CN110504683A - The control method and control system of grid switching operation - Google Patents

The control method and control system of grid switching operation Download PDF

Info

Publication number
CN110504683A
CN110504683A CN201910769242.XA CN201910769242A CN110504683A CN 110504683 A CN110504683 A CN 110504683A CN 201910769242 A CN201910769242 A CN 201910769242A CN 110504683 A CN110504683 A CN 110504683A
Authority
CN
China
Prior art keywords
switching
inlet wire
switching operation
grid
grid switching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910769242.XA
Other languages
Chinese (zh)
Inventor
李中鹤
王严飞
杨文海
宋旭东
张胜文
王振华
丁贺
徐林
张春强
刘泽峰
李轶楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National Energy Group Ningxia Coal Industry Co Ltd
Original Assignee
National Energy Group Ningxia Coal Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National Energy Group Ningxia Coal Industry Co Ltd filed Critical National Energy Group Ningxia Coal Industry Co Ltd
Priority to CN201910769242.XA priority Critical patent/CN110504683A/en
Publication of CN110504683A publication Critical patent/CN110504683A/en
Pending legal-status Critical Current

Links

Abstract

The embodiment of the present invention provides a kind of control system of grid switching operation, which includes: data acquisition device, for obtaining the switching command of grid switching operation, switching command switch between inlet wire or inlet wire and mother between switch;Logging-controlling apparatus used in situ, it is connect with data acquisition device, for in the case where electric system meets grid switching operation condition, starting parallel connection is cut fastly, the switching command of the grid switching operation got according to data acquisition device sends the reclosing command for being directed to object to be run, and sends the separating brake instruction for object to be mediated;And fast switching device, it is connect with logging-controlling apparatus used in situ, feed motion is executed according to the reclosing command for object to be run that logging-controlling apparatus used in situ is sent, execute separating brake movement according to the separating brake instruction for object to be mediated is automatic.The time of system paired running when can reduce grid switching operation by the control method, avoid in traditional grid switching operation that cyclization is more and the operating time it is upper brought by risk.

Description

The control method and control system of grid switching operation
Technical field
The present invention relates to electric switching operations, more particularly to the control method and control system of grid switching operation.
Background technique
In traditional back brake mode, when carrying out method of operation adjustment to 35kV or less system, system need to be placed in fortune arranged side by side Row state, and 35kV and above system must be carried out to cyclization one by one before being placed in paired running state, side to be run 35kV and above system are unlinked one by one again after system sectionalizing after formula adjusts.
1. in traditional grid switching operation mode, due to more than closing the ring point and being related to multiple substations, the operating time is long, existing The personnel amount of confirmation equipment state is more, wastes a large amount of manpower, and personnel are also because of long-time operation, under the state of mind It is sliding, it is possible to maloperation occur.
If short circuit current is larger at this time 2. breaking down during grid switching operation, the energy of part breaker breaking current Power can not disengagement failure electric current, when such as 35kV bus-bar fault, short circuit current numerical value has reached 41kA, far beyond breaker sheet The breaking capacity (31.5kA) of body, meanwhile, the voltage of faulty line is reduced to 0V substantially, has substantially dragged down the system electricity of nearby lines Pressure causes 10kV and 0.4kV sub-load protection act or the decompression tripping of the system of closing on.
Summary of the invention
The purpose of the embodiment of the present invention is that the control method and control system of a kind of grid switching operation are provided, wherein passing through the control The time of system paired running when method processed can reduce grid switching operation, when avoiding more cyclization in traditional grid switching operation and operation Between it is upper brought by risk.
To achieve the goals above, the embodiment of the present invention provides a kind of control system of grid switching operation, the grid switching operation Control system include:
Data acquisition device, for obtaining the switching command of grid switching operation, wherein the switching command switches between inlet wire Or switch between inlet wire and mother;
Logging-controlling apparatus used in situ is connect with the data acquisition device, for meeting grid switching operation condition in electric system In the case of, starting parallel connection is cut fastly, and the switching command of the grid switching operation got according to the data acquisition device sends needle The reclosing command of operation object is treated, and sends the separating brake instruction for object to be mediated;And
Fast switching device is connect with the logging-controlling apparatus used in situ, for according to the logging-controlling apparatus used in situ send for The reclosing command for running object executes feed motion, the separating brake for object to be mediated sent according to the logging-controlling apparatus used in situ Instruction is automatic to execute separating brake movement.
Optionally, switching includes one of following person between the inlet wire: operation inlet wire 1 simultaneously mediates inlet wire 2 or operation inlet wire 2 simultaneously Mediate inlet wire 1;
Switching includes one of following person between the inlet wire and mother: operation inlet wire simultaneously mediates mother or operation mother and mediates Inlet wire.
Optionally, the system further include:
Detection device, for detecting whether electric system meets grid switching operation condition, and will test result be sent to it is described Logging-controlling apparatus used in situ.
Optionally, the grid switching operation condition includes:
Under the current method of operation operation part and inoperative part respectively with object to be mediated described in the switching command Match with the object to be run;
The change-over switch of the fast switching device is connected to object's position to be run in the switching command of the grid switching operation;
The switching position of the fast switching device is remote location;And
The series/parallel switching position connection of fast switching device switching position most in parallel.
Optionally, the logging-controlling apparatus used in situ is also used in the ungratified feelings of any one of described grid switching operation condition condition Under condition, terminate switching control operation.
Optionally, after the fast switching device executes feed motion according to the reclosing command for wait run object, The fast switching device is also used to execute following operation:
Detect whether the fast switching device succeeds according to the feed motion that the reclosing command for object to be run executes;
Wherein, in the case where closing success, separating brake is executed according to the separating brake instruction for object to be mediated is automatic Movement;
In the case where closing a floodgate failure, terminate handover operation.
The embodiment of the present invention also provides a kind of control method of grid switching operation, and the control method of the grid switching operation includes:
Obtain grid switching operation switching command, wherein the switching command switch between inlet wire or inlet wire and mother between cut It changes;
In the case where electric system meets grid switching operation condition, starting parallel connection is cut fastly, according to cutting for the grid switching operation It changes instruction and sends the reclosing command for being directed to object to be run, and transmission is instructed for the separating brake of object to be mediated;And
Feed motion is executed according to the reclosing command for object to be run, according to described for object to be mediated Separating brake instruction is automatic to execute separating brake movement.
Optionally, switching includes one of following person between the inlet wire: operation inlet wire 1 simultaneously mediates inlet wire 2 or operation inlet wire 2 simultaneously Mediate inlet wire 1;
Switching includes one of following person between the inlet wire and mother: operation inlet wire simultaneously mediates mother or operation mother and mediates Inlet wire.
Optionally, this method further include:
Whether detection electric system in advance meets grid switching operation condition.
Optionally, the grid switching operation condition that meets includes:
Under the current method of operation operation part and inoperative part respectively with object to be mediated described in institute's switching command and The object to be run matches;
The change-over switch of fast switching device is connected to object's position to be run in the switching command of the grid switching operation;
Transposition is set to remote location earnestly fastly;And
The series/parallel switching position connection of fast switching device switching position most in parallel.
Optionally, the control method of the grid switching operation further include:
In the ungratified situation of any one of described grid switching operation condition condition, terminate switching control operation.
Optionally, after executing feed motion according to the reclosing command for wait run object, the grid switching operation Control method further include:
Whether detection fast switching device succeeds according to the feed motion that the reclosing command for object to be run executes;
Wherein, in the case where closing success, separating brake is executed according to the separating brake instruction for object to be mediated is automatic Movement;
In the case where closing a floodgate failure, terminate handover operation.
Through the above technical solutions, start switching in parallel in the case where electric system meets grid switching operation condition, according to The switching command of grid switching operation sends the reclosing command for object to be run and the separating brake for object to be mediated instructs, into One step the reclosing command that is sent according to logging-controlling apparatus used in situ of fast switching device and separating brake instruction execute corresponding close a floodgate respectively Movement and separating brake movement are to complete grid switching operation.When can reduce grid switching operation by the control method system paired running when Between, avoid in traditional grid switching operation that cyclization is more and the operating time it is upper brought by risk.
The other feature and advantage of the embodiment of the present invention will the following detailed description will be given in the detailed implementation section.
Detailed description of the invention
Attached drawing is to further understand for providing to the embodiment of the present invention, and constitute part of specification, under The specific embodiment in face is used to explain the present invention embodiment together, but does not constitute the limitation to the embodiment of the present invention.Attached In figure:
Fig. 1 is the control system architecture schematic diagram of grid switching operation provided in an embodiment of the present invention;
Fig. 2 is the connection schematic diagram of logging-controlling apparatus used in situ and fast switching device provided in an embodiment of the present invention;
Fig. 3 is the control flow schematic diagram switched between inlet wire provided in an embodiment of the present invention;
Fig. 4 is the control flow schematic diagram switched between inlet wire provided in an embodiment of the present invention and mother.
Description of symbols
10 data acquisition device, 20 logging-controlling apparatus used in situ
30 fast switching devices
Specific embodiment
It is described in detail below in conjunction with specific embodiment of the attached drawing to the embodiment of the present invention.It should be understood that this Locate described specific embodiment and be merely to illustrate and explain the present invention embodiment, is not intended to restrict the invention embodiment.
The embodiment of the present invention provides a kind of control system of grid switching operation, and Fig. 1 shows the control system of grid switching operation Structural schematic diagram, as shown in Figure 1, the control system may include: data acquisition device 10, logging-controlling apparatus used in situ 20 and cut fastly Device 30, wherein the data acquisition device 10 obtains the switching command for the grid switching operation that electrical monitoring system is sent, and wherein this is cut Instruction is changed to switch between switching or inlet wire and mother between inlet wire.The logging-controlling apparatus used in situ 20 is connect with data acquisition device 10, Middle logging-controlling apparatus used in situ 20 starts switching in parallel in the case where determining that electric system the present situation meets grid switching operation condition, The switching command of the grid switching operation got according to data acquisition device 10 sends the reclosing command for being directed to object to be run, and For the separating brake instruction of object to be mediated.The fast switching device 30 is connect with the logging-controlling apparatus used in situ 20, for being surveyed according to the scene Control device 20 send switching command execute corresponding operating, specifically, according to the logging-controlling apparatus used in situ 20 send for The reclosing command for running object executes feed motion, point for object to be mediated sent according to the logging-controlling apparatus used in situ 20 Lock instruction is automatic to execute separating brake movement.
Switching includes one of following person between the inlet wire: operation inlet wire 1 and mediate inlet wire 2 or operation inlet wire 2 and mediate into Line 1;Switching includes one of following person between the inlet wire and mother: operation inlet wire and mediate mother or operation mother and mediate into Line.The grid switching operation condition includes: to be run partially under the current method of operation with inoperative part respectively and in the switching command The object to be mediated and the object to be run match;The change-over switch of the fast switching device is connected to the grid switching operation Switching command in object's position to be run;The switching position of the fast switching device is remote location;And the fast switching device Series/parallel switching position connection switching position most in parallel.In the inspection for whether meeting grid switching operation condition for electric system During survey, in the ungratified situation of any of the above-described condition, it is dynamic which controls grid switching operation switching Work terminates.
The device can also include detection device 40, for detecting whether electric system meets grid switching operation condition, and will Testing result is sent to the logging-controlling apparatus used in situ.By detecting whether electric system meets grid switching operation condition in advance, with true Grid switching operation is protected to execute safely.The logging-controlling apparatus used in situ 20 receives the testing result of the detection device, is determining electric system symbol In the case where closing grid switching operation condition, start switching in parallel.
To guarantee that electric system persistently operates normally, which treats operation object first and carries out closing operation, And after determining closing operation success, then treats and mediate object progress sub-switching operation, but by above-mentioned combined floodgate and separating brake institute The switch speed of the switching action of completion is ms rank, and the system paired running time is very short, one by one without superior system inlet wire Cyclization avoids the more brought risks of cyclization point in grid switching operation.
Fig. 2 shows the connection schematic diagrams of logging-controlling apparatus used in situ provided in an embodiment of the present invention and fast switching device, such as Fig. 4 institute Show, intermediate need to realize that electrical monitoring system is to survey using measure and control device inlet wire to realize that handoff functionality in parallel is cut in long-range starting fastly After controlling device sending method of operation adjustment order, measure and control device cuts handoff functionality in parallel by exporting to start fastly, and detection device is also Series/parallel switching position, the 1/ mother position of change-over switch inlet wire of fast switching device, fast switching device of fast switching device must be acquired 2/ mother position of change-over switch inlet wire, 1/ inlet wire of change-over switch inlet wire, 2 position of fast switching device, fast switching device switching position It whether is remote location.
Embodiment 1
Fig. 3 shows the control flow schematic diagram switched between inlet wire provided in an embodiment of the present invention, as shown in figure 3, inlet wire 1 The control flow of operation switching between inlet wire 2 is as follows:
S101: electrical monitoring system, which issues, to be closed inlet wire 1, divides the adjustment order of inlet wire 2;
S102: the current method of operation of 40 detection system of detection device is the operation of inlet wire 2, and inlet wire 1 has a power failure, mother operation, In S103 is executed in the case where meeting the condition, otherwise executes S110;
S103: the change-over switch that detection device 40 detects fast switching device is connected to 1/ inlet wire of inlet wire, 2 position, is meeting this S104 is executed in the case where part, otherwise executes S110;
S104: the switching position that detection device 40 detects fast switching device is connected to remote location, in the feelings for meeting the condition S105 is executed under condition, otherwise executes S110;
S105: the series/parallel switching position that detection device 40 detects fast switching device is connected to switching position in parallel, full S106 is executed in the case where the foot condition, otherwise executes S110;
S106: in the case where meeting all conditions, measure and control device, which is sent, to be closed inlet wire 1, inlet wire 2 is divided to instruct;
S107: fast switching device carries out closing operation to inlet wire 1;
S108: fast switching device is determined to the success of 1 closing operation of inlet wire, and S109 is executed in the case where meeting the condition, no Then execute S110;
S109: fast switching device carries out sub-switching operation to inlet wire 2;
S110: operation terminates, or terminates because abnormal conditions occurs in handoff procedure.
The embodiment of the present invention also provides a kind of control method of grid switching operation, and specifically this method includes obtaining electric monitoring System send grid switching operation switching command, wherein the switching command switch between inlet wire or inlet wire and mother between switch.In After getting the switching command of the grid switching operation, whether detection electric system the present situation meets grid switching operation condition, to ensure Grid switching operation executes safely.Wherein in the case where electric system the present situation meets grid switching operation condition, start switching in parallel, The reclosing command for being directed to object to be run is sent according to the switching command of the grid switching operation got, and for object to be mediated Separating brake instruction.Corresponding operating is executed according to the switching command of transmission, specifically, is sent according to the logging-controlling apparatus used in situ 20 Execute feed motion for the reclosing command of object to be run, according to the logging-controlling apparatus used in situ 20 send for wait mediate pair The separating brake instruction of elephant is automatic to execute separating brake movement.
Switching includes one of following person between the inlet wire: operation inlet wire 1 and mediate inlet wire 2 or operation inlet wire 2 and mediate into Line 1;Switching includes one of following person between the inlet wire and mother: operation inlet wire and mediate mother or operation mother and mediate into Line.The grid switching operation condition includes: to be run partially under the current method of operation with inoperative part respectively and in the switching command The object to be mediated and the object to be run match;The change-over switch of the fast switching device is connected to the grid switching operation Switching command in object's position to be run;The switching position of the fast switching device is remote location;And the fast switching device Series/parallel switching position connection switching position most in parallel.In the inspection for whether meeting grid switching operation condition for electric system During survey, in the ungratified situation of any of the above-described condition, controlling the grid switching operation switching action terminates.
To guarantee that electric system persistently operates normally, operation object is treated first and carries out closing operation, and should determining After closing operation success, then treats and mediate object progress sub-switching operation, but since the switching that above-mentioned combined floodgate and separating brake are completed is dynamic The switch speed of work is ms rank, and the system paired running time is very short, is not necessarily to the cyclization one by one of superior system inlet wire, avoids down The more brought risks of cyclization point in lock operation.
Embodiment 2
Fig. 4 shows the control flow schematic diagram switched between inlet wire provided in an embodiment of the present invention and mother, such as Fig. 4 institute Show, the control flow of the operation switching between inlet wire and mother is as follows:
S201: electrical monitoring system, which issues, closes inlet wire 2, the whole order of denominator joint debugging;
S202: the current method of operation of 40 detection system of detection device is mother operation, and inlet wire 2 has a power failure, and inlet wire 1 is run, In S203 is executed in the case where meeting the condition, otherwise executes S210;
S203: the change-over switch that detection device 40 detects fast switching device is connected to inlet wire/mother position, is meeting the condition In the case where execute S204, otherwise execute S210;
S204: the switching position that detection device 40 detects fast switching device is connected to remote location, in the feelings for meeting the condition S205 is executed under condition, otherwise executes S210;
S205: the series/parallel switching position that detection device 40 detects fast switching device is connected to switching position in parallel, full S206 is executed in the case where the foot condition, otherwise executes S210;
S206: in the case where meeting all conditions, logging-controlling apparatus used in situ 20, which issues, closes inlet wire 2, denominator connection order;
S207: fast switching device carries out closing operation to inlet wire 2;
S208: fast switching device is determined to the success of 2 closing operation of inlet wire, and S209 is executed in the case where meeting the condition, no Then execute S210;
S209: fast switching device carries out sub-switching operation to inlet wire 1;
S210: operation terminates, or terminates because abnormal conditions occurs in handoff procedure.
It can be further improved safety of electric system during grid switching operation through the above technical solution, substantially subtract The time of few grid switching operation, operator's quantity is reduced, is needed in all voltage class of coal oil project (0.4kV to 330kV system System) fast switching device is added, and the manual grid switching operation function of fast switching device is opened, thoroughly solve grid switching operation cyclization point mostly and the time Risk brought by long.Meanwhile to further increase the Efficiency of Switching Operation, the complexity of multilevel system grid switching operation is reduced, is divided Not Cai Yong distant place man-machine interface normalizing operation and human-computer interface control disk on the spot, pass through intelligent terminal and control fast switching device Series and parallel handoff functionality, simplify grid switching operation sequencing, cut the grid switching operation time fastly at this time and can be compressed to millisecond for every grade Grade, the time of multistage grid switching operation is compressible to significantly reduce the time arranged side by side of system in minute grade, avoidance system for a long time at When paired running state, short-circuit current is excessive and generation the case where damaging breaker, " sequencing " grid switching operation, substantially Grid switching operation difficulty is reduced, accident odds is reduced.
The optional embodiment of the embodiment of the present invention is described in detail in conjunction with attached drawing above, still, the embodiment of the present invention is simultaneously The detail being not limited in above embodiment can be to of the invention real in the range of the technology design of the embodiment of the present invention The technical solution for applying example carries out a variety of simple variants, these simple variants belong to the protection scope of the embodiment of the present invention.
It is further to note that specific technical features described in the above specific embodiments, in not lance In the case where shield, it can be combined in any appropriate way.In order to avoid unnecessary repetition, the embodiment of the present invention pair No further explanation will be given for various combinations of possible ways.
It will be appreciated by those skilled in the art that implementing the method for the above embodiments is that can pass through Program is completed to instruct relevant hardware, which is stored in a storage medium, including some instructions are used so that single Piece machine, chip or processor (processor) execute all or part of the steps of each embodiment the method for the application.And it is preceding The storage medium stated includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory The various media that can store program code such as (RAM, Random Access Memory), magnetic or disk.
In addition, any combination can also be carried out between a variety of different embodiments of the embodiment of the present invention, as long as it is not The thought of the embodiment of the present invention is violated, equally should be considered as disclosure of that of the embodiment of the present invention.

Claims (12)

1. a kind of control system of grid switching operation, which is characterized in that the control system of the grid switching operation includes:
Data acquisition device, for obtaining the switching command of grid switching operation, wherein the switching command switch between inlet wire or into Switch between line and mother;
Logging-controlling apparatus used in situ is connect with the data acquisition device, for the case where electric system meets grid switching operation condition Under, starting parallel connection is cut fastly, the switching command of the grid switching operation got according to the data acquisition device send for The reclosing command of object is run, and sends the separating brake instruction for object to be mediated;And
Fast switching device is connect with the logging-controlling apparatus used in situ, is directed to for what is sent according to the logging-controlling apparatus used in situ wait run The reclosing command of object executes feed motion, is instructed according to the separating brake for object to be mediated that the logging-controlling apparatus used in situ is sent It is automatic to execute separating brake movement.
2. the control system of grid switching operation according to claim 1, which is characterized in that switching includes following between the inlet wire One of person: operation inlet wire 1 simultaneously mediates inlet wire 2 or operation inlet wire 2 and mediates inlet wire 1;
Switching includes one of following person between the inlet wire and mother: operation inlet wire and mediate mother or operation mother and mediate into Line.
3. the control system of grid switching operation according to claim 1, which is characterized in that the system further include:
Detection device for detecting whether electric system meets grid switching operation condition, and will test result and be sent to the scene Measure and control device.
4. the control system of grid switching operation according to claim 1-3, which is characterized in that the grid switching operation item Part includes:
Under the current method of operation operation part and inoperative part respectively with object to be mediated described in the switching command and institute Object to be run is stated to match;
The change-over switch of the fast switching device is connected to object's position to be run in the switching command of the grid switching operation;
The switching position of the fast switching device is remote location;And
The series/parallel switching position connection of fast switching device switching position most in parallel.
5. the control system of grid switching operation according to claim 1, which is characterized in that the logging-controlling apparatus used in situ is also used to In the ungratified situation of any one of described grid switching operation condition condition, terminate switching control operation.
6. the control system of grid switching operation according to claim 1, which is characterized in that in the fast switching device according to After executing feed motion for the reclosing command wait run object, the fast switching device is also used to execute following operation:
Detect whether the fast switching device succeeds according to the feed motion that the reclosing command for object to be run executes;
Wherein, in the case where closing success, separating brake movement is executed according to the separating brake instruction for object to be mediated is automatic;
In the case where closing a floodgate failure, terminate handover operation.
7. a kind of control method of grid switching operation, which is characterized in that the control method of the grid switching operation includes:
Obtain grid switching operation switching command, wherein the switching command switch between inlet wire or inlet wire and mother between switch;
In the case where electric system meets grid switching operation condition, starting parallel connection is cut fastly, is referred to according to the switching of the grid switching operation The reclosing command for sending and being directed to object to be run is enabled, and transmission is instructed for the separating brake of object to be mediated;And
Feed motion is executed according to the reclosing command for object to be run, according to the separating brake for object to be mediated Instruction is automatic to execute separating brake movement.
8. the control method of grid switching operation according to claim 7, which is characterized in that
Switching includes one of following person between the inlet wire: operation inlet wire 1 simultaneously mediates inlet wire 2 or operation inlet wire 2 and mediates inlet wire 1;
Switching includes one of following person between the inlet wire and mother: operation inlet wire and mediate mother or operation mother and mediate into Line.
9. the control method of grid switching operation according to claim 7, which is characterized in that this method further include:
Whether detection electric system in advance meets grid switching operation condition.
10. according to the control method of the described in any item grid switching operations of claim 7-9, which is characterized in that described to meet back brake Operating condition includes:
Under the current method of operation operation part and inoperative part respectively with object to be mediated described in institute's switching command and described Object to be run matches;
The change-over switch of fast switching device is connected to object's position to be run in the switching command of the grid switching operation;
Transposition is set to remote location earnestly fastly;And
The series/parallel switching position connection of fast switching device switching position most in parallel.
11. the control method of grid switching operation according to claim 7, which is characterized in that the controlling party of the grid switching operation Method further include:
In the ungratified situation of any one of described grid switching operation condition condition, terminate switching control operation.
12. the control method of grid switching operation according to claim 7, which is characterized in that be directed to according to described wait run After the reclosing command of object executes feed motion, the control method of the grid switching operation further include:
Whether detection fast switching device succeeds according to the feed motion that the reclosing command for object to be run executes;
Wherein, in the case where closing success, separating brake movement is executed according to the separating brake instruction for object to be mediated is automatic;
In the case where closing a floodgate failure, terminate handover operation.
CN201910769242.XA 2019-08-20 2019-08-20 The control method and control system of grid switching operation Pending CN110504683A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910769242.XA CN110504683A (en) 2019-08-20 2019-08-20 The control method and control system of grid switching operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910769242.XA CN110504683A (en) 2019-08-20 2019-08-20 The control method and control system of grid switching operation

Publications (1)

Publication Number Publication Date
CN110504683A true CN110504683A (en) 2019-11-26

Family

ID=68588356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910769242.XA Pending CN110504683A (en) 2019-08-20 2019-08-20 The control method and control system of grid switching operation

Country Status (1)

Country Link
CN (1) CN110504683A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101728865A (en) * 2009-09-23 2010-06-09 南京合富共展机电科技有限公司 Undisturbed stable switching method for industrial enterprise factory electrical system
CN202353304U (en) * 2011-12-05 2012-07-25 宁波顺泽橡胶有限公司 Rapid-switching power system
CN104659904A (en) * 2015-03-20 2015-05-27 山东钢铁股份有限公司 Spare power automatic switching method, device and system
CN106160185A (en) * 2015-03-25 2016-11-23 南京理工大学 A kind of method using fast switching device to carry out power supply switching
CN206195453U (en) * 2016-08-31 2017-05-24 王国红 Million units do not have high -pressure stand -by power supply's quick recovering start -up system
CN107171431A (en) * 2017-06-29 2017-09-15 国网山东省电力公司淄博供电公司 Tune electric equipment free of discontinuities, system and control method
CN107465255A (en) * 2017-08-10 2017-12-12 西安热工研究院有限公司 A kind of Turbo-generator Set accident starts auxiliary Power switching method and system
CN107947340A (en) * 2017-10-30 2018-04-20 国网山西省电力公司晋城供电公司 A kind of quick power switching system and its switching method
CN108345706A (en) * 2017-01-24 2018-07-31 中国石油化工股份有限公司 A kind of emulation mode that power supply is cut soon and model
CN110034604A (en) * 2019-04-18 2019-07-19 徐州矿达机电科技有限公司 A kind of dual power supply fast switching system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101728865A (en) * 2009-09-23 2010-06-09 南京合富共展机电科技有限公司 Undisturbed stable switching method for industrial enterprise factory electrical system
CN202353304U (en) * 2011-12-05 2012-07-25 宁波顺泽橡胶有限公司 Rapid-switching power system
CN104659904A (en) * 2015-03-20 2015-05-27 山东钢铁股份有限公司 Spare power automatic switching method, device and system
CN106160185A (en) * 2015-03-25 2016-11-23 南京理工大学 A kind of method using fast switching device to carry out power supply switching
CN206195453U (en) * 2016-08-31 2017-05-24 王国红 Million units do not have high -pressure stand -by power supply's quick recovering start -up system
CN108345706A (en) * 2017-01-24 2018-07-31 中国石油化工股份有限公司 A kind of emulation mode that power supply is cut soon and model
CN107171431A (en) * 2017-06-29 2017-09-15 国网山东省电力公司淄博供电公司 Tune electric equipment free of discontinuities, system and control method
CN107465255A (en) * 2017-08-10 2017-12-12 西安热工研究院有限公司 A kind of Turbo-generator Set accident starts auxiliary Power switching method and system
CN107947340A (en) * 2017-10-30 2018-04-20 国网山西省电力公司晋城供电公司 A kind of quick power switching system and its switching method
CN110034604A (en) * 2019-04-18 2019-07-19 徐州矿达机电科技有限公司 A kind of dual power supply fast switching system

Similar Documents

Publication Publication Date Title
CN104539043B (en) A kind of automatic switching device of standby power supply system haul oneself willingly into method
CN103618377B (en) For being connected to backup auto-activating device system and the spare power automatic switching method of small power supply
CN104638618B (en) A kind of GIS bus equipment tripping operation fast recovery of power supply method
CN106058910A (en) Energy storage inverter dual-mode seamless intelligent switching system and switching method
CN104052148A (en) Automatic switching and automatic recovery method and device suitable for diesel generator
CN104333143B (en) Intelligent feeder terminal device for power distribution network fault detection
CN108345706B (en) Power supply fast switching simulation method and model
CN110504683A (en) The control method and control system of grid switching operation
CN103837826B (en) High-voltage switch gear operation circuit fault zone identification system and method
CN206524622U (en) A kind of fast arc extinction device
CN110098599B (en) Fault processing method and system for overhead line-cable hybrid line
CN116937808A (en) Fault isolation method and device for low-voltage distribution network, electronic equipment and storage medium
CN102944809B (en) Method for rapidly identifying power grid fault
CN103384062A (en) Isolation control system of grid power distribution fault detection
CN207675865U (en) A kind of high-tension cable differential protection check system of no load condition
CN217282209U (en) Open circuit protection device for current transformer
CN115498608A (en) Method, device and equipment for pre-identifying line interelectrode short circuit under metal return wire
Wang et al. The analysis and simulation of commutation failure and protection strategies
CN104022492A (en) Auxiliary short circuit protection device for low-voltage power supply device of long-distance mine laneway
CN108181528A (en) The high-tension cable differential protection check system of no load condition
CN104009453A (en) Method for detecting faults generated in off-network operating process of micro grid
CN204947582U (en) Loop is distributed in the jumping of 220kV failure protection connection rationally
CN102890222A (en) Method for judging breaking of PT (potential transformer) in fast switch
CN105552855A (en) Method for preventing single-CT saturation of 3/2 wiring mode from causing distance protection misoperation
CN106356242A (en) Control method, control device and control equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191126