CN110503317A - A kind of Collaborative Manufacturing management system based on industry internet - Google Patents

A kind of Collaborative Manufacturing management system based on industry internet Download PDF

Info

Publication number
CN110503317A
CN110503317A CN201910717377.1A CN201910717377A CN110503317A CN 110503317 A CN110503317 A CN 110503317A CN 201910717377 A CN201910717377 A CN 201910717377A CN 110503317 A CN110503317 A CN 110503317A
Authority
CN
China
Prior art keywords
period
supplier
finished product
next period
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910717377.1A
Other languages
Chinese (zh)
Inventor
潘道伟
胡厚志
汪礼贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Three Squirrels Co Ltd
Original Assignee
Three Squirrels Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Three Squirrels Co Ltd filed Critical Three Squirrels Co Ltd
Priority to CN201910717377.1A priority Critical patent/CN110503317A/en
Publication of CN110503317A publication Critical patent/CN110503317A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Factory Administration (AREA)

Abstract

The present invention is suitable for Internet technical field, provides a kind of Collaborative Manufacturing management system based on industry internet, which includes: procurement plan unit, and the procurement plan in next period is determined at the end of current period;Unit is purchased, inquiry is issued to the supplier having higher rating based on procurement plan, will be the finished product supply of material in next period for the optimal supplier of commodity price;Quality inspection unit carries out quality testing to the finished product that supplier provides, examines qualified production product to be put into warehouse, the underproof finished product of quality inspection is returned to corresponding supplier;Warehousing management unit carries out warehousing management to the finished product for being put into warehouse.It realizes the digitlization of each core link operation in production management, and digitized each link is integrated in identical platform, is conducive to the production management efficiency improved and scientific management.

Description

A kind of Collaborative Manufacturing management system based on industry internet
Technical field
The invention belongs to industry internet technical fields, provide a kind of Collaborative Manufacturing management system based on industry internet System.
Background technique
The production management of enterprise is completed by the cooperation of multiple departments mostly, and each department mostly uses greatly labor management mould Formula, and interdepartmental communication is to be docked by profession, such as the formulation of procurement plan mainly manually carries out, and exists Data statistics is many and diverse, low efficiency and by the stronger problem of interference caused by subjective factors, supplier select it is mostly be based on subjective impression into Row selection, exists by the stronger problem of interference caused by subjective factors.
Summary of the invention
The embodiment of the invention provides a kind of Collaborative Manufacturing management systems based on industry internet, realize in production management The digitlization of each core link operation, and digitized each link is integrated in identical platform, is conducive to the production management improved Efficiency and scientific management.
The invention is realized in this way a kind of Collaborative Manufacturing management system based on industry internet, the system comprises: Procurement plan unit, buying unit, quality inspection unit and warehousing management unit, wherein
Procurement plan unit determines the procurement plan in next period at the end of current period;
Unit is purchased, inquiry is issued to the supplier having higher rating based on procurement plan, by the supply optimal for commodity price Quotient is the finished product supplier in next period;
Quality inspection unit carries out quality testing to the finished product that supplier provides, examines qualified finished product to be put into warehouse, quality inspection is not Qualified finished product is returned to corresponding supplier;
Warehousing management unit carries out warehousing management to the finished product for being put into warehouse.
Further, procurement plan unit determines the buying meter in next period based on the expectation sales volume in next period It draws, i.e., determines the amount of purchase in next period based on the expectation sales volume in next period, then the amount of purchase in next period is divided On each working day being assigned in next period, form the procurement plan in next period.
Further, the expectation sales volume in next period is the history same period sales volume based on next period and next period Expectation increment determine.
Further, the expectation incremental computations formula in next period are as follows:
Expectation sale in (the expectation sales volume in effective sale amount-current period in current period)/current period Amount.
Further, the expectation sales volume in next period are as follows:
The expectation increment in a lower period in history same period sales volume+next period history same period sales volume * in next period.
Further, the timeliness of supply of material quality and the supply of material of the buying unit based on each supplier within the examination period is to each confession Quotient is answered to evaluate.
Further, each vendors' evaluating forming process is specific as follows:
It obtains each supplier and retracts rate and overdue delivery rate within the examination period;
Rate maximum value and overdue delivery rate maximum value are retracted in determination;
Calculate scoring of each supplier within the examination period;
The calculation method of scoring are as follows: a1* (supplier examination the period in the rate of retracting/retract rate most in the examination period Big value)+a2 (maximum value of the overdue delivery rate of overdue delivery rate of the supplier within the examination period/in the examination period), wherein A1+a2=1;
Supplier is arranged by the sequence of scoring from low to high, this puts in order as supplier evaluation from high in the end Sequence.
Further, quality inspection unit carries out double check to the finished product that supplier provides, and the first re-detection is to supplier The production procedure report of offer and quality appraisal report are detected, at the either quality evaluation of the production underproof product of process The underproof finished product of index of correlation parameter is retracted in report;Second re-detection is carried out to the finished product of the first re-detection qualification It inspects by random samples, is retracted for inspecting underproof batch by random samples in batches, inspect qualified batch releasing warehouse by random samples and store in a warehouse.
Further, the process of warehousing management is specific as follows:
Record enters production time, expired time and the storage quantity of each batch of finished product in warehouse, and defines the sensitive of product and belong to Property,
Specified storage area is placed in based on the finished product there are Sensitive Attributes;
The Sensitive Attributes of specified storage area are monitored;
Further, the Sensitive Attributes include: temperature sensitivity and humidity sensitive.
Collaborative Manufacturing management system Internet-based provided by the invention has the following beneficial effects:
1. being based on industry internet technology, the digitlization of each core link operation in production management is realized, and digitize Each link be integrated in identical platform, be conducive to the production management efficiency and scientific management that improve enterprise;
2. generate the procurement plan in next period based on real sales data, without manually carrying out the statistics of data and pre- Estimate, improve the objectivity of procurement plan, in addition, carrying out examination scoring, system automatic screening to each supplier based on real data The best supplier of various product out, reduces the subjectivity of human intervention.
Detailed description of the invention
Fig. 1 is the Collaborative Manufacturing schematic diagram of management system structure provided in an embodiment of the present invention based on industry internet.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Fig. 1 is the Collaborative Manufacturing schematic diagram of management system structure provided in an embodiment of the present invention based on industry internet, is Convenient for explanation, part related to the embodiment of the present invention is only shown.
The system includes:
Procurement plan unit determines the procurement plan in next period at the end of current period;
In embodiments of the present invention, procurement plan is usually as unit of week, the moon or season, and procurement plan unit is based on down The expectation sales volume in one period determines the procurement plan in next period, i.e., is determined down based on the expectation sales volume in next period Amount of purchase in one period, then by the working day in the order quantity allocation in next period to next period, form next period Procurement plan;
In this clearly demarcated embodiment, the expectation sales volume in next period is based on history same period sales volume and next period It is expected that increment determines, in embodiments of the present invention, the expectation increment in next period is determined based on the sales volume of current period, If the effective sale amount in current period is greater than corresponding expectation sales volume, the expectation increment in next period is positive, if working as Effective sale amount in the preceding period is less than corresponding expectation sales volume, then the expectation increment in next period is set as negative,
In embodiments of the present invention, the expectation incremental computations formula in next period are as follows: (effective sale in current period Expectation sales volume in amount-current period) expectation sales volume in/current period, corresponding, the expectation sales volume in next period Are as follows: the expectation increment in a lower period in history same period sales volume+next period history same period sales volume * in next period.
Unit is purchased, inquiry is issued to the supplier having higher rating based on procurement plan, selectes the confession optimal for commodity price Answering quotient is the finished product supplier in next period;
In embodiments of the present invention, buying unit based on each supplier examine the period in supply of material quality and the supply of material when Effect evaluates each supplier, and supply of material quality is evaluated based on the testing result of quality inspection unit feedback, moves back as used Return rate evaluated, the supply of material timeliness be to be evaluated based on overdue delivery rate, overdue delivery rate be overdue delivery number and The ratio of total delivery number, buying unit issues inquiry to the supplier having higher rating, using the optimal supplier of price as under The finished product supplier in one period;
In embodiments of the present invention, each vendors' evaluating forming method is specific as follows:
It obtains each supplier and retracts rate and overdue delivery rate within the examination period;
Rate maximum value and overdue delivery rate maximum value are retracted in determination;
Calculate scoring of each supplier within the examination period;
The calculation method of scoring are as follows: a1* (supplier examination the period in the rate of retracting/retract rate most in the examination period Big value)+a2 (maximum value of the overdue delivery rate of overdue delivery rate of the supplier within the examination period/in the examination period), wherein The value of a1+a2=1, a1 and a2 are the demands based on enterprise to be arranged, if supply of material process more pays close attention to the timeliness of the supply of material, such as fruit And the fresh goods such as aquatic products, then a2 assignment is larger, if supply of material process more focuses on quality of supplying, a1 assignment is larger;;
Supplier is arranged by the sequence of scoring from low to high, this puts in order as supplier evaluation from high in the end Sequence
In this law inventive embodiments, such as the product category of three squirrels sale is more, therefore, all for various product Corresponding points supplier is selected according to above-mentioned method, is supplied for the production in next period.
Quality inspection unit carries out quality testing to the finished product that supplier provides, qualified production product is examined to be put into warehouse, quality inspection Underproof finished product is returned to corresponding supplier;
Quality inspection unit carries out double check to the finished product that supplier provides, and the first re-detection is the production provided supplier Process report and quality appraisal report are detected, to related in the underproof product of process either quality appraisal report at producing The underproof finished product of index parameter is retracted;Second re-detection is the finished product point by detection device to the first re-detection qualification It criticizes and is inspected by random samples, retracted for inspecting underproof batch by random samples, inspect qualified batch releasing warehouse by random samples and store in a warehouse.
Warehousing management unit carries out warehousing management to the finished product for being put into warehouse;
In embodiments of the present invention, the process of warehousing management is specific as follows:
Record enters production time, expired time and the storage quantity of each batch of finished product in warehouse, and defines the sensitive of product and belong to Property,
Specified storage area is placed in based on the finished product there are Sensitive Attributes;
The Sensitive Attributes of specified storage area are monitored.
In embodiments of the present invention, Sensitive Attributes include: temperature sensitivity and humidity sensitive, are belonged to the product of nut fruits wet Sensitive finished product is spent, as the biggish cake of humidity, belongs to temperature sensitive finished product, there is no apparent sensitivities to belong to for finished product also Property, temperature sensitive finished product is put into specified storage area 2, the finished product of humidity sensitive is put into specified storage area 3, to storage The temperature in area 2 is monitored, and by the temperature control of storage area 2 within the scope of suitable temperature, is supervised to the humidity of storage area 3 Control, by the humid control of storage area 3 in suitable humidity range.
Collaborative Manufacturing management system Internet-based provided by the invention has the following beneficial effects:
1. being based on industry internet technology, the digitlization of each core link operation in production management is realized, and digitize Each link be integrated in identical platform, be conducive to the production management efficiency and scientific management that improve enterprise;
2. generate the procurement plan in next period based on real sales data, without manually carrying out the statistics of data and pre- Estimate, improve the objectivity of procurement plan, in addition, carrying out examination scoring, system automatic screening to each supplier based on real data The best supplier of various product out, reduces the subjectivity of human intervention.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of Collaborative Manufacturing management system based on industry internet, which is characterized in that the system comprises: procurement plan list Member, buying unit, quality inspection unit and warehousing management unit, wherein
Procurement plan unit determines the procurement plan in next period at the end of current period;
Unit is purchased, inquiry is issued to the supplier having higher rating based on procurement plan, will be for the optimal supplier of commodity price Finished product supplier in next period;
Quality inspection unit carries out quality testing to the finished product that supplier provides, examines qualified finished product to be put into warehouse, quality inspection is unqualified Finished product be returned to corresponding supplier;Warehousing management unit carries out warehousing management to the finished product for being put into warehouse.
2. the Collaborative Manufacturing management system based on industry internet as described in claim 1, which is characterized in that procurement plan unit Determine the procurement plan in next period based on the expectation sales volume in next period, i.e., based on the expectation sales volume in next period come The amount of purchase in next period is determined, then by each working day in the order quantity allocation in next period to next period, under formation The procurement plan in one period.
3. the Collaborative Manufacturing management system based on industry internet as claimed in claim 2, which is characterized in that the phase in next period Hope that sales volume is determined based on the expectation increment in the history same period sales volume in next period and next period.
4. the Collaborative Manufacturing management system based on industry internet as claimed in claim 3, which is characterized in that the phase in next period Hope incremental computations formula are as follows:
Expectation sales volume in (the expectation sales volume in effective sale amount-current period in current period)/current period.
5. the Collaborative Manufacturing management system based on industry internet as claimed in claim 3, which is characterized in that the phase in next period Hope sales volume are as follows:
The expectation increment in a lower period in history same period sales volume+next period history same period sales volume * in next period.
6. the Collaborative Manufacturing management system based on industry internet as described in claim 1, which is characterized in that buying unit is based on The timeliness of supply of material quality and the supply of material of each supplier within the examination period evaluates each supplier.
7. the Collaborative Manufacturing management system based on industry internet as claimed in claim 6, which is characterized in that each supplier's comments The new forming process of valence is specific as follows:
It obtains each supplier and retracts rate and overdue delivery rate within the examination period;
Rate maximum value and overdue delivery rate maximum value are retracted in determination;
Calculate scoring of each supplier within the examination period;
The calculation method of scoring are as follows: a1* (supplier examination the period in the rate of retracting/retract rate maximum value in the examination period) + a2 (overdue delivery rate/overdue delivery rate examination period in maximum value of the supplier within the examination period), wherein a1+a2 =1;
Supplier is arranged by scoring sequence from low to high, this puts in order as supplier evaluation from high in the end suitable Sequence.
8. the Collaborative Manufacturing management system based on industry internet as described in claim 1, which is characterized in that quality inspection unit is to confession The finished product for answering quotient to provide carries out double check, and the first re-detection is the production procedure report provided supplier and quality evaluation report Announcement is detected, at the underproof finished product of index of correlation parameter in the production underproof product of process either quality appraisal report It is retracted;Second re-detection is inspected by random samples in batches to the finished product of the first re-detection qualification, for inspecting underproof batch by random samples It is retracted, inspects qualified batch releasing warehouse by random samples and store in a warehouse.
9. the Collaborative Manufacturing management system based on industry internet as described in claim 1, which is characterized in that the mistake of warehousing management Journey is specific as follows:
Record enters production time, expired time and the storage quantity of each batch of finished product in warehouse, and defines the Sensitive Attributes of product,
Specified storage area is placed in based on the finished product there are Sensitive Attributes;
The Sensitive Attributes of specified storage area are monitored.
10. the Collaborative Manufacturing management system based on industry internet as described in claim 1, which is characterized in that the sensitive category Property include: that temperature is sensitive and humidity sensitive.
CN201910717377.1A 2019-08-05 2019-08-05 A kind of Collaborative Manufacturing management system based on industry internet Pending CN110503317A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910717377.1A CN110503317A (en) 2019-08-05 2019-08-05 A kind of Collaborative Manufacturing management system based on industry internet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910717377.1A CN110503317A (en) 2019-08-05 2019-08-05 A kind of Collaborative Manufacturing management system based on industry internet

Publications (1)

Publication Number Publication Date
CN110503317A true CN110503317A (en) 2019-11-26

Family

ID=68587938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910717377.1A Pending CN110503317A (en) 2019-08-05 2019-08-05 A kind of Collaborative Manufacturing management system based on industry internet

Country Status (1)

Country Link
CN (1) CN110503317A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111105192A (en) * 2019-12-16 2020-05-05 三只松鼠股份有限公司 Product raw material management system based on industrial internet
CN114792167A (en) * 2022-05-09 2022-07-26 山东大学 QLA-based production order full-process quality visual monitoring method and system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106529978A (en) * 2016-11-09 2017-03-22 三只松鼠股份有限公司 Method and system for monitoring product quality
CN107239903A (en) * 2017-06-02 2017-10-10 深圳齐心集团股份有限公司 A kind of ecommerce information management system
CN107767102A (en) * 2017-11-02 2018-03-06 成都吱吖科技有限公司 A kind of food security inventory storage detection method based on data processing
CN107844934A (en) * 2017-09-26 2018-03-27 国网江西省电力公司电力科学研究院 A kind of electric energy meter intelligent storage delivery management system
CN108022111A (en) * 2017-11-27 2018-05-11 广东广凌信息科技股份有限公司 A kind of purchasing system cloud platform
CN108830534A (en) * 2018-06-26 2018-11-16 南通森雅商务服务有限公司 Computer network system for enterprise purchasing management
CN109242375A (en) * 2017-07-11 2019-01-18 周武增 A kind of e-commerce system and method based on Internet of Things

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106529978A (en) * 2016-11-09 2017-03-22 三只松鼠股份有限公司 Method and system for monitoring product quality
CN107239903A (en) * 2017-06-02 2017-10-10 深圳齐心集团股份有限公司 A kind of ecommerce information management system
CN109242375A (en) * 2017-07-11 2019-01-18 周武增 A kind of e-commerce system and method based on Internet of Things
CN107844934A (en) * 2017-09-26 2018-03-27 国网江西省电力公司电力科学研究院 A kind of electric energy meter intelligent storage delivery management system
CN107767102A (en) * 2017-11-02 2018-03-06 成都吱吖科技有限公司 A kind of food security inventory storage detection method based on data processing
CN108022111A (en) * 2017-11-27 2018-05-11 广东广凌信息科技股份有限公司 A kind of purchasing system cloud platform
CN108830534A (en) * 2018-06-26 2018-11-16 南通森雅商务服务有限公司 Computer network system for enterprise purchasing management

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111105192A (en) * 2019-12-16 2020-05-05 三只松鼠股份有限公司 Product raw material management system based on industrial internet
CN114792167A (en) * 2022-05-09 2022-07-26 山东大学 QLA-based production order full-process quality visual monitoring method and system

Similar Documents

Publication Publication Date Title
Kiefer et al. An empirical analysis of warehouse measurement systems in the context of supply chain implementation
Eichenbaum et al. Reference prices, costs, and nominal rigidities
CN107665448A (en) For determining the method, apparatus and storage medium of consumption contributed value
Garcia et al. The pricing efficiency of agricultural futures markets: an analysis of previous research results
CN110503317A (en) A kind of Collaborative Manufacturing management system based on industry internet
CN107451636A (en) Retrospect inquiry system based on screw rod production technology
CN108830492B (en) Method for determining spot-check merchants based on big data
Kuswandi et al. Development of monitoring reverse logistic system for leather tanning industry using scor model
Amin et al. A review of closed-loop supply chain models
Rout et al. An EPQ model for deteriorating items with imperfect production, two types of inspection errors and rework under complete backordering
CN108681948A (en) Commodity sale system for e-commerce
Kadłubek Completeness meter in logistics service quality management of transport companies
Temasova et al. Application of statistical methods for quality control of agro-industrial production processes
CN110084523B (en) Agricultural product detection task allocation method and platform
Finch et al. Process-oriented production planning and control: Factors that influence system design
Deodhar Motivation for and cost of HACCP in Indian food processing industry
CN110909966A (en) Efficiency evaluation method and efficiency evaluation system
Guita et al. Effect of Price, Quality Service and Trust to Customer Satisfaction
Werbińska-Wojciechowska On logistics service quality evaluation-case study
Mubaraq et al. Strategic Information System, Supply Chain Performance and Operational Performance in the Fishing Industry: A Conceptual Model
Nugroho et al. Efficiency analysis of vannamei shrimp supply chain performance in PT Sari Indonesia Group, Suak Pandan Village, West Aceh Regency, Aceh Province
Wang et al. Decision-making analysis of e-procurement with the rough set theory
Ye et al. Comparative Analysis of the Current Status of the Cosmetics Supply Chain Imported from China to Thailand by Applying the SCOR Model
Susanto Usefulness of management accounting systems information and market competition on strategic business unit output
Zeng et al. A supplier performance evaluation solution for proactive supplier quality management

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191126