A kind of zero the cold shower equipment
Technical field
The present invention relates to shower set technical fields, more particularly to a kind of zero the cold shower equipment.
Background technique
The thing that most people can all contact daily when shower, and most of supplied per capita using hot water such as water heaters is set
It is standby, it is taken a shower using the warm water for carrying out hot and cold water mixing sum, and demand degree of the process that takes a shower to hot water is relatively high.
In existing shower set, hot water will be remained in hot water supply pipe after stopping using by a large amount of hot water,
Both it will not be utilized, and also cannot achieve the recycling of thermal water resource, and the waste of heating power resource be caused, and in shower, due to heat
It is cooling after remaining hot water through a long time is placed in water pipe, so that the when cold water that hot-water line supplies at first, so that hot water supply is slow
Slowly, shower experience is caused to decline, and user demand is hot water, so that the cold water of outflow all can be slatterned directly substantially,
Cause the direct waste of water resource.
Summary of the invention
The purpose of the present invention is to solve the supplies of hot water for shower in the prior art slowly, and it is wasting that useless cold water is discharged
Problem, and the zero the cold shower equipment of one kind proposed.
To achieve the goals above, present invention employs following technical solutions: a kind of zero the cold shower equipment, including plugs
The connecting pin of hot-water line and cold water pipe in boiler, the hot-water line and boiler is equipped with water feeding one-way valve, the hot water
It is equipped with heat-exchanger pump inside case, is connected to inside the water outlet of the heat-exchanger pump and hot-water line, the hot-water line is close to boiler one end
Side wall was inserted with into water communicating pipe, the glued flexible capsule in the one end being located at communicating pipe in hot-water line of intaking, and the water inlet connects
The siphunculus other end is inserted in cold water pipe, and cold water pipe is connected to by the water inlet communicating pipe with elastomeric bladder, in the water inlet communicating pipe
Equipped with water inlet control valve, the elastomeric bladder is inserted with water outlet communicating pipe far from boiler one end side wall, and the water outlet communicating pipe is remote
One end from elastomeric bladder is connected to inside hot-water line and cold water pipe, and the water outlet communicating pipe is equipped with cold water pipe junction and is connected to
Control valve, side wall of the hot-water line close to boiler one end is connected to by return pipe and boiler inside, in the return pipe
Portion is equipped with return water check valve, and the hot-water line is communicated with mixing tank far from one end of boiler, and the hot-water line and mixing tank connect
Meet place and be equipped with hot water control valve, the cold water pipe is plugged in mixing tank far from one end of boiler, the cold water pipe with mix
The junction of case is equipped with cold water control valve, and the side wall of the mixing tank offers water outlet.
In zero above-mentioned the cold shower equipment, the water outlet communicating pipe passes through close to hot-water line one end outer wall with cold water pipe
Water reservoir connection, the water reservoir and the junction of water outlet communicating pipe are equipped with water storage control valve, the water reservoir and cold water pipe
Junction is equipped with water storage check valve.
In zero above-mentioned the cold shower equipment, the elastomeric bladder is that elastic rubber material is made with water reservoir, described
Elastomeric bladder be it is cone-shaped, pointed cone one end of the elastomeric bladder is towards boiler.
Compared with prior art, the present invention has the advantages that
1, in the present invention, by the design of elastomeric bladder, after hot water control valve closes, cold water is entered in elastomeric bladder, and makes
It is expanded after obtaining elastomeric bladder compression deformation, so that remaining hot water will gradually be squeezed during elastomeric bladder deformation in hot-water line
It is depressed into return pipe, so that residual hot water enters in boiler through return pipe, realizes to the recycling of residual hot water, avoid and make
At the waste of thermal water resource;
2, in the present invention, by the way that the residual hot water in hot-water line to be recycled in boiler, so that not had in hot-water line
Ponding avoids long-time ponding and causes to remain cold water in hot-water line, and when leading to subsequent use hot water, what is be discharged first is cold
Water, so that hot water supply is not in time, cold water is largely wasted, the inconvenience for causing user to use.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of zero the cold shower equipment proposed by the present invention.
In figure: 1 hot-water line, 2 cold water pipes, 3 boilers, 4 heat-exchanger pumps, 5 water feeding one-way valves, 6 return pipes, 7 return water check valves,
It is 8 water inlet communicating pipes, 9 water inlet control valves, 10 elastomeric bladders, 11 water outlet communicating pipes, 12 connection control valves, 13 hot water control valves, 14 cold
Water control valve, 15 mixing tanks, 16 water outlets, 17 water reservoirs, 18 water storage control valves, 19 water storage check valves.
Specific embodiment
Following embodiment only exists in illustrative purpose, limits the scope of the invention without being intended to.
Embodiment
Referring to Fig.1, a kind of zero the cold shower equipment, including the hot-water line 1 and cold water pipe 2 being plugged in boiler 3, hot water
The connecting pin of pipe 1 and boiler 3 is equipped with water feeding one-way valve 5, is oriented to hot-water line 1 by boiler 3, is equipped with hot water inside boiler 3
4 are pumped, is connected to inside the water outlet of heat-exchanger pump 4 and hot-water line 1, hot-water line 1 is inserted with into water close to 3 one end side wall of boiler and is connected to
Pipe 8, the glued flexible capsule 10 in the one end being located at communicating pipe 8 in hot-water line 1 of intaking, water inlet 8 other end of communicating pipe are inserted in cold water
In pipe 2, cold water pipe 2 is connected to communicating pipe 8 by water inlet with elastomeric bladder 10, is equipped with water inlet control valve 9, elastomeric bladder in communicating pipe 8 of intaking
10 are inserted with water outlet communicating pipe 11 far from 3 one end side wall of boiler, are discharged one end penetration heat of the communicating pipe 11 far from elastomeric bladder 10
It is connected to inside water pipe 1 and cold water pipe 2, water outlet communicating pipe 11 is equipped with 2 junction of cold water pipe and is connected to control valve 12, and hot-water line 1 leans on
The side wall of 3 one end of near-thermal water tank passes through to be connected to inside return pipe 6 and boiler 3, and return water check valve 7 is equipped with inside return pipe 6, by
Hot-water line 1 is connected into return pipe 6, and hot-water line 1 is communicated with mixing tank 15, hot-water line 1 and mixing tank far from one end of boiler 3
15 junctions are equipped with hot water control valve 13, and cold water pipe 2 is plugged in mixing tank 15 far from one end of boiler 3, cold water pipe 2 and mixed
The junction of mould assembling 15 is equipped with cold water control valve 14, and the side wall of mixing tank 15 offers water outlet 16.
Water inlet control valve 9 synchronous need to be carried out with water storage control valve 18 and the opening-closing process of hot water control valve 13, and in hot water
When control valve 13 and water storage control valve 18 are closed, water inlet control valve 9 is opened, and is opened in hot water control valve 13 and water storage control valve
When, water inlet control valve 9 is closed, this three valve is controlled by same external control switch, and hot water is adjusted in hot water control valve 13
Flow, the 18 control opening and closings of water inlet control valve 9 and water storage control valve, connection control valve 12 and cold water control valve 14 are by same outside
Switch control is turned on or off simultaneously.
Water outlet communicating pipe 11 is connected to close to 1 one end outer wall of hot-water line and cold water pipe 2 by water reservoir 17, water reservoir 17 with out
The junction of water communicating pipe 11 is equipped with water storage control valve 18, and water reservoir 17 and the junction of cold water pipe 2 are equipped with water storage check valve 19,
Water flow can only be flowed in hot-water line 1 by water reservoir 17, when cold water control valve 14 is closed, since the hydraulic pressure in cold water pipe 2 is excessive,
So that water reservoir 17 can store a certain amount of water by deformation, without directly water is discharged into cold water pipe 2, to cold water control valve
After 14 open, hydraulic pressure in cold water pipe 2 is reduced, under the effect of elasticity, the cold water in water reservoir 17 will be delivered in cold water pipe 2 with
Supply cold water is used together.
Elastomeric bladder 10 is that elastic rubber material is made with water reservoir 17, can be with deformation occurs, and elastomeric bladder 10 passes through deformation
Hot water remaining in hot-water line 1 is squeezed and is recycled, water reservoir 17 stores a large amount of cold water by deformation, and under the effect of elasticity, will
The cold water of storage is delivered in cold water pipe 2, elastomeric bladder 10 be it is cone-shaped, pointed cone one end of elastomeric bladder 10 guarantees towards boiler 3
When elastomeric bladder 10 is by compression swelling, 6 direction of residual heat water container backwater pipe in hot-water line 1 can be squeezed, and defeated by return pipe 6
It send into boiler 3.
When needing to be taken a shower by shower bath water outlet, suitable warm water, opens heat-exchanger pump 4 for hot water in order to obtain
Hot water in case 3 is conveyed into hot-water line 1, and hot water control valve 13 and cold water control valve 14 are opened simultaneously, and it is big to adjust it
Small, the amount of cold water and hot water to output controls, and then realizes the mixing temperature that preference temperature is mixed into mixing tank 15
Water, then be discharged by water outlet 16, it takes a shower when for using;
At the end of shower, hot water control valve 13 and cold water control valve 14 are simultaneously closed off, close synchronously has connection to control
Valve 12 and water storage control valve 18 processed, and synchronous unlatching water inlet control valve 9, so that the cold water in cold water pipe 2 is under the action of water pressure, warp
Water inlet enters in elastomeric bladder 10 communicating pipe 8, after this cold water enters 10 inside of elastomeric bladder, will make bullet in the presence of hydraulic pressure
Property capsule 10 is gradually by compression swelling, due to the cone-shaped design of elastomeric bladder 10, so that remaining hot water will under extrusion in hot-water line 1
It is mobile towards tip direction, and then entered in boiler 3 under continuous squeeze through return pipe 6;It is realized with this to hot-water line 1
The recycling of middle residual hot water avoids hot water from largely remaining in after hot water control valve 13 closes cooling in hot-water line 1;In subsequent need
When exporting hot water, the hot water exported from boiler 3 only needs hot water can be realized minute quantity cold water extrusion remaining in 1
Supply, reduces and water resource is caused largely to waste, and accelerates the water speed out of hot water, meets user demand.
When only needing to use hot water, cold water control valve 14 can be closed, what is simultaneously closed off has connection 12 He of control valve
Water inlet control valve 9 opens hot water control valve 13, and synchronous unlatching has water storage control valve 18 and water inlet control valve 9, at this point, due to
When hot water control valve 13 closes, is blocked in elastomeric bladder 10 filled with a large amount of cold water, and by hot-water line 1, reopen heat-exchanger pump 4 and heat
After water control valve 13, the cold water in elastomeric bladder 10 enters under the high-pressure water heating effect that heat-exchanger pump 4 exports in water reservoir 17
It is stored, so that elastomeric bladder 10 is shunk, so that hot-water line 1 is able to conveying hot water into mixing tank 15, realizes hot water warp
The purpose of the discharge supply of water outlet 16.
Although hot-water line 1, cold water pipe 2, boiler 3, heat-exchanger pump 4, water feeding one-way valve 5, return water is used more herein
Pipe 6, return water check valve 7, water inlet communicating pipe 8, water inlet control valve 9, elastomeric bladder 10, water outlet communicating pipe 11, connection control valve 12, heat
Water control valve 13, cold water control valve 14, mixing tank 15, water outlet 16, water reservoir 17, water storage control valve 18, water storage check valve 19
Equal terms, but it does not exclude the possibility of using other terms.The use of these items is only for more easily describe to conciliate
Release essence of the invention;Being construed as any additional limitation is disagreed with spirit of that invention.