CN110492227A - The communication antenna mounting bracket of electric force pole tower - Google Patents

The communication antenna mounting bracket of electric force pole tower Download PDF

Info

Publication number
CN110492227A
CN110492227A CN201910677717.2A CN201910677717A CN110492227A CN 110492227 A CN110492227 A CN 110492227A CN 201910677717 A CN201910677717 A CN 201910677717A CN 110492227 A CN110492227 A CN 110492227A
Authority
CN
China
Prior art keywords
electric force
pylon
pole tower
force pole
mounting bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910677717.2A
Other languages
Chinese (zh)
Inventor
余天生
叶伟力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUIZHOU ELECTRIC POWER PROSPECTING DESIGN INSTITUTE CO LTD
Original Assignee
HUIZHOU ELECTRIC POWER PROSPECTING DESIGN INSTITUTE CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUIZHOU ELECTRIC POWER PROSPECTING DESIGN INSTITUTE CO LTD filed Critical HUIZHOU ELECTRIC POWER PROSPECTING DESIGN INSTITUTE CO LTD
Priority to CN201910677717.2A priority Critical patent/CN110492227A/en
Publication of CN110492227A publication Critical patent/CN110492227A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • E04H12/10Truss-like structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2207Sockets or holders for poles or posts not used
    • E04H12/2215Sockets or holders for poles or posts not used driven into the ground
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01QANTENNAS, i.e. RADIO AERIALS
    • H01Q1/00Details of, or arrangements associated with, antennas
    • H01Q1/12Supports; Mounting means
    • H01Q1/1207Supports; Mounting means for fastening a rigid aerial element
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01QANTENNAS, i.e. RADIO AERIALS
    • H01Q1/00Details of, or arrangements associated with, antennas
    • H01Q1/12Supports; Mounting means
    • H01Q1/1242Rigid masts specially adapted for supporting an aerial
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The present invention discloses a kind of communication antenna mounting bracket of electric force pole tower, including pylon, cabinet, cable assembly and bracket component, by setting, bracket component is set on electric force pole tower, and then the antenna assembly of communication equipment can be provided to the space of placement, and then it avoids building shared steel tower using a large amount of land resource, expenditure is drastically reduced, and bracket component is light-weight, it is easy to install;By setting cable fixing piece, data cable can be tightly secured on pylon, and then can guarantee that data cable is not easy to fall under atrocious weather, and the mechanism of cable fixing piece is simple, it is light-weight, it is easier to be fixed on brandreth.Meanwhile the bracket component structure in the application is simple, it is convenient to assemble, and bracket component need to be only fixed on pylon by construction personnel by simple process.

Description

The communication antenna mounting bracket of electric force pole tower
Technical field
The present invention relates to electric force pole tower fields, more particularly to a kind of communication antenna mounting bracket of electric force pole tower.
Background technique
Currently, electric force pole tower is the tower-like building of transmission of electricity.They are structurally characterized in that various towers belong to space purlin Frame structure, rod piece are mainly made of single equal leg angle or combination angle steel, and connection uses rough bolt between rod piece, is cut by bolt Power connection, entire tower are made of angle steel, junction steel plate and bolt, and individual part such as column foot etc. is welded into a group by several blocks of steel plates Component, therefore hot galvanizing anti-corrosion, transport and construction set up extremely convenient but perfect with cordless communication network, need to arrange More and more shared steel towers, in short supply with land resource, it is more and more difficult to increase shared steel tower newly, especially builds up in city Area, the more complicated multiplicity of factor in need of consideration.If can use existing power circuit steel tower in completed region of the city, carry out Communication network is layouted, then just greatly increasing cloth spot speed.
However, most of electric force pole tower does not have the function of offer signal yet at this stage, but build shared steel tower not only The cost for occupying a large amount of land resource, while significantly putting into, and construction period is longer;The day of communication equipment at this stage Although line apparatus has small part to be mounted on electric force pole tower, but its mounting structure is complex, and mounting structure weight is larger, When encountering bad weather, such as typhoon, mounting structure is easy to fall, and then causes danger to construction personnel and pedestrian;At this stage Data cable is not provided with fixed mechanism and fixes to it, and when bad weather occurs, data cable is easy to fall, and in turn results in peace Full accident.
Summary of the invention
The purpose of the present invention is overcoming shortcoming in the prior art, providing one kind can be traditional thread binding by the day of communication equipment Set be fixed on electric force pole tower, the communication antenna of the electric force pole tower that data cable can be securely fixed on electric force pole tower peace Fill bracket.
The purpose of the present invention is achieved through the following technical solutions:
A kind of communication antenna mounting bracket of electric force pole tower, comprising:
Pylon is provided with the area Zhi Gui on the pylon;
Cabinet, the cabinet include that communication cabinet body and load-bearing bases, the communication cabinet body are set on the load-bearing bases, The load-bearing bases are set in the area Zhi Gui;
Cable assembly, the cable assembly include data cable and cable fixing piece, the data cable and the communication Cabinet body electrical connection, the data cable are set on the pylon, and the cable fixing piece is set in the data cable;And
Bracket component, the bracket component include support rod, cross bar and installation part, and the cross bar and the installation part connect It connects, the installation part is set on the pylon, and the installation part includes pedestal, clamping block and fastener, the clamping block One side is welded on the pedestal, and the another side of the clamping block is set on the pylon, and the fastener is set to On the pedestal, the area Bi Wei is offered on the pedestal, one end of the cross bar is welded in the area Bi Wei, the cross bar The other end is connect with the support rod.
The installation part further includes the first reinforcing rib in one of the embodiments, and first reinforcing rib is set to institute It states on cross bar.
The installation part further includes the second reinforcing rib in one of the embodiments, the second reinforcing rib setting and institute It states on pedestal.
Via hole is offered on the pedestal in one of the embodiments, the fastener wears the via hole.
The cable fixing piece includes locking fixture and limit clamp, the locking fixture in one of the embodiments, It is set in the data cable, the limit clamp is set in the data cable, the locking fixture and the limit Interval is provided between fixture.
The cable assembly further includes protection tube body in one of the embodiments, and the protection tube body is sheathed on described In data cable.
The protection tube body is pvc pipe in one of the embodiments,.
The cabinet further includes guardrail in one of the embodiments, and the guardrail is set in the area Zhi Gui, the load-bearing Pedestal is set in the guardrail.
It in one of the embodiments, further include column foot, the column foot is connect with the pylon, and the column foot is for fixing On the ground.
In one of the embodiments, further include cross biling assembly, the cross biling assembly include the first cross-arm, the second cross-arm and Third cross-arm, first cross-arm, second cross-arm and the third cross-arm are respectively separated and are set on the pylon.
The present invention compared with the prior art the advantages of and have the beneficial effect that:
The present invention is a kind of communication antenna mounting bracket of electric force pole tower, and bracket group is arranged by being arranged on electric force pole tower Part, and then the antenna assembly of communication equipment can be provided to the space of placement, and then avoid building using a large amount of land resource Shared steel tower, drastically reduces expenditure, and bracket component is light-weight, easy to install;It, can by the way that cable fixing piece is arranged Data cable is tightly secured on pylon, and then can guarantee that data cable is not easy to fall under atrocious weather, and cable The mechanism of fixing piece is simple, light-weight, is easier to be fixed on brandreth.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the structural schematic diagram of the communication antenna mounting bracket of the electric force pole tower of an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of the bracket component of an embodiment of the present invention;
Fig. 3 is the structural schematic diagram of the pedestal of an embodiment of the present invention;
Fig. 4 is the structural schematic diagram of the limit clamp of an embodiment of the present invention;
Fig. 5 is the structural schematic diagram of the locking fixture of an embodiment of the present invention;
Fig. 6 is the structural schematic diagram of the clamping block of an embodiment of the present invention;
Fig. 7 is first fixed link of an embodiment of the present invention and the structural schematic diagram of the second fixed link.
Specific embodiment
To facilitate the understanding of the present invention, a more comprehensive description of the invention is given in the following sections with reference to the relevant attached drawings.In attached drawing Give better embodiment of the invention.But the invention can be realized in many different forms, however it is not limited to herein Described embodiment.On the contrary, the purpose of providing these embodiments is that making to understand more the disclosure Add thorough and comprehensive.
It should be noted that it can directly on the other element when element is referred to as " being fixed on " another element Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it, which can be, is directly connected to To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ", " right side " and similar statement for illustrative purposes only, are not meant to be the only embodiment.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more Any and all combinations of relevant listed item.
Referring to Fig. 1, a kind of communication antenna mounting bracket 10 of electric force pole tower, including pylon 100, cabinet 200, cable group Part 300 and bracket component 400, pylon 100 are electric force pole tower, and cabinet 200 is used for for providing electric power output, cable assembly 300 Data are transmitted, bracket component 400 is used to place the antenna assembly of communication equipment.
Referring to Fig. 1, the area Zhi Gui is provided on pylon 100;Cabinet 200 includes communication cabinet body 210 and load-bearing bases 220, communication cabinet body 210 is set on load-bearing bases 220, and load-bearing bases 220 are set in the area Zhi Gui;Cable assembly 300 includes Data cable 310 and cable fixing piece 320, data cable 310 are electrically connected with communication cabinet body 210, and data cable 310 is set to tower On frame 100, cable fixing piece 320 is set in data cable 310;Referring to Fig. 2, bracket component 400 include support rod 410, Cross bar 420 and installation part 430, cross bar 420 are connect with installation part 430, and installation part 430 is set on pylon 100, installation part 430 Including pedestal 431, clamping block 432 and fastener 433, the one side of clamping block 432 is welded on pedestal 431, clamping block 432 Another side is set on pylon 100, and fastener 433 is set on pedestal 431, is kept away referring to Fig. 3, offering on pedestal 431 Position area 431a, one end of cross bar 420 are welded on the area Bi Wei 431a, and the other end of cross bar 420 is connect with support rod 410.
It should be noted that the area Zhi Gui is located at the underface of pylon 100, it can be communication cabinet body by the setting area Zhi Gui 210 provide one from the installation site that pylon 100 is closer, and then need not extend for the length of data cable 310, increase cost Investment, while load-bearing bases 220 form for concreting, by the way that load-bearing bases 220 are arranged, can make to communicate cabinet body 210 with There is certain height from the ground;Further, one end of data cable 310 is electrically connected with communication cabinet body 210, data cable 310 The other end be introduced on pylon 100, by be arranged cable fixing piece 320, data cable 310 can be tightly secured in tower It on frame 100, and then can guarantee that data cable 310 is fallen under atrocious weather environment, pedestrian or construction personnel are caused to endanger Danger;Still further, the application is provided with 3 bracket components 400 altogether, the setting that this 3 bracket components 400 are respectively separated is in tower In the main material of frame 100, cross bar 420 is welded on the area the Bi Wei 431a of pedestal 431, and clamping block 432 is welded by construction personnel It connects on pedestal 431, and is locked pedestal 431 and clamping block 432 in the main material of pylon 100 by fastener 433, by such as This is designed, on the cross bar 420 that can install the antenna assembly of communication equipment, so that electric force pole tower has communication and electric power The function of output.Further, a bracket component 400 includes 3 cross bars, 420,3 installation parts 430 and 3 support rods 410,3 cross bars 420 by welding, are welded on 3 support rods 410, and set between cross bar 420 and cross bar 420 It is equipped with interval, interval is again provided between support rod 410 and support rod 410, in this way, guaranteeing that the antenna of communication equipment has enough Installation space, will not be intertwined.Cross bar 420 and support rod 410 are round steel, and it is circular reality that round steel, which is a kind of section, The light-weight and hardness of heart strip steel, round steel is big, by the way that cross bar 420 and support rod 410 are arranged to round steel, can guarantee whole The mechanical strength of a bracket component 400.Wherein, multiple cross bars 410 and support rod 420 can be set according to the actual situation.
In this way, bracket component 400 is arranged by being arranged on electric force pole tower, and then can be by the antenna assembly of communication equipment The space placed is provided, and then avoids building shared steel tower using a large amount of land resource, drastically reduces expenditure, and prop up Frame component 400 it is light-weight, it is easy to install;By the way that cable fixing piece 320 is arranged, data cable 310 can be tightly secured in tower On frame 100, and then it can guarantee that data cable 310 is not easy to fall under atrocious weather, and the mechanism letter of cable fixing piece 320 It is single, it is light-weight, it is easier to be fixed on pylon 100.Meanwhile 400 structure of bracket component in the application is simple, it is convenient to assemble, And bracket component 400 need to be only fixed on pylon 100 by construction personnel by simple process.
Referring to Fig. 2, further, in one embodiment, installation part 430 further includes the first reinforcing rib 434, the One reinforcing rib 434 is set on cross bar 420.In this way, can be improved cross bar by the way that the first reinforcing rib 434 is arranged on cross bar 420 420 mechanical strength, so that cross bar 420 is more firm.
Referring to Fig. 2, further, in one embodiment, installation part 430 further includes the second reinforcing rib 435, the In the setting of two reinforcing ribs 435 and pedestal 431.In this way, can be improved pedestal by the way that the second reinforcing rib 435 is arranged on pedestal 431 431 mechanical strength enables pedestal 431 to be more firmly secured on clamping block 432.
Referring to Fig. 3, further, in one embodiment, via hole 431b is offered on pedestal 431, fasten Part 433 wears via hole 431b.
It should be noted that fastener 433 is U bolt, the both ends of U bolt are respectively arranged with screw thread and and and screw thread The nut combined.U bolt passes through the via hole 431b on pedestal 431, and construction personnel is by tightening nuts, until by pedestal 431 are locked.
Referring to Figure 4 together and Fig. 5, further, in one embodiment, cable fixing piece 320 includes locking fixture 321 and limit clamp 322, locking fixture 321 be set in data cable 310, limit clamp 322 is set to data cable 310 On, interval is provided between locking fixture 321 and limit clamp 322.Referring to Fig. 5, specifically, cable assembly 300 further includes Tube body 330 is protected, protection tube body 330 is sheathed in data cable 310.Referring to Fig. 5, more specifically, protection tube body 330 is Pvc pipe.
It should be noted that the application is respectively arranged with multiple limit clamps 322 and multiple locking fixtures 321, in this way, logical It crosses and multiple limit clamps 322 and multiple locking fixtures 321 is set, pylon 100 can be firmly secured to data cable 310 On, and then can guarantee that data cable 310 is not easy to fall under atrocious weather.Further, pvc pipe is hard polyvinyl chloride Pipe, be with Corvic and stabilizer, lubricant etc. after use pressure sintering extrusion forming, be to be developed and applied earliest Plastic pipe.Pvc pipe resistance to corrosion is strong, be easy to be bonded, price is low and quality is hard, by the way that pvc pipe is set in number According on cable 310, can be avoided data cable 310 because being chronically exposed in air, by the vapor corrosion in air, Jin Eryou Data cable 310 is protected to effect, extends the service life of data cable 310.
Referring to Fig. 4, further, in another embodiment, cable assembly 300 further includes coating steel pipe 340, Coating steel pipe 340 is sheathed in data cable 310, and limit clamp 322 includes locking member 322a and top holding piece 322b, top holding piece Multiple connecting holes are offered on 322b, locking member 322a wears connecting hole, holding chamber, coating steel pipe are offered on locking member 322a 340 wear holding chamber, and coating steel pipe 340 is pushed up with top holding piece 322b phase and held.
It should be noted that locking member 322a is all U bolt, the both ends of U bolt wear the 2 of top holding piece 322b respectively A connecting hole, by the nut of turn-knob U bolt, so that top holding piece 322b and coating steel pipe 340 closely press, and U-shaped spiral shell Bolt is welded on pylon 100, so, it is possible further fixed data cable 310, prevents the loosening of data cable 310 from falling. Further, above-mentioned coating steel pipe 340 is hot dip galvanizing pipe, and hot dip galvanizing pipe is to make molten metal and iron-based precursor reactant and generate conjunction Layer gold, so that both matrix and coating be made to combine.Hot galvanizing is that steel pipe is first carried out pickling, in order to remove the oxygen of steel tube surface Change iron, after pickling, by being cleaned in ammonium chloride or solder(ing)acid or ammonium chloride and zinc chloride mixed aqueous solution slot, so It is sent into hot-dip tank afterwards.The advantages that hot galvanizing has coating uniform, and adhesive force is strong, long service life.Hot galvanized steel pipe matrix Complicated physics, chemical reaction occurs with the plating solution of melting, forms corrosion resistant hard-packed one iron alloy layer of zinc.Alloy-layer It combines together with pure zinc layer, steel pipe matrix, therefore its corrosion resistance is strong.In this way, being set in data cable by using hot dip galvanizing pipe On line 310, data cable 310 can be avoided because being chronically exposed in air, by the vapor corrosion in air, and then effectively Data cable 310 is protected, the service life of data cable 310 is extended.
Still further, include turn-knob part 321a, fastener 321b and fastening piece 321c referring to Fig. 5, locking and pressing from both sides 321, The turn-knob part 321a is connect with the one side of the fastener 321b, and the fastening piece 321c is another with the fastener 321b's One side connection.Clamping chamber is offered on the fastener 321b, the inner sidewall of the clamping chamber has first side and second Side offers on the fastening piece 321c and keeps away a chamber.
It should be noted that turn-knob part 321a is bolt, locking fixture 321 is used to lock the data in pvc pipe and its pipe Cable 310.Fastener 321b is fastened on pylon first, the first side of inner sidewall for being clamped chamber is made by turn-knob bolt It is closely pressed with second side and pylon 100, then, pvc pipe is passed through and keeps away a chamber, passes through the spiral shell on turn-knob fastening piece 321c Bolt locks pvc pipe.In this way, data cable 310 can be locked at pylon 100 securely by setting locking fixture 321 On, and then in inclement weather, such as typhoon, data cable 310 will not loosen, and by locking pvc pipe, so that it will not occur It falls.
Referring to Fig. 1, further, in one embodiment, cabinet 200 further includes guardrail 230, and guardrail 230 is set It is placed in the area Zhi Gui, load-bearing bases 220 are set in guardrail 230.In this way, pedestrian can be prevented to be strayed by setting guardrail 230 Into danger zone, and then it ensure that the safety of pedestrian.
It further include column foot 500, column foot 500 and pylon 100 in one embodiment further referring to Fig. 1 Connection, column foot 500 is for fixing on the ground.It should be noted that column foot 500 forms for concreting.
It further include cross biling assembly 600 in one embodiment, cross biling assembly 600 wraps further referring to Fig. 1 The first cross-arm 610, the second cross-arm 620 and third cross-arm 630 are included, the first cross-arm 610, the second cross-arm 620 and third cross-arm 630 divide It is not arranged at intervals on pylon 100.
It further include insulation assembly 700, insulation assembly 700 in another embodiment further referring to Fig. 1 Including multiple insulators 710, each insulator 710, which is respectively separated, to be arranged on pylon 100, it should be noted that insulator 710 is The important component of transmission line of electricity, is unique electrical insulations and important structural support, 710 performance of insulator and its The reasonability of configuration directly affects the safe and stable operation of route.Further, cross-arm is equally composition portion important in shaft tower Point, its effect is to support conducting wire, lightning conducter, and to be allowed to protect by national Specification for installing insulator 710 and fitting Hold certain safe distance.
Referring to Fig. 6, further, in another embodiment, installation part 430 further includes unfilled corner portion 436 and weld part 437, unfilled corner portion 436 is set on clamping block 432, and weld part 437 is set on clamping block 432.It further include angle bar component, angle bar Component includes the first bending part and the second bending part, and the first bending part is set on the second bending part, the first bending part and second Bending part is arranged on pylon 100.
It should be noted that weld part 437 is by welding, it is mounted on pedestal 431.Meanwhile unfilled corner portion 436 has Have a triangular cross section, angle bar component has a triangular cross section, and the angle that is formed of the first bending part and the second bending part and The angle in unfilled corner portion 436 is identical, and the clamping block 432 that so, it is possible to be, which can fasten, to be held on pylon 100, so that day After line apparatus is installed on bracket component 400, pedestal 431 be not in slide up and down, thus do not fall out injure pedestrian or Construction personnel.Further, the first bending part and the second bending part are respectively angle steel, and angle steel is mainly used for making frame structure, Such as the pylon of high voltage power transmission, the frame of steel structure bridge girder two sides, the column of derrick crane and armed lever on construction site, The column and beam in workshop etc., also, angle steel category construction structural carbon steel, are the fashioned iron steel of simple section, are mainly used for gold Metal elements and the frame of workshop etc..Require have preferable solderability, plastically deformed performance and certain mechanical strength in use.
Referring to Fig. 7, further, in another embodiment, bracket component 400 further include the first fixed link 440 and Second fixed link 450, one end of support rod 410 are welded in the first fixed link 440, and the other end of support rod 410 is welded in In two fixed links 450.
It should be noted that the application is provided with 3 the first fixed links 440 and 3 the second fixed links 450 altogether.By setting The first fixed link 440 and the second fixed link 450 are set, the load-bearing dynamics of support rod 410 can be increased, and then is avoided since it is traditional thread binding It is the problem of placement set causes support rod 410 to be broken, on the other hand, fixed by the first fixed link of setting 440 and second Bar 450 enables to the stress of support rod 410 more balanced.Further, the first fixed link 440 and the second fixed link 450 are equal Light-weight and hardness for round steel, round steel is big.
Referring to Fig. 1, further, in another embodiment, being additionally provided with construction area on pylon 100.
It should be noted that the application work, which is provided with 3 bracket components, 400,3 bracket components 400, is separately mounted to tower In the main material of frame 100, it will be understood that pylon 100 has 4 ends angle, and 3 bracket components 400 are provided respectively therein 3 ends angle Main material on.By being provided with construction area on pylon 100, the space of climbing can be provided for construction personnel, and then to communication The antenna assembly of device carries out Maintenance and Repair, meanwhile, also facilitate construction personnel to carry out Maintenance and Repair to bracket component 400.
Compared with prior art, the invention has the following advantages that
Bracket component 400 is arranged by being arranged on electric force pole tower in the communication antenna mounting bracket 10 of above-mentioned electric force pole tower, And then the antenna assembly of communication equipment can be provided to the space of placement, and then avoid building using a large amount of land resource shared Steel tower drastically reduces expenditure, and bracket component 400 is light-weight, easy to install;By the way that cable fixing piece 320, energy is arranged It is enough that data cable 310 is tightly secured on pylon 100, and then can guarantee that data cable 310 is not easy under atrocious weather It falls, and the mechanism of cable fixing piece 320 is simple, it is light-weight, it is easier to be fixed on pylon 100.Meanwhile the branch in the application 400 structure of frame component is simple, and it is convenient to assemble, and bracket component 400 only need to be fixed on tower by simple process by construction personnel On frame 100.
Only several embodiments of the present invention are expressed for embodiment described above, and the description thereof is more specific and detailed, but It cannot be construed as a limitation to the scope of the present invention.It should be pointed out that for the ordinary skill people of this field For member, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to of the invention Protection scope.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (10)

1. a kind of communication antenna mounting bracket of electric force pole tower characterized by comprising
Pylon is provided with the area Zhi Gui on the pylon;
Cabinet, the cabinet include communication cabinet body and load-bearing bases, and the communication cabinet body is set on the load-bearing bases, described Load-bearing bases are set in the area Zhi Gui;
Cable assembly, the cable assembly include data cable and cable fixing piece, the data cable and the communication cabinet body Electrical connection, the data cable are set on the pylon, and the cable fixing piece is set in the data cable;And
Bracket component, the bracket component include support rod, cross bar and installation part, and the cross bar is connect with the installation part, institute It states installation part to be set on the pylon, the installation part includes pedestal, clamping block and fastener, the one side of the clamping block It is welded on the pedestal, the another side of the clamping block is set on the pylon, and the fastener is set to the bottom On seat, the area Bi Wei is offered on the pedestal, one end of the cross bar is welded in the area Bi Wei, the other end of the cross bar It is connect with the support rod.
2. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that the installation part also wraps The first reinforcing rib is included, first reinforcing rib is set on the cross bar.
3. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that the installation part also wraps Include the second reinforcing rib, the second reinforcing rib setting on the pedestal.
4. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that opened up on the pedestal There is via hole, the fastener wears the via hole.
5. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that the cable fixing piece Including locking fixture and limit clamp, the locking fixture is set in the data cable, and the limit clamp is set to institute It states in data cable, interval is provided between the locking fixture and the limit clamp.
6. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that the cable assembly is also Including protecting tube body, the protection tube body is sheathed in the data cable.
7. the communication antenna mounting bracket of electric force pole tower according to claim 6, which is characterized in that the protection tube body is Pvc pipe.
8. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that the cabinet further includes Guardrail, the guardrail are set in the area Zhi Gui, and the load-bearing bases are set in the guardrail.
9. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that it further include column foot, institute It states column foot to connect with the pylon, the column foot is for fixing on the ground.
10. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that further include cross-arm group Part, the cross biling assembly include the first cross-arm, the second cross-arm and third cross-arm, first cross-arm, second cross-arm and institute It states third cross-arm and is respectively separated and be set on the pylon.
CN201910677717.2A 2019-07-25 2019-07-25 The communication antenna mounting bracket of electric force pole tower Pending CN110492227A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910677717.2A CN110492227A (en) 2019-07-25 2019-07-25 The communication antenna mounting bracket of electric force pole tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910677717.2A CN110492227A (en) 2019-07-25 2019-07-25 The communication antenna mounting bracket of electric force pole tower

Publications (1)

Publication Number Publication Date
CN110492227A true CN110492227A (en) 2019-11-22

Family

ID=68548482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910677717.2A Pending CN110492227A (en) 2019-07-25 2019-07-25 The communication antenna mounting bracket of electric force pole tower

Country Status (1)

Country Link
CN (1) CN110492227A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206814A (en) * 2020-03-30 2020-05-29 杭州东南吉通网络有限公司 Water tower type integrated 5G beautifying base station
CN112096164A (en) * 2020-09-09 2020-12-18 国网福建省电力有限公司经济技术研究院 Special support for sharing tower and mounting method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2569394Y (en) * 2002-06-06 2003-08-27 广东省电信科学技术研究院 Special clip ring device for angletype telecommunication iron tower
GB201005028D0 (en) * 2009-12-08 2010-05-12 Telecoms Comm Infrastructure P Improvements in and relating to strengthening antenna towers
CN101761263A (en) * 2009-12-31 2010-06-30 电联工程技术有限公司 Wind power generation communication tower
CN205173885U (en) * 2015-11-18 2016-04-20 四川汇源光通信有限公司 Install in iron tower scissor holder's ptz support
CN207116670U (en) * 2017-08-16 2018-03-16 云南电网有限责任公司 A kind of antenna for base station support
CN208077506U (en) * 2018-05-08 2018-11-09 广东电网有限责任公司 A kind of power circuit tower number plate or warning sign holder
CN210245695U (en) * 2019-07-25 2020-04-03 惠州电力勘察设计院有限公司 Communication antenna mounting bracket of electric power tower
CN211698329U (en) * 2020-04-30 2020-10-16 中国电建集团四川工程有限公司 Support for installing OPPC optical cable junction box

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2569394Y (en) * 2002-06-06 2003-08-27 广东省电信科学技术研究院 Special clip ring device for angletype telecommunication iron tower
GB201005028D0 (en) * 2009-12-08 2010-05-12 Telecoms Comm Infrastructure P Improvements in and relating to strengthening antenna towers
CN101761263A (en) * 2009-12-31 2010-06-30 电联工程技术有限公司 Wind power generation communication tower
CN205173885U (en) * 2015-11-18 2016-04-20 四川汇源光通信有限公司 Install in iron tower scissor holder's ptz support
CN207116670U (en) * 2017-08-16 2018-03-16 云南电网有限责任公司 A kind of antenna for base station support
CN208077506U (en) * 2018-05-08 2018-11-09 广东电网有限责任公司 A kind of power circuit tower number plate or warning sign holder
CN210245695U (en) * 2019-07-25 2020-04-03 惠州电力勘察设计院有限公司 Communication antenna mounting bracket of electric power tower
CN211698329U (en) * 2020-04-30 2020-10-16 中国电建集团四川工程有限公司 Support for installing OPPC optical cable junction box

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206814A (en) * 2020-03-30 2020-05-29 杭州东南吉通网络有限公司 Water tower type integrated 5G beautifying base station
CN112096164A (en) * 2020-09-09 2020-12-18 国网福建省电力有限公司经济技术研究院 Special support for sharing tower and mounting method thereof

Similar Documents

Publication Publication Date Title
US11322923B2 (en) Overhead power distribution line
US10971915B2 (en) Mounting bracket systems for dead-end utility lines
CN110492227A (en) The communication antenna mounting bracket of electric force pole tower
US5749198A (en) Tapered composite elevated support structure
CN106602979A (en) Fixed cable rod bracket system for installing photovoltaic module
CN106602978A (en) Fixed cable pipe support for installing photovoltaic assembly
CN218069483U (en) Arc attracting assembly, insulator and composite cross arm
CN105239817A (en) Composite material power transformation framework
CN206349961U (en) Fixed rope bar mounting system for installation photovoltaic component
US20160344338A1 (en) Profiled-Rail Retaining Element Having Protuberances for a Mechanical and Electrical Connection
CN210245695U (en) Communication antenna mounting bracket of electric power tower
CN205846264U (en) A kind of nano-graphite flexible ground module
CN206349962U (en) Fixed rope pipe holder for installation photovoltaic component
CN115110832B (en) Composite cross arm and power transmission tower
CN210640652U (en) Wear pre-buried device of electric crane span structure of roof beam
CN209016663U (en) A kind of insulator crossarm connection gold utensil
CN210074720U (en) Wire hanging plate and insulating beam
CN219436174U (en) Equipment protective grounding terminal board
CN221652523U (en) Flexible photovoltaic bracket
CN212726327U (en) Novel tower crane cable fixing fastener
CN214273137U (en) Box type cross arm for high-voltage terminal tower
CN219013072U (en) Installation staple bolt on steel construction
CN211258899U (en) Concrete tower
CN211572849U (en) Movable branch cross arm for iron tower
CN219419548U (en) Wire nose structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination