CN110492227A - The communication antenna mounting bracket of electric force pole tower - Google Patents
The communication antenna mounting bracket of electric force pole tower Download PDFInfo
- Publication number
- CN110492227A CN110492227A CN201910677717.2A CN201910677717A CN110492227A CN 110492227 A CN110492227 A CN 110492227A CN 201910677717 A CN201910677717 A CN 201910677717A CN 110492227 A CN110492227 A CN 110492227A
- Authority
- CN
- China
- Prior art keywords
- electric force
- pylon
- pole tower
- force pole
- mounting bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004891 communication Methods 0.000 title claims abstract description 44
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 29
- 238000009434 installation Methods 0.000 claims description 22
- 230000003014 reinforcing effect Effects 0.000 claims description 14
- 229910000831 Steel Inorganic materials 0.000 abstract description 33
- 239000010959 steel Substances 0.000 abstract description 33
- 238000010276 construction Methods 0.000 abstract description 16
- 230000007246 mechanism Effects 0.000 abstract description 5
- 238000000034 method Methods 0.000 abstract description 4
- 230000008569 process Effects 0.000 abstract description 3
- 238000005452 bending Methods 0.000 description 10
- 239000011248 coating agent Substances 0.000 description 8
- 238000000576 coating method Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 7
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 6
- 238000005260 corrosion Methods 0.000 description 6
- 238000005246 galvanizing Methods 0.000 description 6
- 230000007797 corrosion Effects 0.000 description 5
- 239000012212 insulator Substances 0.000 description 5
- NLXLAEXVIDQMFP-UHFFFAOYSA-N Ammonia chloride Chemical compound [NH4+].[Cl-] NLXLAEXVIDQMFP-UHFFFAOYSA-N 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 3
- 229910052742 iron Inorganic materials 0.000 description 3
- 239000011159 matrix material Substances 0.000 description 3
- 239000000243 solution Substances 0.000 description 3
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 description 2
- 235000019270 ammonium chloride Nutrition 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 2
- 239000010931 gold Substances 0.000 description 2
- 229910052737 gold Inorganic materials 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 238000005554 pickling Methods 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 229910052725 zinc Inorganic materials 0.000 description 2
- 239000011701 zinc Substances 0.000 description 2
- JIAARYAFYJHUJI-UHFFFAOYSA-L zinc dichloride Chemical compound [Cl-].[Cl-].[Zn+2] JIAARYAFYJHUJI-UHFFFAOYSA-L 0.000 description 2
- NGNBDVOYPDDBFK-UHFFFAOYSA-N 2-[2,4-di(pentan-2-yl)phenoxy]acetyl chloride Chemical class CCCC(C)C1=CC=C(OCC(Cl)=O)C(C(C)CCC)=C1 NGNBDVOYPDDBFK-UHFFFAOYSA-N 0.000 description 1
- 229910000975 Carbon steel Inorganic materials 0.000 description 1
- 229910000640 Fe alloy Inorganic materials 0.000 description 1
- PMVSDNDAUGGCCE-TYYBGVCCSA-L Ferrous fumarate Chemical compound [Fe+2].[O-]C(=O)\C=C\C([O-])=O PMVSDNDAUGGCCE-TYYBGVCCSA-L 0.000 description 1
- 229910001335 Galvanized steel Inorganic materials 0.000 description 1
- 239000002253 acid Substances 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 239000007864 aqueous solution Substances 0.000 description 1
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000010962 carbon steel Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 238000010292 electrical insulation Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000008397 galvanized steel Substances 0.000 description 1
- 239000000314 lubricant Substances 0.000 description 1
- 238000002844 melting Methods 0.000 description 1
- 230000008018 melting Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 229910052760 oxygen Inorganic materials 0.000 description 1
- 239000001301 oxygen Substances 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 229920003023 plastic Polymers 0.000 description 1
- 238000007747 plating Methods 0.000 description 1
- 239000004800 polyvinyl chloride Substances 0.000 description 1
- 229920000915 polyvinyl chloride Polymers 0.000 description 1
- 239000002243 precursor Substances 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 239000000376 reactant Substances 0.000 description 1
- 238000005245 sintering Methods 0.000 description 1
- 229910000679 solder Inorganic materials 0.000 description 1
- 239000003381 stabilizer Substances 0.000 description 1
- 235000005074 zinc chloride Nutrition 0.000 description 1
- 239000011592 zinc chloride Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
- E04H12/10—Truss-like structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2207—Sockets or holders for poles or posts not used
- E04H12/2215—Sockets or holders for poles or posts not used driven into the ground
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/24—Cross arms
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01Q—ANTENNAS, i.e. RADIO AERIALS
- H01Q1/00—Details of, or arrangements associated with, antennas
- H01Q1/12—Supports; Mounting means
- H01Q1/1207—Supports; Mounting means for fastening a rigid aerial element
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01Q—ANTENNAS, i.e. RADIO AERIALS
- H01Q1/00—Details of, or arrangements associated with, antennas
- H01Q1/12—Supports; Mounting means
- H01Q1/1242—Rigid masts specially adapted for supporting an aerial
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/05—Suspension arrangements or devices for electric cables or lines
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The present invention discloses a kind of communication antenna mounting bracket of electric force pole tower, including pylon, cabinet, cable assembly and bracket component, by setting, bracket component is set on electric force pole tower, and then the antenna assembly of communication equipment can be provided to the space of placement, and then it avoids building shared steel tower using a large amount of land resource, expenditure is drastically reduced, and bracket component is light-weight, it is easy to install;By setting cable fixing piece, data cable can be tightly secured on pylon, and then can guarantee that data cable is not easy to fall under atrocious weather, and the mechanism of cable fixing piece is simple, it is light-weight, it is easier to be fixed on brandreth.Meanwhile the bracket component structure in the application is simple, it is convenient to assemble, and bracket component need to be only fixed on pylon by construction personnel by simple process.
Description
Technical field
The present invention relates to electric force pole tower fields, more particularly to a kind of communication antenna mounting bracket of electric force pole tower.
Background technique
Currently, electric force pole tower is the tower-like building of transmission of electricity.They are structurally characterized in that various towers belong to space purlin
Frame structure, rod piece are mainly made of single equal leg angle or combination angle steel, and connection uses rough bolt between rod piece, is cut by bolt
Power connection, entire tower are made of angle steel, junction steel plate and bolt, and individual part such as column foot etc. is welded into a group by several blocks of steel plates
Component, therefore hot galvanizing anti-corrosion, transport and construction set up extremely convenient but perfect with cordless communication network, need to arrange
More and more shared steel towers, in short supply with land resource, it is more and more difficult to increase shared steel tower newly, especially builds up in city
Area, the more complicated multiplicity of factor in need of consideration.If can use existing power circuit steel tower in completed region of the city, carry out
Communication network is layouted, then just greatly increasing cloth spot speed.
However, most of electric force pole tower does not have the function of offer signal yet at this stage, but build shared steel tower not only
The cost for occupying a large amount of land resource, while significantly putting into, and construction period is longer;The day of communication equipment at this stage
Although line apparatus has small part to be mounted on electric force pole tower, but its mounting structure is complex, and mounting structure weight is larger,
When encountering bad weather, such as typhoon, mounting structure is easy to fall, and then causes danger to construction personnel and pedestrian;At this stage
Data cable is not provided with fixed mechanism and fixes to it, and when bad weather occurs, data cable is easy to fall, and in turn results in peace
Full accident.
Summary of the invention
The purpose of the present invention is overcoming shortcoming in the prior art, providing one kind can be traditional thread binding by the day of communication equipment
Set be fixed on electric force pole tower, the communication antenna of the electric force pole tower that data cable can be securely fixed on electric force pole tower peace
Fill bracket.
The purpose of the present invention is achieved through the following technical solutions:
A kind of communication antenna mounting bracket of electric force pole tower, comprising:
Pylon is provided with the area Zhi Gui on the pylon;
Cabinet, the cabinet include that communication cabinet body and load-bearing bases, the communication cabinet body are set on the load-bearing bases,
The load-bearing bases are set in the area Zhi Gui;
Cable assembly, the cable assembly include data cable and cable fixing piece, the data cable and the communication
Cabinet body electrical connection, the data cable are set on the pylon, and the cable fixing piece is set in the data cable;And
Bracket component, the bracket component include support rod, cross bar and installation part, and the cross bar and the installation part connect
It connects, the installation part is set on the pylon, and the installation part includes pedestal, clamping block and fastener, the clamping block
One side is welded on the pedestal, and the another side of the clamping block is set on the pylon, and the fastener is set to
On the pedestal, the area Bi Wei is offered on the pedestal, one end of the cross bar is welded in the area Bi Wei, the cross bar
The other end is connect with the support rod.
The installation part further includes the first reinforcing rib in one of the embodiments, and first reinforcing rib is set to institute
It states on cross bar.
The installation part further includes the second reinforcing rib in one of the embodiments, the second reinforcing rib setting and institute
It states on pedestal.
Via hole is offered on the pedestal in one of the embodiments, the fastener wears the via hole.
The cable fixing piece includes locking fixture and limit clamp, the locking fixture in one of the embodiments,
It is set in the data cable, the limit clamp is set in the data cable, the locking fixture and the limit
Interval is provided between fixture.
The cable assembly further includes protection tube body in one of the embodiments, and the protection tube body is sheathed on described
In data cable.
The protection tube body is pvc pipe in one of the embodiments,.
The cabinet further includes guardrail in one of the embodiments, and the guardrail is set in the area Zhi Gui, the load-bearing
Pedestal is set in the guardrail.
It in one of the embodiments, further include column foot, the column foot is connect with the pylon, and the column foot is for fixing
On the ground.
In one of the embodiments, further include cross biling assembly, the cross biling assembly include the first cross-arm, the second cross-arm and
Third cross-arm, first cross-arm, second cross-arm and the third cross-arm are respectively separated and are set on the pylon.
The present invention compared with the prior art the advantages of and have the beneficial effect that:
The present invention is a kind of communication antenna mounting bracket of electric force pole tower, and bracket group is arranged by being arranged on electric force pole tower
Part, and then the antenna assembly of communication equipment can be provided to the space of placement, and then avoid building using a large amount of land resource
Shared steel tower, drastically reduces expenditure, and bracket component is light-weight, easy to install;It, can by the way that cable fixing piece is arranged
Data cable is tightly secured on pylon, and then can guarantee that data cable is not easy to fall under atrocious weather, and cable
The mechanism of fixing piece is simple, light-weight, is easier to be fixed on brandreth.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached
Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair
The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this
A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the structural schematic diagram of the communication antenna mounting bracket of the electric force pole tower of an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of the bracket component of an embodiment of the present invention;
Fig. 3 is the structural schematic diagram of the pedestal of an embodiment of the present invention;
Fig. 4 is the structural schematic diagram of the limit clamp of an embodiment of the present invention;
Fig. 5 is the structural schematic diagram of the locking fixture of an embodiment of the present invention;
Fig. 6 is the structural schematic diagram of the clamping block of an embodiment of the present invention;
Fig. 7 is first fixed link of an embodiment of the present invention and the structural schematic diagram of the second fixed link.
Specific embodiment
To facilitate the understanding of the present invention, a more comprehensive description of the invention is given in the following sections with reference to the relevant attached drawings.In attached drawing
Give better embodiment of the invention.But the invention can be realized in many different forms, however it is not limited to herein
Described embodiment.On the contrary, the purpose of providing these embodiments is that making to understand more the disclosure
Add thorough and comprehensive.
It should be noted that it can directly on the other element when element is referred to as " being fixed on " another element
Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it, which can be, is directly connected to
To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ",
" right side " and similar statement for illustrative purposes only, are not meant to be the only embodiment.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention
The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool
The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more
Any and all combinations of relevant listed item.
Referring to Fig. 1, a kind of communication antenna mounting bracket 10 of electric force pole tower, including pylon 100, cabinet 200, cable group
Part 300 and bracket component 400, pylon 100 are electric force pole tower, and cabinet 200 is used for for providing electric power output, cable assembly 300
Data are transmitted, bracket component 400 is used to place the antenna assembly of communication equipment.
Referring to Fig. 1, the area Zhi Gui is provided on pylon 100;Cabinet 200 includes communication cabinet body 210 and load-bearing bases
220, communication cabinet body 210 is set on load-bearing bases 220, and load-bearing bases 220 are set in the area Zhi Gui;Cable assembly 300 includes
Data cable 310 and cable fixing piece 320, data cable 310 are electrically connected with communication cabinet body 210, and data cable 310 is set to tower
On frame 100, cable fixing piece 320 is set in data cable 310;Referring to Fig. 2, bracket component 400 include support rod 410,
Cross bar 420 and installation part 430, cross bar 420 are connect with installation part 430, and installation part 430 is set on pylon 100, installation part 430
Including pedestal 431, clamping block 432 and fastener 433, the one side of clamping block 432 is welded on pedestal 431, clamping block 432
Another side is set on pylon 100, and fastener 433 is set on pedestal 431, is kept away referring to Fig. 3, offering on pedestal 431
Position area 431a, one end of cross bar 420 are welded on the area Bi Wei 431a, and the other end of cross bar 420 is connect with support rod 410.
It should be noted that the area Zhi Gui is located at the underface of pylon 100, it can be communication cabinet body by the setting area Zhi Gui
210 provide one from the installation site that pylon 100 is closer, and then need not extend for the length of data cable 310, increase cost
Investment, while load-bearing bases 220 form for concreting, by the way that load-bearing bases 220 are arranged, can make to communicate cabinet body 210 with
There is certain height from the ground;Further, one end of data cable 310 is electrically connected with communication cabinet body 210, data cable 310
The other end be introduced on pylon 100, by be arranged cable fixing piece 320, data cable 310 can be tightly secured in tower
It on frame 100, and then can guarantee that data cable 310 is fallen under atrocious weather environment, pedestrian or construction personnel are caused to endanger
Danger;Still further, the application is provided with 3 bracket components 400 altogether, the setting that this 3 bracket components 400 are respectively separated is in tower
In the main material of frame 100, cross bar 420 is welded on the area the Bi Wei 431a of pedestal 431, and clamping block 432 is welded by construction personnel
It connects on pedestal 431, and is locked pedestal 431 and clamping block 432 in the main material of pylon 100 by fastener 433, by such as
This is designed, on the cross bar 420 that can install the antenna assembly of communication equipment, so that electric force pole tower has communication and electric power
The function of output.Further, a bracket component 400 includes 3 cross bars, 420,3 installation parts 430 and 3 support rods
410,3 cross bars 420 by welding, are welded on 3 support rods 410, and set between cross bar 420 and cross bar 420
It is equipped with interval, interval is again provided between support rod 410 and support rod 410, in this way, guaranteeing that the antenna of communication equipment has enough
Installation space, will not be intertwined.Cross bar 420 and support rod 410 are round steel, and it is circular reality that round steel, which is a kind of section,
The light-weight and hardness of heart strip steel, round steel is big, by the way that cross bar 420 and support rod 410 are arranged to round steel, can guarantee whole
The mechanical strength of a bracket component 400.Wherein, multiple cross bars 410 and support rod 420 can be set according to the actual situation.
In this way, bracket component 400 is arranged by being arranged on electric force pole tower, and then can be by the antenna assembly of communication equipment
The space placed is provided, and then avoids building shared steel tower using a large amount of land resource, drastically reduces expenditure, and prop up
Frame component 400 it is light-weight, it is easy to install;By the way that cable fixing piece 320 is arranged, data cable 310 can be tightly secured in tower
On frame 100, and then it can guarantee that data cable 310 is not easy to fall under atrocious weather, and the mechanism letter of cable fixing piece 320
It is single, it is light-weight, it is easier to be fixed on pylon 100.Meanwhile 400 structure of bracket component in the application is simple, it is convenient to assemble,
And bracket component 400 need to be only fixed on pylon 100 by construction personnel by simple process.
Referring to Fig. 2, further, in one embodiment, installation part 430 further includes the first reinforcing rib 434, the
One reinforcing rib 434 is set on cross bar 420.In this way, can be improved cross bar by the way that the first reinforcing rib 434 is arranged on cross bar 420
420 mechanical strength, so that cross bar 420 is more firm.
Referring to Fig. 2, further, in one embodiment, installation part 430 further includes the second reinforcing rib 435, the
In the setting of two reinforcing ribs 435 and pedestal 431.In this way, can be improved pedestal by the way that the second reinforcing rib 435 is arranged on pedestal 431
431 mechanical strength enables pedestal 431 to be more firmly secured on clamping block 432.
Referring to Fig. 3, further, in one embodiment, via hole 431b is offered on pedestal 431, fasten
Part 433 wears via hole 431b.
It should be noted that fastener 433 is U bolt, the both ends of U bolt are respectively arranged with screw thread and and and screw thread
The nut combined.U bolt passes through the via hole 431b on pedestal 431, and construction personnel is by tightening nuts, until by pedestal
431 are locked.
Referring to Figure 4 together and Fig. 5, further, in one embodiment, cable fixing piece 320 includes locking fixture
321 and limit clamp 322, locking fixture 321 be set in data cable 310, limit clamp 322 is set to data cable 310
On, interval is provided between locking fixture 321 and limit clamp 322.Referring to Fig. 5, specifically, cable assembly 300 further includes
Tube body 330 is protected, protection tube body 330 is sheathed in data cable 310.Referring to Fig. 5, more specifically, protection tube body 330 is
Pvc pipe.
It should be noted that the application is respectively arranged with multiple limit clamps 322 and multiple locking fixtures 321, in this way, logical
It crosses and multiple limit clamps 322 and multiple locking fixtures 321 is set, pylon 100 can be firmly secured to data cable 310
On, and then can guarantee that data cable 310 is not easy to fall under atrocious weather.Further, pvc pipe is hard polyvinyl chloride
Pipe, be with Corvic and stabilizer, lubricant etc. after use pressure sintering extrusion forming, be to be developed and applied earliest
Plastic pipe.Pvc pipe resistance to corrosion is strong, be easy to be bonded, price is low and quality is hard, by the way that pvc pipe is set in number
According on cable 310, can be avoided data cable 310 because being chronically exposed in air, by the vapor corrosion in air, Jin Eryou
Data cable 310 is protected to effect, extends the service life of data cable 310.
Referring to Fig. 4, further, in another embodiment, cable assembly 300 further includes coating steel pipe 340,
Coating steel pipe 340 is sheathed in data cable 310, and limit clamp 322 includes locking member 322a and top holding piece 322b, top holding piece
Multiple connecting holes are offered on 322b, locking member 322a wears connecting hole, holding chamber, coating steel pipe are offered on locking member 322a
340 wear holding chamber, and coating steel pipe 340 is pushed up with top holding piece 322b phase and held.
It should be noted that locking member 322a is all U bolt, the both ends of U bolt wear the 2 of top holding piece 322b respectively
A connecting hole, by the nut of turn-knob U bolt, so that top holding piece 322b and coating steel pipe 340 closely press, and U-shaped spiral shell
Bolt is welded on pylon 100, so, it is possible further fixed data cable 310, prevents the loosening of data cable 310 from falling.
Further, above-mentioned coating steel pipe 340 is hot dip galvanizing pipe, and hot dip galvanizing pipe is to make molten metal and iron-based precursor reactant and generate conjunction
Layer gold, so that both matrix and coating be made to combine.Hot galvanizing is that steel pipe is first carried out pickling, in order to remove the oxygen of steel tube surface
Change iron, after pickling, by being cleaned in ammonium chloride or solder(ing)acid or ammonium chloride and zinc chloride mixed aqueous solution slot, so
It is sent into hot-dip tank afterwards.The advantages that hot galvanizing has coating uniform, and adhesive force is strong, long service life.Hot galvanized steel pipe matrix
Complicated physics, chemical reaction occurs with the plating solution of melting, forms corrosion resistant hard-packed one iron alloy layer of zinc.Alloy-layer
It combines together with pure zinc layer, steel pipe matrix, therefore its corrosion resistance is strong.In this way, being set in data cable by using hot dip galvanizing pipe
On line 310, data cable 310 can be avoided because being chronically exposed in air, by the vapor corrosion in air, and then effectively
Data cable 310 is protected, the service life of data cable 310 is extended.
Still further, include turn-knob part 321a, fastener 321b and fastening piece 321c referring to Fig. 5, locking and pressing from both sides 321,
The turn-knob part 321a is connect with the one side of the fastener 321b, and the fastening piece 321c is another with the fastener 321b's
One side connection.Clamping chamber is offered on the fastener 321b, the inner sidewall of the clamping chamber has first side and second
Side offers on the fastening piece 321c and keeps away a chamber.
It should be noted that turn-knob part 321a is bolt, locking fixture 321 is used to lock the data in pvc pipe and its pipe
Cable 310.Fastener 321b is fastened on pylon first, the first side of inner sidewall for being clamped chamber is made by turn-knob bolt
It is closely pressed with second side and pylon 100, then, pvc pipe is passed through and keeps away a chamber, passes through the spiral shell on turn-knob fastening piece 321c
Bolt locks pvc pipe.In this way, data cable 310 can be locked at pylon 100 securely by setting locking fixture 321
On, and then in inclement weather, such as typhoon, data cable 310 will not loosen, and by locking pvc pipe, so that it will not occur
It falls.
Referring to Fig. 1, further, in one embodiment, cabinet 200 further includes guardrail 230, and guardrail 230 is set
It is placed in the area Zhi Gui, load-bearing bases 220 are set in guardrail 230.In this way, pedestrian can be prevented to be strayed by setting guardrail 230
Into danger zone, and then it ensure that the safety of pedestrian.
It further include column foot 500, column foot 500 and pylon 100 in one embodiment further referring to Fig. 1
Connection, column foot 500 is for fixing on the ground.It should be noted that column foot 500 forms for concreting.
It further include cross biling assembly 600 in one embodiment, cross biling assembly 600 wraps further referring to Fig. 1
The first cross-arm 610, the second cross-arm 620 and third cross-arm 630 are included, the first cross-arm 610, the second cross-arm 620 and third cross-arm 630 divide
It is not arranged at intervals on pylon 100.
It further include insulation assembly 700, insulation assembly 700 in another embodiment further referring to Fig. 1
Including multiple insulators 710, each insulator 710, which is respectively separated, to be arranged on pylon 100, it should be noted that insulator 710 is
The important component of transmission line of electricity, is unique electrical insulations and important structural support, 710 performance of insulator and its
The reasonability of configuration directly affects the safe and stable operation of route.Further, cross-arm is equally composition portion important in shaft tower
Point, its effect is to support conducting wire, lightning conducter, and to be allowed to protect by national Specification for installing insulator 710 and fitting
Hold certain safe distance.
Referring to Fig. 6, further, in another embodiment, installation part 430 further includes unfilled corner portion 436 and weld part
437, unfilled corner portion 436 is set on clamping block 432, and weld part 437 is set on clamping block 432.It further include angle bar component, angle bar
Component includes the first bending part and the second bending part, and the first bending part is set on the second bending part, the first bending part and second
Bending part is arranged on pylon 100.
It should be noted that weld part 437 is by welding, it is mounted on pedestal 431.Meanwhile unfilled corner portion 436 has
Have a triangular cross section, angle bar component has a triangular cross section, and the angle that is formed of the first bending part and the second bending part and
The angle in unfilled corner portion 436 is identical, and the clamping block 432 that so, it is possible to be, which can fasten, to be held on pylon 100, so that day
After line apparatus is installed on bracket component 400, pedestal 431 be not in slide up and down, thus do not fall out injure pedestrian or
Construction personnel.Further, the first bending part and the second bending part are respectively angle steel, and angle steel is mainly used for making frame structure,
Such as the pylon of high voltage power transmission, the frame of steel structure bridge girder two sides, the column of derrick crane and armed lever on construction site,
The column and beam in workshop etc., also, angle steel category construction structural carbon steel, are the fashioned iron steel of simple section, are mainly used for gold
Metal elements and the frame of workshop etc..Require have preferable solderability, plastically deformed performance and certain mechanical strength in use.
Referring to Fig. 7, further, in another embodiment, bracket component 400 further include the first fixed link 440 and
Second fixed link 450, one end of support rod 410 are welded in the first fixed link 440, and the other end of support rod 410 is welded in
In two fixed links 450.
It should be noted that the application is provided with 3 the first fixed links 440 and 3 the second fixed links 450 altogether.By setting
The first fixed link 440 and the second fixed link 450 are set, the load-bearing dynamics of support rod 410 can be increased, and then is avoided since it is traditional thread binding
It is the problem of placement set causes support rod 410 to be broken, on the other hand, fixed by the first fixed link of setting 440 and second
Bar 450 enables to the stress of support rod 410 more balanced.Further, the first fixed link 440 and the second fixed link 450 are equal
Light-weight and hardness for round steel, round steel is big.
Referring to Fig. 1, further, in another embodiment, being additionally provided with construction area on pylon 100.
It should be noted that the application work, which is provided with 3 bracket components, 400,3 bracket components 400, is separately mounted to tower
In the main material of frame 100, it will be understood that pylon 100 has 4 ends angle, and 3 bracket components 400 are provided respectively therein 3 ends angle
Main material on.By being provided with construction area on pylon 100, the space of climbing can be provided for construction personnel, and then to communication
The antenna assembly of device carries out Maintenance and Repair, meanwhile, also facilitate construction personnel to carry out Maintenance and Repair to bracket component 400.
Compared with prior art, the invention has the following advantages that
Bracket component 400 is arranged by being arranged on electric force pole tower in the communication antenna mounting bracket 10 of above-mentioned electric force pole tower,
And then the antenna assembly of communication equipment can be provided to the space of placement, and then avoid building using a large amount of land resource shared
Steel tower drastically reduces expenditure, and bracket component 400 is light-weight, easy to install;By the way that cable fixing piece 320, energy is arranged
It is enough that data cable 310 is tightly secured on pylon 100, and then can guarantee that data cable 310 is not easy under atrocious weather
It falls, and the mechanism of cable fixing piece 320 is simple, it is light-weight, it is easier to be fixed on pylon 100.Meanwhile the branch in the application
400 structure of frame component is simple, and it is convenient to assemble, and bracket component 400 only need to be fixed on tower by simple process by construction personnel
On frame 100.
Only several embodiments of the present invention are expressed for embodiment described above, and the description thereof is more specific and detailed, but
It cannot be construed as a limitation to the scope of the present invention.It should be pointed out that for the ordinary skill people of this field
For member, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to of the invention
Protection scope.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.
Claims (10)
1. a kind of communication antenna mounting bracket of electric force pole tower characterized by comprising
Pylon is provided with the area Zhi Gui on the pylon;
Cabinet, the cabinet include communication cabinet body and load-bearing bases, and the communication cabinet body is set on the load-bearing bases, described
Load-bearing bases are set in the area Zhi Gui;
Cable assembly, the cable assembly include data cable and cable fixing piece, the data cable and the communication cabinet body
Electrical connection, the data cable are set on the pylon, and the cable fixing piece is set in the data cable;And
Bracket component, the bracket component include support rod, cross bar and installation part, and the cross bar is connect with the installation part, institute
It states installation part to be set on the pylon, the installation part includes pedestal, clamping block and fastener, the one side of the clamping block
It is welded on the pedestal, the another side of the clamping block is set on the pylon, and the fastener is set to the bottom
On seat, the area Bi Wei is offered on the pedestal, one end of the cross bar is welded in the area Bi Wei, the other end of the cross bar
It is connect with the support rod.
2. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that the installation part also wraps
The first reinforcing rib is included, first reinforcing rib is set on the cross bar.
3. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that the installation part also wraps
Include the second reinforcing rib, the second reinforcing rib setting on the pedestal.
4. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that opened up on the pedestal
There is via hole, the fastener wears the via hole.
5. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that the cable fixing piece
Including locking fixture and limit clamp, the locking fixture is set in the data cable, and the limit clamp is set to institute
It states in data cable, interval is provided between the locking fixture and the limit clamp.
6. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that the cable assembly is also
Including protecting tube body, the protection tube body is sheathed in the data cable.
7. the communication antenna mounting bracket of electric force pole tower according to claim 6, which is characterized in that the protection tube body is
Pvc pipe.
8. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that the cabinet further includes
Guardrail, the guardrail are set in the area Zhi Gui, and the load-bearing bases are set in the guardrail.
9. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that it further include column foot, institute
It states column foot to connect with the pylon, the column foot is for fixing on the ground.
10. the communication antenna mounting bracket of electric force pole tower according to claim 1, which is characterized in that further include cross-arm group
Part, the cross biling assembly include the first cross-arm, the second cross-arm and third cross-arm, first cross-arm, second cross-arm and institute
It states third cross-arm and is respectively separated and be set on the pylon.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910677717.2A CN110492227A (en) | 2019-07-25 | 2019-07-25 | The communication antenna mounting bracket of electric force pole tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910677717.2A CN110492227A (en) | 2019-07-25 | 2019-07-25 | The communication antenna mounting bracket of electric force pole tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110492227A true CN110492227A (en) | 2019-11-22 |
Family
ID=68548482
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910677717.2A Pending CN110492227A (en) | 2019-07-25 | 2019-07-25 | The communication antenna mounting bracket of electric force pole tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110492227A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111206814A (en) * | 2020-03-30 | 2020-05-29 | 杭州东南吉通网络有限公司 | Water tower type integrated 5G beautifying base station |
CN112096164A (en) * | 2020-09-09 | 2020-12-18 | 国网福建省电力有限公司经济技术研究院 | Special support for sharing tower and mounting method thereof |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2569394Y (en) * | 2002-06-06 | 2003-08-27 | 广东省电信科学技术研究院 | Special clip ring device for angletype telecommunication iron tower |
GB201005028D0 (en) * | 2009-12-08 | 2010-05-12 | Telecoms Comm Infrastructure P | Improvements in and relating to strengthening antenna towers |
CN101761263A (en) * | 2009-12-31 | 2010-06-30 | 电联工程技术有限公司 | Wind power generation communication tower |
CN205173885U (en) * | 2015-11-18 | 2016-04-20 | 四川汇源光通信有限公司 | Install in iron tower scissor holder's ptz support |
CN207116670U (en) * | 2017-08-16 | 2018-03-16 | 云南电网有限责任公司 | A kind of antenna for base station support |
CN208077506U (en) * | 2018-05-08 | 2018-11-09 | 广东电网有限责任公司 | A kind of power circuit tower number plate or warning sign holder |
CN210245695U (en) * | 2019-07-25 | 2020-04-03 | 惠州电力勘察设计院有限公司 | Communication antenna mounting bracket of electric power tower |
CN211698329U (en) * | 2020-04-30 | 2020-10-16 | 中国电建集团四川工程有限公司 | Support for installing OPPC optical cable junction box |
-
2019
- 2019-07-25 CN CN201910677717.2A patent/CN110492227A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2569394Y (en) * | 2002-06-06 | 2003-08-27 | 广东省电信科学技术研究院 | Special clip ring device for angletype telecommunication iron tower |
GB201005028D0 (en) * | 2009-12-08 | 2010-05-12 | Telecoms Comm Infrastructure P | Improvements in and relating to strengthening antenna towers |
CN101761263A (en) * | 2009-12-31 | 2010-06-30 | 电联工程技术有限公司 | Wind power generation communication tower |
CN205173885U (en) * | 2015-11-18 | 2016-04-20 | 四川汇源光通信有限公司 | Install in iron tower scissor holder's ptz support |
CN207116670U (en) * | 2017-08-16 | 2018-03-16 | 云南电网有限责任公司 | A kind of antenna for base station support |
CN208077506U (en) * | 2018-05-08 | 2018-11-09 | 广东电网有限责任公司 | A kind of power circuit tower number plate or warning sign holder |
CN210245695U (en) * | 2019-07-25 | 2020-04-03 | 惠州电力勘察设计院有限公司 | Communication antenna mounting bracket of electric power tower |
CN211698329U (en) * | 2020-04-30 | 2020-10-16 | 中国电建集团四川工程有限公司 | Support for installing OPPC optical cable junction box |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111206814A (en) * | 2020-03-30 | 2020-05-29 | 杭州东南吉通网络有限公司 | Water tower type integrated 5G beautifying base station |
CN112096164A (en) * | 2020-09-09 | 2020-12-18 | 国网福建省电力有限公司经济技术研究院 | Special support for sharing tower and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11322923B2 (en) | Overhead power distribution line | |
US10971915B2 (en) | Mounting bracket systems for dead-end utility lines | |
CN110492227A (en) | The communication antenna mounting bracket of electric force pole tower | |
US5749198A (en) | Tapered composite elevated support structure | |
CN106602979A (en) | Fixed cable rod bracket system for installing photovoltaic module | |
CN106602978A (en) | Fixed cable pipe support for installing photovoltaic assembly | |
CN218069483U (en) | Arc attracting assembly, insulator and composite cross arm | |
CN105239817A (en) | Composite material power transformation framework | |
CN206349961U (en) | Fixed rope bar mounting system for installation photovoltaic component | |
US20160344338A1 (en) | Profiled-Rail Retaining Element Having Protuberances for a Mechanical and Electrical Connection | |
CN210245695U (en) | Communication antenna mounting bracket of electric power tower | |
CN205846264U (en) | A kind of nano-graphite flexible ground module | |
CN206349962U (en) | Fixed rope pipe holder for installation photovoltaic component | |
CN115110832B (en) | Composite cross arm and power transmission tower | |
CN210640652U (en) | Wear pre-buried device of electric crane span structure of roof beam | |
CN209016663U (en) | A kind of insulator crossarm connection gold utensil | |
CN210074720U (en) | Wire hanging plate and insulating beam | |
CN219436174U (en) | Equipment protective grounding terminal board | |
CN221652523U (en) | Flexible photovoltaic bracket | |
CN212726327U (en) | Novel tower crane cable fixing fastener | |
CN214273137U (en) | Box type cross arm for high-voltage terminal tower | |
CN219013072U (en) | Installation staple bolt on steel construction | |
CN211258899U (en) | Concrete tower | |
CN211572849U (en) | Movable branch cross arm for iron tower | |
CN219419548U (en) | Wire nose structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |