CN110500137A - 一种无底柱分段崩落法回采进度自动监测方法 - Google Patents
一种无底柱分段崩落法回采进度自动监测方法 Download PDFInfo
- Publication number
- CN110500137A CN110500137A CN201910889782.1A CN201910889782A CN110500137A CN 110500137 A CN110500137 A CN 110500137A CN 201910889782 A CN201910889782 A CN 201910889782A CN 110500137 A CN110500137 A CN 110500137A
- Authority
- CN
- China
- Prior art keywords
- resistance
- back production
- production progress
- string
- welding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/22—Methods of underground mining; Layouts therefor for ores, e.g. mining placers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/18—Special adaptations of signalling or alarm devices
Abstract
本发明涉及一种无底柱分段崩落法回采进度自动监测方法,包括如下步骤:(1)制作并联电阻串:采用2.5平方的双股电缆1,等距离做开口,并在开口内焊接电阻,焊接后用胶带包扎;(2)监测装置的现场安装:在回采进路5顶板中间部位铺设等值电阻的并联电阻串,将多条回采进路的电阻串通过连线电缆7连接至多路电阻测量仪8,并进行进路代码编号;(3)利用并联电阻串在炸断时的总电阻值变化原理,解算出回采进度的位置。本发明的优点是:实现无底柱分段崩落法矿山回采进度的实时自动监测,解决了以往传统人工上报方式效率低、实时性差、工作量大的难题,本发明更加快捷高效,便于采矿工程技术人员实时掌握各回采进路的回采进度。
Description
技术领域
本发明属于采矿工程技术领域,尤其是涉及一种无底柱分段崩落法回采进度自动监测方法。
背景技术
采用无底柱分段崩落法的地下金属矿山,尤其是矿体厚大的矿山,存在大量回采进路,在回采进路内要进行凿岩和回采工作。通常采用逐排爆破的方法,进行后退式回采。而在该类矿山中,回采进度的控制与管理非常关键,关系到生产的衔接协调。传统方法则是采用人工上报的方式进行统计各进路的回采进度,这种方法存在效率低,实时性差的缺点,且工作量较大,因此,需要发明一种能够实时监测回采进度的方法与装置。
发明内容
本发明的目的是提供一种快捷高效,便于采矿工程技术人员实时掌握各回采进路的回采进度,提高了生产组织调度效率的无底柱分段崩落法回采进度自动监测方法。
本发明的技术方案是这样实现的。
本发明的.一种无底柱分段崩落法回采进度自动监测方法,包括如下步骤:
(1)制作并联电阻串:
采用2.5平方的双股电缆1,等距离做开口,并在开口内焊接电阻,焊接后用胶带包扎;
(2)监测装置的现场安装:
在回采进路5顶板最高点部位铺设等值电阻的并联电阻串,将多条回采进路的电阻串通过连线电缆7连接至多路电阻测量仪8,并进行进路代码编号;
(3)回采位置的求算:
并联电阻全部为等值电阻,电阻值设为r,电阻的数量为n(n>1),即R1=R2=R3=……=Rn=r。由于每隔1m焊接一个电阻,并联电阻串总长度为n-1米。
未被炸断前的总电阻为R0,有以下关系:
若并联电阻串第m(1<m≤n)个电阻前面的电阻都被炸断,则并联电阻串总电阻值为Rmn,有以下关系:
可得,
则已回采的长度为:
进一步地,所述的步骤(1)中制作并联电阻串是:采用2.5平方的双股电缆1,每隔1m做开口,并在开口内焊接1kΩ电阻,焊接后用胶带包扎。
本发明的优点是:利用并联电阻串在炸断时的总电阻值变化原理,解算出回采进度的位置,实现无底柱分段崩落法矿山回采进度的实时自动监测,解决了以往传统人工上报方式效率低、实时性差、工作量大的难题,本监测方法和装置更加快捷高效,便于采矿工程技术人员实时掌握各回采进路的回采进度,提高了生产组织调度效率。
附图说明
图1为电阻焊接示意图。
图2为现场回采进度监测装置电阻串的布置示意图。
图3为图2的A-A剖视图。
图4为电阻并联原理示意图。
附图标记列表:
1-并联电阻串电缆线,2-电阻,3-回采进度线,4-联络道,5-回采进路,6-并联电阻串,7-连线电缆,8-多路电阻测量仪。
具体实施方式
为使本发明的目的、技术方案及优点更加清楚明白,以下结合附图和实施例,对本发明进行进一步的详细说明。此处所描述的具体实施例仅用于解释本发明,并不用于限定发明。
如图1~4所示,本实施例的一种无底柱分段崩落法回采进度自动监测方法,包括如下步骤:
(1)制作并联电阻串:
采用2.5平方的双股电缆1,每隔1m做开口,焊接电阻1kΩ电阻2,焊接后用胶带包扎。
(2)监测装置的现场安装:
在回采进路5顶板最高点部位铺设等值电阻的并联电阻串,将多条回采进路的电阻串通过连线电缆7连接至多路电阻测量仪8,并进行进路代码编号;
(3)回采位置的求算。由于并联电阻全部为等值电阻,电阻值设为1kΩ,电阻的数量为100,即R1=R2=R3=……=R100=1kΩ。由于每隔1m焊接一个电阻,并联电阻串总长度为99米。
未被炸断前的总电阻为R0,有以下关系:
可得,R0=10Ω
若回采进路已经进行回采,并联电阻串被炸断,且测出并联电阻串总电阻值为20Ω,根据式(3)可得已回采的长度L为:
实施例2:
(3)回采位置的求算。由于并联电阻全部为等值电阻,电阻值设为10kΩ,电阻的数量为400,即R1=R2=R3=……=R301=10kΩ。由于每隔1m焊接一个电阻,并联电阻串总长度为399米。
未被炸断前的总电阻为R0,有以下关系:
可得,R0=25Ω
若回采进路已经进行回采,并联电阻串被炸断,且测出并联电阻串总电阻值为100Ω,根据式(3)可得已回采的长度L为:
本专利方案所公开的技术手段不仅限于上述实施方式所公开的技术手段,还包括由以上技术特征任意组合所组成的技术方案。应当指出,对于本技术领域的技术人员来说,在不脱离本发明方法的前提下,还可以做出若干改进和润饰,这些改进和润饰也视为本专利的保护范围。
Claims (2)
1.一种无底柱分段崩落法回采进度自动监测方法,包括如下步骤:
(1)制作并联电阻串:
采用2.5平方的双股电缆1,等距离做开口,并在开口内焊接电阻,焊接后用胶带包扎;
(2)监测装置的现场安装:
在回采进路5顶板中间部位铺设等值电阻的并联电阻串,将多条回采进路的电阻串通过连线电缆7连接至多路电阻测量仪8,并进行进路代码编号;
(3)回采位置的求算:
并联电阻全部为等值电阻,电阻值设为r,电阻的数量为n(n>1),即R1=R2=R3=……=Rn=r。由于每隔1m焊接一个电阻,并联电阻串总长度为n-1米。
未被炸断前的总电阻为R0,有以下关系:
若并联电阻串第m(1<m≤n)个电阻前面的电阻都被炸断,则并联电阻串总电阻值为Rmn,有以下关系:
可得,
则已回采的长度为:
2.根据权利要求1所述的无底柱分段崩落法回采进度自动监测方法,其特征在于,
所述的步骤1)中(1)制作并联电阻串是:采用2.5平方的双股电缆1,每隔1m做开口,并在开口内焊接1kΩ电阻,焊接后用胶带包扎。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910889782.1A CN110500137A (zh) | 2019-09-20 | 2019-09-20 | 一种无底柱分段崩落法回采进度自动监测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910889782.1A CN110500137A (zh) | 2019-09-20 | 2019-09-20 | 一种无底柱分段崩落法回采进度自动监测方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110500137A true CN110500137A (zh) | 2019-11-26 |
Family
ID=68592469
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910889782.1A Pending CN110500137A (zh) | 2019-09-20 | 2019-09-20 | 一种无底柱分段崩落法回采进度自动监测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110500137A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113236252A (zh) * | 2021-05-28 | 2021-08-10 | 辽宁科技大学 | 单进路无底柱分段崩落法覆盖岩层远距离钻孔注浆方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06264690A (ja) * | 1993-03-16 | 1994-09-20 | Hitachi Ltd | 高速車両用トンネル |
CN2224280Y (zh) * | 1995-06-19 | 1996-04-10 | 武汉钢铁(集团)公司 | 一种远距离岩体破坏集中监测装置 |
AU2009338680A1 (en) * | 2009-01-29 | 2011-08-18 | Commonwealth Scientific And Industrial Research Organisation | System and method for mitigating at least one component from a fluid stream |
CN104658683A (zh) * | 2015-03-09 | 2015-05-27 | 江苏省电力公司盐城供电公司 | 高压输电电力电缆 |
CN207556451U (zh) * | 2017-12-08 | 2018-06-29 | 鞍钢集团矿业有限公司 | 一种采空区冒落进程的控测装置 |
-
2019
- 2019-09-20 CN CN201910889782.1A patent/CN110500137A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06264690A (ja) * | 1993-03-16 | 1994-09-20 | Hitachi Ltd | 高速車両用トンネル |
CN2224280Y (zh) * | 1995-06-19 | 1996-04-10 | 武汉钢铁(集团)公司 | 一种远距离岩体破坏集中监测装置 |
AU2009338680A1 (en) * | 2009-01-29 | 2011-08-18 | Commonwealth Scientific And Industrial Research Organisation | System and method for mitigating at least one component from a fluid stream |
CN104658683A (zh) * | 2015-03-09 | 2015-05-27 | 江苏省电力公司盐城供电公司 | 高压输电电力电缆 |
CN207556451U (zh) * | 2017-12-08 | 2018-06-29 | 鞍钢集团矿业有限公司 | 一种采空区冒落进程的控测装置 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113236252A (zh) * | 2021-05-28 | 2021-08-10 | 辽宁科技大学 | 单进路无底柱分段崩落法覆盖岩层远距离钻孔注浆方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105257339B (zh) | 掘进工作面多参量综合监测预警方法 | |
CN201170093Y (zh) | 水平井多点温度压力动态监测仪器 | |
CN102562013A (zh) | 用于注水井的自动测调与监测分注方法及其系统 | |
CN202531136U (zh) | 用于注水井的自动测调与监测分注系统 | |
CN103592904A (zh) | 一种电力隧道远程监控系统 | |
CN106593422A (zh) | 一种水平井油管内存储式测试方法及管柱 | |
CN110500137A (zh) | 一种无底柱分段崩落法回采进度自动监测方法 | |
CN101440707B (zh) | 一种煤层瓦斯压力测定仪及测定方法 | |
CN207423101U (zh) | 一种基于电阻的煤矿巷道顶底板位移测量装置 | |
CN205638466U (zh) | 一种特长区间盾构隧道地面钻孔投点复测装置 | |
CN102444111A (zh) | 地下溶洞造影探测法 | |
CN202402023U (zh) | 用于井下无线随钻测井的探管系统 | |
CN203687823U (zh) | 一种矿用伸缩测量杆 | |
CN205748369U (zh) | 地铁疏散平台测量工具 | |
CN201144695Y (zh) | 一种新型信号传输钻柱 | |
CN202431189U (zh) | 一种钻孔变径导向装置 | |
CN104763409B (zh) | 一种石油井下流量测量装置及测量方法 | |
CN203939504U (zh) | 一种盾构法隧道强制对中控制点测量装置 | |
CN208718630U (zh) | 一种油管传输全方位精准控制起爆系统用智能遥传装置 | |
CN103941095B (zh) | 一种对地下金属管道周围土壤的电阻率进行测试的方法 | |
CN207437063U (zh) | 一种水平井存储式产液剖面测试管柱 | |
CN110295848A (zh) | 一种爆破孔孔底找平钻孔方法 | |
CN105588539A (zh) | 一种在线监测煤体横向变形装置及其监测方法 | |
CN201277061Y (zh) | 一种煤层瓦斯压力测定仪 | |
CN202548621U (zh) | 一种电网隧道用自动化远程监控系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191126 |
|
RJ01 | Rejection of invention patent application after publication |