Specifically, when the instruction for receiving multiple new task buildings, Whether the sum that can first judge to construct new task is more than that task module single carrying task constructs the total upper limit;If so, according to The sum and task module single carrying task for constructing new task construct the total upper limit and create multiple tasks module.Herein, task Module single carries the total upper limit of task building can be true according to the actual motion state of Jenkins building machine and user demand progress It is fixed, as long as can guarantee that task module currently runs building total task number and efficient, stable can execute within the upper limit, this Application is not limited in any way this.For example, it is 100 that task module single carrying task, which constructs the total upper limit, and is received The sum for constructing new task to user is 480, then 5 task modules can be created simultaneously, each task module is randomly assigned Multiple building tasks of the same user optionally can be put into the same task model and concurrently execute by 96 building tasks.
The embodiment of the present invention provides corresponding realization device also directed to task construction method, further such that the method With more practicability.Task construction device provided in an embodiment of the present invention is introduced below, task building described below Device can correspond to each other reference with above-described task construction method.
Referring to Fig. 3, Fig. 3 is a kind of structure of the task construction device provided in an embodiment of the present invention under specific embodiment Figure is applied to Jenkins and constructs machine, the device can include:
Plug-in unit installs module 301, inserts for installing Build User Vars Plugin in advance for Jenkins building machine Part.
Environmental variance configuration module 302 includes creation version number and the environmental variance for creating user name for configuring.
Task module creation module 303, for creating task module when the instruction for receiving multiple new task buildings, and For the specified creation name of task module and configuration file;Name is created to contain multiple while running building task, configuration text Part is used in creation name generate new building task.
Multi-task parallel constructs module 304, for triggering multiple new building tasks simultaneously in creation name, for executing The building task of relative users.
Optionally, in some embodiments of the present embodiment, referring to Fig. 4, described device can also be deleted including task Except module 305 and task completion notice module 306.
Task removing module 305 can be used for then deleting completed new building when detecting new building task completion building Task;
Task completion notice module 306 can be used for then sending to relative users when detecting new building task completion building The instruction that task building is completed.
Optionally, in other embodiments of the present embodiment, described device for example can also include correction verification module 307, the correction verification module 307 may particularly include:
Feedback command checks submodule, receives receiving for all users' transmissions for detecting whether within a preset period of time The feedback command of instruction is completed in task building;
Judging submodule, for judging whether the new building task for the target user for not receiving feedback command has deleted;
Command retransmission submodule, if the new building task of the target user for not receiving feedback command is not deleted, and mesh Building is completed in the new building task of mark user, then sends the instruction that task building is completed to target user again;
Task reconfiguration builds submodule, if the new building task of the target user for not receiving feedback command has been deleted, Again the triggering one new building task in creation name.
As a preferred embodiment, the task module creation module 303 may also include that
Judging submodule, whether the sum for judging to construct new task is more than that the carrying task building of task module single is total The number upper limit;
Submodule is created, if the sum for constructing new task is more than task module single carrying task building sum Limit then constructs the total upper limit according to the sum of building new task and task module single carrying task and creates multiple tasks module.
The function of each functional module of task construction device described in the embodiment of the present invention can be according in above method embodiment Method specific implementation, specific implementation process is referred to the associated description of above method embodiment, and details are not described herein again.
It supports Multi-task Concurrency to execute from the foregoing, it will be observed that the embodiment of the present invention realizes Jenkins building machine, improves Jenkins constructs machine task and constructs efficiency, can effectively shorten program compilation time, improves working efficiency.
The embodiment of the invention also provides a kind of tasks to construct equipment, specifically can include:
Memory, for storing computer program;
Processor realizes the step of task construction method described in any one embodiment as above for executing computer program Suddenly.
The function that task described in the embodiment of the present invention constructs each functional module of equipment can be according in above method embodiment Method specific implementation, specific implementation process is referred to the associated description of above method embodiment, and details are not described herein again.
It supports Multi-task Concurrency to execute from the foregoing, it will be observed that the embodiment of the present invention realizes Jenkins building machine, improves Jenkins constructs machine task and constructs efficiency, can effectively shorten program compilation time, improves working efficiency.
The embodiment of the invention also provides a kind of computer readable storage medium, it is stored with task construction procedures, described Business construction procedures when being executed by processor as above task construction method described in any one embodiment the step of.
The function of each functional module of computer readable storage medium described in the embodiment of the present invention can be according to above method reality The method specific implementation in example is applied, specific implementation process is referred to the associated description of above method embodiment, herein no longer It repeats.
It supports Multi-task Concurrency to execute from the foregoing, it will be observed that the embodiment of the present invention realizes Jenkins building machine, improves Jenkins constructs machine task and constructs efficiency, can effectively shorten program compilation time, improves working efficiency.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with it is other The difference of embodiment, same or similar part may refer to each other between each embodiment.For being filled disclosed in embodiment For setting, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part Explanation.
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These Function is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Profession Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered Think beyond the scope of this invention.
The step of method described in conjunction with the examples disclosed in this document or algorithm, can directly be held with hardware, processor The combination of capable software module or the two is implemented.Software module can be placed in random access memory (RAM), memory, read-only deposit Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology In any other form of storage medium well known in field.
Above to a kind of task construction method provided by the present invention, device, equipment and computer readable storage medium into It has gone and has been discussed in detail.Used herein a specific example illustrates the principle and implementation of the invention, the above implementation The explanation of example is merely used to help understand method and its core concept of the invention.It should be pointed out that for the general of the art , without departing from the principle of the present invention, can be with several improvements and modifications are made to the present invention for logical technical staff, this A little improvement and modification are also fallen within the protection scope of the claims of the present invention.

Claims (10)

1. a kind of task construction method, which is characterized in that be applied to Jenkins and construct machine, comprising:
Machine being constructed for Jenkins in advance, Build User Vars Plugin plug-in unit being installed, configuration includes creation version number and wound Build the environmental variance of user name;
When the instruction for receiving multiple new task buildings, task module is created, and for the specified creation name of the task module and is matched Set file;The creation name is used for contain multiple while running building task, the configuration file in the creation New building task is generated in name;
Multiple new building tasks are triggered simultaneously in the creation name, with the building task for executing relative users.
2. task construction method according to claim 1, which is characterized in that described triggering is more simultaneously in the creation name After a new building task, further includes:
When detecting new building task completion building, then completed new building task is deleted, and send task to relative users Construct the instruction completed.
3. task construction method according to claim 2, which is characterized in that described triggering is more simultaneously in the creation name After a new building task, further includes:
It detects whether to receive the feedback command for receiving task building and completing instruction that all users send within a preset period of time;
Judge whether the new building task for the target user for not receiving feedback command has deleted;
If the new building task for not receiving the target user of feedback command is not deleted, and the new building task of the target user is Building is completed, then sends the instruction that task building is completed to the target user again;
If the new building task for not receiving the target user of feedback command has been deleted, one is triggered in the creation name again New building task.
4. according to claim 1 to task construction method described in 3 any one, which is characterized in that described multiple when receiving The instruction of new task building, creation task module include:
Whether the sum for judging to construct new task is more than that task module single carrying task constructs the total upper limit;
If so, it is multiple to construct total upper limit creation according to the sum of building new task and task module single carrying task Task module.
5. task construction method according to claim 4, which is characterized in that the creation name includes the creation version Number, the creation user name and creation time.
6. a kind of task construction device, which is characterized in that be applied to Jenkins and construct machine, comprising:
Plug-in unit installs module, installs Build User Vars Plugin plug-in unit for constructing machine in advance for Jenkins;
Environmental variance configuration module includes creation version number and the environmental variance for creating user name for configuring;
Task module creation module for creating task module when the instruction for receiving multiple new task buildings, and is appointed to be described The specified creation name of module of being engaged in and configuration file;The creation name is described to match to contain multiple while running building task File is set for generating new building task in the creation name;
Multi-task parallel constructs module, for triggering multiple new building tasks simultaneously in the creation name, for executing phase Using the building task at family.
7. task construction device according to claim 6, which is characterized in that further include that task removing module and task are completed Notification module;
The task removing module is used to then delete completed new building task when detecting new building task completion building;
The task completion notice module is used to then send task structure to relative users when detecting new building task completion building Build the instruction of completion.
8. task construction device according to claim 7, which is characterized in that the correction verification module, the correction verification module packet It includes:
Feedback command checks submodule, and for detecting whether to receive within a preset period of time, all users are sent receives task The feedback command of instruction is completed in building;
Judging submodule, for judging whether the new building task for the target user for not receiving feedback command has deleted;
Command retransmission submodule, if the new building task of the target user for not receiving feedback command is not deleted, and the mesh Building is completed in the new building task of mark user, then sends the instruction that task building is completed to the target user again;
Task reconfiguration builds submodule, if the new building task of the target user for not receiving feedback command has been deleted, again A new building task is triggered in the creation name.
9. a kind of task constructs equipment, which is characterized in that including processor, the processor is used to executing to be stored in memory It is realized when computer program as described in any one of claim 1 to 5 the step of task construction method.
10. a kind of computer readable storage medium, which is characterized in that be stored with task structure on the computer readable storage medium Program is built, the task construction method as described in any one of claim 1 to 5 is realized when the task construction procedures are executed by processor The step of.
CN201910711946.1A 2019-08-02 2019-08-02 Task construction method, device, equipment and computer readable storage medium Pending CN110515625A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910711946.1A CN110515625A (en) 2019-08-02 2019-08-02 Task construction method, device, equipment and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910711946.1A CN110515625A (en) 2019-08-02 2019-08-02 Task construction method, device, equipment and computer readable storage medium

Publications (1)

Publication Number Publication Date
CN110515625A true CN110515625A (en) 2019-11-29

Family

ID=68624297

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910711946.1A Pending CN110515625A (en) 2019-08-02 2019-08-02 Task construction method, device, equipment and computer readable storage medium

Country Status (1)

Country Link
CN (1) CN110515625A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111338634A (en) * 2020-02-14 2020-06-26 香港乐蜜有限公司 Parallel construction method, device and equipment
CN111857801A (en) * 2020-07-08 2020-10-30 广州云徙科技有限公司 Construction method of mobile application
CN112256326A (en) * 2020-10-27 2021-01-22 北京字跳网络技术有限公司 Information processing method, device, equipment and storage medium
CN112463123A (en) * 2020-11-25 2021-03-09 北京字跳网络技术有限公司 Task compiling method, device, network node, system and storage medium
CN116991374A (en) * 2023-09-27 2023-11-03 北京凌云雀科技有限公司 Control method, device, electronic equipment and medium for constructing continuous integration task

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107608710A (en) * 2017-08-31 2018-01-19 华为技术有限公司 Software project structure task collocation method and device based on Jenkins instruments

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107608710A (en) * 2017-08-31 2018-01-19 华为技术有限公司 Software project structure task collocation method and device based on Jenkins instruments

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111338634A (en) * 2020-02-14 2020-06-26 香港乐蜜有限公司 Parallel construction method, device and equipment
CN111338634B (en) * 2020-02-14 2023-05-23 卓米私人有限公司 Parallel construction method, device and equipment
CN111857801A (en) * 2020-07-08 2020-10-30 广州云徙科技有限公司 Construction method of mobile application
CN112256326A (en) * 2020-10-27 2021-01-22 北京字跳网络技术有限公司 Information processing method, device, equipment and storage medium
CN112256326B (en) * 2020-10-27 2023-07-07 北京字跳网络技术有限公司 Information processing method, device, equipment and storage medium
CN112463123A (en) * 2020-11-25 2021-03-09 北京字跳网络技术有限公司 Task compiling method, device, network node, system and storage medium
CN116991374A (en) * 2023-09-27 2023-11-03 北京凌云雀科技有限公司 Control method, device, electronic equipment and medium for constructing continuous integration task
CN116991374B (en) * 2023-09-27 2024-01-19 北京凌云雀科技有限公司 Control method, device, electronic equipment and medium for constructing continuous integration task

Similar Documents

Publication Publication Date Title
CN110515625A (en) Task construction method, device, equipment and computer readable storage medium
CN110752947B (en) K8s cluster deployment method and device, and deployment platform
US20210405985A1 (en) Computer-Automated Software Release and Deployment Architecture
CN109426516A (en) Software version management method and device
CN108279866B (en) Method, device and medium for arranging and executing business process
US20160117161A1 (en) Installing and updating software systems
CN108574702A (en) A kind of cloud application dispositions method and system
CN109324799A (en) A kind of code compiling method, computer installation and computer readable storage medium
CN108897547B (en) Software automation deployment method and device
CN106610839B (en) Method for issuing upgrade package, lightweight upgrade method, device and system
CN104580480A (en) Remote automatic deployment system and method for client end
US20160117160A1 (en) Preparing installations and updates for software systems
CN101937336A (en) Software asset bundling and consumption method and system
CN108021415A (en) Automatic packaging method, apparatus, computer equipment and storage medium
CN110389766A (en) HBase container cluster dispositions method, system, equipment and computer readable storage medium
CN106055334A (en) Code management system and method
CN111857801B (en) Construction method of mobile application
CN109871241A (en) A kind of configuration method of Cross-environment application server
CN115860143A (en) Operator model generation method, device and equipment
CN110716786B (en) Page display method, system and storage medium
CN116820493A (en) Mirror image file deployment method, system, equipment and storage medium
CN110795105A (en) Automatic compiling and deploying method and system for power distribution automation master station system
CN109933536A (en) A kind of method and system of intelligent integrated automatic test
CN110795139A (en) Client batch packaging method and device, computer equipment and storage medium
US20200278845A1 (en) Method and system for development of web software application

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191129