CN110489334A - A kind of system integration and test test processing method and device - Google Patents
A kind of system integration and test test processing method and device Download PDFInfo
- Publication number
- CN110489334A CN110489334A CN201910672089.9A CN201910672089A CN110489334A CN 110489334 A CN110489334 A CN 110489334A CN 201910672089 A CN201910672089 A CN 201910672089A CN 110489334 A CN110489334 A CN 110489334A
- Authority
- CN
- China
- Prior art keywords
- test
- goal systems
- built
- virtual objects
- joint debugging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
- G06F11/362—Software debugging
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
- G06F11/3668—Software testing
- G06F11/3672—Test management
- G06F11/3688—Test management for test execution, e.g. scheduling of test suites
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Debugging And Monitoring (AREA)
Abstract
The embodiment of the invention discloses a kind of system integration and test test processing method and devices, method includes: when built-in system is docked with goal systems for the first time, the truthful data of the goal systems is obtained, and constructs the virtual objects of the goal systems according to the truthful data;When the built-in system and the goal systems carry out joint debugging test, if judging, the goal systems does not provide test environment docking, establishes docking for the built-in system and the virtual objects;After judging that the built-in system docks successfully with the virtual objects, joint debugging test is carried out with the virtual objects.The virtual objects that the embodiment of the present invention passes through building goal systems, when goal systems does not provide test environment, it is docked with virtual objects and carries out joint debugging test, avoiding goal systems from mismatching causes new function to occur various problems after online, make built-in system when carrying out joint debugging test without the goal systems outside relying on simultaneously, testing progress and testing cost are more controllable.
Description
Technical field
The present invention relates to field of computer technology, and in particular to a kind of system integration and test test processing method and device.
Background technique
Before carrying out system integration and test test, after needing to guarantee that current built-in system is docked with another system completion,
System integration and test test can be normally carried out.But built-in system needs constantly to carry out function upgrading in many cases, in function liter
After grade, in order to guarantee the normal use of new function, it is necessary to carry out system integration and test test to relevant system.However, for portion
The sensibility or part system of subsystem belong to external system, and current built-in system can not often be cooperated to carry out system connection
Commissioning examination.
For example, bank has personnel's cooperation when docking for the first time when built-in system is docked with banking system, survey is provided
It is verified on test ring border and line.But after docking for the first time, if built-in system has new function, needs are online, will encounter
The problem of being unable to test verifying, because not testing environment, the prior art is used and is carried out at code logic according to interface document
Reason.
But the problem of can not embodying in interface document, can not find ahead of time, and such as: abnormal problem, anti-pressure ability, even
Logic loopholes caused by having some development tasks to make mistakes, eventually leading to function can not be normal online, can be forcing online
The many problems of exposure on line.
Summary of the invention
Since existing method is there are the above problem, the embodiment of the present invention proposes a kind of system integration and test test processing method and dress
It sets.
In a first aspect, the embodiment of the present invention proposes a kind of system integration and test test processing method, comprising:
When built-in system is docked with goal systems for the first time, the truthful data of the goal systems is obtained, and according to
The truthful data constructs the virtual objects of the goal systems;
When the built-in system and the goal systems carry out joint debugging test, if judging, the goal systems does not provide survey
The docking of test ring border, then establish docking for the built-in system and the virtual objects;
After judging that the built-in system docks successfully with the virtual objects, joint debugging test is carried out with the virtual objects.
Optionally, the virtual objects are mock object, and the mock object is independently of the built-in system.
Optionally, described when built-in system is docked with goal systems for the first time, obtain the true of the goal systems
Data, and after constructing according to the truthful data virtual objects of the goal systems, further includes:
The parameter of the goal systems whole and the opposite joining relation of return value are collected, is improved according to the opposite joining relation described
The logic of virtual objects, the opposite joining relation include all abnormal conditions.
Optionally, described when the built-in system and the goal systems carry out joint debugging test, if judging the target
System does not provide test environment docking, then establishes docking for the built-in system and the virtual objects, specifically include:
When the built-in system and the goal systems carry out joint debugging test, if determining the target according to target identification
System does not provide test environment docking, then establishes docking for the built-in system and the virtual objects.
Optionally, the system integration and test test processing method further include:
When the built-in system and the goal systems carry out joint debugging test, if judging, the goal systems provides test
Environment docking, then establish docking for the built-in system and the goal systems, judge the built-in system and the target system
After system docks successfully, joint debugging test is carried out with the goal systems.
Second aspect, the embodiment of the present invention also propose a kind of system integration and test test processes device, comprising:
Virtual objects construct module, for obtaining the target when built-in system is docked with goal systems for the first time
The truthful data of system, and construct according to the truthful data virtual objects of the goal systems;
Module is established in docking, is used for when the built-in system and the goal systems carry out joint debugging test, if judging institute
It states goal systems and test environment docking is not provided, then establish docking for the built-in system and the virtual objects;
First joint debugging test module, it is and described after judging that the built-in system docks successfully with the virtual objects
Virtual objects carry out joint debugging test.
Optionally, the virtual objects are mock object, and the mock object is independently of the built-in system.
Optionally, the system integration and test test processes device further include:
Logic improves module, for collecting the parameter of the goal systems whole and the opposite joining relation of return value, according to institute
The logic that opposite joining relation improves the virtual objects is stated, the opposite joining relation includes all abnormal conditions.
Optionally, the docking is established module and is specifically used for:
When the built-in system and the goal systems carry out joint debugging test, if determining the target according to target identification
System does not provide test environment docking, then establishes docking for the built-in system and the virtual objects.
Optionally, the system integration and test test processes device further include:
Second joint debugging test module is used for when the built-in system and the goal systems carry out joint debugging test, if sentencing
The goal systems of breaking provides test environment docking, then establishes docking for the built-in system and the goal systems, judge institute
It states after built-in system docks successfully with the goal systems, carries out joint debugging test with the goal systems.
The third aspect, the embodiment of the present invention also propose a kind of electronic equipment, comprising:
At least one processor;And
At least one processor being connect with the processor communication, in which:
The memory is stored with the program instruction that can be executed by the processor, and the processor calls described program to refer to
Order is able to carry out the above method.
Fourth aspect, the embodiment of the present invention also propose a kind of non-transient computer readable storage medium, the non-transient meter
Calculation machine readable storage medium storing program for executing stores computer program, and the computer program makes the computer execute the above method.
As shown from the above technical solution, the embodiment of the present invention works as goal systems by the virtual objects of building goal systems
When test environment is not provided, joint debugging test is docked and carried out with virtual objects, avoiding goal systems from mismatching causes new function to exist
Occur various problems after online, while making built-in system when carrying out joint debugging test without the goal systems outside relying on, test
Progress and testing cost are more controllable.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
Other attached drawings are obtained according to these figures.
Fig. 1 is a kind of flow diagram for system integration and test test processing method that one embodiment of the invention provides;
Fig. 2 is the flow diagram of system integration and test test when docking the first time that one embodiment of the invention provides;
Fig. 3 is the process that the system integration and test when bank that one embodiment of the invention provides does not provide test environment docking is tested
Schematic diagram;
Fig. 4 is a kind of structural schematic diagram for system integration and test test processes device that one embodiment of the invention provides;
Fig. 5 is the logic diagram for the electronic equipment that one embodiment of the invention provides.
Specific embodiment
With reference to the accompanying drawing, further description of the specific embodiments of the present invention.Following embodiment is only used for more
Technical solution of the present invention is clearly demonstrated, and not intended to limit the protection scope of the present invention.
Fig. 1 shows a kind of flow diagram of system integration and test test processing method provided in this embodiment, comprising:
S101, when built-in system is docked with goal systems for the first time, obtain the truthful data of the goal systems, and
The virtual objects of the goal systems are constructed according to the truthful data.
Wherein, the built-in system is the system for carrying out function upgrading, need to carry out joint debugging test with goal systems be
System.
The goal systems is external system, before carrying out joint debugging test, needs to hold consultation, the phase to goal systems
After pass personnel cooperation, the joint debugging test of built-in system and goal systems just can be carried out.
The virtual objects are according to the virtual system for the truthful data building collected in goal systems, which is inside
System, but be independently of the current built-in system.
Specifically, the virtual objects are mock object, and mock test is during the test, to be not easy structure for certain
The object obtained is made or be not easy, creates the test method so as to test with a virtual object.This virtual pair
As being exactly mock object.Mock object is exactly substitute of the real object during debugging.This is described using an interface
Object.This interface is realized in product code, test code in realize this interface, in tested code simply by
Interface carrys out reference object, so it does not know that the object of this reference is real object or mock object.
Currently, main Mock testing tool has JMock, MockCreator, Mockrunner in the camp Java,
EasyMock, MockMaker etc. are mainly Nmock .NetMock etc. in the camp .Net of Microsoft.
S102, when the built-in system and the goal systems carry out joint debugging test, if judging the goal systems not
Test environment docking is provided, then establishes docking for the built-in system and the virtual objects.
S103, after judging that the built-in system docks successfully with the virtual objects, joint debugging is carried out with the virtual objects
Test.
Specifically, using banking system as goal systems, for financial service system is as built-in system, by building one
A unified mock object carrys out simulated bank's system, carries out joint debugging survey as banking system when no banking environment
Examination.
As shown in Fig. 2, the mock object of the banking system is built when first time docking banking system, this mock pairs
As in the docking operation that first time carries out financial service, collecting truthful data on line and being saved in data independently of built-in system
In library.
It is subsequent docked with banking system when, if bank do not provide test environment docking, built-in system is just
The mock system established when first time can be docked carries out joint debugging test as banking system, as shown in Figure 3.
It needs to control the time at 3 days when banking system carries out joint debugging due to docking at present, and uses mock system integration and test
When test, since mock system is internal system, the testing progress and testing cost of joint debugging test can be according to surveys
Examination needs to be adjusted at any time.
Embodiment is by the virtual objects of building goal systems, and virtual right when goal systems does not provide test environment
As docking and carrying out joint debugging test, avoiding goal systems from mismatching causes new function to occur various problems after online, makes simultaneously
It obtains when built-in system carries out joint debugging test without the goal systems outside relying on, testing progress and testing cost are more controllable.
Further, on the basis of above method embodiment, after S101, further includes:
The opposite joining relation of S1012, the parameter for collecting the goal systems whole and return value, it is complete according to the opposite joining relation
It is apt to the logic of the virtual objects, the opposite joining relation includes all abnormal conditions.
Specifically, the logic in built-in system with improving mock system in bank's first time docking operation, is collected whole
The opposite joining relation of parameter and return value, including all abnormal conditions, such as: the interface of bank breaks down, and exception occurs in network,
Or the return value of parameter does not meet the fact.These mock data collected are become into virtual banking system.Due to identical
Parameter is sent to banking system and mock system, returning the result of can obtaining be it is identical, therefore it is subsequent by built-in system with
When banking system carries out joint debugging test, the confidence level of test result is high.
Further, on the basis of above method embodiment, S102 is specifically included:
When the built-in system and the goal systems carry out joint debugging test, if determining the target according to target identification
System does not provide test environment docking, then establishes docking for the built-in system and the virtual objects.
Specifically, an isMockEnable mark can be set in built-in system, and isMockEnable mark is
For target identification, for being identified to whether goal systems provides test environment.
For example, true is set by isMockEnable mark if banking environment is obstructed, in this way in request service system
First branch will be entered into when system, i.e., carries out joint debugging test with mock system docking, mock data are obtained, before returning to
The built-in system at end.
Further, on the basis of above method embodiment, after S101 or S103 further include:
S104, when the built-in system and the goal systems carry out joint debugging test, if judging, the goal systems is mentioned
For test environment docking, then establish docking for the built-in system and the goal systems, judge the built-in system with it is described
After goal systems is docked successfully, joint debugging test is carried out with the goal systems.
Specifically, when carrying out joint debugging test with goal systems, if goal systems is capable of providing the test wrapper of joint debugging test
Border, i.e. isMockEnable are false, then selection, which dock with goal systems, carries out joint debugging test, to guarantee test data
Property as true as a die.
Fig. 4 shows a kind of structural schematic diagram of system integration and test test processes device provided in this embodiment, described device
Include: virtual objects building module 401, dock and establish module 402 and the first joint debugging test module 403, in which:
The virtual objects building module 401 is used for when built-in system is docked with goal systems for the first time, obtains institute
The truthful data of goal systems is stated, and constructs the virtual objects of the goal systems according to the truthful data;
The docking is established module 402 and is used for when the built-in system and the goal systems carry out joint debugging test, if
Judge that the goal systems does not provide test environment docking, then establishes docking for the built-in system and the virtual objects;
After the first joint debugging test module 403 is used to judge that the built-in system docks successfully with the virtual objects,
Joint debugging test is carried out with the virtual objects.
Specifically, the virtual objects building module 401 is obtained when built-in system is docked with goal systems for the first time
The truthful data of the goal systems, and construct according to the truthful data virtual objects of the goal systems;The docking
Module 402 is established when the built-in system and the goal systems carry out joint debugging test, the goal systems does not mention if judging
For test environment docking, then docking for the built-in system and the virtual objects is established;The first joint debugging test module 403
After judging that the built-in system docks successfully with the virtual objects, joint debugging test is carried out with the virtual objects.
The present embodiment is and virtual when goal systems does not provide test environment by the virtual objects of building goal systems
Object docks and carries out joint debugging test, and avoiding goal systems from mismatching causes new function to occur various problems after online, simultaneously
So that testing progress and testing cost are more controllable without the goal systems outside relying on when built-in system carries out joint debugging test.
Further, on the basis of above-mentioned apparatus embodiment, the virtual objects are mock object, the mock object
Independently of the built-in system.
Further, on the basis of above-mentioned apparatus embodiment, the system integration and test test processes device further include:
Logic improves module, for collecting the parameter of the goal systems whole and the opposite joining relation of return value, according to institute
The logic that opposite joining relation improves the virtual objects is stated, the opposite joining relation includes all abnormal conditions.
Further, on the basis of above-mentioned apparatus embodiment, the docking is established module 402 and is specifically used for described interior
When portion's system and the goal systems carry out joint debugging test, if determining that the goal systems does not provide test wrapper according to target identification
Border docking, then establish docking for the built-in system and the virtual objects.
Further, on the basis of above-mentioned apparatus embodiment, the system integration and test test processes device further include:
Second joint debugging test module is used for when the built-in system and the goal systems carry out joint debugging test, if sentencing
The goal systems of breaking provides test environment docking, then establishes docking for the built-in system and the goal systems, judge institute
It states after built-in system docks successfully with the goal systems, carries out joint debugging test with the goal systems.
System integration and test test processes device described in the present embodiment can be used for executing above method embodiment, principle and
Technical effect is similar, and details are not described herein again.
Referring to Fig. 5, the electronic equipment, comprising: processor (processor) 501, memory (memory) 502 and total
Line 503;
Wherein,
The processor 501 and memory 502 complete mutual communication by the bus 503;
The processor 501 is used to call the program instruction in the memory 502, to execute above-mentioned each method embodiment
Provided method.
The present embodiment discloses a kind of computer program product, and the computer program product includes being stored in non-transient calculating
Computer program on machine readable storage medium storing program for executing, the computer program include program instruction, when described program instruction is calculated
When machine executes, computer is able to carry out method provided by above-mentioned each method embodiment.
The present embodiment provides a kind of non-transient computer readable storage medium, the non-transient computer readable storage medium
Computer instruction is stored, the computer instruction makes the computer execute method provided by above-mentioned each method embodiment.
The apparatus embodiments described above are merely exemplary, wherein described, unit can as illustrated by the separation member
It is physically separated with being or may not be, component shown as a unit may or may not be physics list
Member, it can it is in one place, or may be distributed over multiple network units.It can be selected according to the actual needs
In some or all of the modules achieve the purpose of the solution of this embodiment.Those of ordinary skill in the art are not paying creativeness
Labour in the case where, it can understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can
It realizes by means of software and necessary general hardware platform, naturally it is also possible to pass through hardware.Based on this understanding, on
Stating technical solution, substantially the part that contributes to existing technology can be embodied in the form of software products in other words, should
Computer software product may be stored in a computer readable storage medium, such as ROM/RAM, magnetic disk, CD, including several fingers
It enables and using so that a computer equipment (can be personal computer, server or the network equipment etc.) executes each implementation
Method described in certain parts of example or embodiment.
It is noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although reference
Invention is explained in detail for previous embodiment, those skilled in the art should understand that: it still can be right
Technical solution documented by foregoing embodiments is modified or equivalent replacement of some of the technical features;And this
It modifies or replaces, the spirit and model of technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution
It encloses.
Claims (10)
1. a kind of system integration and test test processing method characterized by comprising
When built-in system is docked with goal systems for the first time, the truthful data of the goal systems is obtained, and according to described
Truthful data constructs the virtual objects of the goal systems;
When the built-in system and the goal systems carry out joint debugging test, if judging, the goal systems does not provide test wrapper
Border docking, then establish docking for the built-in system and the virtual objects;
After judging that the built-in system docks successfully with the virtual objects, joint debugging test is carried out with the virtual objects.
2. system according to claim 1 joint debugging test processing method, which is characterized in that the virtual objects are mock pairs
As the mock object is independently of the built-in system.
3. system according to claim 1 joint debugging test processing method, which is characterized in that it is described built-in system for the first time with
When goal systems is docked, the truthful data of the goal systems is obtained, and the target is constructed according to the truthful data
After the virtual objects of system, further includes:
The parameter of the goal systems whole and the opposite joining relation of return value are collected, is improved according to the opposite joining relation described virtual
The logic of object, the opposite joining relation include all abnormal conditions.
4. system according to claim 1 joint debugging test processing method, which is characterized in that it is described the built-in system with
When the goal systems carries out joint debugging test, if judging, the goal systems does not provide test environment docking, establishes in described
Portion's system is docked with the virtual objects, is specifically included:
When the built-in system and the goal systems carry out joint debugging test, if determining the goal systems according to target identification
Test environment docking is not provided, then establishes docking for the built-in system and the virtual objects.
5. system integration and test test processing method according to claim 1-4, which is characterized in that the system integration and test
Test processing method further include:
When the built-in system and the goal systems carry out joint debugging test, if judging, the goal systems provides test environment
Docking then establishes docking for the built-in system and the goal systems, judges the built-in system and the goal systems pair
After being connected into function, joint debugging test is carried out with the goal systems.
6. a kind of system integration and test test processes device characterized by comprising
Virtual objects construct module, for obtaining the goal systems when built-in system is docked with goal systems for the first time
Truthful data, and construct according to the truthful data virtual objects of the goal systems;
Module is established in docking, is used for when the built-in system and the goal systems carry out joint debugging test, if judging the mesh
Mark system does not provide test environment docking, then establishes docking for the built-in system and the virtual objects;
First joint debugging test module, it is and described virtual after judging that the built-in system docks successfully with the virtual objects
Object carries out joint debugging test.
7. system integration and test test processes device according to claim 6, which is characterized in that the virtual objects are mock pairs
As the mock object is independently of the built-in system.
8. system integration and test test processes device according to claim 6, which is characterized in that the system integration and test test processes
Device further include:
Logic improves module, for collecting the parameter of the goal systems whole and the opposite joining relation of return value, according to described right
The relationship of connecing improves the logic of the virtual objects, and the opposite joining relation includes all abnormal conditions.
9. a kind of electronic equipment including memory, processor and stores the calculating that can be run on a memory and on a processor
Machine program, which is characterized in that the processor realizes system connection as claimed in claim 1 to 5 when executing described program
Adjust test processing method.
10. a kind of non-transient computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer
System integration and test test processing method as claimed in claim 1 to 5 is realized when program is executed by processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910672089.9A CN110489334A (en) | 2019-07-24 | 2019-07-24 | A kind of system integration and test test processing method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910672089.9A CN110489334A (en) | 2019-07-24 | 2019-07-24 | A kind of system integration and test test processing method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110489334A true CN110489334A (en) | 2019-11-22 |
Family
ID=68548099
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910672089.9A Withdrawn CN110489334A (en) | 2019-07-24 | 2019-07-24 | A kind of system integration and test test processing method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110489334A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110941557A (en) * | 2019-11-27 | 2020-03-31 | 中国银行股份有限公司 | Social insurance payment simulation method and device |
CN113297078A (en) * | 2021-05-24 | 2021-08-24 | 平安壹钱包电子商务有限公司 | MOCK system and data testing method based on MOCK system |
CN113297079A (en) * | 2021-05-25 | 2021-08-24 | 平安壹钱包电子商务有限公司 | Service test method, device, service test equipment and storage medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105335281A (en) * | 2014-07-30 | 2016-02-17 | 阿里巴巴集团控股有限公司 | Method and device for automatic mock of external dependency |
CN108563567A (en) * | 2018-04-09 | 2018-09-21 | 平安普惠企业管理有限公司 | Automated testing method, device, equipment and computer readable storage medium |
CN109271325A (en) * | 2018-10-26 | 2019-01-25 | 携程旅游网络技术(上海)有限公司 | Test method, system, electronic equipment and the storage medium of application |
-
2019
- 2019-07-24 CN CN201910672089.9A patent/CN110489334A/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105335281A (en) * | 2014-07-30 | 2016-02-17 | 阿里巴巴集团控股有限公司 | Method and device for automatic mock of external dependency |
CN108563567A (en) * | 2018-04-09 | 2018-09-21 | 平安普惠企业管理有限公司 | Automated testing method, device, equipment and computer readable storage medium |
CN109271325A (en) * | 2018-10-26 | 2019-01-25 | 携程旅游网络技术(上海)有限公司 | Test method, system, electronic equipment and the storage medium of application |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110941557A (en) * | 2019-11-27 | 2020-03-31 | 中国银行股份有限公司 | Social insurance payment simulation method and device |
CN110941557B (en) * | 2019-11-27 | 2023-09-26 | 中国银行股份有限公司 | Social security payment simulation method and device |
CN113297078A (en) * | 2021-05-24 | 2021-08-24 | 平安壹钱包电子商务有限公司 | MOCK system and data testing method based on MOCK system |
CN113297079A (en) * | 2021-05-25 | 2021-08-24 | 平安壹钱包电子商务有限公司 | Service test method, device, service test equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110489334A (en) | A kind of system integration and test test processing method and device | |
CN103201724B (en) | Providing application high availability in highly-available virtual machine environments | |
CN109634728A (en) | Job scheduling method, device, terminal device and readable storage medium storing program for executing | |
CN107368365A (en) | Cloud platform automatic O&M method, system, equipment and storage medium | |
CN109698771A (en) | Game server method for testing pressure and device | |
CN114064208A (en) | Method and device for detecting application service state, electronic equipment and storage medium | |
CN110188049A (en) | Container Management method, apparatus and electronic equipment | |
CN107291621A (en) | Processing method, processing unit, medium and the electronic equipment of test case | |
CN112732499A (en) | Test method and device based on micro-service architecture and computer system | |
CN104504495A (en) | Operation and maintenance abnormity processing method, device and equipment | |
CN110489320A (en) | Restoring method, device, terminal device and the medium of test data | |
CN105955798A (en) | Method, device and system for detecting abnormal state of virtual machine in cloud platform | |
CN109818994A (en) | Information processing method and device for agent side | |
CN115113528A (en) | Operation control method, device, equipment and medium of neural network model | |
CN109586946B (en) | Exception handling method and device and computer readable storage medium | |
CN110502399A (en) | Fault detection method and device | |
CN109639755A (en) | Interconnected system server decoupling method, device, medium and electronic equipment | |
CN113495825A (en) | Line alarm processing method and device, electronic equipment and readable storage medium | |
CN116194894A (en) | Fault localization of native cloud applications | |
CN109359034A (en) | A kind of operation system test method, computer readable storage medium and terminal device | |
CN111078444B (en) | System and method for security analysis of fault behavior | |
CN110413287A (en) | The dispositions method and device of software | |
JP2013114437A (en) | System construction support method | |
CN115167896A (en) | Method and device for updating software version, storage medium and electronic equipment | |
CN105868957A (en) | Continuous integration method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20191122 |
|
WW01 | Invention patent application withdrawn after publication |