CN110489882A - A kind of intellectualized design method of marine float mooring line - Google Patents

A kind of intellectualized design method of marine float mooring line Download PDF

Info

Publication number
CN110489882A
CN110489882A CN201910778449.3A CN201910778449A CN110489882A CN 110489882 A CN110489882 A CN 110489882A CN 201910778449 A CN201910778449 A CN 201910778449A CN 110489882 A CN110489882 A CN 110489882A
Authority
CN
China
Prior art keywords
mooring line
mooring
design
scheme
population
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910778449.3A
Other languages
Chinese (zh)
Other versions
CN110489882B (en
Inventor
吴波
程小明
叶永林
倪歆韵
许心愿
杨吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
702th Research Institute of CSIC
Original Assignee
702th Research Institute of CSIC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 702th Research Institute of CSIC filed Critical 702th Research Institute of CSIC
Priority to CN201910778449.3A priority Critical patent/CN110489882B/en
Publication of CN110489882A publication Critical patent/CN110489882A/en
Application granted granted Critical
Publication of CN110489882B publication Critical patent/CN110489882B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00Computing arrangements based on biological models
    • G06N3/12Computing arrangements based on biological models using genetic models
    • G06N3/126Evolutionary algorithms, e.g. genetic algorithms or genetic programming

Abstract

The present invention relates to a kind of intellectualized design methods of marine float mooring line, entire flow and key technology based on mooring line design, design and analysis and the complete procedure of assessment are contained in method, mooring line detailed design, Mechanics Calculation, Performance Evaluation and intelligent optimization algorithm technology have been systematically combined, has been input to the mooring line detailed protocol that autonomous operation output has feasibility and function admirable from design requirement.This method have intelligentized characteristic and advantage, the autonomous evolution of process and scheme can be designed, complete scheme intelligentized design and preferably;Without manual operation, the automation of entire design analysis process is realized.This method is suitable in engineering the design and optimization of floating body mooring line under the conditions of varying environment.

Description

A kind of intellectualized design method of marine float mooring line
Technical field
The present invention relates to marine mooring line technical field, especially a kind of intelligentized design side of marine float mooring line Method.
Background technique
Mooring positioning is the key technology of floating body Project Realization and safety work, in the prior art, the design of floating body mooring line Universal method is generally used, condition analysis, floating body Calculation of Hydrodynamic specially need to be artificially designed, on the basis of the above, knot It closes engineer experience and carries out the design of anchoring system tentative programme, reapply business software and carry out Digital calculation modelling, according to performance Assessment result carries out project setting and optimization, is recycled to numerical value and calculates, assesses, adjusting and optimizing, the circulation through excessive round obtains Final preferably mooring scheme out.This universal method has following defects that
The balance being based substantially between engineer experience, each design parameter be difficult to it is accurate and it is systemic hold, design evaluation with Optimization process need to iterate, working efficiency is low and time-consuming.
With the development of technology and the raising of engineering demand, intelligentized design become the inexorable trend of technology development, knot Modernism is applied to engineering field and improves design efficiency by the floating body mooring line design for closing intelligent optimization algorithm, at present in state It is inside and outside not have ready-made floating body mooring line intellectualized design method also.
Summary of the invention
For the disadvantage in above-mentioned existing production technology, the intelligence for providing a kind of marine float mooring line is set the applicant Meter method realizes the automation of entire design analysis process without manual operation.
The technical solution adopted in the present invention is as follows:
A kind of intellectualized design method of marine float mooring line, including following operating procedure:
Step 1: the sample point based on mooring line length fits semiempirical formula, it is specific as follows:
p1=659.19 × e-0.06×ω (2)
p2=0.0103 × e-0.004×ω (3)
p3=0.0019 × e-0.001×ω (4)
q1=-1399.8 × e-0.003×ω (6)
q2=14.561 × e-0.003×ω (7)
q3=6.0078 × e-0.004×ω (8)
Step 2: design condition and independently analysis: input design condition, according to the environmental parameter of design requirement, automatic point Analysis obtains permanent environmental load suffered by floating body and wind-force, stream force coefficient;Based on the mooring material database established, determine Mooring material properties parameter;In conjunction with permanent environmental load, the suggested range of mooring line length is determined based on formula (1)~(4), is based on Formula (5)~(8) determine the suggested range of mooring radius;According to floating body type and mooring form, mooring point coordinate is specified;
Step 3: preliminary design scheme generates: according to environmental load, safety coefficient, determine mooring line minimum rupture strength, According to selection combined data library, minimum weight needed for analyzing mooring line and each material properties parameter, in this, as intelligence Change the initial scheme population of design;
Step 4: performance evaluation and engineering and normal constraint Conditions Evaluation: carrying out the calculating of floating body and mooring line, with mooring Cable restoring force effect energy is right in conjunction with constraint conditions such as classification society rule and engineering experiences as function admirable evaluation criteria The comprehensive performance of each mooring scheme is analyzed;
The anchoring system scheme for being unsatisfactory for each constraint condition is eliminated one by one in the initial stage, each constraint condition is through whole A process;
Step 5: scheme preferably with Evolution of Population: in conjunction with mooring line Mechanics Calculation, Performance Evaluation and genetic algorithm Yu Benzhi It can change in design method, since initial mooring line scheme, generate the scheme population of every generation, be assessed by calculating with analysis, The adaptation value function for forming every generation mooring scheme population carries out the evolution of population using genetic operator of algorithm etc., retains full Sufficient condition and the high anchoring system scheme individual of adaptive value eliminate the condition that is unsatisfactory for or the relatively low scheme individual of adaptive value, Follow-on mooring line scheme population is generated, by iteration and constantly evolution, up to algorithmic statement and obtains optimal mooring line side Case;
Step 6: mooring line scheme exports: the mooring line scheme that output intelligentized design is obtained, and provide detailed side Case parameter, the dry measure of design length, mooring radius, seabed anchor point coordinate position and selection including mooring line, weight in wet base, just The attribute of degree, fracture tension.
Its further technical solution is:
In the first step, Fe、h、w、Lmoor、RmoorFor environmental load, the depth of water, mooring line weight in wet base, mooring line length, mooring half Diameter, fitting result and sample point comparison coincide, and in method, provide mooring line length and mooring radius by semiempirical formula It is recommended that standard, realizes the preferred function of intelligence based on this.
Beneficial effects of the present invention are as follows:
Structure of the invention is compact, reasonable, easy to operate, by the entire flow and key technology designed based on mooring line, Design and analysis and the complete procedure of assessment are contained in method, be systematically combined mooring line detailed design, Mechanics Calculation, Performance Evaluation and intelligent optimization algorithm technology, being input to autonomous operation output from design requirement has feasibility and function admirable Mooring line detailed protocol.
This method has intelligentized characteristic and advantage, can be designed the autonomous evolution of process and scheme, completes scheme Intelligentized design and preferably;Without manual operation, the automation of entire design analysis process is realized.This method is suitable for engineering The design and optimization of floating body mooring line under the conditions of middle varying environment.
Meanwhile the present invention is also equipped with following advantage:
(1) the floating body mooring line intellectualized design method that the present invention establishes, combines mooring line design, Mechanics Calculation, property Can assess can be designed the mooring line scheme with feasibility and function admirable with intelligent optimization algorithm technology, application method.
(2) method established by the present invention, complete design require input after, it can be achieved that entirely design analysis process from Dynamicization is input to autonomous operation output from design condition, is not necessarily to human intervention.
(3) it is big needed for project setting from being designed into greatly to have saved mooring line in engineering for method established by the present invention The work of amount and time cost improve the efficiency of mooring line design work.
(4) present invention is suitable for that offshore engineering, the detailed protocol of the mooring line of floating structure positioning is set in ocean engineering Meter.
Detailed description of the invention
Fig. 1 independently analyzes for mooring line design condition of the present invention and initial scheme population production Methods figure.
Fig. 2 is that the present invention is based on the mooring line intellectualized design method flow charts of genetic algorithm.
Fig. 3 is the mooring line diagram that offshore floating type of the present invention transports oil storage ship and intelligentized design.
Fig. 4 is the mooring line for the single full anchor chain ingredient that application method intelligentized design of the present invention goes out.
Fig. 5 is anchor chain-wirerope-anchor chain three-stage mooring line that application method intelligentized design of the present invention goes out.
Specific embodiment
Specific embodiments of the present invention will be described below with reference to the accompanying drawings.
As depicted in figs. 1 and 2, the intellectualized design method of the marine float mooring line of the present embodiment, including operate as follows Step:
Step 1: the sample point based on mooring line length fits semiempirical formula, it is specific as follows:
p1=659.19 × e-0.006×ω (2)
p2=0.0103 × e-0.004×ω (3)
p3=0.0019 × e-0.001×ω (4)
q1=-1399.8 × e-0.003×ω (6)
q2=14.561 × e-0.003×ω (7)
q3=6.0078 × e-0.004×ω (8)
In the first step, Fe、h、ω、Lmoor、RmoorRespectively environmental load, the depth of water, mooring line weight in wet base, mooring line length, be Radius is moored, fitting result and sample point comparison coincide, and in method, provide mooring line length and mooring half by semiempirical formula The suggestion standard of diameter realizes the preferred function of intelligence based on this.
Step 2: design condition and independently analysis: input design condition, according to the environmental parameter of design requirement, automatic point Analysis obtains permanent environmental load suffered by floating body and wind-force, stream force coefficient;Based on the mooring material database established, determine Mooring material properties parameter;In conjunction with permanent environmental load, the suggested range of mooring line length is determined based on formula (1)~(4), is based on Formula (5)~(8) determine the suggested range of mooring radius;According to floating body type and mooring form, mooring point coordinate is specified;
Step 3: preliminary design scheme generates: according to environmental load, safety coefficient, determine mooring line minimum rupture strength, According to selection combined data library, minimum weight needed for analyzing mooring line and each material properties parameter, in this, as intelligence Change the initial scheme population of design;
Step 4: performance evaluation and engineering and normal constraint Conditions Evaluation: carrying out the calculating of floating body and mooring line, with mooring Cable restoring force effect energy is right in conjunction with constraint conditions such as classification society rule and engineering experiences as function admirable evaluation criteria The comprehensive performance of each mooring scheme is analyzed, and will be unsatisfactory for the anchoring system scheme of each constraint condition one by one in the initial stage It eliminates, each constraint condition is through whole process;
Step 5: scheme preferably with Evolution of Population: in conjunction with mooring line Mechanics Calculation, Performance Evaluation and genetic algorithm Yu Benzhi It can change in design method, since initial mooring line scheme, generate the scheme population of every generation, be assessed by calculating with analysis, The adaptation value function for forming every generation mooring scheme population carries out the evolution of population using genetic operator of algorithm etc., retains full Sufficient condition and the high anchoring system scheme individual of adaptive value eliminate the condition that is unsatisfactory for or the relatively low scheme individual of adaptive value, Follow-on mooring line scheme population is generated, by iteration and constantly evolution, up to algorithmic statement and obtains optimal mooring line side Case;
Step 6: mooring line scheme exports: the mooring line scheme that output intelligentized design is obtained, and provide detailed side Case parameter, the dry measure of design length, mooring radius, seabed anchor point coordinate position and selection including mooring line, weight in wet base, just The attribute of degree, fracture tension.
In practical work process, specific implementation process is as follows:
As shown in figure 3, transporting oil storage ship for an offshore floating type, ship type parameter joins table 1, and design condition joins table 2, using this The intellectualized design method of marine float mooring line designs mooring line scheme.
Firstly, design item simultaneously independently analyze by part: input design condition is automatically analyzed according to the environmental parameter of design requirement Obtain permanent environmental load suffered by floating body and wind-force, stream force coefficient;
Based on the mooring material database established, mooring material properties parameter is determined;
In conjunction with permanent environmental load, the suggested range of mooring line length is determined based on formula (1)~(4), based on formula (5)~ (8) suggested range of mooring radius is determined;
According to floating body type and mooring form, mooring point coordinate is specified.
Then, preliminary design scheme generates: according to environmental load, safety coefficient, determine mooring line minimum rupture strength, according to According to selection combined data library, minimum weight needed for analyzing mooring line and each material properties parameter, in this, as intelligence The initial scheme population of design.Detailed process is as shown in Figure 1.
Subsequently, performance evaluation and engineering and normal constraint Conditions Evaluation: carry out the calculating of floating body and mooring line, with mooring Cable restoring force effect energy is right in conjunction with constraint conditions such as classification society rule and engineering experiences as function admirable evaluation criteria The comprehensive performance of each mooring scheme is analyzed.To be under the kinematic constraint of floating body, mooring morphological requirements and different conditions The mechanics constraint of cable is moored in addition in calculating each step, the anchoring system scheme of each constraint condition will be unsatisfactory for one by one in the initial stage It eliminates, each constraint condition is through whole process.
Secondly, scheme preferably with Evolution of Population: in conjunction with mooring line Mechanics Calculation, Performance Evaluation and genetic algorithm in this intelligence Change in design method, since initial mooring line scheme, generate the scheme population of every generation, is assessed by calculating with analysis, shape At the adaptation value function of every generation mooring scheme population, the evolution of population is carried out using genetic operator of algorithm etc., is retained and is met Condition and the high anchoring system scheme individual of adaptive value eliminate the condition that is unsatisfactory for or the relatively low scheme individual of adaptive value, raw Optimal mooring line scheme up to algorithmic statement and is obtained by iteration and constantly evolution at follow-on mooring line scheme population.
Finally, mooring line scheme exports: the mooring line scheme that output intelligentized design is obtained, and provide detailed scheme Parameter, the dry measure of design length, mooring radius, seabed anchor point coordinate position and selection including mooring line, weight in wet base, rigidity, Be broken the attributes such as tension.
The process of above-mentioned whole process is as shown in Figure 2.
The mooring line example for the single full anchor chain ingredient that the lower intelligentized design of sea situation 1 goes out is as shown in figure 4, anchoring system is detailed Parameter joins table 3.
Anchor chain-wirerope-anchor chain three-stage mooring line example that the lower intelligentized design of sea situation 2 goes out is as shown in figure 5, mooring system Detail parameters of uniting join table 4.
1 offshore floating type of table transports oil storage ship parameter
2 ocean environment parameter of table
The mooring line parameter for the single full anchor chain ingredient that the lower intelligentized design of 3 sea situation 1 of table goes out
Anchor chain-wirerope-anchor chain three-stage mooring line parameter that the lower intelligentized design of 4 sea situation 2 of table goes out
Above description is explanation of the invention, is not intended to limit the invention, and limited range of the present invention is referring to right It is required that within protection scope of the present invention, any type of modification can be made.

Claims (2)

1. a kind of intellectualized design method of marine float mooring line, it is characterised in that: including following operating procedure:
Step 1: the sample point based on mooring line length fits semiempirical formula, it is specific as follows:
p1=659.19 × e-0.006×ω (2)
p2=0.0103 × e-0.004×ω (3)
p3=0.0019 × e-0.001×ω (4)
q1=-1399.8 × e-0.003×ω (6)
q2=14.561 × e-0.003×ω (7)
q3=6.0078 × e-0.004×ω (8)
Step 2: design condition and independently analysis: input design condition is automatically analyzed according to the environmental parameter of design requirement Permanent environmental load suffered by floating body and wind-force, stream force coefficient out;Based on the mooring material database established, mooring is determined Material properties parameter;In conjunction with permanent environmental load, the suggested range of mooring line length is determined based on formula (1)~(4), is based on formula (5)~(8) determine the suggested range of mooring radius;According to floating body type and mooring form, mooring point coordinate is specified;
Step 3: preliminary design scheme generates: according to environmental load, safety coefficient, determining mooring line minimum rupture strength, foundation Selection combined data library, minimum weight needed for analyzing mooring line and each material properties parameter, set in this, as intelligence The initial scheme population of meter;
Step 4: performance evaluation and engineering and normal constraint Conditions Evaluation: carrying out the calculating of floating body and mooring line, returned with mooring line Multiple power effect energy is as function admirable evaluation criteria, in conjunction with constraint conditions such as classification society rule and engineering experiences, to each The comprehensive performance of mooring scheme is analyzed.By mooring line under the kinematic constraint of floating body, mooring morphological requirements and different conditions Mechanics constraint in addition in calculating each step, the anchoring system scheme for being unsatisfactory for each constraint condition is washed in a pan one by one in the initial stage It eliminates, each constraint condition is through whole process;
Step 5: scheme preferably with Evolution of Population: in conjunction with mooring line Mechanics Calculation, Performance Evaluation and genetic algorithm in this intelligence In design method, since initial mooring line scheme, the scheme population of every generation is generated, is assessed by calculating with analysis, is formed The adaptation value function of every generation mooring scheme population, the evolution of population is carried out using genetic operator of algorithm etc., and reservation meets item Part and the high anchoring system scheme individual of adaptive value are eliminated the condition that is unsatisfactory for or the relatively low scheme individual of adaptive value, are generated Follow-on mooring line scheme population up to algorithmic statement and obtains optimal mooring line scheme by iteration and constantly evolution;
Step 6: mooring line scheme exports: the mooring line scheme that output intelligentized design is obtained, and provide detailed scheme ginseng Number, the dry measure of design length, mooring radius, seabed anchor point coordinate position and selection including mooring line, rigidity, are broken at weight in wet base The attribute of disconnected tension.
2. a kind of intellectualized design method of marine float mooring line as described in claim 1, it is characterised in that: the first step In, Fe、h、ω、Lmoor、RmoorFor environmental load, the depth of water, mooring line weight in wet base, mooring line length, mooring radius, fitting result with Sample point comparison coincide, and in method, the suggestion standard of mooring line length Yu mooring radius is provided by semiempirical formula, with The preferred function of intelligence is realized based on this.
CN201910778449.3A 2019-08-22 2019-08-22 Intelligent design method for offshore floating body mooring cable Active CN110489882B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910778449.3A CN110489882B (en) 2019-08-22 2019-08-22 Intelligent design method for offshore floating body mooring cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910778449.3A CN110489882B (en) 2019-08-22 2019-08-22 Intelligent design method for offshore floating body mooring cable

Publications (2)

Publication Number Publication Date
CN110489882A true CN110489882A (en) 2019-11-22
CN110489882B CN110489882B (en) 2022-02-18

Family

ID=68552951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910778449.3A Active CN110489882B (en) 2019-08-22 2019-08-22 Intelligent design method for offshore floating body mooring cable

Country Status (1)

Country Link
CN (1) CN110489882B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111814252A (en) * 2020-07-09 2020-10-23 上海雄程海洋工程股份有限公司 Parameter determination method for asymmetric mooring system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103295078A (en) * 2013-05-21 2013-09-11 中国海洋石油总公司 Structural design optimization method for deepwater catenary mooring rope
CN106777742A (en) * 2016-12-28 2017-05-31 合肥学院 A kind of anchoring system design methods based on many components

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103295078A (en) * 2013-05-21 2013-09-11 中国海洋石油总公司 Structural design optimization method for deepwater catenary mooring rope
CN106777742A (en) * 2016-12-28 2017-05-31 合肥学院 A kind of anchoring system design methods based on many components

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
丁军等: "近岛礁浅水环境下浮式平台系泊系统设计研究", 《船舶力学》 *
许小颖等: "基于神经网络和遗传算法的系泊优化设计", 《中国舰船研究》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111814252A (en) * 2020-07-09 2020-10-23 上海雄程海洋工程股份有限公司 Parameter determination method for asymmetric mooring system

Also Published As

Publication number Publication date
CN110489882B (en) 2022-02-18

Similar Documents

Publication Publication Date Title
CN108894282B (en) Municipal pipe network operation safety dynamic early warning method
CN106600136B (en) Power section out-of-limit control efficiency evaluation method
CN102609591A (en) Optimization method of cutting parameters of heavy machine tool
CN109818347B (en) Assessment method for wind power consumption capability of electric power system
JP4533601B2 (en) Design optimization method
CN110939870A (en) Water supply network pressure monitoring point arrangement method for pipe burst monitoring
CN107742170A (en) A kind of storm sewer system the Hydraulic Design parameter optimization method
CN104573869A (en) Optimization method and system for achieving dredging operations based on BP neural network and NSGA-II
CN110489882A (en) A kind of intellectualized design method of marine float mooring line
CN106777742B (en) A kind of anchoring system design methods based on multiple groups part
CN103501008A (en) Intelligent AVC system on-line control method based on preference decision theory
CN107942860A (en) Open Wharf mooring line power method for early warning and system
CN116796644A (en) Wind farm parameter identification method based on multi-agent SAC deep reinforcement learning
CN103810324B (en) A kind of build-up tolerance Optimization Design optimized based on cost objective
KR101627771B1 (en) A Method of Data-driven modeling for predicting uplifting forces of suction caisson anchors
CN111523165A (en) Building aided design method and system based on deep learning
CN111598366A (en) Real-time drilling auxiliary decision-making method and system
CN116520074A (en) Active power distribution network fault positioning method and system based on cloud edge cooperation
CN110728060A (en) Method for determining safe operation condition of ship lock opening lock of tidal river reach
CN103617206A (en) Genetic clustering based on self-adaptation ecological niches
CN109837862B (en) River step development design and scheduling application method based on ecological water level connection
CN103136424B (en) Towards the assembling model quantitative description that universal design structure is excavated
Lee et al. A knowledge-based expert system as a pre-post processor in engineering optimization
CN104363293A (en) Web service selection method based on variable coefficients
CN113669626B (en) Two-stage monitoring method and system for long-distance gas pipeline network

Legal Events

Date Code Title Description