CN110489334A CN201910672089.9A CN201910672089A CN110489334A CN 110489334 A CN110489334 A CN 110489334A CN 201910672089 A CN201910672089 A CN 201910672089A CN 110489334 A CN110489334 A CN 110489334A
Authority
CN
China
Prior art keywords
test
goal systems
built
virtual objects
joint debugging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910672089.9A
Other languages
Chinese (zh)
Inventor
李彬
刘国才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beike Technology Co Ltd
Original Assignee
Beike Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beike Technology Co Ltd filed Critical Beike Technology Co Ltd
Priority to CN201910672089.9A priority Critical patent/CN110489334A/en
Publication of CN110489334A publication Critical patent/CN110489334A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/362Software debugging
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • G06F11/3688Test management for test execution, e.g. scheduling of test suites

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Debugging And Monitoring (AREA)

Abstract

The embodiment of the invention discloses a kind of system integration and test test processing method and devices, method includes: when built-in system is docked with goal systems for the first time, the truthful data of the goal systems is obtained, and constructs the virtual objects of the goal systems according to the truthful data;When the built-in system and the goal systems carry out joint debugging test, if judging, the goal systems does not provide test environment docking, establishes docking for the built-in system and the virtual objects;After judging that the built-in system docks successfully with the virtual objects, joint debugging test is carried out with the virtual objects.The virtual objects that the embodiment of the present invention passes through building goal systems, when goal systems does not provide test environment, it is docked with virtual objects and carries out joint debugging test, avoiding goal systems from mismatching causes new function to occur various problems after online, make built-in system when carrying out joint debugging test without the goal systems outside relying on simultaneously, testing progress and testing cost are more controllable.

Description

A kind of system integration and test test processing method and device
Technical field
The present invention relates to field of computer technology, and in particular to a kind of system integration and test test processing method and device.
Background technique
Before carrying out system integration and test test, after needing to guarantee that current built-in system is docked with another system completion, System integration and test test can be normally carried out.But built-in system needs constantly to carry out function upgrading in many cases, in function liter After grade, in order to guarantee the normal use of new function, it is necessary to carry out system integration and test test to relevant system.However, for portion The sensibility or part system of subsystem belong to external system, and current built-in system can not often be cooperated to carry out system connection Commissioning examination.
For example, bank has personnel's cooperation when docking for the first time when built-in system is docked with banking system, survey is provided It is verified on test ring border and line.But after docking for the first time, if built-in system has new function, needs are online, will encounter The problem of being unable to test verifying, because not testing environment, the prior art is used and is carried out at code logic according to interface document Reason.
But the problem of can not embodying in interface document, can not find ahead of time, and such as: abnormal problem, anti-pressure ability, even Logic loopholes caused by having some development tasks to make mistakes, eventually leading to function can not be normal online, can be forcing online The many problems of exposure on line.
Summary of the invention
Since existing method is there are the above problem, the embodiment of the present invention proposes a kind of system integration and test test processing method and dress It sets.
In a first aspect, the embodiment of the present invention proposes a kind of system integration and test test processing method, comprising:
When built-in system is docked with goal systems for the first time, the truthful data of the goal systems is obtained, and according to The truthful data constructs the virtual objects of the goal systems;
When the built-in system and the goal systems carry out joint debugging test, if judging, the goal systems does not provide survey The docking of test ring border, then establish docking for the built-in system and the virtual objects;
After judging that the built-in system docks successfully with the virtual objects, joint debugging test is carried out with the virtual objects.
Optionally, the virtual objects are mock object, and the mock object is independently of the built-in system.
Optionally, described when built-in system is docked with goal systems for the first time, obtain the true of the goal systems Data, and after constructing according to the truthful data virtual objects of the goal systems, further includes:
The parameter of the goal systems whole and the opposite joining relation of return value are collected, is improved according to the opposite joining relation described The logic of virtual objects, the opposite joining relation include all abnormal conditions.
Optionally, described when the built-in system and the goal systems carry out joint debugging test, if judging the target System does not provide test environment docking, then establishes docking for the built-in system and the virtual objects, specifically include:
When the built-in system and the goal systems carry out joint debugging test, if determining the target according to target identification System does not provide test environment docking, then establishes docking for the built-in system and the virtual objects.
Optionally, the system integration and test test processing method further include:
When the built-in system and the goal systems carry out joint debugging test, if judging, the goal systems provides test Environment docking, then establish docking for the built-in system and the goal systems, judge the built-in system and the target system After system docks successfully, joint debugging test is carried out with the goal systems.
Second aspect, the embodiment of the present invention also propose a kind of system integration and test test processes device, comprising:
Virtual objects construct module, for obtaining the target when built-in system is docked with goal systems for the first time The truthful data of system, and construct according to the truthful data virtual objects of the goal systems;
Module is established in docking, is used for when the built-in system and the goal systems carry out joint debugging test, if judging institute It states goal systems and test environment docking is not provided, then establish docking for the built-in system and the virtual objects;
First joint debugging test module, it is and described after judging that the built-in system docks successfully with the virtual objects Virtual objects carry out joint debugging test.
Optionally, the virtual objects are mock object, and the mock object is independently of the built-in system.
Optionally, the system integration and test test processes device further include:
Logic improves module, for collecting the parameter of the goal systems whole and the opposite joining relation of return value, according to institute The logic that opposite joining relation improves the virtual objects is stated, the opposite joining relation includes all abnormal conditions.
Optionally, the docking is established module and is specifically used for:
When the built-in system and the goal systems carry out joint debugging test, if determining the target according to target identification System does not provide test environment docking, then establishes docking for the built-in system and the virtual objects.
Optionally, the system integration and test test processes device further include:
Second joint debugging test module is used for when the built-in system and the goal systems carry out joint debugging test, if sentencing The goal systems of breaking provides test environment docking, then establishes docking for the built-in system and the goal systems, judge institute It states after built-in system docks successfully with the goal systems, carries out joint debugging test with the goal systems.
The third aspect, the embodiment of the present invention also propose a kind of electronic equipment, comprising:
At least one processor;And
At least one processor being connect with the processor communication, in which:
The memory is stored with the program instruction that can be executed by the processor, and the processor calls described program to refer to Order is able to carry out the above method.
Fourth aspect, the embodiment of the present invention also propose a kind of non-transient computer readable storage medium, the non-transient meter Calculation machine readable storage medium storing program for executing stores computer program, and the computer program makes the computer execute the above method.
As shown from the above technical solution, the embodiment of the present invention works as goal systems by the virtual objects of building goal systems When test environment is not provided, joint debugging test is docked and carried out with virtual objects, avoiding goal systems from mismatching causes new function to exist Occur various problems after online, while making built-in system when carrying out joint debugging test without the goal systems outside relying on, test Progress and testing cost are more controllable.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Other attached drawings are obtained according to these figures.
Fig. 1 is a kind of flow diagram for system integration and test test processing method that one embodiment of the invention provides;
Fig. 2 is the flow diagram of system integration and test test when docking the first time that one embodiment of the invention provides;
Fig. 3 is the process that the system integration and test when bank that one embodiment of the invention provides does not provide test environment docking is tested Schematic diagram;
Fig. 4 is a kind of structural schematic diagram for system integration and test test processes device that one embodiment of the invention provides;
Fig. 5 is the logic diagram for the electronic equipment that one embodiment of the invention provides.
Specific embodiment
With reference to the accompanying drawing, further description of the specific embodiments of the present invention.Following embodiment is only used for more Technical solution of the present invention is clearly demonstrated, and not intended to limit the protection scope of the present invention.
Fig. 1 shows a kind of flow diagram of system integration and test test processing method provided in this embodiment, comprising:
S101, when built-in system is docked with goal systems for the first time, obtain the truthful data of the goal systems, and The virtual objects of the goal systems are constructed according to the truthful data.
Wherein, the built-in system is the system for carrying out function upgrading, need to carry out joint debugging test with goal systems be System.
The goal systems is external system, before carrying out joint debugging test, needs to hold consultation, the phase to goal systems After pass personnel cooperation, the joint debugging test of built-in system and goal systems just can be carried out.
The virtual objects are according to the virtual system for the truthful data building collected in goal systems, which is inside System, but be independently of the current built-in system.
Specifically, the virtual objects are mock object, and mock test is during the test, to be not easy structure for certain The object obtained is made or be not easy, creates the test method so as to test with a virtual object.This virtual pair As being exactly mock object.Mock object is exactly substitute of the real object during debugging.This is described using an interface Object.This interface is realized in product code, test code in realize this interface, in tested code simply by Interface carrys out reference object, so it does not know that the object of this reference is real object or mock object.
Currently, main Mock testing tool has JMock, MockCreator, Mockrunner in the camp Java, EasyMock, MockMaker etc. are mainly Nmock .NetMock etc. in the camp .Net of Microsoft.
S102, when the built-in system and the goal systems carry out joint debugging test, if judging the goal systems not Test environment docking is provided, then establishes docking for the built-in system and the virtual objects.
S103, after judging that the built-in system docks successfully with the virtual objects, joint debugging is carried out with the virtual objects Test.
Specifically, using banking system as goal systems, for financial service system is as built-in system, by building one A unified mock object carrys out simulated bank's system, carries out joint debugging survey as banking system when no banking environment Examination.
As shown in Fig. 2, the mock object of the banking system is built when first time docking banking system, this mock pairs As in the docking operation that first time carries out financial service, collecting truthful data on line and being saved in data independently of built-in system In library.
It is subsequent docked with banking system when, if bank do not provide test environment docking, built-in system is just The mock system established when first time can be docked carries out joint debugging test as banking system, as shown in Figure 3.
It needs to control the time at 3 days when banking system carries out joint debugging due to docking at present, and uses mock system integration and test When test, since mock system is internal system, the testing progress and testing cost of joint debugging test can be according to surveys Examination needs to be adjusted at any time.
Embodiment is by the virtual objects of building goal systems, and virtual right when goal systems does not provide test environment As docking and carrying out joint debugging test, avoiding goal systems from mismatching causes new function to occur various problems after online, makes simultaneously It obtains when built-in system carries out joint debugging test without the goal systems outside relying on, testing progress and testing cost are more controllable.
Further, on the basis of above method embodiment, after S101, further includes:
The opposite joining relation of S1012, the parameter for collecting the goal systems whole and return value, it is complete according to the opposite joining relation It is apt to the logic of the virtual objects, the opposite joining relation includes all abnormal conditions.
Specifically, the logic in built-in system with improving mock system in bank's first time docking operation, is collected whole The opposite joining relation of parameter and return value, including all abnormal conditions, such as: the interface of bank breaks down, and exception occurs in network, Or the return value of parameter does not meet the fact.These mock data collected are become into virtual banking system.Due to identical Parameter is sent to banking system and mock system, returning the result of can obtaining be it is identical, therefore it is subsequent by built-in system with When banking system carries out joint debugging test, the confidence level of test result is high.
Further, on the basis of above method embodiment, S102 is specifically included:
When the built-in system and the goal systems carry out joint debugging test, if determining the target according to target identification System does not provide test environment docking, then establishes docking for the built-in system and the virtual objects.
Specifically, an isMockEnable mark can be set in built-in system, and isMockEnable mark is For target identification, for being identified to whether goal systems provides test environment.
For example, true is set by isMockEnable mark if banking environment is obstructed, in this way in request service system First branch will be entered into when system, i.e., carries out joint debugging test with mock system docking, mock data are obtained, before returning to The built-in system at end.
Further, on the basis of above method embodiment, after S101 or S103 further include:
S104, when the built-in system and the goal systems carry out joint debugging test, if judging, the goal systems is mentioned For test environment docking, then establish docking for the built-in system and the goal systems, judge the built-in system with it is described After goal systems is docked successfully, joint debugging test is carried out with the goal systems.
Specifically, when carrying out joint debugging test with goal systems, if goal systems is capable of providing the test wrapper of joint debugging test Border, i.e. isMockEnable are false, then selection, which dock with goal systems, carries out joint debugging test, to guarantee test data Property as true as a die.
Fig. 4 shows a kind of structural schematic diagram of system integration and test test processes device provided in this embodiment, described device Include: virtual objects building module 401, dock and establish module 402 and the first joint debugging test module 403, in which:
The virtual objects building module 401 is used for when built-in system is docked with goal systems for the first time, obtains institute The truthful data of goal systems is stated, and constructs the virtual objects of the goal systems according to the truthful data;
The docking is established module 402 and is used for when the built-in system and the goal systems carry out joint debugging test, if Judge that the goal systems does not provide test environment docking, then establishes docking for the built-in system and the virtual objects;
After the first joint debugging test module 403 is used to judge that the built-in system docks successfully with the virtual objects, Joint debugging test is carried out with the virtual objects.
Specifically, the virtual objects building module 401 is obtained when built-in system is docked with goal systems for the first time The truthful data of the goal systems, and construct according to the truthful data virtual objects of the goal systems;The docking Module 402 is established when the built-in system and the goal systems carry out joint debugging test, the goal systems does not mention if judging For test environment docking, then docking for the built-in system and the virtual objects is established;The first joint debugging test module 403 After judging that the built-in system docks successfully with the virtual objects, joint debugging test is carried out with the virtual objects.
The present embodiment is and virtual when goal systems does not provide test environment by the virtual objects of building goal systems Object docks and carries out joint debugging test, and avoiding goal systems from mismatching causes new function to occur various problems after online, simultaneously So that testing progress and testing cost are more controllable without the goal systems outside relying on when built-in system carries out joint debugging test.
Further, on the basis of above-mentioned apparatus embodiment, the virtual objects are mock object, the mock object Independently of the built-in system.
Further, on the basis of above-mentioned apparatus embodiment, the system integration and test test processes device further include:
Logic improves module, for collecting the parameter of the goal systems whole and the opposite joining relation of return value, according to institute The logic that opposite joining relation improves the virtual objects is stated, the opposite joining relation includes all abnormal conditions.
Further, on the basis of above-mentioned apparatus embodiment, the docking is established module 402 and is specifically used for described interior When portion's system and the goal systems carry out joint debugging test, if determining that the goal systems does not provide test wrapper according to target identification Border docking, then establish docking for the built-in system and the virtual objects.
Further, on the basis of above-mentioned apparatus embodiment, the system integration and test test processes device further include:
Second joint debugging test module is used for when the built-in system and the goal systems carry out joint debugging test, if sentencing The goal systems of breaking provides test environment docking, then establishes docking for the built-in system and the goal systems, judge institute It states after built-in system docks successfully with the goal systems, carries out joint debugging test with the goal systems.
System integration and test test processes device described in the present embodiment can be used for executing above method embodiment, principle and Technical effect is similar, and details are not described herein again.
Referring to Fig. 5, the electronic equipment, comprising: processor (processor) 501, memory (memory) 502 and total Line 503;
Wherein,
The processor 501 and memory 502 complete mutual communication by the bus 503;
The processor 501 is used to call the program instruction in the memory 502, to execute above-mentioned each method embodiment Provided method.
The present embodiment discloses a kind of computer program product, and the computer program product includes being stored in non-transient calculating Computer program on machine readable storage medium storing program for executing, the computer program include program instruction, when described program instruction is calculated When machine executes, computer is able to carry out method provided by above-mentioned each method embodiment.
The present embodiment provides a kind of non-transient computer readable storage medium, the non-transient computer readable storage medium Computer instruction is stored, the computer instruction makes the computer execute method provided by above-mentioned each method embodiment.
The apparatus embodiments described above are merely exemplary, wherein described, unit can as illustrated by the separation member It is physically separated with being or may not be, component shown as a unit may or may not be physics list Member, it can it is in one place, or may be distributed over multiple network units.It can be selected according to the actual needs In some or all of the modules achieve the purpose of the solution of this embodiment.Those of ordinary skill in the art are not paying creativeness Labour in the case where, it can understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can It realizes by means of software and necessary general hardware platform, naturally it is also possible to pass through hardware.Based on this understanding, on Stating technical solution, substantially the part that contributes to existing technology can be embodied in the form of software products in other words, should Computer software product may be stored in a computer readable storage medium, such as ROM/RAM, magnetic disk, CD, including several fingers It enables and using so that a computer equipment (can be personal computer, server or the network equipment etc.) executes each implementation Method described in certain parts of example or embodiment.
It is noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although reference Invention is explained in detail for previous embodiment, those skilled in the art should understand that: it still can be right Technical solution documented by foregoing embodiments is modified or equivalent replacement of some of the technical features;And this It modifies or replaces, the spirit and model of technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution It encloses.

Claims (10)

1. a kind of system integration and test test processing method characterized by comprising
When built-in system is docked with goal systems for the first time, the truthful data of the goal systems is obtained, and according to described Truthful data constructs the virtual objects of the goal systems;
When the built-in system and the goal systems carry out joint debugging test, if judging, the goal systems does not provide test wrapper Border docking, then establish docking for the built-in system and the virtual objects;
After judging that the built-in system docks successfully with the virtual objects, joint debugging test is carried out with the virtual objects.
2. system according to claim 1 joint debugging test processing method, which is characterized in that the virtual objects are mock pairs As the mock object is independently of the built-in system.
3. system according to claim 1 joint debugging test processing method, which is characterized in that it is described built-in system for the first time with When goal systems is docked, the truthful data of the goal systems is obtained, and the target is constructed according to the truthful data After the virtual objects of system, further includes:
The parameter of the goal systems whole and the opposite joining relation of return value are collected, is improved according to the opposite joining relation described virtual The logic of object, the opposite joining relation include all abnormal conditions.
4. system according to claim 1 joint debugging test processing method, which is characterized in that it is described the built-in system with When the goal systems carries out joint debugging test, if judging, the goal systems does not provide test environment docking, establishes in described Portion's system is docked with the virtual objects, is specifically included:
When the built-in system and the goal systems carry out joint debugging test, if determining the goal systems according to target identification Test environment docking is not provided, then establishes docking for the built-in system and the virtual objects.
5. system integration and test test processing method according to claim 1-4, which is characterized in that the system integration and test Test processing method further include:
When the built-in system and the goal systems carry out joint debugging test, if judging, the goal systems provides test environment Docking then establishes docking for the built-in system and the goal systems, judges the built-in system and the goal systems pair After being connected into function, joint debugging test is carried out with the goal systems.
6. a kind of system integration and test test processes device characterized by comprising
Virtual objects construct module, for obtaining the goal systems when built-in system is docked with goal systems for the first time Truthful data, and construct according to the truthful data virtual objects of the goal systems;
Module is established in docking, is used for when the built-in system and the goal systems carry out joint debugging test, if judging the mesh Mark system does not provide test environment docking, then establishes docking for the built-in system and the virtual objects;
First joint debugging test module, it is and described virtual after judging that the built-in system docks successfully with the virtual objects Object carries out joint debugging test.
7. system integration and test test processes device according to claim 6, which is characterized in that the virtual objects are mock pairs As the mock object is independently of the built-in system.
8. system integration and test test processes device according to claim 6, which is characterized in that the system integration and test test processes Device further include:
Logic improves module, for collecting the parameter of the goal systems whole and the opposite joining relation of return value, according to described right The relationship of connecing improves the logic of the virtual objects, and the opposite joining relation includes all abnormal conditions.
9. a kind of electronic equipment including memory, processor and stores the calculating that can be run on a memory and on a processor Machine program, which is characterized in that the processor realizes system connection as claimed in claim 1 to 5 when executing described program Adjust test processing method.
10. a kind of non-transient computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer System integration and test test processing method as claimed in claim 1 to 5 is realized when program is executed by processor.
CN201910672089.9A 2019-07-24 2019-07-24 A kind of system integration and test test processing method and device Withdrawn CN110489334A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910672089.9A CN110489334A (en) 2019-07-24 2019-07-24 A kind of system integration and test test processing method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910672089.9A CN110489334A (en) 2019-07-24 2019-07-24 A kind of system integration and test test processing method and device

Publications (1)

Publication Number Publication Date
CN110489334A true CN110489334A (en) 2019-11-22

Family

ID=68548099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910672089.9A Withdrawn CN110489334A (en) 2019-07-24 2019-07-24 A kind of system integration and test test processing method and device

Country Status (1)

Country Link
CN (1) CN110489334A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110941557A (en) * 2019-11-27 2020-03-31 中国银行股份有限公司 Social insurance payment simulation method and device
CN113297078A (en) * 2021-05-24 2021-08-24 平安壹钱包电子商务有限公司 MOCK system and data testing method based on MOCK system
CN113297079A (en) * 2021-05-25 2021-08-24 平安壹钱包电子商务有限公司 Service test method, device, service test equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105335281A (en) * 2014-07-30 2016-02-17 阿里巴巴集团控股有限公司 Method and device for automatic mock of external dependency
CN108563567A (en) * 2018-04-09 2018-09-21 平安普惠企业管理有限公司 Automated testing method, device, equipment and computer readable storage medium
CN109271325A (en) * 2018-10-26 2019-01-25 携程旅游网络技术(上海)有限公司 Test method, system, electronic equipment and the storage medium of application

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105335281A (en) * 2014-07-30 2016-02-17 阿里巴巴集团控股有限公司 Method and device for automatic mock of external dependency
CN108563567A (en) * 2018-04-09 2018-09-21 平安普惠企业管理有限公司 Automated testing method, device, equipment and computer readable storage medium
CN109271325A (en) * 2018-10-26 2019-01-25 携程旅游网络技术(上海)有限公司 Test method, system, electronic equipment and the storage medium of application

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110941557A (en) * 2019-11-27 2020-03-31 中国银行股份有限公司 Social insurance payment simulation method and device
CN110941557B (en) * 2019-11-27 2023-09-26 中国银行股份有限公司 Social security payment simulation method and device
CN113297078A (en) * 2021-05-24 2021-08-24 平安壹钱包电子商务有限公司 MOCK system and data testing method based on MOCK system
CN113297079A (en) * 2021-05-25 2021-08-24 平安壹钱包电子商务有限公司 Service test method, device, service test equipment and storage medium

Similar Documents

Publication Publication Date Title
CN110489334A (en) A kind of system integration and test test processing method and device
CN103201724B (en) Providing application high availability in highly-available virtual machine environments
CN109634728A (en) Job scheduling method, device, terminal device and readable storage medium storing program for executing
CN107368365A (en) Cloud platform automatic O&M method, system, equipment and storage medium
CN109698771A (en) Game server method for testing pressure and device
CN114064208A (en) Method and device for detecting application service state, electronic equipment and storage medium
CN110188049A (en) Container Management method, apparatus and electronic equipment
CN107291621A (en) Processing method, processing unit, medium and the electronic equipment of test case
CN112732499A (en) Test method and device based on micro-service architecture and computer system
CN104504495A (en) Operation and maintenance abnormity processing method, device and equipment
CN110489320A (en) Restoring method, device, terminal device and the medium of test data
CN105955798A (en) Method, device and system for detecting abnormal state of virtual machine in cloud platform
CN109818994A (en) Information processing method and device for agent side
CN115113528A (en) Operation control method, device, equipment and medium of neural network model
CN109586946B (en) Exception handling method and device and computer readable storage medium
CN110502399A (en) Fault detection method and device
CN109639755A (en) Interconnected system server decoupling method, device, medium and electronic equipment
CN113495825A (en) Line alarm processing method and device, electronic equipment and readable storage medium
CN116194894A (en) Fault localization of native cloud applications
CN109359034A (en) A kind of operation system test method, computer readable storage medium and terminal device
CN111078444B (en) System and method for security analysis of fault behavior
CN110413287A (en) The dispositions method and device of software
JP2013114437A (en) System construction support method
CN115167896A (en) Method and device for updating software version, storage medium and electronic equipment
CN105868957A (en) Continuous integration method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20191122

WW01 Invention patent application withdrawn after publication