CN110485422A - Pile pulling device and its pile-pulling construction method - Google Patents

Pile pulling device and its pile-pulling construction method Download PDF

Info

Publication number
CN110485422A
CN110485422A CN201910812221.1A CN201910812221A CN110485422A CN 110485422 A CN110485422 A CN 110485422A CN 201910812221 A CN201910812221 A CN 201910812221A CN 110485422 A CN110485422 A CN 110485422A
Authority
CN
China
Prior art keywords
waste
pile
bushing type
stake
old stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910812221.1A
Other languages
Chinese (zh)
Other versions
CN110485422B (en
Inventor
尚贤菊
庄光明
尚俏佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Wanjian Construction Co ltd
Original Assignee
Ningbo Easily And Pile Foundation Engineering Technique Development Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Easily And Pile Foundation Engineering Technique Development Corp Ltd filed Critical Ningbo Easily And Pile Foundation Engineering Technique Development Corp Ltd
Priority to CN201910812221.1A priority Critical patent/CN110485422B/en
Publication of CN110485422A publication Critical patent/CN110485422A/en
Application granted granted Critical
Publication of CN110485422B publication Critical patent/CN110485422B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing

Abstract

The invention discloses a kind of pile pulling device and its pile-pulling construction methods, including the full-sleeve being connect with the power head of assembly power perforating piling machine, the bottom end of full-sleeve is fixed with bushing type pile extractor, bushing type pile extractor is equipped with multiple groups and is driven from oil cylinder and can constitute multiple dogs to waste and old stake bottom end axial direction pop-up or the waste and old stake of cutting to tube hub protrusion, dog inner surface has several carbide buttons, and oil cylinder is connect through solenoid valve and oil pipe with the oil pump and fuel tank being set on assembly power perforating piling machine;There are multiple high-pressure water nozzles in bushing type pile extractor bottom end, and high-pressure water nozzle is connect through solenoid valve and high-pressure water pipe with being set on assembly power perforating piling machine and be connected with the water pump at water source;The range sensor of elongation under detection piston rod is additionally provided on oil cylinder, Distance-sensing is electrically connected with the controller.Pillar is accurate to revealing all the details for waste and old stake, reliable, and construction noise is small, and waste and old stake, time saving and energy saving, short construction period, construction efficiency height are extracted or extracted after cutting off in disposable rotation.

Description

Pile pulling device and its pile-pulling construction method
Technical field
It is especially a kind of pile pulling device and its pile-pulling construction method the present invention relates to waste and old stake Removal Technology field.
Background technique
With the popularity of enlargement of cities improvement project and the rise of Construction of Urban Rail Traffic, last century such as eight, nine The cleaning for the waste and old stake that the ten's building is left after being disassembled, which has become new skyscraper and urban track traffic, to be faced The technical issues of.Generally face two kinds of situations: first is that waste and old stake is no more than 30 meters, disposable extraction.Although another is useless Old stake is very long such as 60 meters, but meets the needs of urban rail transit construction, as long as pulling out 30 meters or more of part.It generally adopts at present Method is using hammering, rotary digging or twists off the destructive means such as old pile foundation, destroys after waste and old pile body to clear up again and leaves hole, takes When it is laborious, long construction period, construction efficiency is low, construction noise is big;Or isostructural fixture is controlled using spring using full-sleeve, It is clamped on the outer diameter of waste and old stake, then pulls up after going deep into certain depth, but its clamping degree is difficult to control in practical operation, The waste and old stake of pinch off has been not achieved the purpose of whole waste and old stake or not clamping and can not extract waste and old stake;Or utilize a full set Pipe sets multiple groups cutting assembly in full-sleeve, gos deep into after certain depth first being cut waste and old stake with cutting assembly, then by the steel of crane Cord, which is manually fixed in section stake, hangs out ground for waste and old stake, and this method tool wear is big, and process is more, and worker operation is tired Difficulty, construction efficiency is low, and construction speed is slow.According to the applicant understood, comparatively ideal waste and old stake pile pulling device and method be there is no at present.
Summary of the invention
The invention solves a technical problem be to provide it is a kind of can disposably pull out one whole waste and old stake pile pulling dress It sets.
A kind of technical solution of the invention is to provide a kind of pile pulling device, including with assembly power perforating piling machine The full-sleeve of power head connection, the bottom end of the full-sleeve are fixed with bushing type pile extractor, bushing type pile extractor be equipped with by Oil cylinder drives and can constitute to tube hub protrusion multiple dogs to waste and old stake bottom end axial direction pop-up, and the oil cylinder is through electromagnetism Valve and the oil pipe in pile extractor casing and full-sleeve are connect with the oil pump and fuel tank being set on assembly power perforating piling machine;Institute The bushing type pile extractor bottom end stated is equipped at least one high-pressure water nozzle, and the high-pressure water nozzle is through solenoid valve and set on pulling out High-pressure water pipe in stake device casing and full-sleeve on the assembly power perforating piling machine and the water pump that is connect with water source;Described Be additionally provided on oil cylinder detection piston rod under elongation range sensor, the range sensor pass through be set to pile extractor casing and Conducting wire in full-sleeve is electrically connected with the controller of assembly power perforating piling machine.
After using the above structure, pile pulling device of the present invention has the advantage that the pile pulling set and overcome the above prior art The shortcomings that device, bushing type pile extractor rotates in sinking watching to be rinsed using high pressure water, to after predetermined depth, then will be more with oil cylinder A pillar carries out axial pop-up to waste and old stake and is commonly called as revealing all the details or backing, if controller such as MCU is detected according to range sensor Data determine when not revealing all the details, sink again until revealing all the details, and pillar is accurate to the backing of waste and old stake, reliable, and construction noise is small, can one Waste and old stake is extracted in secondary property rotation, and time saving and energy saving, short construction period, construction efficiency is high, is enlargement of cities improvement project and city rail Pulling out for waste and old stake provides a kind of ideal pile pulling device in road transport development.
Further, the dog is four arranged along bushing type pile extractor even circumferential.After using the above structure, Backing device its mechanical property that four dogs are constituted is more preferable, more solid and reliable to waste and old stake backing.
Further, the inner surface of the dog is equipped with several when dog is raised to tube hub and is driven by power head The carbide button of waste and old stake can be cut off when rotation, the waste and old stake bottom end includes the bottom end of the waste and old stake broken pile after being cut off.It adopts After the above structure, only need to pull out the feelings of such as 30 meters or more of one section of waste and old stake of the old stake part of expense in traffic track engineering Under condition, waste and old stake is cut off using the pile pulling device and extracts 30 meters or more of the waste and old stake part, tool wear is small, process Few, worker operation is simple, and construction efficiency is high, and construction speed is fast.
Further, the upper end warp beam of each oil cylinder is hinged on the upper end of the inside and outside tube wall of bushing type pile extractor, each oil The lower end of the piston rod of cylinder and the upper end of the first articulated jib are hinged, and the upper end of the lower end of the first articulated jib and the second articulated jib is cut with scissors It connects, the lower end warp beam of the second articulated jib is hinged on the lower end of the inside and outside tube wall of bushing type pile extractor;The inner tube of bushing type pile extractor Wall is retracted equipped with multiple for the first articulated jib and the second articulated jib to tube hub protrusion with return with axial pop-up or to tube wall Notch;If the inner surface of first articulated jib and the second articulated jib is equipped with a carbide button;Multiple oil cylinders are through respective Piston rod drives respective first articulated jib and the second articulated jib to tube hub protrusion, to constitute to waste and old stake bottom end or waste and old The bottom end axial direction pop-up of stake broken pile and symmetrical multiple dogs.After the dog of oil cylinder driving uses the above specific structure, structure Simpler, operation is more flexible, and tool wear is small when needing to cut off, and cutting is quickly thorough, also more steady to waste and old stake axial direction pop-up Gu reliable.
Further, two articulated jibs are respectively positioned on bushing type pile extractor after first articulated jib and the second articulated jib return Inside and outside tube wall between space in.After using the above structure, the rotation of bushing type pile extractor is sunk i.e. not backing and when not cutting off When avoid the interference to waste and old stake, it is also more convenient when keeping bushing type pile extractor decline process more smooth, and unloading.
Further, the range sensor is multiple, there is one on each oil cylinder, is mounted on the outer bottom end of each oil cylinder On face, the distance change of the bottom face of detecting distance sensor to the first articulated jib top surface.After using the above structure, testing result More comprehensively more acurrate, the installation and replacement of range sensor are more convenient.
Further, the high-pressure water nozzle is multiple, each high pressure arranged along bushing type pile extractor even circumferential The spout of sprinkler head is outside.After using the above structure, the effect of impacting with high pressure soil sandstone is more preferable.
The invention solves another technical problem be to provide a kind of pile pulling that can disposably pull out one whole waste and old stake Construction method.
Another technical solution of the invention is to provide a kind of using the progress of pile pulling device described in any of the above one The method of pile pulling construction, comprising the following steps:
1., the bushing type pile extractor of full-sleeve lower end is linked in outside the waste and old stake that need to be pulled out;
2., starting assembly power perforating piling machine, controller steering maneuver head make bushing type pile extractor rotation sink and simultaneously It opens high-pressure water nozzle and washes the soil sandstone around waste and old stake open;
3., the height of estimated multiple dogs start multiple oil cylinders driving pistons when being lower than the bottom end that need to pull out waste and old stake Bar drives multiple dogs to tube hub protrusion, meanwhile, controller according to the signal that range sensor is passed back judge multiple dogs to Tube hub protrusion whether in place,
If judge multiple dogs to tube hub protrusion not in place, controller manipulate multiple oil cylinders driving piston rods drive it is multiple Dog is retracted in the space between the inside and outside tube wall of bushing type pile extractor, and steering maneuver head makes bushing type pile extractor to controller again Continue rotation to sink and keep washing soil sandstone around waste and old stake open with high-pressure water nozzle, repeat above operation until apart from biography The signal that sensor is passed back shows multiple dogs to tube hub protrusion in place;
If judge multiple dogs to tube hub protrusion in place if the rotation pile pulling of controller steering maneuver head, until the waste and old stake Entirety hangs out ground;Or
When if desired cutting off waste and old stake, after above the 2. step, by multiple dogs sink to it is predetermined cut a position, start Multiple oil cylinder driving piston rods drive multiple dogs to tube hub protrusion, power head while rotary cutting, and controller is according to distance The signal that sensor is passed back judges whether in place whether i.e. waste and old stake is cut off multiple dogs to tube hub protrusion,
If judging, multiple dogs do not judge that waste and old stake is not switched off to tube hub protrusion in place, and controller manipulates multiple oil Cylinder driving piston rod drives multiple dogs to continue to tube hub protrusion, power head while rotary cutting, until judging multiple dogs In place to tube hub protrusion,
If judge multiple dogs to tube hub protrusion in place if the rotation pile pulling of controller steering maneuver head, until this is linked in Waste and old stake in full-sleeve and bushing type pile extractor integrally hangs out ground.
After above step, pile-pulling construction method of the present invention has the advantage that the present invention overcomes above existing There is the shortcomings that pile extracting method of technology, bushing type pile extractor rotates in sinking watching to be rinsed using high pressure water, to after predetermined depth, Multiple pillars are carried out axial pop-up to waste and old stake with oil cylinder again to be commonly called as revealing all the details or backing, if controller such as MCU is according to distance When the determination of sensor detection data is not revealed all the details, sink again until revealing all the details.Pillar is accurate to the backing of waste and old stake, reliable, construction Noise is small, can disposably rotate and extract waste and old stake, time saving and energy saving, short construction period, and construction efficiency is high.In traffic track engineering In the case where needing to pull out one section of waste and old stake such as 30 meters or more of old stake part of expense, waste and old stake is cut off using the pile extracting method And extract 30 meters or more of the waste and old stake part, tool wear is small, and process is few, and worker operation is simple, and construction efficiency is high, construct into Degree is fast.It provides a kind of ideal pile pulling for pulling out for waste and old stake in enlargement of cities improvement project and Construction of Urban Rail Traffic and applies Work method.
Further, pile-pulling construction method of the present invention is further comprising the steps of: 4., by full-sleeve and bushing type pile extractor turning To unloading at stake, controller manipulates the inside and outside tube wall that multiple oil cylinder driving piston rods drive multiple dogs to be retracted to bushing type pile extractor Between space in, the waste and old stake being linked in full-sleeve and bushing type pile extractor is fallen under self gravity at this time unloads stake Place.After above step, the waste and old stake for hanging out ground can be under lock and key or be transported using large car, unload a fast power-saving, Keep the removing of waste and old stake more thorough, construction efficiency is higher.
Detailed description of the invention
Fig. 1 is structural schematic diagram when pile pulling device of the present invention is connected on assembly power hole-forming device.
Fig. 2 is the structural schematic diagram (showing oil pipe water pipe and conducting wire) when the pile extractor pillar in the present invention retracts.
Fig. 3 is the vertical profile structural schematic diagram of the pile extractor in Fig. 2.
Fig. 4 be the pillar of the pile extractor in the present invention to tube hub protrusion when structural schematic diagram (show high pressure water jets Head).
Fig. 5 is the pile extractor vertical profile structural schematic diagram in Fig. 4.
As shown in the figure 1, bushing type pile extractor, 2, power head, 3, sliding rail, 4, full-sleeve, 5, mainmast, 6, chassis, 7, oil Cylinder, 8, high-pressure water pipe, 9, conducting wire, 10, oil pipe, 11, axis, 12, range sensor, the 13, first articulated jib, the 14, second articulated jib, 15, dog, 16, piston rod, 17, high-pressure water nozzle, 18, notch, 19, carbide button.
Specific embodiment
Specific embodiments of the present invention will be further explained with reference to the accompanying drawing.Herein it is to be understood that, for The explanation of these specific embodiments is used to help understand the present invention, but and does not constitute a limitation of the invention.In addition, following institute Technical characteristic involved in each specific embodiment of the invention of description is as long as they do not conflict with each other It is combined with each other.
As shown in figure 1, figure 2, figure 3, figure 4 and figure 5
Pile pulling device of the present invention, the full-sleeve 4 being connect including the power head 2 with assembly power perforating piling machine.The company It connects and flanged joint or the connection type using prior arts such as quick coupling connections can be used.The assembly power drilling pile Machine, such as the hydraulic walking stake machine of the prior art, generally comprise chassis 6, mainmast 5, sliding rail 3, by hoist engine and traction rope band It is dynamic and can be in the power head 2 that sliding rail 3 slides up and down.Combined type power perforating piling machine, also referred to as rotary pile-digging machine, are alternatively referred to as herein Rotary piling machine or rotary pile-drawing machine.
The bottom end of the full-sleeve 4 is fixed with bushing type pile extractor 1.The fixation can be welding, flanged joint Or the fixed form of the prior arts such as quick coupling connection.Bushing type pile extractor 1 be equipped with it is multiple from oil cylinder 7 driving and can be to pipe Central protuberance is to constitute axial pop-up or following multiple dogs 1 as disconnecting device to waste and old stake bottom end, the oil Oil pipe 10 of the cylinder 7 through solenoid valve and in pile extractor casing and full-sleeve 4 and the oil pump being set on assembly power perforating piling machine And fuel tank connection.The dog 15 is preferably four arranged along 1 even circumferential of bushing type pile extractor, certainly, three, five It is a, six, seven, eight it is good.The axial pop-up is alternatively referred to as revealed all the details to waste and old stake bottom end or backing, can also claim For axial limiting.
The range sensor 12 of the lower elongation of detection piston rod 16 is additionally provided on the oil cylinder 7.The Distance-sensing Conducting wire 9 of the device 12 through being set in pile extractor casing and full-sleeve 4 is electrically connected with the controller of assembly power perforating piling machine.According to normal Know it is found that an oil cylinder is usually two oil pipes.Since for example preferred four oil cylinders of multiple oil cylinders are synchronization action, can also only exist Mounting distance sensor on one of oil cylinder.Certainly, the preferably several range sensors 12 of the present invention are set on each oil cylinder One range sensor 12, reliability is stronger, and testing result is more comprehensively more acurrate.The range sensor 12 is preferred Be mounted on the outer bottom face of each oil cylinder 7, the bottom face of detecting distance sensor 12 to following 13 top surfaces of the first hinge arm away from From variation.Certainly the range sensor 12 is also mountable on the interior headboard of each oil cylinder 7, detecting distance sensor 12 For bottom face to the distance change of oil cylinder piston, range sensor 12 is mounted on the inside of oil cylinder 7, influenced by muddy water etc. it is relatively small, But installation and replacement trouble.
The upper end warp beam 11 of each oil cylinder 7 is hinged on the upper end of the inside and outside tube wall of bushing type pile extractor 1, each oil cylinder 7 The lower end of piston rod 16 and the upper end of the first articulated jib 13 are hinged, the upper end of the lower end of the first articulated jib 13 and the second articulated jib 14 Hingedly, the lower end warp beam 11 of the second articulated jib 14 is hinged on the lower end of the inside and outside tube wall of bushing type pile extractor 1.It is described above each Oil cylinder 7 and the first articulated jib 13, the second articulated jib 14 it is hinged, can be structure in detail below: the upper end of each oil cylinder 7 and axis The upper of the inner tubal wall and outer tube wall for being such as riveted on bushing type pile extractor 1 is fixed at 11 middle part rotation connection, the both ends of axis 11 respectively End.The rotation connection of the middle part of the through-hole of the axle sleeve of the lower end of the piston rod 16 of each oil cylinder 7 and an axis 11, the both ends point of the axis 11 It is unfixed as riveted with the respective through-hole of the upper end of two piece of first articulated jib 13.The lower end of two piece of first articulated jib 13 it is respective The both ends of through-hole and an axis 11 are fixed as riveted, and the upper end of the middle part of the axis 11 and the second articulated jib 14 is rotatablely connected.Second hinge The middle part of the lower end and an axis 11 that connect arm 14 is rotatablely connected, and fixation is such as riveted on bushing type pile extractor 1 respectively at the both ends of the axis 11 Inner tubal wall and outer tube wall lower end.
The inner tubal wall of bushing type pile extractor 1 is equipped with multiple convex to tube hub for the first articulated jib 13 and the second articulated jib 14 It rises with axial pop-up or retracts to tube wall with the notch 18 of return.In other words, the inner tubal wall of bushing type pile extractor 1 is equipped with It is multiple such as four notches, for respective first articulated jib 13 and the second articulated jib 14 to tube hub protrusion with axial pop-up i.e. to useless It old stake axial limiting or reveals all the details or backing or the waste and old tubular pole of cutting or retract to tube wall is used with return.Certainly, the notch 18 The bottom end of the inner tubal wall of bushing type pile extractor 1 can also be penetrated through, notch can also be set on the outer tube wall of bushing type pile extractor 1, the notch The bottom end of the outer tube wall of tubular type pile extractor 1 can also be penetrated through.Two hinge after 14 return of first articulated jib 13 and the second articulated jib It connects in the space that arm is respectively positioned between the inside and outside tube wall of bushing type pile extractor 1.In other words, the whole of two articulated jibs wrap after return Include following carbide buttons 19 be respectively positioned on 1 inner tube of bushing type pile extractor inner wall plumb line close to the side of outer tube wall.At this point, living The vertical middle line of the axis of stopper rod 16 and the first articulated jib 13 and the second articulated jib 14 certainly, does not have generally on same plumb line Having also is allowed on same plumb line, but two articulated jibs are respectively positioned between the inside and outside tube wall of bushing type pile extractor 1 after return Space in plumb line i.e. positioned at the inner wall of 1 inner tube of bushing type pile extractor close to the side of outer tube wall, in order to avoid interference bushing type Pile extractor 1 is moved up and down along waste and old stake.First articulated jib 13 is alternatively referred to as the first hinge arm, the second articulated jib 14 alternatively referred to as the Two hinge arms.
The inner surface of the dog 15 is equipped with several when dog 15 is to tube hub protrusion and by the driving rotation of power head 2 When can cut off the carbide button 19 of waste and old stake, that is, if the inner surface of first articulated jib 13 and the second articulated jib 14 be equipped with it is a Carbide button 19, it can be appreciated that inner surface described here refers to this one side close to tube hub.The carbide button 19 can be managed Solution is pick, can be square cone, is also possible to cone.The waste and old stake bottom end includes the waste and old stake after being cut off The bottom end of broken pile.Multiple oil cylinders 7 drive respective first articulated jib 13 and the second articulated jib 14 to pipe through respective piston rod 16 Central protuberance, to constitute the bottom end axial direction pop-up to waste and old stake bottom end or waste and old stake broken pile and symmetrical multiple dogs 15.
1 bottom end of bushing type pile extractor is equipped at least one high-pressure water nozzle 17, the high-pressure water nozzle 17 High-pressure water pipe 8 through solenoid valve and in pile extractor casing and full-sleeve 4 be set on assembly power perforating piling machine and and water Source connects water pump.The water source such as water tank on setting assembly power perforating piling machine, or it is located at the pond on ground.It is not difficult to manage Solution, commonly referred to as water inner pipe water pressure are greater than 4 kilograms every square centimeter and are known as high pressure water.The high-pressure water nozzle 17 can be for along casing Multiple 4 as illustrated in the drawing of 1 even circumferential of formula pile extractor arrangement, the spout of preferably each high-pressure water nozzle 17 is outside.When So, only illustrate in figure, high-pressure water nozzle 17 can also be any number in 5~16, figure mesohigh sprinkler head 17 it is straight Diameter and shape are also only illustrated, and can also be major diameter and other shapes.
The method that pile pulling construction is carried out using above-described pile pulling device, comprising the following steps:
1., the bushing type pile extractor 1 of 4 lower end of full-sleeve is linked in outside the waste and old stake that need to be pulled out.
2., starting assembly power perforating piling machine, controller steering maneuver head 2 make bushing type pile extractor 1 rotation sink and it is same Shi Kaiqi high-pressure water nozzle 17 washes the soil sandstone around waste and old stake open.
3., the height of estimated multiple dogs 15 such as have dropped to 30 meters when being lower than the bottom end that need to pull out waste and old stake, start simultaneously Multiple oil cylinders 7 drive piston rod 16 to drive multiple dogs 15 to tube hub protrusion, while controller is passed according to range sensor 12 In place whether the signal returned judge multiple dogs 15 to tube hub protrusion.
If judge multiple dogs 15 to tube hub protrusion not in place, controller manipulates multiple oil cylinders 7 and drives 16 bands of piston rod It moves multiple dogs 15 to be retracted in the space in the tube wall of bushing type pile extractor 1 between i.e. inside and outside tube wall, controller manipulates dynamic again Power head 2 makes bushing type pile extractor 1 continue rotation sinking and keeps washing the soil sandstone around waste and old stake open with high-pressure water nozzle 17; It repeats above operation until the signal that range sensor is passed back shows multiple dogs 15 to tube hub protrusion in place.
If judge multiple dogs 15 to tube hub protrusion in place if controller steering maneuver head 2 rotate pile pulling, until the set The waste and old stake closed in full-sleeve 4 and bushing type pile extractor 1 integrally hangs out ground.High-pressure water nozzle 17 can still be opened when pile pulling, It can also close.Or
When if desired cutting off waste and old stake, after above the 2. step, by multiple dogs 15 sink to it is predetermined cut a position, open Moving multiple oil cylinders 7 drives piston rod 16 to drive multiple dogs 15 to tube hub protrusion, power head while rotary cutting, controller root Judge whether in place whether i.e. waste and old stake is cut off multiple dogs 15 to tube hub protrusion according to the signal that range sensor 12 is passed back.
If judging, multiple dogs 15 do not judge that waste and old stake is not switched off to tube hub protrusion in place, and controller manipulation is multiple Oil cylinder 7 drives piston rod 16 that multiple dogs 15 is driven to continue to tube hub protrusion, power head while rotary cutting, until judging more A dog 15 to tube hub protrusion in place, that is, until the signal via controller passed back of range sensor 12 judges multiple dogs 15 In place to tube hub protrusion.
If judge multiple dogs 15 to tube hub protrusion in place if controller steering maneuver head 2 rotate pile pulling, until the set It closes and integrally hangs out ground in the waste and old stake that the waste and old stake in full-sleeve 4 and bushing type pile extractor 1 is the upper section after cutting off.
4., full-sleeve 4 and bushing type pile extractor 1 gone to and is unloaded as on trailer bus at stake, controller manipulates multiple oil cylinders 7 Driving piston rod 16 drives multiple dogs 15 to be retracted in the space between the inside and outside tube wall of bushing type pile extractor 1, at this time the set It closes to fall under self gravity in the waste and old stake in full-sleeve 4 and bushing type pile extractor 1 and unload at stake as dragged on trailer bus From building site.
Certainly, 5. pile-pulling construction method of the present invention may also include step, leave backfill in hole in the waste and old stake of extraction.
The foregoing is merely the preferred embodiment of the present invention, are not intended to restrict the invention, for the technology of this field For personnel, the invention may be variously modified and varied.It is all within spirit of that invention and principle, it is made it is any modification, Equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (9)

1. a kind of pile pulling device, including the full-sleeve (4) that the power head (2) with assembly power perforating piling machine is connect, feature exists In: the bottom end of the full-sleeve (4) is fixed with bushing type pile extractor (1), and bushing type pile extractor (1) is equipped with by oil cylinder (7) Multiple dogs (1) to waste and old stake bottom end axial direction pop-up are driven and can constitute to tube hub protrusion, the oil cylinder (7) is through electricity Magnet valve and the oil pump and oil for being set to the oil pipe (10) in pile extractor casing and full-sleeve (4) and being set on assembly power perforating piling machine Case connection;Described bushing type pile extractor (1) bottom end is equipped at least one high-pressure water nozzle (17), the high-pressure water nozzle (17) through solenoid valve and the high-pressure water pipe (8) being set in pile extractor casing and full-sleeve (4) and set on assembly power perforating piling machine Go up and be connected with the water pump connection at water source;The Distance-sensing of elongation under detection piston rod (16) is additionally provided on the oil cylinder (7) Device (12), the range sensor (12) through be set to pile extractor casing and full-sleeve (4) in conducting wire (9) and assembly power at The controller electrical connection of hole stake machine.
2. pile pulling device according to claim 1, it is characterised in that: dog (15) quantity is along bushing type pile pulling Four of device (1) even circumferential arrangement.
3. pile pulling device according to claim 1, it is characterised in that: the inner surface of the dog (15) is equipped with several The carbide button (19) of waste and old stake can be cut off when dog (15) is to tube hub protrusion and is driven and is rotated by power head (2), it is described Waste and old stake bottom end includes the bottom end of the waste and old stake broken pile after being cut off.
4. pile pulling device according to claim 1 or 3, it is characterised in that: the upper end warp beam (11) of each oil cylinder (7) is hinged In the upper end of the inside and outside tube wall of bushing type pile extractor (1), the lower end of the piston rod (16) of each oil cylinder (7) and the first articulated jib (13) upper end is hinged, and the lower end of the first articulated jib (13) and the upper end of the second articulated jib (14) are hinged, the second articulated jib (14) Lower end warp beam (11) be hinged on bushing type pile extractor (1) inside and outside tube wall lower end;On the inner tubal wall of bushing type pile extractor (1) Equipped with it is multiple for the first articulated jib (13) and the second articulated jib (14) to tube hub protrusion with axial pop-up or to tube wall retraction with The notch (18) of return;The inner surface of first articulated jib (13) and the second articulated jib (14) is equipped with several carbide buttons (19);Multiple oil cylinders (7) through respective piston rod (16) drive respective first articulated jib (13) and the second articulated jib (14) to Tube hub protrusion, to constitute the bottom end axial direction pop-up to waste and old stake bottom end or waste and old stake broken pile and symmetrical multiple dogs (15)。
5. pile pulling device according to claim 4, it is characterised in that: first articulated jib (13) and the second articulated jib (14) two articulated jibs are respectively positioned in the space between the inside and outside tube wall of bushing type pile extractor (1) after return.
6. pile pulling device according to claim 4, it is characterised in that: the range sensor (12) be it is multiple, each Oil cylinder has one on (7), is mounted on each oil cylinder (7) outer bottom face, the bottom face of detecting distance sensor (12) to first The distance change of articulated jib (13) top surface.
7. pile pulling device according to claim 1, it is characterised in that: the high-pressure water nozzle (17) is to pull out along bushing type Stake device (1) even circumferential arrangement it is multiple, the spout of each high-pressure water nozzle (17) is outside.
8. a kind of using pile pulling device pile-pulling construction method described in any one of claim 1~7, which is characterized in that packet Include following steps:
1., the bushing type pile extractor (1) of full-sleeve (4) lower end is linked in outside the waste and old stake that need to be pulled out;
2., starting assembly power perforating piling machine, controller steering maneuver head (2) make bushing type pile extractor (1) rotation sink and it is same Shi Kaiqi high-pressure water nozzle (17) washes the soil sandstone around waste and old stake open;
3., the height of estimated multiple dogs (15) starts multiple oil cylinders (7) driving and lives when being lower than the bottom end that need to pull out waste and old stake Stopper rod (16) drives multiple dogs (15) to tube hub protrusion, meanwhile, the signal that controller is passed back according to range sensor (12) Judge multiple dogs (15) to tube hub protrusion whether in place,
If judge multiple dogs (15) to tube hub protrusion not in place, controller manipulates multiple oil cylinders (7) drivings piston rod (16) Multiple dogs (15) are driven to be retracted in the space between the inside and outside tube wall of bushing type pile extractor (1), controller steering maneuver again Head (2) makes bushing type pile extractor (1) continue rotation to sink and keep washing soil sandstone around stake open with high-pressure water nozzle (17), It repeats above operation until the signal that range sensor (12) are passed back shows multiple dogs (15) to tube hub protrusion in place;
If judge multiple dogs (15) to tube hub protrusion in place if controller steering maneuver head (2) rotation pile pulling, until the set The waste and old stake closed in full-sleeve (4) and bushing type pile extractor (1) integrally hangs out ground;Or
When if desired cutting off waste and old stake, after above the 2. step, by multiple dogs (15) sink to it is predetermined cut a position, start Multiple oil cylinder (7) drivings piston rod (16) drive multiple dogs (15) to tube hub protrusion, power head while rotary cutting, control Device judges whether in place i.e. waste and old stake is multiple dogs (15) to tube hub protrusion according to the signal that range sensor (12) is passed back It is no to be cut off,
If judging, multiple dogs (15) do not judge that waste and old stake is not switched off to tube hub protrusion in place, and controller manipulates multiple oil Cylinder (7) driving piston rod (16) drives multiple dogs (15) to continue to tube hub protrusion, power head while rotary cutting, until sentencing Break multiple dogs (15) to tube hub protrusion in place,
If judge multiple dogs (15) to tube hub protrusion in place if controller steering maneuver head (2) rotation pile pulling, until the set The waste and old stake closed in full-sleeve (4) and bushing type pile extractor (1) integrally hangs out ground.
9. pile-pulling construction method according to claim 8, which is characterized in that further comprising the steps of:
4., full-sleeve (4) and bushing type pile extractor (1) gone to and unloaded at stake, controller manipulates multiple oil cylinders (7) and drives piston rods (16) multiple dogs (15) are driven to be retracted in the space between the inside and outside tube wall of bushing type pile extractor (1), this is linked at this time Waste and old stake in full-sleeve (4) and bushing type pile extractor (1) is fallen under self gravity unloads at stake.
CN201910812221.1A 2019-08-30 2019-08-30 Pile pulling construction method of pile pulling device Active CN110485422B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910812221.1A CN110485422B (en) 2019-08-30 2019-08-30 Pile pulling construction method of pile pulling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910812221.1A CN110485422B (en) 2019-08-30 2019-08-30 Pile pulling construction method of pile pulling device

Publications (2)

Publication Number Publication Date
CN110485422A true CN110485422A (en) 2019-11-22
CN110485422B CN110485422B (en) 2021-04-13

Family

ID=68555375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910812221.1A Active CN110485422B (en) 2019-08-30 2019-08-30 Pile pulling construction method of pile pulling device

Country Status (1)

Country Link
CN (1) CN110485422B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649083A (en) * 2016-03-18 2016-06-08 宁波鸿晨建设有限公司 All-casing one-time rotary cutting type pile removing device and pile removing method thereof
CN105970962A (en) * 2016-06-28 2016-09-28 宁波鸿晨建设有限公司 Double full casing pipe one-time rotary-cutting pile removing device and pile removing method thereof
CN108517865A (en) * 2018-06-14 2018-09-11 宁波市政工程建设集团股份有限公司 The clear stake device of casing balanced type and its clear piling method
JP2018199928A (en) * 2017-05-26 2018-12-20 株式会社徳永組 Chucking mechanism of pile puller and pile pulling method
CN210507443U (en) * 2019-08-30 2020-05-12 宁波易和桩基工程技术开发有限公司 Pile pulling device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649083A (en) * 2016-03-18 2016-06-08 宁波鸿晨建设有限公司 All-casing one-time rotary cutting type pile removing device and pile removing method thereof
CN105970962A (en) * 2016-06-28 2016-09-28 宁波鸿晨建设有限公司 Double full casing pipe one-time rotary-cutting pile removing device and pile removing method thereof
JP2018199928A (en) * 2017-05-26 2018-12-20 株式会社徳永組 Chucking mechanism of pile puller and pile pulling method
CN108517865A (en) * 2018-06-14 2018-09-11 宁波市政工程建设集团股份有限公司 The clear stake device of casing balanced type and its clear piling method
CN210507443U (en) * 2019-08-30 2020-05-12 宁波易和桩基工程技术开发有限公司 Pile pulling device

Also Published As

Publication number Publication date
CN110485422B (en) 2021-04-13

Similar Documents

Publication Publication Date Title
CN104763328B (en) A kind of hydraulic pressure reaming circulation drilling machine and its reaming pile constructing process
CN101358452B (en) Construction method and construction equipment of total rotary rapid cutting barrier clearance and pile extracting
CN105649083B (en) The clear stake device of the disposable rotary-cutting type of full-sleeve and its clear piling method
WO2013152457A1 (en) Sidewall coring while drilling tool
CN109973040A (en) Rotary digging drill bit fishing device and construction method
WO2009049470A1 (en) A bored pile drilling machine
CN109025876A (en) A kind of rope salvaging type fluid power pressure core drill
CN104712292A (en) Ultrasonic blockage removal technology and blockage removal device
CN208934628U (en) A kind of rope salvaging type pitching, which builds the pressure, forces core drill
CN205387708U (en) Clear stake device of disposable rotary -cut formula of a complete set of pipe
CN106013150B (en) A kind of pile press machine
CN201610591U (en) Combined dredging car for water draining pipeline
CN110485422A (en) Pile pulling device and its pile-pulling construction method
CN210507443U (en) Pile pulling device
CN105970962A (en) Double full casing pipe one-time rotary-cutting pile removing device and pile removing method thereof
CN102605768A (en) Bore cleaning device for cast-in-place bored piles
CN204627406U (en) A kind of hydraulic pressure reaming circulation drilling machine
CN112095607B (en) Device and method for quickly removing pile core soil of precast tubular pile
CN108756744A (en) Underbalance air reverse circulation drilling equipment in a kind of shield type casing
CN108952568B (en) Drilling machine
CN206428738U (en) Rig on excavator with quartering hammer
JP2001323767A (en) Pit excavator
CN201071509Y (en) Full-slewing fast-cutting barrier clearing and pile pulling device
CN206815303U (en) Observation of groundwater levels bores into well
CN212506465U (en) Hydraulic grab bucket device for taking soil in full sleeve cast-in-place pile sleeve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 315000 22-1, building 6, hemeicheng Plaza, No. 666, yangmuqi Road, high tech Zone, Ningbo City, Zhejiang Province

Applicant after: Zhejiang Yihe Geotechnical Engineering Co.,Ltd.

Address before: 315000 22-1, building 6, hemeicheng Plaza, No. 666, yangmuqi Road, high tech Zone, Ningbo City, Zhejiang Province

Applicant before: NINGBO YIHE PILE ENGINEERING TECHNOLOGY DEVELOPMENT Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220622

Address after: 315000 5-3, building 7, No. 199, Xiangyun North Road, high tech Zone, Ningbo, Zhejiang

Patentee after: Zhejiang wanjian Construction Co.,Ltd.

Address before: 22-1, building 6, hemeicheng Plaza, 666 yangmuqi Road, high tech Zone, Ningbo City, Zhejiang Province, 315000

Patentee before: Zhejiang Yihe Geotechnical Engineering Co.,Ltd.