CN110486585A - Construction engineering cost field surveys device - Google Patents

Construction engineering cost field surveys device Download PDF

Info

Publication number
CN110486585A
CN110486585A CN201910799815.3A CN201910799815A CN110486585A CN 110486585 A CN110486585 A CN 110486585A CN 201910799815 A CN201910799815 A CN 201910799815A CN 110486585 A CN110486585 A CN 110486585A
Authority
CN
China
Prior art keywords
plate
mapping
fixed
connect
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910799815.3A
Other languages
Chinese (zh)
Other versions
CN110486585B (en
Inventor
吕路
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Uni Construction Sixth Development And Construction Co ltd
Beijing Uni Construction Group Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910799815.3A priority Critical patent/CN110486585B/en
Publication of CN110486585A publication Critical patent/CN110486585A/en
Application granted granted Critical
Publication of CN110486585B publication Critical patent/CN110486585B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M11/00Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters
    • F16M11/02Heads
    • F16M11/04Means for attachment of apparatus; Means allowing adjustment of the apparatus relatively to the stand
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M11/00Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters
    • F16M11/20Undercarriages with or without wheels
    • F16M11/24Undercarriages with or without wheels changeable in height or length of legs, also for transport only, e.g. by means of tubes screwed into each other
    • F16M11/26Undercarriages with or without wheels changeable in height or length of legs, also for transport only, e.g. by means of tubes screwed into each other by telescoping, with or without folding
    • F16M11/32Undercarriages for supports with three or more telescoping legs
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Manipulator (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses construction engineering cost field surveys device, including protective device, the bottom surface of the protective device is equipped with support device;Pass through fixed device, mapping worker is facilitated to be fixed and dismantle instrument of surveying and mapping, to be safeguarded to instrument of surveying and mapping, pass through pendulous device, mapping worker is set fast and accurately to carry out centering operation, increase mapping speed, further improve the accuracy of mapping, pass through protective device, clamping apparatus, the cooperation of pendulous device and lifting device, so that instrument of surveying and mapping is come from the pop-up of the inside of protective device and puts into mapping operations, pass through the cooperation of clamping apparatus and lifting device, retighten mapping worker can by instrument of surveying and mapping in the inside of protective device using directly pressing sealing plug after complete instrument of surveying and mapping, operating process is simple and fast, it is very convenient, it is time saving and energy saving, help to improve working efficiency, further increase mapping speed, improve the practicability of the construction engineering cost field surveys device.

Description

Construction engineering cost field surveys device
Technical field
The present invention relates to construction engineering cost field surveys apparatus fields, existing more specifically to construction engineering cost Field plotting board.
Background technique
Project cost just refers to the construction price of engineering, refers to complete the construction of an engineering, it is contemplated that or it is actually required Full payment summation, defined from the angle of owner or investor, project cost refers to the construction cost of engineering, as builds The complete equipment investment cost of one engineering expectation payment or actual delivery, these expenses mainly include equipment and Work tool Purchase commodity, architectural engineering and installing engineering expense, engineering construction other fees, reserve fund, interest incurred during construction, investment in fixed assets side To regulatory tax etc., gives out a contract for a project angle from holding and define, project cost refers to engineering price, as builds up an engineering, it is contemplated that or it is real Border is in soil, equipment, technology labor service and contracts etc. in the market, is formed by construction and installation work by modes of doing business such as biddings The price and construction project total price of journey, need to fill using construction engineering cost field surveys before estimating construction engineering cost It sets and scene is surveyed and drawn, landform is measured, more accurately to estimate construction engineering cost, existing building work Journey cost field surveys device is made of instrument of surveying and mapping and tripod, and wherein tripod is by three telescopic supporting legs and support plate It constitutes, in use, instrument of surveying and mapping to be mounted on to the top of tripod first, then tripod is strutted and is placed on mapped point Top then moves tripod and the length of instrument of surveying and mapping and tripod supporting leg is adjusted, makes instrument of surveying and mapping and mapped point Centering is simultaneously in a horizontal state, and starts to carry out field surveys later.
But existing building project cost field surveys device is in actual use, the opening angle of three supporting legs The experience for fully relying on mapping worker is controlled, and is easy to keep the opening angle of three supporting legs inconsistent, cause mapping error compared with Greatly, and the direct bolt of instrument of surveying and mapping is mounted on tripod and is in exposed state, after single use finishes, in order not to allow Instrument of surveying and mapping is damaged in the handling process, and instrument of surveying and mapping is usually separated with tripod and instrument of surveying and mapping is put into suitcase by people It is inside carried, operating process is cumbersome, and very inconvenient, time-consuming and laborious, working efficiency is low, and mapping speed is slow, therefore needs to set Count a kind of construction engineering cost field surveys device.
Summary of the invention
1. technical problems to be solved
In actual use for existing building project cost field surveys device existing in the prior art, three supporting legs Opening angle fully rely on the experience of mapping worker and controlled, be easy to keep the opening angle of three supporting legs inconsistent, cause Mapping error is larger, and the direct bolt of instrument of surveying and mapping is mounted on tripod and is in exposed state, finishes it in single use Afterwards, in order not to allow instrument of surveying and mapping to be damaged in the handling process, instrument of surveying and mapping is usually separated with tripod and by surveying instrument by people Device is put into suitcase and is carried, and operating process is cumbersome, and very inconvenient, time-consuming and laborious, working efficiency is low, and mapping speed is slow The problem of, the purpose of the present invention is to provide construction engineering cost field surveys devices, it can be very good to solve background technique The problem of middle proposition.
2. technical solution
To solve the above problems, the present invention adopts the following technical scheme that.
Construction engineering cost field surveys device, including protective device, the bottom surface of the protective device are equipped with support dress It sets.
Preferably, the protective device includes protective housing, and the bottom surface of box cavity is protected to be equipped with clamping apparatus, protective housing Bottom surface is equipped with pendulous device, and the inside of protective housing is equipped with lifting slide bar, and the bottom surface of the bottom end and protection box cavity that go up and down slide bar connects It connects, the top for going up and down slide bar is connect with the top surface of protection box cavity, and the external activity for going up and down slide bar is socketed with lifting spring, lifting The bottom end of spring is connect with the bottom surface of protection box cavity, and the external activity for going up and down slide bar is arranged with lifting device, lifting device Top is equipped with fixed device, is connected with instrument of surveying and mapping at the top of fixed device, sealing plug is connected at the top of instrument of surveying and mapping, protect The top surface of case offers pop-up hole, and the bottom end activity of sealing plug is plugged on the inside in pop-up hole.
Preferably, the support device includes rectangular block, and the bottom surface of rectangular block is fixedly connected with telescopic outrigger, rectangular block Top surface is equipped with convex block, and the inside of convex block offers lock chamber, and the left side fixation of convex block is interspersed with locating shaft, the left end of locating shaft Movable sleeve is connected to dial, and the top of dial is fixedly connected with the bottom surface of protective housing, is fixedly connected on the top surface of rectangular block Pointer compatible with dial, the right end of locating shaft extend to the inside of lock chamber, and the outside of locating shaft is fixedly connected with position Positive stop strip inside lock chamber, the external activity of locating shaft are socketed with moving casing, and the inner wall of moving casing offers track Slot, track groove and positive stop strip sliding are clamped, and the right end of moving casing is connected with movable fluted disc, the inner wall of movable fluted disc and lock chamber It is slidably connected, the external activity of moving casing is socketed with buffer spring, and one end of buffer spring is connect with movable fluted disc, buffering elastic The other end of spring is connect with the left side of lock chamber inner cavity, and the right side activity of convex block is interspersed with fixing axle, the left end of fixing axle It is connected with fixed gear plate, the inner wall of fixed gear plate and lock chamber is slidably connected, and the right end of fixing axle is fixedly connected with fixed plate, Gu The top of fixed board and the bottom surface of protective housing connect, and the internal activity of fixing axle is interspersed with pressing lever, and the right end of pressing lever is through solid Fixed board and fixing sleeve are connected to pressing plate, and the left end of pressing lever is fixedly connected through fixed gear plate and with movable fluted disc, pressing lever with The equal pivot bush unit of fixing axle, fixed gear plate, fixed plate.
Preferably, the clamping apparatus includes inserting column, and the bottom end of inserting column is connect with the bottom surface of protection box cavity, grafting The inside of column offers installation cavity, and the inner wall of installation cavity is connected with the first positioning plate and the second positioning plate, the first positioning plate it is interior Portion's activity is interspersed with drive rod, and the right end of drive rod is connected with driver plate, and the another side of driver plate is contacted with the inner wall of installation cavity Connection, the right side of driver plate are connected with right-angled trapezium card adapter plate, and the right end of right-angled trapezium card adapter plate extends to the outer of inserting column The second positioning plate is run through in the left end in portion, drive rod, and the outside of drive rod is socketed with sliding block and reset spring, and sliding block is fixedly attached to The outside of drive rod, reset spring are actively socketed on the outside of drive rod, and the left end of reset spring is connect with the second positioning plate, multiple The right end of position spring is connect with sliding block, and the left end of drive rod is connected with transmission rope.
Preferably, the pendulous device includes truncated cone-shaped clump weight, and the bottom surface of truncated cone-shaped clump weight offers spliced eye, circle The top surface of platform shape clump weight offers mounting groove, and mounting groove is connected to spliced eye, and it is sliding that the internal activity of spliced eye is interspersed with grafting Bar, the bottom end of grafting slide bar extend to the outside of spliced eye and are connected with conical blocks, the top surface of conical blocks and truncated cone-shaped clump weight Bottom surface connect, the bottom surface of mounting groove inner cavity offers pilot hole, and the internal activity of pilot hole is interspersed with guide rod, guiding The top of bar extends to the outside of pilot hole and is connected with engaging plate, and the inner wall of engaging plate and mounting groove is slidably connected, guide rod External activity be socketed with engagement spring, engage spring top and engaging plate bottom surface connect, engage bottom end and the peace of spring The bottom surface of tankage inner cavity connects, and pulling rope, the bottom end of pulling rope and the top of grafting slide bar are connected in the middle part of engaging plate bottom surface Connection, the top surface of engaging plate are equipped with engaging tooth, and the inside of mounting groove is equipped with the rotary shaft being located above engaging plate, rotary shaft it is outer Portion has been fixedly attached position limited gear, and the external activity of rotary shaft is socketed with torque spring, one end of torque spring and mounting groove Inner wall connection, the other end of torque spring are connect with position limited gear, and the external fixing sleeve of rotary shaft is connected to the receipts being located therein Line wheel, take-up pulley have been externally wrapped with drag wire, and the other end of drag wire extends to the inside of installation cavity and connect with transmission rope, The external activity of drag wire is socketed with sealing-plug, and the bottom end of sealing-plug is threadedly coupled with mounting groove.
Preferably, the lifting device includes lifter plate, and lifter plate is actively socketed on the outside of lifting slide bar, lifter plate Bottom surface and the top of lifting spring connect, and are connected with limit for height column in the middle part of lifter plate bottom surface, the bottom surface of limit for height column offers undertaking The inner wall of slot, holding groove offers blocked hole, goes up and down and is connected with fixed column in the middle part of plate top surface, and the side of fixed column opens up limited Circle of position slot.
Preferably, the fixed device includes pedestal, and the top surface of pedestal is connect with instrument of surveying and mapping, and the bottom surface of pedestal offers Fixed circular groove, fixed circular groove can be actively socketed on the outside of fixed column, and the inner wall of fixed circular groove offers clamping groove, clamping groove Inner wall is connected with card connection ball by being clamped spring transmission, and the inner wall of card connection ball and clamping groove is slidably connected, and card connection ball can be with limit Circle of position slot grafting, the side of card connection ball are connected with disassembly rope, and the other end for dismantling rope, which extends to the outside of pedestal and is connected with, to be led Cap is drawn, drawing cap activity is plugged on the side of pedestal.
3. beneficial effect
Compared with the prior art, the present invention has the advantages that
By the way that instrument of surveying and mapping to be arranged in the inside of protective device, it is not damaged instrument of surveying and mapping in the handling process, leads to Support device is crossed, facilitates mapping worker to adjust the opening angle of telescopic outrigger, mapping worker is enable to be precisely controlled telescopic outrigger Opening angle, it is ensured that mapping worker can adjust the opening angle of three telescopic outriggers at the same angle, help to mention The accuracy of height mapping facilitates mapping worker to be fixed and dismantle instrument of surveying and mapping, by fixed device so as to surveying instrument Device is safeguarded, by pendulous device, mapping worker is enable fast and accurately to carry out centering operation, is increased mapping speed, The accuracy of mapping is further improved, by the cooperation of protective device, clamping apparatus, pendulous device and lifting device, makes to survey Drawing instrument can pop up come and put into mapping operations from the inside of protective device, by the cooperation of clamping apparatus and lifting device, Retighten mapping worker can instrument of surveying and mapping in protective device using directly pressing sealing plug after complete instrument of surveying and mapping Inside, operating process is simple and fast, very convenient, time saving and energy saving, helps to improve working efficiency, further increases mapping speed Degree, improves the practicability of the construction engineering cost field surveys device.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the schematic diagram of internal structure of protective device in Fig. 1 of the present invention;
Fig. 3 is the schematic diagram of internal structure of support device in Fig. 1 of the present invention;
Fig. 4 is the left view of Fig. 3 of the present invention;
Fig. 5 is the section structure diagram of moving casing in Fig. 3 of the present invention;
Fig. 6 is the schematic diagram of internal structure of clamping apparatus in Fig. 2 of the present invention;
Fig. 7 is the schematic diagram of internal structure of pendulous device in Fig. 2 of the present invention;
Fig. 8 is the schematic diagram of internal structure of lifting device in Fig. 2 of the present invention;
Fig. 9 is the schematic diagram of internal structure that device is fixed in Fig. 2 of the present invention.
Figure label explanation:
1, protective device;11, protective housing;12, slide bar is gone up and down;13, lifting spring;14, hole is popped up;2, support device;201, square Shape block;202, telescopic outrigger;203, convex block;204, lock chamber;205, locating shaft;206, dial;207, pointer;208, it limits Item;209, moving casing;210, track groove;211, movable fluted disc;212, buffer spring;213, fixing axle;214, fixed gear plate; 215, fixed plate;216, pressing lever;217, pressing plate;3, clamping apparatus;301, inserting column;302, installation cavity;303, first is fixed Position plate;304, the second positioning plate;305, drive rod;306, driver plate;307, right-angled trapezium card adapter plate;308, sliding block;309, multiple Position spring;310, transmission rope;4, pendulous device;400, mounting groove;401, truncated cone-shaped clump weight;402, spliced eye;403, grafting Slide bar;404, conical blocks;405, pilot hole;406, guide rod;407, engaging plate;408, spring is engaged;409, pulling rope;410, Engaging tooth;411, rotary shaft;412, position limited gear;413, torque spring;414, take-up pulley;415, drag wire;416, sealing-plug; 5, lifting device;51, lifter plate;52, limit for height column;53, holding groove;54, blocked hole;55, fixed column;56, circular groove is limited;6, solid Determine device;61, pedestal;62, fixed circular groove;63, clamping groove;64, it is clamped spring;65, card connection ball;66, disassembly rope;67, it pulls Cap;7, instrument of surveying and mapping;8, sealing plug.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention;Technical solution in the embodiment of the present invention carries out clear, complete Site preparation description;Obviously;Described embodiments are only a part of the embodiments of the present invention;Instead of all the embodiments.It is based on Embodiment in the present invention;It is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment;It shall fall within the protection scope of the present invention.
Fig. 1-9, construction engineering cost field surveys device, including protective device 1 are please referred to, on the bottom surface of protective device 1 Equipped with support device 2.
Protective device 1 includes protective housing 11, and the bottom surface of 11 inner cavity of protective housing is equipped with clamping apparatus 3, the bottom of protective housing 11 Face is equipped with pendulous device 4, and the inside of protective housing 11 is equipped with lifting slide bar 12, goes up and down the bottom end and 11 inner cavity of protective housing of slide bar 12 The top of bottom surface connection, lifting slide bar 12 is connect with the top surface of 11 inner cavity of protective housing, and the external activity of lifting slide bar 12 is socketed with The bottom end of lifting spring 13, lifting spring 13 is connect with the bottom surface of 11 inner cavity of protective housing, and the external activity of lifting slide bar 12 is arranged There is lifting device 5, the top of lifting device 5 is equipped with fixed device 6, and the top of fixed device 6 is connected with instrument of surveying and mapping 7, surveys and draws The top of instrument 7 is connected with sealing plug 8, and the top surface of protective housing 11 offers pop-up hole 14, and the bottom end activity of sealing plug 8 is plugged on Pop up the inside in hole 14.
Support device 2 includes rectangular block 201, and the bottom surface of rectangular block 201 is fixedly connected with telescopic outrigger 202, rectangular block 201 Top surface be equipped with convex block 203, the inside of convex block 203 offers lock chamber 204, and the left side fixation of convex block 203 is interspersed with positioning Axis 205, the left end movable sleeve of locating shaft 205 are connected to dial 206, and the top of dial 206 and the bottom surface of protective housing 11 are fixed It connects, is fixedly connected with pointer 207 compatible with dial 206 on the top surface of rectangular block 201, the right end of locating shaft 205 prolongs The inside of lock chamber 204 is extended to, the outside of locating shaft 205 is fixedly connected with the positive stop strip 208 inside lock chamber 204, fixed The external activity of position axis 205 is socketed with moving casing 209, and the inner wall of moving casing 209 offers track groove 210, track groove 210 It slides and is clamped with positive stop strip 208, the right end of moving casing 209 is connected with movable fluted disc 211, movable fluted disc 211 and lock chamber 204 Inner wall be slidably connected, the external activity of moving casing 209 is socketed with buffer spring 212, one end of buffer spring 212 and activity Fluted disc 211 connects, and the other end of buffer spring 212 is connect with the left side of 204 inner cavity of lock chamber, and the right side of convex block 203 is living Dynamic to be interspersed with fixing axle 213, the left end of fixing axle 213 is connected with fixed gear plate 214, and fixed gear plate 214 is interior with lock chamber 204 Wall is slidably connected, and the right end of fixing axle 213 is fixedly connected with fixed plate 215, the top of fixed plate 215 and the bottom surface of protective housing 11 Connection, the internal activity of fixing axle 213 are interspersed with pressing lever 216, and the right end of pressing lever 216 is through fixed plate 215 and fixing sleeve It is connected to pressing plate 217, the left end of pressing lever 216 is fixedly connected through fixed gear plate 214 and with movable fluted disc 211, pressing lever 216 With fixing axle 213, fixed gear plate 214, the equal pivot bush unit of fixed plate 215.
Clamping apparatus 3 includes inserting column 301, and the bottom end of inserting column 301 is connect with the bottom surface of 11 inner cavity of protective housing, inserting column 301 inside offers installation cavity 302, and the inner wall of installation cavity 302 is connected with the first positioning plate 303 and the second positioning plate 304, the The internal activity of one positioning plate 303 is interspersed with drive rod 305, and the right end of drive rod 305 is connected with driver plate 306, driver plate 306 Another side and the inner wall of installation cavity 302 connect, the right side of driver plate 306 is connected with right-angled trapezium card adapter plate 307, directly The right end of the trapezoidal card adapter plate 307 in angle extends to the outside of inserting column 301, and the second positioning plate 304 is run through in the left end of drive rod 305, The outside of drive rod 305 is socketed with sliding block 308 and reset spring 309, and sliding block 308 is fixedly attached to the outside of drive rod 305, multiple Position spring 309 is actively socketed on the outside of drive rod 305, and the left end of reset spring 309 is connect with the second positioning plate 304, resets The right end of spring 309 is connect with sliding block 308, and the left end of drive rod 305 is connected with transmission rope 310.
Pendulous device 4 includes truncated cone-shaped clump weight 401, and the bottom surface of truncated cone-shaped clump weight 401 offers spliced eye 402, circle The top surface of platform shape clump weight 401 offers mounting groove 400, and mounting groove 400 is connected to spliced eye 402, and the inside of spliced eye 402 is living Dynamic to be interspersed with grafting slide bar 403, the bottom end of grafting slide bar 403 extends to the outside of spliced eye 402 and is connected with conical blocks 404, The top surface of conical blocks 404 and the bottom surface of truncated cone-shaped clump weight 401 connect, and the bottom surface of 400 inner cavity of mounting groove offers guiding Hole 405, the internal activity of pilot hole 405 are interspersed with guide rod 406, and the top of guide rod 406 extends to the outside of pilot hole 405 And it is connected with engaging plate 407, engaging plate 407 and the inner wall of mounting groove 400 are slidably connected, the external activity socket of guide rod 406 There is engagement spring 408, the top of engagement spring 408 is connect with the bottom surface of engaging plate 407, engages bottom end and the installation of spring 408 The bottom surface of 400 inner cavity of slot connects, and is connected with pulling rope 409, the bottom end of pulling rope 409 and grafting in the middle part of 407 bottom surface of engaging plate The top of slide bar 403 connects, and the top surface of engaging plate 407 is equipped with engaging tooth 410, and the inside of mounting groove 400, which is equipped with, is located at engaging plate The rotary shaft 411 of 407 tops, the outside of rotary shaft 411 has been fixedly attached position limited gear 412, the external activity set of rotary shaft 411 Be connected to torque spring 413, one end of torque spring 413 is connect with the inner wall of mounting groove 400, the other end of torque spring 413 with Position limited gear 412 connects, and the external fixing sleeve of rotary shaft 411 is connected to the take-up pulley 414 being located therein, take-up pulley 414 outside Portion is wound with drag wire 415, and the other end of drag wire 415 extends to the inside of installation cavity 302 and connect with transmission rope 310, leads The external activity of bracing wire 415 is socketed with sealing-plug 416, and the bottom end of sealing-plug 416 is threadedly coupled with mounting groove 400.
Lifting device 5 includes lifter plate 51, and lifter plate 51 is actively socketed on the outside of lifting slide bar 12, the bottom of lifter plate 51 Face is connect with the top of lifting spring 13, and limit for height column 52 is connected in the middle part of 51 bottom surface of lifter plate, and the bottom surface of limit for height column 52 opens up There is holding groove 53, the inner wall of holding groove 53 offers blocked hole 54, and the end of right-angled trapezium card adapter plate 307 can be inserted with blocked hole 54 It connects, fixed column 55 is connected in the middle part of 51 top surface of lifter plate, the side of fixed column 55 offers limit circular groove 56.
Fixed device 6 includes pedestal 61, and the top surface of pedestal 61 is connect with instrument of surveying and mapping 7, and the bottom surface of pedestal 61 offers solid Determine circular groove 62, fixed circular groove 62 can be actively socketed on the outside of fixed column 55, and the inner wall of fixed circular groove 62 offers clamping groove 63, The inner wall of clamping groove 63 is sequentially connected with card connection ball 65 by being clamped spring 64, and the inner wall sliding of card connection ball 65 and clamping groove 63 connects It connects, card connection ball 65 can be connected with disassembly rope 66, the other end of disassembly rope 66 with limit 56 grafting of circular groove, the side of card connection ball 65 It extends to the outside of pedestal 61 and is connected with drawing cap 67, drawing 67 activity of cap is plugged on the side of pedestal 61.
Working principle:
The device is transported to mapping region first, then presses pressing plate 217, pressing plate 217 presses pressing lever 216, pressing 216 promotion activity fluted disc 211 of bar is moved to the left, and separates movable fluted disc 211 and fixed gear plate 214, releases the limit to convex block 203 System then rotates telescopic outrigger 202, rotates telescopic outrigger 202 with the central axes center line of locating shaft 205, to flexible branch The opening angle of leg 202 is adjusted, and reads telescopic outrigger 202 by the cooperation of dial 206 and pointer 207 in adjustment process Open-angle angle value, until telescopic outrigger 202 open-angle angle value reach mapping require, later unclamp pressing plate 217, make activity Fluted disc 211 moves right under the action of 212 elastic force of buffer spring and engages with fixed gear plate 214, and then fixing axle 213 passes through Engagement, positive stop strip 208 and the clamping of track groove 210 of movable fluted disc 211 and fixed gear plate 214 are acted on locating shaft 205 It fixes, so that convex block 203 be fixed, finally fixes the opening angle of telescopic outrigger 202, then repeat appeal behaviour Make, the opening angle of remaining two telescopic outriggers 202 is adjusted, adjusts and the device is erected at mapped point after completing Top is held truncated cone-shaped clump weight 401 and pull downwards later, makes drag wire 415 by downward pulling force, then drag wire 415 drawing transmission ropes 310, transmission rope 310 are bent downwardly deformation and pull drive rod 305 to the movement of the inside of installation cavity 302, pass Lever 305 is mobile to the inside of installation cavity 302 with right-angled trapezium card adapter plate 307 by driver plate 306, is clamped right-angled trapezium Plate 307 is separated with blocked hole 54, releases the limitation to limit for height column 52, then lifter plate 51 is under the action of 13 elastic force of lifting spring It is moved up with fixed device 6, instrument of surveying and mapping 7, sealing plug 8, instrument of surveying and mapping 7 and fixed device 6 sequentially pass through pop-up later Hole 14 is moved instrument of surveying and mapping 7 and fixed device 6 from the inside of protective housing 11, and state at this time can be by instrument of surveying and mapping 7 It disassembles and is safeguarded, when disassembly, drawing drawing cap 67, the drawing drawing disassembly of cap 67 rope 66,66 drawing card connection balls of disassembly rope 65, it separates card connection ball 65 with limit circular groove 56, mentions sealing plug 8 then up, instrument of surveying and mapping 7 can be disassembled, dismantle Mode is simple and fast, and instrument of surveying and mapping 7 is then put into mapping operations, truncated cone-shaped clump weight 401 is held on the other hand later, makes truncated cone-shaped Clump weight 401 is fixed, and another hand pulls downwards conical blocks 404, and conical blocks 404 pull grafting slide bar 403, grafting slide bar 403 drawing pulling ropes 409 downwards, the drawing engaging plate 407 downwards of pulling rope 409, engaging plate 407 is with engaging tooth 410 to moving down It is dynamic, separate engaging tooth 410 with position limited gear 412, limitation of the releasing to rotary shaft 411, then by truncated cone-shaped clump weight 401 to Lower movement, then drag wire 415 gradually decreases the position height of pendulous device 4 from the external release of take-up pulley 414, until The bottom end of conical blocks 404 and ground face contact unclamp conical blocks 404, effect of the engaging plate 407 in engagement 408 elastic force of spring later Under moved up with engaging tooth 410, engage engaging tooth 410 with position limited gear 412, rotary shaft 411 limited, thus The position height of pendulous device 4 is fixed, meanwhile, engaging plate 407 is by pulling rope 409, grafting slide bar 403 with conical blocks 404 move up, until the top surfaces of conical blocks 404 is contacted with the bottom surface of truncated cone-shaped clump weight 401, the bottom of conical blocks 404 at this time End and surface separation, then move the device, make the pendency of pendulous device 4 in the surface of mapped point, complete the work of centering, connect The work of horizontal adjustment is carried out by the cooperation of instrument of surveying and mapping 7 and telescopic outrigger 202, start to be surveyed and drawn after the completion of adjusting, After mapping, sealing plug 8 is pressed, so that holding groove 53 is socketed in the outside of inserting column 301, then sliding block 308 is in reset spring It is displaced outwardly under the action of 309 elastic force with drive rod 305, drive rod 305 is by driver plate 306 with right-angled trapezium card adapter plate 307 are displaced outwardly, and then blocked hole 54 is inserted into the end of right-angled trapezium card adapter plate 307, and limit for height column 52 and inserting column 301 is fixed Together, so that instrument of surveying and mapping 7 to be fixed on to the inside of protective housing 11, make conical blocks 404 with respect to truncated cone-shaped clump weight 401 later It moves down, separates engaging tooth 410 with position limited gear 412, then effect of the position limited gear 412 in 413 torsion of torque spring Under with rotary shaft 411 rotate, rotary shaft 411 with take-up pulley 414 rotate, twine drag wire 415 to the outside of take-up pulley 414 Around, then the position height of pendulous device 4 increases, until the top surface of sealing-plug 416 is contacted with the bottom surface of protective housing 11, it is then loose Conical blocks 404 are opened, the position height of pendulous device 4 is fixed, support device 2 is adjusted later, makes telescopic outrigger 202 pack up, and carry the device to facilitate, the device is then carried to next mapped point and is surveyed and drawn.
More than;It is merely preferred embodiments of the present invention;But scope of protection of the present invention is not limited thereto;It is any Those familiar with the art is in the technical scope disclosed by the present invention;According to the technique and scheme of the present invention and its improve Design is subject to equivalent substitution or change;It should be covered by the scope of protection of the present invention.

Claims (7)

1. construction engineering cost field surveys device, including protective device (1), it is characterised in that: the bottom of the protective device (1) Face is equipped with support device (2).
2. construction engineering cost field surveys device according to claim 1, it is characterised in that: the protective device (1) Including protective housing (11), the bottom surface of protective housing (11) inner cavity is equipped with clamping apparatus (3), and the bottom surface of protective housing (11) is equipped with pendency The inside of device (4), protective housing (11) is equipped with lifting slide bar (12), goes up and down the bottom end and protective housing (11) inner cavity of slide bar (12) Bottom surface connection, the top of lifting slide bar (12) are connect with the top surface of protective housing (11) inner cavity, go up and down the external activity of slide bar (12) It is socketed with lifting spring (13), the bottom end of lifting spring (13) is connect with the bottom surface of protective housing (11) inner cavity, is gone up and down slide bar (12) External activity be arranged with lifting device (5), the top of lifting device (5) is equipped with fixed device (6), the top of fixed device (6) Portion is connected with instrument of surveying and mapping (7), is connected at the top of instrument of surveying and mapping (7) sealing plug (8), and the top surface of protective housing (11) offers bullet Portal (14), the bottom end activity of sealing plug (8) is plugged on the inside of pop-up hole (14).
3. construction engineering cost field surveys device according to claim 1, it is characterised in that: the support device (2) Including rectangular block (201), the bottom surface of rectangular block (201) is fixedly connected with telescopic outrigger (202), and the top surface of rectangular block (201) is set Have convex block (203), the inside of convex block (203) offers lock chamber (204), and the left side fixation of convex block (203) is interspersed with positioning Axis (205), the left end movable sleeve of locating shaft (205) are connected to dial (206), the top and protective housing (11) of dial (206) Bottom surface be fixedly connected, be fixedly connected on the top surface of rectangular block (201) with dial (206) compatible pointer (207), it is fixed The right end of position axis (205) extends to the inside of lock chamber (204), and the outside of locating shaft (205) is fixedly connected with positioned at lock chamber (204) internal positive stop strip (208), the external activity of locating shaft (205) are socketed with moving casing (209), moving casing (209) Inner wall offer track groove (210), track groove (210) and positive stop strip (208) sliding be clamped, the right end of moving casing (209) It is connected with movable fluted disc (211), movable fluted disc (211) and the inner wall of lock chamber (204) are slidably connected, moving casing (209) External activity is socketed with buffer spring (212), and one end of buffer spring (212) is connect with movable fluted disc (211), buffer spring (212) the other end is connect with the left side of lock chamber (204) inner cavity, and the right side activity of convex block (203) is interspersed with fixing axle (213), the left end of fixing axle (213) is connected with fixed gear plate (214), and the inner wall of fixed gear plate (214) and lock chamber (204) is sliding Dynamic connection, the right end of fixing axle (213) are fixedly connected with fixed plate (215), top and protective housing (11) of fixed plate (215) Bottom surface connection, the internal activity of fixing axle (213) are interspersed with pressing lever (216), and the right end of pressing lever (216) runs through fixed plate (215) and fixing sleeve is connected to pressing plate (217), the left end of pressing lever (216) through fixed gear plate (214) and with movable fluted disc (211) it is fixedly connected, pressing lever (216) and fixing axle (213), fixed gear plate (214), fixed plate (215) equal pivot bush unit.
4. construction engineering cost field surveys device according to claim 2, it is characterised in that: the clamping apparatus (3) Including inserting column (301), the bottom end of inserting column (301) is connect with the bottom surface of protective housing (11) inner cavity, the inside of inserting column (301) It offering installation cavity (302), the inner wall of installation cavity (302) is connected with the first positioning plate (303) and the second positioning plate (304), the The internal activity of one positioning plate (303) is interspersed with drive rod (305), and the right end of drive rod (305) is connected with driver plate (306), The another side of driver plate (306) and the inner wall of installation cavity (302) connect, and the right side of driver plate (306) is connected with right angle Trapezoidal card adapter plate (307), the right end of right-angled trapezium card adapter plate (307) extend to the outside of inserting column (301), drive rod (305) Left end run through the second positioning plate (304), the outside of drive rod (305) is socketed with sliding block (308) and reset spring (309), cunning Block (308) is fixedly attached to the outside of drive rod (305), and reset spring (309) is actively socketed on the outside of drive rod (305), The left end of reset spring (309) is connect with the second positioning plate (304), and the right end of reset spring (309) is connect with sliding block (308), The left end of drive rod (305) is connected with transmission rope (310).
5. construction engineering cost field surveys device according to claim 2, it is characterised in that: the pendulous device (4) Including truncated cone-shaped clump weight (401), the bottom surface of truncated cone-shaped clump weight (401) offers spliced eye (402), truncated cone-shaped clump weight (401) top surface offers mounting groove (400), and mounting groove (400) is connected to spliced eye (402), and the inside of spliced eye (402) is living Dynamic to be interspersed with grafting slide bar (403), the bottom end of grafting slide bar (403) extends to the outside of spliced eye (402) and is connected with circular cone Block (404), the top surface of conical blocks (404) and the bottom surface of truncated cone-shaped clump weight (401) connect, mounting groove (400) inner cavity Bottom surface offers pilot hole (405), and the internal activity of pilot hole (405) is interspersed with guide rod (406), the top of guide rod (406) End extends to the outside of pilot hole (405) and is connected with engaging plate (407), and the inner wall of engaging plate (407) and mounting groove (400) is sliding Dynamic connection, the external activity of guide rod (406) are socketed with engagement spring (408), engage top and the engaging plate of spring (408) (407) bottom surface connection, the bottom end of engagement spring (408) are connect with the bottom surface of mounting groove (400) inner cavity, engaging plate (407) bottom It is connected in the middle part of face pulling rope (409), the bottom end of pulling rope (409) is connect with the top of grafting slide bar (403), engaging plate (407) top surface is equipped with engaging tooth (410), and the inside of mounting groove (400) is equipped with the rotary shaft being located above engaging plate (407) (411), the outside of rotary shaft (411) has been fixedly attached position limited gear (412), and the external activity of rotary shaft (411) is socketed with torsion One end of power spring (413), torque spring (413) is connect with the inner wall of mounting groove (400), the other end of torque spring (413) It is connect with position limited gear (412), the external fixing sleeve of rotary shaft (411) is connected to the take-up pulley (414) being located therein, take-up pulley (414) be externally wrapped with drag wire (415), the other end of drag wire (415) extend to the inside of installation cavity (302) and with biography Running rope (310) connection, the external activity of drag wire (415) are socketed with sealing-plug (416), the bottom end of sealing-plug (416) and installation Slot (400) is threadedly coupled.
6. construction engineering cost field surveys device according to claim 2, it is characterised in that: the lifting device (5) Including lifter plate (51), lifter plate (51) is actively socketed on the outside of lifting slide bar (12), the bottom surface of lifter plate (51) and lifting The top of spring (13) connects, and is connected with limit for height column (52) in the middle part of lifter plate (51) bottom surface, the bottom surface of limit for height column (52) opens up Have holding groove (53), the inner wall of holding groove (53) offers blocked hole (54), is connected with fixation in the middle part of lifter plate (51) top surface Column (55), the side of fixed column (55) offer limit circular groove (56).
7. construction engineering cost field surveys device according to claim 2, it is characterised in that: the fixed device (6) Including pedestal (61), the top surface of pedestal (61) is connect with instrument of surveying and mapping (7), and the bottom surface of pedestal (61) offers fixed circular groove (62), fixed circular groove (62) can be actively socketed on the outside of fixed column (55), and the inner wall of fixed circular groove (62) offers clamping groove (63), the inner wall of clamping groove (63) is sequentially connected with card connection ball (65) by being clamped spring (64), card connection ball (65) and clamping groove (63) inner wall is slidably connected, and card connection ball (65) can be with limit circular groove (56) grafting, and the side of card connection ball (65), which is connected with, tears open It unloads rope (66), the other end of disassembly rope (66) extends to the outside of pedestal (61) and is connected with drawing cap (67), pulls cap (67) Activity is plugged on the side of pedestal (61).
CN201910799815.3A 2019-08-28 2019-08-28 Construction engineering cost on-site surveying and mapping device Active CN110486585B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910799815.3A CN110486585B (en) 2019-08-28 2019-08-28 Construction engineering cost on-site surveying and mapping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910799815.3A CN110486585B (en) 2019-08-28 2019-08-28 Construction engineering cost on-site surveying and mapping device

Publications (2)

Publication Number Publication Date
CN110486585A true CN110486585A (en) 2019-11-22
CN110486585B CN110486585B (en) 2020-11-27

Family

ID=68553582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910799815.3A Active CN110486585B (en) 2019-08-28 2019-08-28 Construction engineering cost on-site surveying and mapping device

Country Status (1)

Country Link
CN (1) CN110486585B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110925564A (en) * 2019-12-17 2020-03-27 于帮海 Building measuring device capable of being adjusted to be horizontal and elevation angle
CN112576874A (en) * 2020-12-03 2021-03-30 江豪杰 On-spot mapping device of building engineering cost
CN112648495A (en) * 2021-01-14 2021-04-13 河北工程大学 Land resource exploration device
CN112696579A (en) * 2020-12-30 2021-04-23 南京古发建筑装饰工程有限公司 Building engineering cost on-site mapping device based on BIM technology
CN113550315A (en) * 2021-08-12 2021-10-26 苏祺 Grouting device for hydraulic engineering construction
CN113607147A (en) * 2021-08-04 2021-11-05 中国建筑土木建设有限公司 Pile machine levelness detection device
CN113685665A (en) * 2021-08-13 2021-11-23 河北道桥工程检测有限公司 Road engineering surveying instrument
CN114383582A (en) * 2022-01-14 2022-04-22 浙江四维远见信息技术有限公司 Multi-angle mapping device
CN114811367A (en) * 2022-03-30 2022-07-29 中交二公局第三工程有限公司 Survey and drawing laying-out device based on BIM
CN114811314A (en) * 2022-05-06 2022-07-29 马德强 Mapping equipment for municipal civil engineering and application method thereof
CN114923095A (en) * 2022-05-16 2022-08-19 中测(浙江)勘测设计有限公司 Urban water supply pipeline lays and uses mapping device based on handheld laser 3D technique
CN116006870A (en) * 2023-02-06 2023-04-25 福建上若工程技术有限公司 Novel building foundation pit engineering detection device and method
CN117588667A (en) * 2024-01-18 2024-02-23 赣州经济技术开发区房产测绘大队 Engineering measurement equipment convenient to receive and release

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007315985A (en) * 2006-05-29 2007-12-06 Daishowa Seiki Co Ltd Marking device
CN207816271U (en) * 2018-01-23 2018-09-04 贵州陆通工程管理咨询有限责任公司 A kind of engineering mapping surveying instrument positioning device
CN207882907U (en) * 2018-02-09 2018-09-18 湖北顺安伟业科技有限公司 A kind of computer display with guarding against theft type fixed structure
CN208751546U (en) * 2018-09-07 2019-04-16 芜湖中安电力设计院有限公司 A kind of rangefinder
CN209214618U (en) * 2019-02-15 2019-08-06 焦彦磊 A kind of traffic civil engineering measuring device easy to remove to carry

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007315985A (en) * 2006-05-29 2007-12-06 Daishowa Seiki Co Ltd Marking device
CN207816271U (en) * 2018-01-23 2018-09-04 贵州陆通工程管理咨询有限责任公司 A kind of engineering mapping surveying instrument positioning device
CN207882907U (en) * 2018-02-09 2018-09-18 湖北顺安伟业科技有限公司 A kind of computer display with guarding against theft type fixed structure
CN208751546U (en) * 2018-09-07 2019-04-16 芜湖中安电力设计院有限公司 A kind of rangefinder
CN209214618U (en) * 2019-02-15 2019-08-06 焦彦磊 A kind of traffic civil engineering measuring device easy to remove to carry

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110925564A (en) * 2019-12-17 2020-03-27 于帮海 Building measuring device capable of being adjusted to be horizontal and elevation angle
CN112576874A (en) * 2020-12-03 2021-03-30 江豪杰 On-spot mapping device of building engineering cost
CN112696579A (en) * 2020-12-30 2021-04-23 南京古发建筑装饰工程有限公司 Building engineering cost on-site mapping device based on BIM technology
CN112648495A (en) * 2021-01-14 2021-04-13 河北工程大学 Land resource exploration device
CN113607147A (en) * 2021-08-04 2021-11-05 中国建筑土木建设有限公司 Pile machine levelness detection device
CN113550315B (en) * 2021-08-12 2022-06-03 苏祺 Grouting device for hydraulic engineering construction
CN113550315A (en) * 2021-08-12 2021-10-26 苏祺 Grouting device for hydraulic engineering construction
CN113685665A (en) * 2021-08-13 2021-11-23 河北道桥工程检测有限公司 Road engineering surveying instrument
CN114383582A (en) * 2022-01-14 2022-04-22 浙江四维远见信息技术有限公司 Multi-angle mapping device
CN114811367A (en) * 2022-03-30 2022-07-29 中交二公局第三工程有限公司 Survey and drawing laying-out device based on BIM
CN114811367B (en) * 2022-03-30 2023-05-02 中交二公局第三工程有限公司 Mapping lofting device based on BIM
CN114811314A (en) * 2022-05-06 2022-07-29 马德强 Mapping equipment for municipal civil engineering and application method thereof
CN114923095A (en) * 2022-05-16 2022-08-19 中测(浙江)勘测设计有限公司 Urban water supply pipeline lays and uses mapping device based on handheld laser 3D technique
CN114923095B (en) * 2022-05-16 2024-03-26 中测(浙江)勘测设计有限公司 Urban water supply pipeline lays and uses mapping device based on handheld laser 3D technique
CN116006870A (en) * 2023-02-06 2023-04-25 福建上若工程技术有限公司 Novel building foundation pit engineering detection device and method
CN116006870B (en) * 2023-02-06 2023-08-22 福建上若工程技术有限公司 Novel building foundation pit engineering detection device and method
CN117588667A (en) * 2024-01-18 2024-02-23 赣州经济技术开发区房产测绘大队 Engineering measurement equipment convenient to receive and release
CN117588667B (en) * 2024-01-18 2024-04-05 赣州经济技术开发区房产测绘大队 Engineering measurement equipment convenient to receive and release

Also Published As

Publication number Publication date
CN110486585B (en) 2020-11-27

Similar Documents

Publication Publication Date Title
CN110486585A (en) Construction engineering cost field surveys device
CN110440117A (en) A kind of construction engineering cost field surveys device based on BIM technology
CN110345351A (en) A kind of construction engineering cost field surveys device
CN105444975A (en) Multifunctional drop hammer impact test device
CN208137390U (en) A kind of safety-type scaffold of architectural engineering
CN106840306A (en) A kind of moveable measurement platform peculiar to vessel
CN211057883U (en) Heavy hammer unhooking device for dynamic test of pile foundation by high strain method
CN205483363U (en) Unmanned aerial vehicle motor power survey head
CN205352913U (en) From agriculture paddy field soil adhesion testing arrangement who takes leveling
CN208736426U (en) A kind of construction high-performance formula line pendant
CN103523669B (en) The method of crane and measuring and calculating suspension arm of crane height
CN114199210B (en) Building engineering is with measurement pay-off of being convenient for remove
CN212510292U (en) Portable reconnaissance surveying instrument strutting arrangement
CN113251982A (en) Flexible support for shaft encoder of offshore erecting device
CN205438553U (en) Take pile up neatly machinery hand of camera system
CN209237283U (en) Ball frame lifting/lowering basketball stands
CN109268653B (en) One kind makes Ground Penetrating Radar advance in parallel and labour-saving device and application method
CN211147672U (en) Foundation pit dividing instrument
CN208621067U (en) A kind of laser orientation instrument in bridge construction
CN104668398B (en) Car parking cable balancer machining equipment
CN208328926U (en) A kind of small-sized piling equipment
CN209591197U (en) A kind of construction engineering cost budget practice device
CN202108271U (en) Stage setting of LED (light-emitted diode) advertising vehicle
CN206829201U (en) A kind of micro-strain dynamic test instrument and its exciting combined type power rod
CN219608006U (en) Theodolite leveling device for reinforced building investigation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201105

Address after: No. 320, huizhongli, Chaoyang District, Beijing

Applicant after: BEIJING UNI-CONSTRUCTION GROUP Co.,Ltd.

Address before: Room 161, 576 Nancheng Road, Xianghe Town, Quanjiao County, Chuzhou City, Anhui Province

Applicant before: Lv Lu

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201211

Address after: No.1, Beili, Longxugou, Dongcheng District, Beijing

Patentee after: BEIJING UNI-CONSTRUCTION SIXTH DEVELOPMENT AND CONSTRUCTION Co.,Ltd.

Patentee after: BEIJING UNI-CONSTRUCTION GROUP Co.,Ltd.

Address before: No. 320, huizhongli, Chaoyang District, Beijing

Patentee before: BEIJING UNI-CONSTRUCTION GROUP Co.,Ltd.