CN110466674A - A kind of flat-bulb steel docking facilities - Google Patents

A kind of flat-bulb steel docking facilities Download PDF

Info

Publication number
CN110466674A
CN110466674A CN201910780223.7A CN201910780223A CN110466674A CN 110466674 A CN110466674 A CN 110466674A CN 201910780223 A CN201910780223 A CN 201910780223A CN 110466674 A CN110466674 A CN 110466674A
Authority
CN
China
Prior art keywords
flat
bulb steel
press seat
mandril
fixed structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910780223.7A
Other languages
Chinese (zh)
Inventor
黄翔宇
郑金明
潘裕国
邓焕均
刘桂彬
关汝滔
牛旭
李华平
张呈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Original Assignee
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSSC Huangpu Wenchong Shipbuilding Co Ltd filed Critical CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority to CN201910780223.7A priority Critical patent/CN110466674A/en
Publication of CN110466674A publication Critical patent/CN110466674A/en
Pending legal-status Critical Current

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The present invention relates to a kind of flat-bulb steel docking facilities, including the fixed structure for being detachably secured on ship, the fixed structure is equipped with top-pressure mechanism, the top-pressure mechanism includes press seat, the press seat is fixedly connected by connector with fixed structure, it is vertically disposed with mandril on the press seat, the driving mandril is additionally provided on the press seat and is moved up and down to press the transmission mechanism of flat-bulb steel.The present invention is capable of providing the efficiency of flat-bulb steel assembly compared with prior art, without 7 character codes, it is fixed on ship using fixed structure absorption, the mandril on press seat is driven to move down press flat-bulb steel using transmission mechanism, then it is hammered using hawkbill, reduce in this way using the fixed process made of 7 character codes and remove process, improves the efficiency of flat-bulb steel installation.

Description

A kind of flat-bulb steel docking facilities
Technical field
The present invention relates to ship assembly technical fields, and in particular to a kind of flat-bulb steel docking facilities.
Background technique
In total group, carrying operation process, the structure for carrying out segment folding assembly needs to dock and weld two-by-two ship, Wherein flat-bulb steel occupies 90 or so percent, therefore the installation and docking of flat-bulb steel are important works during ship assembly Sequence.Iron caulked is entered 7 words generally using 7 character codes are fixed in flat-bulb steel neighbouring position spot welding by flat-bulb steel docking in the prior art With among flat-bulb steel, hand hammer hammering is adjusted code, and then flat-bulb steel is docked in spot welding, and rearmost point welding angle connects the fixed spot welding of outside plate, After being welded and fixed, remove 7 character codes, and need batch mend mill etc. operations spot welding position is repaired, take a substantial amount of time and Energy, in actual installation process, segment folding mouth generally has 50 flat-bulb steel abutment joints to need to handle, larger workload;Even In a few thing environment, in double bottom, liquid tank, spot welding polishing is relatively difficult, general welded pipeline arrangement, pipeline cloth of polishing It sets and requires to expend more than half an hour.
Summary of the invention
In view of the above technical problems, the present invention provides a kind of flat-bulb steel docking facilities, are capable of providing flat-bulb steel assembly Efficiency, it is simple for structure without 7 character codes, it is convenient for safeguarding to maintain and operate with, and gross weight is lighter, answers convenient for building berth carrying With.
To achieve the above object, the present invention provides a kind of flat-bulb steel docking facilities, including for being detachably secured to ship Fixed structure on oceangoing ship, the fixed structure are equipped with top-pressure mechanism, and the top-pressure mechanism includes press seat, the press seat It is fixedly connected by connector with fixed structure, mandril is vertically disposed on the press seat, is additionally provided on the press seat The mandril is driven to move up and down to press the transmission mechanism of flat-bulb steel.
Compare the prior art, beneficial effects of the present invention:
1, it compares and is fixed and the mode of the embedding hammering of iron using 7 character code spot welding in the prior art, need to adopt in the prior art It with a large amount of 7 character codes and needs a large amount of batches to mend mill operations, substantially needs using to 7 character codes at least 200 times, then spot welding point needs at 200 The mounting plate of ship installation place can be damaged at least 40 when criticizing and remove or cut off and polish, and remove or so, this Sample needs repair welding to polish, time-consuming work consuming, and the present invention is capable of providing the efficiency of flat-bulb steel assembly compared with prior art, without 7 character codes are fixed on ship using fixed structure absorption, drive the mandril on press seat to move down top using transmission mechanism Then pressure ball band steel is hammered using hawkbill, reduce in this way using the fixed process made of 7 character codes and remove process, improve The efficiency of flat-bulb steel installation.
2, the flat-bulb steel docking of the prior art, which uses, 7 words of processes and dismounting such as is largely welded and is welded and fixed The process of code, multiple welding are easy to damage ship mounting plate, for example, 50, segment folding mouth or so flat-bulb steel abutment joints cause to The fixed something that gives the game away of spot welding at few 200;And multiple hammering ship mounting plate is needed, is repeatedly hammered using hawkbill and is also easy to damage The bulb of flat-bulb steel, or even need to carry out repair welding to bulb, repair welding workload in the prior art is at 100 or so, this Shen Ball steel docking facilities please directly use mandril to press flat-bulb steel, do not need the dismounting of multiple welding and 7 character codes, ball is flat The service precision of steel is high, and does not damage the mounting plate of ship.
3, the consume of invention tooling is low, and the service life is longer.Tradition assembly ball steel uses 7 character codes, 7 character codes fix in spot welding, It constantly being consumed in partition demolishing process, the flat-bulb steel docking facilities in the application are fixed without spot welding, direct strong magnetic suck, and Fixture Design baffle, effective protection tooling during iron embedding hammering, consume is extremely low, and the service life is longer.
4, the flat-bulb steel docking facilities clear function of the application, simple for structure, maintenance convenient for safeguarding and operates with, and Gross weight is lighter, carries application convenient for building berth.
5, applied widely, can not only cover the assembly of No. 3 to No. 8 ball steel, and can using 100mm length and width specification with Lower angle steel, covers the assembly application of most of Ship Structure substantially, and application range is wider.
To sum up, close up in total group, carrying operation and adjust in ball steel docking operation, tooling of the present invention is assembled without 7 character codes Preceding spot welding, batch benefit mill operation of cutting disassembling and something that gives the game away, reduces process, improves work efficiency, reduce and waste material, have after assembling Effect protection Ship Structure.
Preferably, the transmission mechanism is screw nut driven mechanism, and the press seat is equipped with to be extended up and down Through-hole, nut thread is equipped in the through-hole, the mandril is equipped with and the matched threads of lead screw of the nut thread.Silk Thick stick nut transmission mechanism can convert rotary motion to linear motion, and can directly be manually operated can easily realize mandril Move up and down;The height of the mandril of transmission mechanism can be easily adjusted according to the height of flat-bulb steel in this way, realizes top The purpose of pressure ball band steel.
Preferably, the transmission mechanism is screw nut driven mechanism, and the press seat is equipped with to be extended up and down Through-hole, nut is fixed at the top of the through-hole, is equipped with internal screw thread in the nut, the mandril be equipped with it is described The matched threads of lead screw of internal screw thread.Threads of lead screw on mandril is matched with the internal screw thread of nut, can be when rotating mandril Mandril is moved up and down, for pressing flat-bulb steel.
Preferably, being additionally provided on the mandril on the press seat top drives the mandril rotation to drive top The handle that bar moves up and down.Handle can easily drive the rotation of mandril, realize the purpose of convenient manual operation mandril.
Preferably, the connector is angle steel, and the first right-angle side of the angle steel is horizontally disposed and passes through bolt It is fixedly linked with fixed structure;Second right-angle side of the angle steel is vertically arranged and is fixedly connected by bolt with press seat.Angle Two right-angle sides of steel are separately connected fixed structure and press seat, and connection fastens and stablizes.
Preferably, the fixed structure is that structure is identical and two of gap setting, and the press seat, which is arranged, to exist The top in the gap, two fixed structures pass through Bolted angle connection two sides opposite in press seat respectively.Fixed knot The two sides that the flat-bulb steel of ship needs to dock are arranged in structure, and the setting of press seat presses seat and fixed structure is logical on flat-bulb steel top Angle steel is crossed to fix, two fixed structures are symmetrically arranged, make mandril in press flat-bulb steel be to sing in this way, stress equalization and Stablize.
Preferably, the fixed structure is magnetic force base device.
Preferably, the side close to flat-bulb steel of the fixed structure is fixed vertically equipped with flat for block ball To the baffle of the damage of fixed structure when steel welds.Baffle is fixed for when lattice gear welds flat-bulb steel vertically to fixed knot The damage of structure improves the service life of the fixed structure of the application.
Detailed description of the invention
Fig. 1 is a kind of schematic view of the front view of flat-bulb steel docking facilities provided by the present invention.
Wherein: 1, fixed structure;2, top-pressure mechanism;21, seat is pressed;22, mandril;23, nut;24, handle;3, angle steel; 4, flat-bulb steel;5, baffle.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below Example is not intended to limit the scope of the invention for illustrating the present invention.
As shown in Figure 1, being a kind of flat-bulb steel docking facilities provided by the present invention, including for being detachably secured to ship Fixed structure 1 on oceangoing ship, fixed structure 1 are mainly used for the steel ball docking facilities of fixed the application to the position of fixation, fixed knot Structure 1 can be bolted with ship or is clamped using the connector of hinging buckle class, the fixed structure 1 in the application For magnetic force base device, the interior setting switch of magnetic force base device turns on the switch, magnetic force base device can be made to fix with magnetic is propagated, Closing is opened, and magnetic force base device can be disassembled.It is equipped with top-pressure mechanism 2 on the top of fixed structure 1, top-pressure mechanism 2 is and ball Band steel improves the structure of press effect, and top-pressure mechanism 2 includes press seat 21, and press seat 21 is solid by connector and fixed structure 1 Fixed connection, specific top-pressure mechanism 2 can be connect by bracket or connecting plate with fixed structure 1, can by bolt or Person is welded and fixed;In the application, to increase its aesthetics and indirect, fixed structure 1 is connected with top-pressure mechanism 2 by angle steel 3 It connects, the first right-angle side of angle steel 3 is horizontally disposed and is fixedly linked by bolt with fixed structure 1;Second right-angle side of angle steel 3 It is vertically arranged and is fixedly connected by bolt with press seat 21;Two right-angle sides of angle steel 3 are separately connected fixed structure 1 and top Wedge 21, connection fasten and stablize.Wherein, press seat 21 is rectangular parallelepiped structure, the right-angle side and press seat 21 of angle steel 3 It is bolted, the magnet base in the application is two, the opposite two sides for being located at press seat 21, each magnet base dress It sets and is fixedly connected by 3 bolt of angle steel with press seat 21;It is vertically disposed with mandril 22 on press seat 21, presses seat 21 It is equipped with the transmission mechanism for the press flat-bulb steel 4 that driving mandril 22 moves up and down, transmission mechanism drives mandril 22 to move up and down energy It presses flat-bulb steel enough to realize the docking of flat-bulb steel, does not need weld using 7 character codes the even work such as repair welding.
It is compared in the prior art using the flat-bulb steel docking facilities of the application using 7 character code spot welding fixation and the embedding hammer of iron The mode hit needs in the prior art using a large amount of 7 character codes and needs a large amount of batches to mend mill operations, substantially needs using to 7 character codes At least 200 times, then spot welding point needs batch to remove or cut off and polish at 200, and at least 40 when remove at or so can damage The mounting plate for hurting ship installation place, needs repair welding to polish in this way, and time-consuming work consuming, the present invention is capable of providing compared with prior art The efficiency of flat-bulb steel assembly is fixed on ship using the absorption of fixed structure 1 without 7 character codes, utilizes transmission mechanism band The mandril 22 installed on dynamic press seat 21 moves down press flat-bulb steel, is then hammered using hawkbill, reduces utilize 7 in this way The fixed process made of character code and dismounting process, improve the efficiency of flat-bulb steel installation.
The flat-bulb steel of the prior art, which docks, 7 character codes of processes and dismounting such as uses a large amount of spot welding and is welded and fixed Process, multiple welding is easy to damage ship mounting plate, such as 50, segment folding mouth or so flat-bulb steel abutment joints cause at least Something that gives the game away is fixed in spot welding at 200;And multiple hammering ship mounting plate is needed, is repeatedly hammered using hawkbill and is also easy to damage ball The bulb of band steel, or even need to carry out repair welding to bulb, repair welding workload in the prior art is at 100 or so, the application Ball steel docking facilities directly use mandril 22 press flat-bulb steel, do not need the dismounting of multiple welding and 7 character codes, ball is flat The service precision of steel is high, and does not damage the mounting plate of ship.
The docking facilities consume of the application is low, and the service life is longer.Tradition assembly ball steel uses 7 character codes, and 7 character codes are in point Solid welding is fixed, separates and constantly consumes in demolishing process, and the flat-bulb steel docking facilities in the application are fixed without spot welding, direct strong magnetic Absorption, and Fixture Design baffle, effective protection tooling during iron embedding hammering, consume is extremely low, and the service life is longer.
It is the flat-bulb steel docking facilities clear function of the application, simple for structure, it maintenance convenient for safeguarding and operates with, and total Weight is lighter, carries application convenient for building berth;It is applied widely, the assembly of No. 3 to No. 8 ball steel can not only be covered, and can apply The following angle steel of 100mm length and width specification, covers the assembly application of most of Ship Structure substantially, and application range is wider.To sum up, In Total group, carrying operation, which are closed up, to be adjusted in ball steel docking operation, spot welding before tooling of the present invention is assembled without 7 character codes, after assembling Batch benefit mill operation of cutting disassembling and something that gives the game away, reduces process, improves work efficiency, reduce and waste material, effective protection Ship Structure.
Wherein, transmission mechanism is screw nut driven mechanism, and press seat 21 is equipped with the through-hole that extends up and down, in through-hole Equipped with nut thread, mandril 22 is equipped with and the matched threads of lead screw of nut thread.Screw nut driven mechanism can will rotate Conversion of motion is linear motion, and can directly be manually operated can easily realize moving up and down for mandril 22;It can facilitate in this way The height according to flat-bulb steel to adjust the height of the mandril 22 of transmission mechanism, realize the purpose of press flat-bulb steel.
In specific the present embodiment, transmission mechanism is screw nut driven mechanism, and press seat 21 is equipped with to be extended up and down Through-hole is fixed with nut 23 at the top of through-hole, internal screw thread is equipped in nut 23, and mandril 22 is equipped with matched with internal screw thread Threads of lead screw.Threads of lead screw on mandril 22 is matched with the internal screw thread of nut, can be moved up and down when rotating mandril 22 Mandril 22, for pressing flat-bulb steel.Specifically, press seat 21 is using long 110 wide 70mm thickness 10mm or so two pieces of side plates, length The tops of 110 wide mono- piece of top plate of 75mm thickness 10mm and the splicing of two pieces of side plate of the front and back long 75mm wide 70mm thickness 10mm in cuboid shape Wedge, opens the direct hole 25mm in the middle part of top plate and the nut 23 of welding equipment M25,22 one end spiral of mandril penetrate nut 23.
Wherein, pressing on the mandril 22 on 21 top of seat to be additionally provided with drives the rotation of mandril 22 to move down on mandril 22 to drive Dynamic handle 24.Handle 24 can easily drive the rotation of mandril 22, realize the purpose of convenient manual operation mandril 22.
In the side close to flat-bulb steel of fixed structure 1, fixed be equipped with vertically is used for when block flat-bulb steel welds to fixation The baffle 5 of the damage of structure, baffle 5 can weld or bolt is fixed on fixed structure 1 or press seat 21.Baffle 5 is perpendicular Directly it is fixed for damage when lattice gear welds flat-bulb steel to fixed structure 1, improves the service life of the fixed structure 1 of the application.
In the application, specific magnetic force base device includes shell and magnetic part (figure is not drawn into), which includes offering The main body of pilot hole and the fixing piece being fixed in the main body, for the fixing piece for connecting ship, which further includes by leading Shielding case made of magnetic material, the shielding case are contained in the shell, which includes cover, shield and connector, are somebody's turn to do Shield includes shielding portion and the fixed part from shielding portion side extension, and the connector one end and the fixed part are affixed, another End is stretched out from the pilot hole, which is contained in the cover, which offers the wherein pole corresponding to the magnetic part Through-hole, the shielding portion and the cover frictional contact and the opposite cover movably covers at least partly through-hole, and this is solid Determine part to be fixedly arranged on outside the shielding case and correspond to the through-hole.
In the description of the present invention, it should be noted that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" To be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description of the present invention and simplification of the description, rather than indicate or It implies that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as Limitation of the present invention.In addition, term " first ", " second ", " third " are used for description purposes only, and should not be understood as indicating Or imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally connect It connects;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, can be understood with concrete condition above-mentioned The concrete meaning of term in the present invention.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and replacement can also be made, these improve and replace It changes and also should be regarded as protection scope of the present invention.

Claims (8)

1. a kind of flat-bulb steel docking facilities, which is characterized in that described including the fixed structure for being detachably secured on ship Fixed structure is equipped with top-pressure mechanism, and the top-pressure mechanism includes press seat, and the press seat passes through connector and fixed structure It is fixedly connected, mandril is vertically disposed on the press seat, the driving mandril is additionally provided on the press seat and is moved up and down To press the transmission mechanism of flat-bulb steel.
2. flat-bulb steel docking facilities according to claim 1, which is characterized in that the transmission mechanism is screw nut driven Mechanism, the press seat are equipped with the through-hole extended up and down, nut thread are equipped in the through-hole, and the mandril is equipped with and institute State the matched threads of lead screw of nut thread.
3. flat-bulb steel docking facilities according to claim 1, which is characterized in that the transmission mechanism is screw nut driven Mechanism, the press seat are equipped with the through-hole extended up and down, are fixed with nut at the top of the through-hole, are equipped in the nut Internal screw thread, the mandril are equipped with and the matched threads of lead screw of the internal screw thread.
4. flat-bulb steel docking facilities according to claim 1-3, which is characterized in that the top on the press seat top The handle for driving the mandril to rotate to drive mandril to move up and down is additionally provided on bar.
5. flat-bulb steel docking facilities according to claim 1, which is characterized in that the connector is angle steel, the angle steel The first right-angle side it is horizontally disposed and be fixedly linked by bolt and fixed structure;Second right-angle side of the angle steel is vertically arranged And it is fixedly connected by bolt with press seat.
6. flat-bulb steel docking facilities according to claim 5, which is characterized in that the fixed structure be structure it is identical and The top in the gap is arranged in two of gap setting, the press seat, and two fixed structures pass through an angle steel respectively It is connected to the opposite two sides of press seat.
7. flat-bulb steel docking facilities according to claim 1, which is characterized in that the fixed structure is magnetic force base device.
8. flat-bulb steel docking facilities according to claim 1, which is characterized in that the fixed structure close to flat-bulb steel Side is fixed to be equipped with when welding for block flat-bulb steel vertically to the baffle of the damage of fixed structure.
CN201910780223.7A 2019-08-22 2019-08-22 A kind of flat-bulb steel docking facilities Pending CN110466674A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910780223.7A CN110466674A (en) 2019-08-22 2019-08-22 A kind of flat-bulb steel docking facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910780223.7A CN110466674A (en) 2019-08-22 2019-08-22 A kind of flat-bulb steel docking facilities

Publications (1)

Publication Number Publication Date
CN110466674A true CN110466674A (en) 2019-11-19

Family

ID=68513428

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910780223.7A Pending CN110466674A (en) 2019-08-22 2019-08-22 A kind of flat-bulb steel docking facilities

Country Status (1)

Country Link
CN (1) CN110466674A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62290625A (en) * 1986-06-10 1987-12-17 Nikko Kk Carrying-in conveyer in strip material cutting line
CN104191395A (en) * 2014-07-08 2014-12-10 江苏新扬子造船有限公司 Bulb flat steel butt-joint assembly structure
CN204076054U (en) * 2014-07-08 2015-01-07 江苏新扬子造船有限公司 Flat-bulb steel and band steel docking structure
CN205290217U (en) * 2015-12-19 2016-06-08 江苏新时代造船有限公司 Flat -bulb steel does not have horse board interfacing apparatus
CN206702497U (en) * 2017-04-19 2017-12-05 江南造船(集团)有限责任公司 A kind of flat-bulb steel docking facilities
EP3252320A1 (en) * 2016-05-31 2017-12-06 Luciano Guazzieri Coupling system on bulb-flat profiles

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62290625A (en) * 1986-06-10 1987-12-17 Nikko Kk Carrying-in conveyer in strip material cutting line
CN104191395A (en) * 2014-07-08 2014-12-10 江苏新扬子造船有限公司 Bulb flat steel butt-joint assembly structure
CN204076054U (en) * 2014-07-08 2015-01-07 江苏新扬子造船有限公司 Flat-bulb steel and band steel docking structure
CN104191395B (en) * 2014-07-08 2015-12-16 江苏新扬子造船有限公司 Flat-bulb steel Butt Assembling mechanism
CN205290217U (en) * 2015-12-19 2016-06-08 江苏新时代造船有限公司 Flat -bulb steel does not have horse board interfacing apparatus
EP3252320A1 (en) * 2016-05-31 2017-12-06 Luciano Guazzieri Coupling system on bulb-flat profiles
CN206702497U (en) * 2017-04-19 2017-12-05 江南造船(集团)有限责任公司 A kind of flat-bulb steel docking facilities

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈雄剑等: "球扁钢对接工艺改进研究", 《船舶与海洋工程》 *

Similar Documents

Publication Publication Date Title
CN109371225A (en) One kind eliminating welding residual stress machine for automatic ultrasonic impact
CN107096612B (en) A kind of magnetic force vibration and sway impact type ball-milling device
CN110466674A (en) A kind of flat-bulb steel docking facilities
CN108262422B (en) A kind of construction new reinforcing steel bar cut-off equipment
CN209481743U (en) One kind eliminating welding residual stress machine for automatic ultrasonic impact
CN109457106A (en) A kind of towed elimination welding residual stress device
CN109736606A (en) A kind of highly-safe distribution station
CN212634800U (en) No sign indicating number assembly fixture of T section bar
CN210549097U (en) Stainless steel welded fastening support frame
CN209481744U (en) A kind of towed elimination welding residual stress device
CN209483847U (en) It is a kind of to impact the damper for eliminating welding residual stress machine for automatic ultrasonic
CN208368743U (en) A kind of self-rotary high-voltage grounding wire operation bracket panel
CN109505906A (en) It is a kind of to impact the damper for eliminating welding residual stress machine for automatic ultrasonic
KR20170000575U (en) A jig for maintenance 0f axial flow gas pressure regulator
CN213735115U (en) Steel structural component transfer device
CN209481747U (en) It is a kind of to impact the car body for eliminating welding residual stress machine for automatic ultrasonic
CN208132276U (en) A kind of welding positioning tool
CN110293476B (en) Water conservancy pipeline surface rust cleaning device of double track gomphosis
CN209481748U (en) It is a kind of to impact the running gear for eliminating welding residual stress machine for automatic ultrasonic
CN209290102U (en) A kind of semi-trailer suspension fore-stock
CN208467607U (en) A kind of angle of assembling control tooling
CN208914080U (en) A kind of auto repair lying board
CN208663023U (en) A kind of solenoid valve assembly machine
CN105234896B (en) Nut disassembly and assembly device
CN209140783U (en) A kind of auto repair multifunctional wrench

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191119