CN110482334A CN201910776193.2A CN201910776193A CN110482334A CN 110482334 A CN110482334 A CN 110482334A CN 201910776193 A CN201910776193 A CN 201910776193A CN 110482334 A CN110482334 A CN 110482334A
Authority
CN
China
Prior art keywords
paying
substrate
disk body
carrier bars
chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910776193.2A
Other languages
Chinese (zh)
Inventor
李双宝
李博
李想
管延宝
陈南
赵娜
李思研
于欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910776193.2A priority Critical patent/CN110482334A/en
Publication of CN110482334A publication Critical patent/CN110482334A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H75/00Storing webs, tapes, or filamentary material, e.g. on reels
    • B65H75/02Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
    • B65H75/34Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables
    • B65H75/38Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material
    • B65H75/40Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material mobile or transportable
    • B65H75/42Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material mobile or transportable attached to, or forming part of, mobile tools, machines or vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H75/00Storing webs, tapes, or filamentary material, e.g. on reels
    • B65H75/02Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
    • B65H75/34Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables
    • B65H75/38Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material
    • B65H75/44Constructional details
    • B65H75/4473Constructional details without arrangements or adaptations for rotating the core or former
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/34Handled filamentary material electric cords or electric power cables

Abstract

The invention discloses a kind of paying-off implements, it includes chassis, chassis upper center is equipped with bobbin loader, several drums are rotationally equipped with by rotation axis side by side on bobbin loader, drum includes two disk bodies and an internal diameter fixing piece, three slotted holes are circumferentially evenly equipped on disk body end face, internal diameter fixing piece includes substrate and three cable carrier bars being laterally arranged, substrate and two disk body coaxial packages are on the rotating shaft, three cable carrier bars are detachably connected by connecting plate and substrate, and three cable carrier bars are circumferentially uniformly arranged in the periphery of substrate, three cable carrier bars three slotted holes on disk body and are locked in corresponding two disk bodies correspondingly by bolt;Chassis upper end side is equipped with line-outgoing arm, and line-outgoing arm top is equipped with several line outlet rings passed through for cable, and several line outlet rings are arranged in a one-to-one correspondence with several drums.The present invention improves work efficiency, and reduces labor intensity, saves the working time.

Description

Paying-off implement
Technical field
The present invention relates to power transmission and distribution to overhaul field, especially a kind of paying-off implement.
Background technique
When needing to shorten line laying work in work, to accomplish that relevant device installation, debugging carry out on schedule, to ensure entire project Construction speed is completed on schedule.High speed payout there is no preferable solution, teams and groups' acquisition terminal and metering device installment work, be related to Line laying work.When operation, the coil of wire is put on the ground, Dragging Line cable end is carried out by root unwrapping wire.Unwrapping wire quantity is more, easy generation knotting, Winding, the processing used time is longer, seriously affects entire project progress.
Summary of the invention
A kind of high-efficient paying-off implement is provided it is an object of the invention to solve above-mentioned technical problem.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme:
A kind of paying-off implement, including chassis, the chassis upper center are equipped with bobbin loader, pass through rotation on the bobbin loader Axis is rotationally equipped with several drums side by side, and the drum includes two disk bodies and an internal diameter fixing piece, the disk body end face Upper circumferential direction is evenly equipped with three slotted holes, and the internal diameter fixing piece includes substrate and three cable carrier bars being laterally arranged, described On the rotating shaft, three cable carrier bars are removably connected by connecting plate with substrate for substrate and two disk body coaxial packages It connects, and three cable carrier bars are circumferentially uniformly arranged in the periphery of substrate, three cable carrier bars are correspondingly Three slotted holes on disk body are simultaneously locked in corresponding two disk bodies by bolt;Chassis upper end side is equipped with Line-outgoing arm, the line-outgoing arm top are equipped with several line outlet rings passed through for cable, and several line outlet rings and several drums It is arranged in a one-to-one correspondence.
Further, the other side of the chassis upper end is additionally provided with holding rod.
Further, the chassis lower part is laid with four universal wheels.
Further, the bobbin loader includes several triangle frames arranged side by side, per two adjacent triangle frames Between carry a drum.
Further, two fan-shaped support plates for being used to support rotation axis are separately installed on each triangle frame, Arcuate socket there are two the fan-shaped support plate top is provided with the mounting hole for the insertion of rotation axis end, lower part is symmetrically formed.
Further, axis hole is provided in the middle part of the disk body, and embedded with elastic mounting ring in axis hole, the disk body passes through bullet Property mounting ring is matchingly set on the rotating shaft.
Line laying work is carried out with substation the beneficial effects of the present invention are: specially becoming using the paying-off implement developed in high pressure, Paying-off implement can put three cables simultaneously, and when unwrapping wire, cable does not occur winding, knotting phenomenon, and unwrapping wire quality is good, can normally put Line.Hundred meters of its unwrapping wire average used times were less than 3 minutes.It using paying-off implement unwrapping wire, improves work efficiency, it is strong to reduce labour Degree, saves working time, 1 year 623 working hour of saving.
Detailed description of the invention
Fig. 1 is the side structure schematic view of paying-off implement of the present invention;
Fig. 2 is the schematic view of the front view of bobbin loader and drum in the present invention;
Fig. 3 is the schematic view of the front view of line-outgoing arm in the present invention;
Fig. 4 is the structural schematic diagram of disk body in the present invention;
Fig. 5 is the structural schematic diagram of internal diameter fixing piece in the present invention;
Fig. 6 is the structural schematic diagram of fan-shaped support plate in the present invention.
Specific embodiment
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments:
Referring to Fig. 1 to Fig. 6, paying-off implement of the invention includes chassis 1,2, three drums 3 of bobbin loader, rotation axis 4, sector Support plate 5, line-outgoing arm 6, holding rod 7 and four universal wheels 8.
Bobbin loader 2 is welded on 1 upper center of chassis, and bobbin loader 2 includes four triangle frames 21 arranged side by side, and four three 21 bottom of angular frame is fixed together by frame and is welded on chassis 1 jointly.It is separately installed on each triangle frame 21 Two fan-shaped support plates 5, fan-shaped support plate 5 are used to support rotation axis 4, and fan-shaped support plate 5 is bolted on triangle frame On 21, specifically, there are two 5 top of fan-shaped support plate is provided with the mounting hole 51 for the insertion of 4 end of rotation axis, lower part is symmetrically formed Arcuate socket 52, arcuate socket 52 pass through for bolt fan-shaped support plate 5 and triangle frame 21 to be fixed together, arcuate socket 52 Design allows bolt to adjust in it, is conducive to installation, while but also fan-shaped support plate 5 is adapted to the triangle of more polytypic Frame 21.
A drum 3 is carried by a rotation axis 4 respectively between per two adjacent triangle frames 21, bobbin loader 2 is held altogether Drum 3 there are three carrying.Specifically, rotation axis 4 is rotatably arranged between two adjacent triangle frames 21, i.e. rotation axis 4 Both ends be inserted into two 5 tops of fan-shaped support plate and two fan-shaped support plates 5 are split in two adjacent triangle frames 21 On.
Drum 3 includes two disk bodies 31 and an internal diameter fixing piece 32.Three slotted holes are circumferentially evenly equipped on 31 end face of disk body 311.Internal diameter fixing piece 32 includes substrate 321 and three cable carrier bars 322 being laterally arranged, the substrate 321 and two disks 31 coaxial package of body is wherein provided with axis hole in rotation axis 4 in the middle part of disk body 31, and embedded with elastic mounting ring 33, bullet in axis hole Property mounting ring 33 be made of rubber material, disk body 31 passes through elastic mounting ring 33 and is matchingly sleeved in rotation axis 4;Three lines Cable carrier bar 322 is detachably connected by connecting plate 323 and substrate 321, and three cable carrier bars 322 are circumferentially uniformly arranged In the periphery of substrate 321, three cable carrier bars 322 pass through three slotted holes 311 on disk body 31 correspondingly and pass through Bolt is locked between corresponding two disk bodies 31, and to constitute a drum 3, cable can be wrapped in three cable carrier bars 322 Above and by two disk bodies 31 limit.In addition internal diameter fixing piece 32 can change dimensional structure by replacement cable carrier bar 322, with Adapt to the storage demand of more cables.
1 upper end two sides of chassis are equipped with line-outgoing arm 6 and holding rod 7 vertically respectively, and 6 top of line-outgoing arm is set there are three wearing for cable The line outlet ring 61 crossed, and three line outlet rings 61 are arranged in a one-to-one correspondence with three drums 3, so that the line wound on each drum 3 Cable has a corresponding line outlet ring 61 dedicated for its, and cable is avoided winding, knotting phenomenon occur.The lower part of the chassis 1 is uniformly distributed If there are four universal wheel 8, in favor of conveying.
Paying-off implement of the invention can put three cables simultaneously, and when unwrapping wire, cable does not occur winding, knotting phenomenon, unwrapping wire Quality is good, can normal unwrapping wire, each modular construction of paying-off implement is reasonable, and linking is close.
In conclusion the contents of the present invention are not limited in the above embodiments, those skilled in the art can be It is proposed other embodiments within technological guidance's thought of the invention, but these embodiments be included in the scope of the present invention it It is interior.

Claims (6)

1. a kind of paying-off implement, it is characterised in that: including chassis, the chassis upper center is equipped with bobbin loader, the bobbin loader Upper to be rotationally equipped with several drums side by side by rotation axis, the drum includes two disk bodies and an internal diameter fixing piece, institute It states and is circumferentially evenly equipped with three slotted holes on disk body end face, the internal diameter fixing piece includes that substrate and three cables being laterally arranged are held Bar is carried, on the rotating shaft, three cable carrier bars pass through connecting plate and substrate for the substrate and two disk body coaxial packages It is detachably connected, and three cable carrier bars are circumferentially uniformly arranged in the periphery of substrate, three cable carrier bars It three slotted holes on disk body and is locked in corresponding two disk bodies by bolt correspondingly;On the chassis Hold side to be equipped with line-outgoing arm, the line-outgoing arm top is equipped with several line outlet rings for passing through for cable, and several line outlet rings with Several drums are arranged in a one-to-one correspondence.
2. paying-off implement described in accordance with the claim 1, it is characterised in that: the other side of the chassis upper end is additionally provided with hand-held Bar.
3. paying-off implement described in accordance with the claim 1, it is characterised in that: the chassis lower part is laid with four universal wheels.
4. paying-off implement described in accordance with the claim 1, it is characterised in that: the bobbin loader includes arranged side by side several three Angular frame often carries a drum between two adjacent triangle frames.
5. paying-off implement described in accordance with the claim 3, it is characterised in that: be separately installed with two on each triangle frame Be used to support the fan-shaped support plate of rotation axis, the fan-shaped support plate top be provided with the mounting hole for the insertion of rotation axis end, under Portion is symmetrically formed there are two arcuate socket.
6. paying-off implement described in accordance with the claim 1, it is characterised in that: be provided with axis hole in the middle part of the disk body, and axis hole is embedded Equipped with elastic mounting ring, the disk body passes through elastic mounting ring and is matchingly set on the rotating shaft.
CN201910776193.2A 2019-08-22 2019-08-22 Paying-off implement Pending CN110482334A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910776193.2A CN110482334A (en) 2019-08-22 2019-08-22 Paying-off implement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910776193.2A CN110482334A (en) 2019-08-22 2019-08-22 Paying-off implement

Publications (1)

Publication Number Publication Date
CN110482334A true CN110482334A (en) 2019-11-22

Family

ID=68552719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910776193.2A Pending CN110482334A (en) 2019-08-22 2019-08-22 Paying-off implement

Country Status (1)

Country Link
CN (1) CN110482334A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204310614U (en) * 2014-11-26 2015-05-06 宁波音王电声股份有限公司 A kind of cable car
CN205170084U (en) * 2015-11-18 2016-04-20 安徽理工大学 Wire arranging device
CN205397696U (en) * 2016-02-29 2016-07-27 响水县智诚知识产权信息服务有限公司 Electric power cable winding device that work efficiency is high
CN107472987A (en) * 2017-09-24 2017-12-15 国网湖北省电力公司咸宁供电公司 A kind of more cable disc type wire dispensers
CN206751115U (en) * 2017-05-19 2017-12-15 山东电力建设第一工程公司 It is heat-treated disk line device
CN207774478U (en) * 2017-12-15 2018-08-28 许昌永新电气股份有限公司 A kind of draw drum for cable unwrapping wire
CN208199975U (en) * 2018-05-28 2018-12-07 东莞市莱悦电业制造有限公司 Bobbin winder device is used in a kind of production of power supply line

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204310614U (en) * 2014-11-26 2015-05-06 宁波音王电声股份有限公司 A kind of cable car
CN205170084U (en) * 2015-11-18 2016-04-20 安徽理工大学 Wire arranging device
CN205397696U (en) * 2016-02-29 2016-07-27 响水县智诚知识产权信息服务有限公司 Electric power cable winding device that work efficiency is high
CN206751115U (en) * 2017-05-19 2017-12-15 山东电力建设第一工程公司 It is heat-treated disk line device
CN107472987A (en) * 2017-09-24 2017-12-15 国网湖北省电力公司咸宁供电公司 A kind of more cable disc type wire dispensers
CN207774478U (en) * 2017-12-15 2018-08-28 许昌永新电气股份有限公司 A kind of draw drum for cable unwrapping wire
CN208199975U (en) * 2018-05-28 2018-12-07 东莞市莱悦电业制造有限公司 Bobbin winder device is used in a kind of production of power supply line

Similar Documents

Publication Publication Date Title
CN107227724A (en) A kind of water body recovery technology salvages cleaning plant
CN105870841B (en) A kind of cable automatic traction device
CN107673138A (en) A kind of power construction automatic deploying and retracting line apparatus
CN110482334A (en) Paying-off implement
CN205555720U (en) Movable's cable drum
CN209685021U (en) A kind of wiring architecture bobbin winder device
CN210682856U (en) Quick paying-off device
CN207827560U (en) A kind of automatic fishing net is around net device
CN206187497U (en) Laminating machine clamping device
CN210619879U (en) Cable winding device
CN213894673U (en) A pay-off for in wire and cable work progress
CN209685043U (en) Movable type cable jiggering
CN209375054U (en) A kind of cable line bracket
CN212475612U (en) Three-disk paying-off device
CN203946712U (en) A kind of wire twisting machine
CN209709467U (en) Removable electronic box system
CN207404626U (en) A kind of power construction automatic deploying and retracting line apparatus
CN209588627U (en) A kind of belt vibrating dryer
CN207133040U (en) A kind of socket rotates fatigue tester
CN206705375U (en) Communications equipment room optical fiber, which is laid, uses actinobacillus device
CN208101580U (en) A kind of farm machinery traveling wheel
CN208449716U (en) Paint spraying of wind power generation tower drum pivot flange
CN208581542U (en) A kind of ensiling bundling coating machine
CN207118267U (en) A kind of field corn seeder combined with fertilising apparatus
CN209467903U (en) A kind of novel receipts lay cloth apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191122