CN110466050B - Movable tool for producing concrete prefabricated part - Google Patents

Movable tool for producing concrete prefabricated part Download PDF

Info

Publication number
CN110466050B
CN110466050B CN201910709282.5A CN201910709282A CN110466050B CN 110466050 B CN110466050 B CN 110466050B CN 201910709282 A CN201910709282 A CN 201910709282A CN 110466050 B CN110466050 B CN 110466050B
Authority
CN
China
Prior art keywords
prefabricated part
screw rod
screw
concrete prefabricated
connecting support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910709282.5A
Other languages
Chinese (zh)
Other versions
CN110466050A (en
Inventor
胡军强
王坤
张芳
祝捷
杨佳涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Runqianyu Intellectual Property Service Co ltd
Original Assignee
Tianyi Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianyi Construction Development Co ltd filed Critical Tianyi Construction Development Co ltd
Priority to CN201910709282.5A priority Critical patent/CN110466050B/en
Publication of CN110466050A publication Critical patent/CN110466050A/en
Application granted granted Critical
Publication of CN110466050B publication Critical patent/CN110466050B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B28—WORKING CEMENT, CLAY, OR STONE
    • B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B17/00—Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B28—WORKING CEMENT, CLAY, OR STONE
    • B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B28—WORKING CEMENT, CLAY, OR STONE
    • B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00—Moulds; Cores; Mandrels
    • B28B7/0002—Auxiliary parts or elements of the mould
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B28—WORKING CEMENT, CLAY, OR STONE
    • B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00—Moulds; Cores; Mandrels
    • B28B7/0002—Auxiliary parts or elements of the mould
    • B28B7/0014—Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

本发明公开了一种用于混凝土预制构件生产的活动工装,包括固定设置在浇筑模具上的若干块边模连接支座,还包括滑移连接在浇筑模具上的预制件连接支座,相邻两块边模连接支座之间转动地设有螺杆,所述螺杆一端延伸出边模连接支座形成操控段,所述螺杆穿过预制件连接支座,所述预制件连接支座上设有与螺杆相适配的螺纹孔。该活动工装通过螺杆移动的方式对一排上的预埋件连接支座可以进行整体的移动,只需要一次测距即可,操作起来更为方便。

Figure 201910709282

The invention discloses a movable tooling used for the production of concrete prefabricated components. A screw rod is rotatably arranged between the two side mold connecting supports, one end of the screw rod extends out of the side mold connecting support to form a control section, the screw rod passes through the preform connecting support, and the prefab connecting support is provided with There are threaded holes suitable for the screw. The movable tooling can move the connection supports of the embedded parts on a row as a whole by means of screw movement, and only needs to measure the distance once, which is more convenient to operate.

Figure 201910709282

Description

一种用于混凝土预制构件生产的活动工装A movable tooling for the production of concrete prefabricated components

技术领域technical field

本发明涉及预制件生产的技术领域,尤其是涉及一种用于混凝土预制构件生产的活动工装。The invention relates to the technical field of production of prefabricated parts, in particular to a movable tooling used for the production of concrete prefabricated parts.

背景技术Background technique

随着装配式建筑在国内的快速发展,预制构件的生产技术也日趋成熟。目前,预制构件多采用模具浇筑的方式进行生产,在预制构件实际生产过程中,为满足生产或施工的要求,预制构件中通常预埋有多种预埋件;市场上现有的预埋件大致可分为施工用预埋件、生产用预埋件、临时预埋件及电气预埋件等。各预埋件在预制构件中预埋的位置根据具体施工要求往往参差不齐,从而导致现有的整体式工装往往无法重复利用,造成生产资源的极大浪费。With the rapid development of prefabricated buildings in China, the production technology of prefabricated components is also becoming more and more mature. At present, prefabricated components are mostly produced by mould casting. In the actual production process of prefabricated components, in order to meet the requirements of production or construction, prefabricated components are usually embedded with a variety of embedded parts; the existing embedded parts on the market It can be roughly divided into embedded parts for construction, embedded parts for production, temporary embedded parts and electrical embedded parts. The positions of the embedded parts in the prefabricated components are often uneven according to the specific construction requirements, so that the existing integral tooling often cannot be reused, resulting in a great waste of production resources.

申请号为:2018108799877的中国专利公开了一种用于混凝土预制构件生产的活动工装,包括主桥架、设置于主桥架长度方向两侧的边模连接支座以及设置于主桥架上的预埋件连接支座,所述边模连接支座及预埋件连接支座均在主桥架的长度方向上呈滑移设置,且所述主桥架上还设有用于可拆卸固定边模连接支座和预埋件连接支座的第一紧固件。主桥架整体通过两组边模连接支座固定架设于浇筑模具上,而各预埋件分别固定在对应预埋件连接支座上。同时,将边模连接支座和预埋件连接支座同时滑移设置于主桥架上,配合用于可拆卸固定边模连接支座和预埋件连接支座的第一紧固件,在保证各预埋件在浇筑时的稳定性的前提下,不仅使得两边模连接支座的间距可根据设计要求进行调节,而且使得各预埋件连接支座能够根据设计图纸中各预埋件的位置进行灵活调节。通过这种方式,使得该活动工装能够适应多种工况,并满足多样化的设计要求,使其通用性极大提高,便于其重复利用,大大减少生产资源的浪费。The Chinese patent with application number: 2018108799877 discloses a movable tooling for the production of concrete prefabricated components, including a main bridge frame, side form connection supports arranged on both sides of the main bridge frame in the length direction, and embedded parts arranged on the main bridge frame The connection support, the side mold connection support and the embedded part connection support are all arranged in a sliding manner in the length direction of the main bridge, and the main bridge is also provided with a detachable fixed side mold connection support and The embedded part is connected to the first fastener of the support. The main bridge frame is fixedly erected on the pouring mold through two sets of side mold connecting supports, and each embedded part is respectively fixed on the corresponding embedded part connecting support. At the same time, the side mold connecting support and the embedded part connecting support are slidingly arranged on the main bridge at the same time, and cooperate with the first fastener used to detachably fix the side mold connecting support and the embedded part connecting support. Under the premise of ensuring the stability of each embedded part during pouring, not only the distance between the two sides of the die connecting support can be adjusted according to the design requirements, but also the connecting support of each embedded part can be adjusted according to the design drawing of each embedded part. The position can be adjusted flexibly. In this way, the movable tooling can be adapted to a variety of working conditions and meet diverse design requirements, so that its versatility is greatly improved, its reuse is facilitated, and the waste of production resources is greatly reduced.

生产预制件的过程中,往往有的时候一排上的几个预埋件的距离是固定的,改变的是几个预埋件整体的位置,需要将预埋件的整体位置进行偏移,上述的活动工装当一排上的几个预埋件位置需要调节的时候,需要一个个地旋松螺栓对预埋件连接支座后进行测距调节,调节起来就比较麻烦。In the process of producing prefabricated parts, sometimes the distance between several embedded parts in a row is fixed, and the overall position of several embedded parts is changed, and the overall position of the embedded parts needs to be offset. In the above-mentioned movable tooling, when the positions of several embedded parts in a row need to be adjusted, it is necessary to loosen the bolts one by one to adjust the distance after the embedded parts are connected to the support, which is troublesome to adjust.

发明内容SUMMARY OF THE INVENTION

针对现有技术存在的不足,本发明的目的在于提供一种用于混凝土预制构件生产的活动工装,该活动工装通过螺杆移动的方式对一排上的预埋件连接支座可以进行整体的移动,只需要一次测距即可,操作起来更为方便。In view of the deficiencies in the prior art, the purpose of the present invention is to provide a movable tooling for the production of concrete prefabricated components, the movable tooling can integrally move the connection supports of the embedded parts on a row by means of screw movement. , you only need to measure the distance once, which is more convenient to operate.

本发明的上述发明目的是通过以下技术方案得以实现的:The above-mentioned purpose of the present invention is achieved through the following technical solutions:

一种用于混凝土预制构件生产的活动工装,包括固定设置在浇筑模具上的若干块边模连接支座,还包括滑动连接在浇筑模具上的预制件连接支座,相邻两块边模连接支座之间转动地设有螺杆,所述螺杆一端延伸出边模连接支座形成操控段,所述螺杆穿过预制件连接支座,所述预制件连接支座上设有与螺杆相适配的螺纹孔,相邻两块边模连接支座之间至少设有两块预制件连接支座,所述预制件连接支座包括与浇筑模具滑移连接的滑移块和与螺杆螺纹连接的管体,所述滑移块上设有安装通孔,所述管体转动连接在安装通孔内,所述管体通过第一螺栓与滑移块实现固定。A movable tooling used for the production of concrete prefabricated components, comprising a plurality of side mold connecting supports fixedly arranged on a pouring mold, and a prefab connecting support slidingly connected to the pouring mold, and two adjacent side molds are connected A screw rod is rotatably provided between the supports, one end of the screw rod extends out of the side mold connecting support to form a control section, the screw rod passes through the preform connecting support, and the preform connecting support is provided with a screw suitable for the screw There are at least two prefabricated connection supports between two adjacent side mold connection supports, and the prefabricated connection supports include a sliding block for sliding connection with the casting mold and a threaded connection with the screw. The sliding block is provided with an installation through hole, the pipe body is rotatably connected in the installation through hole, and the pipe body is fixed with the sliding block by a first bolt.

通过采用上述技术方案,当需要将一根螺杆上的预制件连接支座整体进行移动时,只需测好相应的距离,转动螺杆即可,操作起来更为方便简单;当某个预制件连接支座不需要移动的时候,只需要旋松第一螺栓,在转动螺杆的时候,螺杆只会带动管体一起转动,而管体在滑移块内发生相对的转动,相应的预制件连接支座就不会发生移动,从而可以适应更多不同工况的需要。By adopting the above technical solution, when it is necessary to move the prefabricated part on a screw to connect the support as a whole, it is only necessary to measure the corresponding distance and rotate the screw, which is more convenient and simple to operate; when a prefabricated part is connected When the support does not need to move, only the first bolt needs to be loosened. When the screw is rotated, the screw will only drive the tube body to rotate together, and the tube body rotates relatively in the sliding block, and the corresponding prefabricated part connects the support. The seat will not move, so it can adapt to the needs of more different working conditions.

本发明进一步设置为:所述管体通过两个滚动轴承转动设置在安装通孔内,相对于安装通孔两端分别开设有沉头孔,滚动轴承固定安装在沉头孔内,所述管体与滚动轴承内圈固定连接。The present invention is further provided as follows: the pipe body is rotatably arranged in the installation through hole through two rolling bearings, and opposite ends of the installation through hole are respectively provided with countersunk holes, the rolling bearings are fixedly installed in the countersunk holes, and the pipe body is connected to the countersunk hole. The inner ring of the rolling bearing is fixedly connected.

通过采用上述技术方案,在安装滚动轴承和管体的时候,只需要先将一个滚动轴承与管体先固定,然后再将两个一起安装到安装通孔内,最后将另外一个滚动轴承安装到相应的沉头孔内即可,安装起来非常方便。By adopting the above technical solution, when installing the rolling bearing and the tube body, it is only necessary to fix one rolling bearing and the tube body first, then install the two together into the installation through hole, and finally install the other rolling bearing to the corresponding sink. It can be installed in the head hole, which is very convenient to install.

本发明进一步设置为:所述沉头孔内壁上设有内螺纹,所述滚动轴承外圈上设有与沉头孔内壁内螺纹相配合的外螺纹,所述管体外壁上设有外螺纹,所述滚动轴承内圈上设有与管体外壁外螺纹相适配的内螺纹。The present invention is further provided as follows: the inner wall of the countersunk hole is provided with an inner thread, the outer ring of the rolling bearing is provided with an outer thread matched with the inner thread of the inner wall of the countersunk hole, and the outer wall of the pipe is provided with an outer thread, The inner ring of the rolling bearing is provided with an inner thread which is adapted to the outer thread of the outer wall of the pipe.

通过采用上述技术方案,管体与滚动轴承螺纹连接,而滚动轴承又与滑移块螺纹连接,这样的结构使得滚动轴承和管体拆卸或安装起来更为方便。By adopting the above technical solution, the tube body is threadedly connected to the rolling bearing, and the rolling bearing is threadedly connected to the sliding block, which makes it more convenient to disassemble or install the rolling bearing and the tube body.

本发明进一步设置为:所述第一螺栓的螺纹端转动连接有圆弧片,所述圆弧片贴合在管体的外壁上,所述安装通孔内壁上设有供圆弧片相对于第一螺栓轴向方向滑动的安装槽。The present invention is further provided that: the threaded end of the first bolt is rotatably connected with a circular arc sheet, the circular arc sheet is attached to the outer wall of the pipe body, and the inner wall of the installation through hole is provided with a circular arc sheet for the circular arc sheet to be relatively A mounting groove for sliding the first bolt in the axial direction.

通过采用上述技术方案,圆弧片的设置可以增大第一螺栓与管体之间的摩擦力,使得管体在被第一螺栓固定的时候更不容易发生转动的现象。By adopting the above technical solution, the arrangement of the circular arc sheet can increase the frictional force between the first bolt and the pipe body, so that the pipe body is less likely to rotate when it is fixed by the first bolt.

本发明进一步设置为:所述螺杆通过第二螺栓与边模连接支座实现固定。The present invention further provides that: the screw rod is fixed with the side die connecting support through the second bolt.

通过采用上述技术方案,第二螺杆的设置使得螺杆在浇筑模具灌注水泥的过程中更不容易发生转动。By adopting the above technical solution, the arrangement of the second screw makes the screw less likely to rotate during the process of pouring cement into the casting mold.

本发明进一步设置为:所述螺杆包括螺纹段和操控段,所述操控段铰接在螺纹段上。The present invention further provides that: the screw rod includes a thread segment and a manipulation segment, and the manipulation segment is hinged on the thread segment.

通过采用上述技术方案,在平常的时候,操控段自然垂下,使外物不易触碰到操控段,从而使螺杆更不容易发生转动。By adopting the above technical solution, in normal times, the control section hangs down naturally, making it difficult for foreign objects to touch the control section, so that the screw is less likely to rotate.

本发明进一步设置为:所述操控段为扁平状。The present invention further provides that: the manipulation section is flat.

通过采用上述技术方案,扁平状的操控段在自然垂下的状态时更不容易被触碰到。By adopting the above technical solution, the flat control section is less likely to be touched when it is in a naturally hanging state.

综上所述,本发明的有益技术效果为:To sum up, the beneficial technical effects of the present invention are:

1.通过螺杆移动的方式可以对一个螺杆上的预制件连接支座整体进行整体移动,操作起来更为简单方便。1. The whole prefabricated connection support on a screw can be moved as a whole by means of screw movement, which is simpler and more convenient to operate.

2.在转动螺杆的时候也可以对该螺杆上的几个预制件连接支座固定不动的,移动想要移动的那个预制件连接支座,从而可以适应更多不同工况的需要。2. When the screw is rotated, several prefabricated connection supports on the screw can also be fixed, and the prefabricated connection support that you want to move can be moved, so as to adapt to the needs of more different working conditions.

附图说明Description of drawings

图1是本发明的立体结构示意图。FIG. 1 is a schematic view of the three-dimensional structure of the present invention.

图2是边模连接支座、预制件连接支座和螺杆之间的结构示意图。Figure 2 is a schematic diagram of the structure between the side mold connecting support, the preform connecting support and the screw.

图3是图2中A的放大图。FIG. 3 is an enlarged view of A in FIG. 2 .

图中,1、边模连接支座;2、预制件连接支座;21、滑移块;22、管体;23、安装通孔;24、第一螺栓;25、滚动轴承;26、沉头孔;27、圆弧片;28、安装槽;3、螺杆;4、操控段;5、螺纹孔;6、第二螺栓;7、螺纹段;71、杆体;72、端盖;8、转轴;9、固定盘;10、卡块;11、卡槽;12、弹性橡胶套;13、支撑片;14、浇筑模具;15、滑移槽。In the figure, 1. Side die connecting support; 2. Prefab connecting support; 21. Sliding block; 22. Tube body; 23. Mounting through hole; 24. First bolt; 25. Rolling bearing; 26. Countersunk head Hole; 27, arc plate; 28, installation slot; 3, screw rod; 4, control section; 5, threaded hole; 6, second bolt; 7, threaded section; 71, rod body; 72, end cover; 8, shaft ; 9, fixed plate; 10, block; 11, card slot; 12, elastic rubber sleeve; 13, support sheet; 14, pouring mold; 15, slip groove.

具体实施方式Detailed ways

以下结合附图对本发明作进一步详细说明。The present invention will be further described in detail below with reference to the accompanying drawings.

参照图1,为本发明公开的一种用于混凝土预制构件生产的活动工装,包括通过螺栓固定在浇筑模具14上的边模连接支座1,浇筑模具14呈矩形框体状,边模连接支座1分为两层,每层高度的边模连接支座1分别设置有四个,四个边模连接支座1分别固定在浇筑模具14的四个角上;高一层横向方向的两个边模连接支座1之间均转动地设有螺杆3,矮一层纵向方向的两个边模连接支座1之间均转动地设有螺杆3,螺杆3与边模连接支座1之间通过第二螺栓6固定,螺杆3的一端延伸出边模连接支座1形成操控段4,操控段4呈扁平状,每根螺杆3上均套设有两个预制件连接支座2,预制件连接支座2上设有与螺杆3相适配的螺纹孔5,预制件连接支座2的下底面上竖直设有三排支撑片13,支撑片13滑动设置在浇筑模具14上。Referring to FIG. 1, it is a movable tooling for the production of concrete prefabricated components disclosed by the present invention, including a side mold connecting support 1 fixed on a pouring mold 14 by bolts, the pouring mold 14 is in the shape of a rectangular frame, and the side molds are connected The support 1 is divided into two layers, and the side mold connecting supports 1 of each layer are respectively provided with four heights, and the four side mold connecting supports 1 are respectively fixed on the four corners of the pouring mold 14; A screw 3 is rotatably provided between the two side mold connecting supports 1, and a screw 3 is rotatably provided between the two side mold connecting supports 1 in the longitudinal direction of the lower layer, and the screw 3 is connected to the side mold connecting support. 1 is fixed by a second bolt 6, one end of the screw 3 extends out of the side die connecting support 1 to form a control section 4, the control section 4 is flat, and each screw 3 is sleeved with two prefabricated connection supports 2. The prefabricated part connecting support 2 is provided with a threaded hole 5 that is adapted to the screw 3; the lower bottom surface of the prefabricated part connecting support 2 is vertically provided with three rows of support sheets 13, and the support sheets 13 are slidably arranged on the casting mold 14 superior.

参照图2所示,预制件连接支座2包括与支撑片13固定连接的滑移块21和与螺杆3螺纹连接的管体22,在滑移块21上开设有用于安装管体22的安装通孔23,在滑移块21相对于安装通孔23的两端又分别开设有沉头孔26,沉头孔26内分别螺纹连接有滚动轴承25,管体22通过滚动轴承25转动地设置在安装通孔23内,沉头孔26的内壁上设有内螺纹,在滚动轴承25外圈的外壁上设有与内螺纹相适配的外螺纹;在管体22的外壁上设有外螺纹,在滚动轴承25内圈的内壁上设有与外螺纹相适配的内螺纹,使滚动轴承25螺纹连接在管体22上,方便拆卸与安装;在滑移块21上螺纹连接有第一螺栓24,第一螺栓24的内端通过轴承转动设有圆弧片27,旋紧第一螺纹,圆弧片27凹陷的圆弧面贴紧在管体22外壁上从而使滑移块21与管体22实现固定,在安装通孔23的内壁上设有供圆弧片27上下滑动的安装槽28,圆弧片27设置在安装槽28内。Referring to FIG. 2 , the preform connection support 2 includes a sliding block 21 fixedly connected with the support sheet 13 and a pipe body 22 threadedly connected with the screw rod 3 . The sliding block 21 is provided with an installation for installing the pipe body 22 The through holes 23 are respectively provided with countersunk holes 26 at both ends of the sliding block 21 relative to the installation through holes 23. The countersunk holes 26 are respectively screwed with rolling bearings 25, and the pipe body 22 is rotatably arranged on the installation through the rolling bearings 25. In the through hole 23, the inner wall of the countersunk hole 26 is provided with an inner thread, and the outer wall of the outer ring of the rolling bearing 25 is provided with an outer thread that matches the inner thread; The inner wall of the inner ring of the rolling bearing 25 is provided with an internal thread that matches the external thread, so that the rolling bearing 25 is threadedly connected to the pipe body 22, which is convenient for disassembly and installation; The inner end of a bolt 24 is provided with a circular arc sheet 27 through the rotation of the bearing, and the first thread is tightened, and the concave arc surface of the circular arc sheet 27 is pressed against the outer wall of the pipe body 22, so that the sliding block 21 and the pipe body 22 are realized. For fixing, an installation groove 28 for the circular arc piece 27 to slide up and down is provided on the inner wall of the installation through hole 23 , and the circular arc piece 27 is arranged in the installation groove 28 .

如图2和图3所示,螺杆3包括螺纹段7和操控段4,在需要转动螺杆3的时候,手可以去转动操控段4实现螺杆3的转动,螺纹段7又包括杆体71和设置在杆体71一端的端盖72,端盖72与杆体71通过过盈配合插接在一起,在端盖72上滑动地穿设有转轴8,转轴8远离杆体71的一端延伸出端盖72,且操控段4铰接在转轴8上;在转轴8靠近杆体71的一端设置有固定盘9,固定盘9与转轴8垂直设置,在端盖72靠近杆体71的一侧开设有供固定盘9相对于转轴8轴向方向滑移的滑移槽15,在固定盘9靠近操控段4的一侧设有卡块10,滑移槽15的底壁上饶转轴8均匀地设有八个卡槽11,位于滑移槽15内的转轴8上套设有弹性橡胶套12。操控段4掰直后与端盖72接触的一端呈凸轮状,在将操控段4掰直的过程中,操控段4会挤压端盖72的端部上,使转轴8被不断地往外拉,从而使卡块10卡入到卡槽11中(如果一下子卡块10没有卡入卡槽11内时,可以转动一下操控段4),卡块10卡入到卡槽11内后才能实现带动螺纹段7一起转动;当操控段4与杆体71垂直后,转轴8在弹性橡胶套12的弹力作用下回复,卡块10从卡槽11中脱离出去,这样转动操控段4的时候,操控段4只能空转。As shown in Figures 2 and 3, the screw 3 includes a thread section 7 and a control section 4. When the screw 3 needs to be rotated, the control section 4 can be rotated by hand to realize the rotation of the screw 3. The screw section 7 also includes a rod body 71 and a setting On the end cover 72 at one end of the rod body 71, the end cover 72 and the rod body 71 are inserted together by interference fit, and the end cover 72 is slidably penetrated with a rotating shaft 8, and the end of the rotating shaft 8 away from the rod body 71 extends out of the end cover 72, And the control section 4 is hinged on the rotating shaft 8; the end of the rotating shaft 8 close to the rod body 71 is provided with a fixed plate 9, the fixed plate 9 is vertically arranged with the rotating shaft 8, and a side of the end cover 72 close to the rod body 71 is provided for the fixed plate 9 to be opposite. The sliding groove 15 sliding in the axial direction of the rotating shaft 8 is provided with a clamping block 10 on the side of the fixed plate 9 close to the control section 4, and the bottom wall of the sliding groove 15 is evenly provided with eight clamping grooves 11 around the rotating shaft 8. , an elastic rubber sleeve 12 is sleeved on the rotating shaft 8 in the sliding groove 15 . After the control section 4 is straightened, the end that is in contact with the end cover 72 is in the shape of a cam. During the process of straightening the control section 4, the control section 4 will squeeze the end of the end cover 72, so that the rotating shaft 8 is continuously pulled out. , so that the card block 10 is snapped into the card slot 11 (if the card block 10 is not snapped into the card slot 11 at once, you can turn the control section 4), and the card block 10 can be inserted into the card slot 11. Drive the threaded section 7 to rotate together; when the control section 4 is perpendicular to the rod body 71, the rotating shaft 8 recovers under the elastic force of the elastic rubber sleeve 12, and the clamping block 10 is detached from the clamping slot 11, so that when the control section 4 is rotated, the control Segment 4 can only idle.

本活动工装的其他部件与对比文件中相同,现不做详细介绍。Other parts of the tooling for this activity are the same as those in the comparison document, and will not be described in detail now.

本实施例的实施原理为:当需要某一根螺杆3上的预制件连接支座2一起移动的时候,只需要先测量好距离,然后再将操控段4掰直,螺杆3内的卡块10卡入到卡槽11内,最后转动操控段4即可实现预制件连接支座2一起移动;当需要一个螺杆3上的某个预制件连接支座2不移动时,只需要旋松第一螺栓24,圆弧片27与管体22分离,这样在转动螺杆3的时候,螺杆3就会带动管体22一起转动,管体22在安装通孔23内空转不会带动滑移块21移动。The implementation principle of this embodiment is: when the prefabricated parts on a certain screw 3 need to be moved together with the support 2, it is only necessary to measure the distance first, and then straighten the control section 4, and the clamping block in the screw 3 10 is snapped into the slot 11, and finally the control section 4 can be rotated to realize the movement of the prefabricated part connecting support 2; when a certain prefabricated part connecting support 2 on a screw 3 is required not to move, it is only necessary to unscrew the first part. A bolt 24, the arc piece 27 is separated from the tube body 22, so when the screw 3 is rotated, the screw 3 will drive the tube body 22 to rotate together, and the tube body 22 will not drive the sliding block 21 when the tube body 22 idles in the installation through hole 23. move.

本具体实施方式的实施例均为本发明的较佳实施例,并非依此限制本发明的保护范围,故:凡依本发明的结构、形状、原理所做的等效变化,均应涵盖于本发明的保护范围之内。The embodiments of this specific embodiment are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore: all equivalent changes made according to the structure, shape and principle of the present invention should be covered in within the protection scope of the present invention.

Claims (7)

1. The utility model provides a movable fixture for production of concrete prefabricated component, includes fixed a plurality of limit mould connection support (1) that set up on pouring mould (14), its characterized in that: the prefabricated part connecting support is characterized by further comprising a prefabricated part connecting support (2) which is connected to the pouring mold (14) in a sliding mode, a screw rod (3) is rotatably arranged between every two adjacent side mold connecting supports (1), one end of the screw rod (3) extends out of the side mold connecting supports (1) to form an operation section (4), the screw rod (3) penetrates through the prefabricated part connecting supports (2), a threaded hole (5) matched with the screw rod (3) is formed in each prefabricated part connecting support (2), at least two prefabricated part connecting supports (2) are arranged between every two adjacent side mold connecting supports (1), each prefabricated part connecting support (2) comprises a sliding block (21) connected with the pouring mold (14) in a sliding mode and a pipe body (22) connected with the screw rod (3) in a threaded mode, an installation through hole (23) is formed in each sliding block (21), and each pipe body (22) is, the pipe body (22) is fixed with the sliding block (21) through a first bolt (24).
2. The movable tool for producing the concrete prefabricated part according to the claim 1, characterized in that: the pipe body (22) is rotatably arranged in the mounting through hole (23) through two rolling bearings (25), counter bores (26) are respectively formed in two ends of the mounting through hole (23), the rolling bearings (25) are fixedly arranged in the counter bores (26), and the pipe body (22) is fixedly connected with inner rings of the rolling bearings (25).
3. The movable tool for producing the concrete prefabricated part according to the claim 2, characterized in that: the inner wall of the counter bore (26) is provided with an internal thread, the outer ring of the rolling bearing (25) is provided with an external thread matched with the internal thread of the inner wall of the counter bore (26), the outer wall of the tube body (22) is provided with an external thread, and the inner ring of the rolling bearing (25) is provided with an internal thread matched with the external thread of the outer wall of the tube body (22).
4. The movable tool for producing the concrete prefabricated part according to the claim 1, characterized in that: the screw thread end of first bolt (24) rotates and is connected with circular arc piece (27), circular arc piece (27) laminating is on the outer wall of body (22), be equipped with on installation through-hole (23) inner wall and supply circular arc piece (27) for the gliding mounting groove (28) of first bolt (24) axial direction.
5. The movable tool for producing the concrete prefabricated part according to the claim 1, characterized in that: and the screw rod (3) is fixed with the side die connecting support (1) through a second bolt (6).
6. The movable tool for producing the concrete prefabricated part according to the claim 1, characterized in that: the screw rod (3) comprises a thread section (7) and a control section (4), and the control section (4) is hinged to the thread section (7).
7. The movable tool for producing the concrete prefabricated part according to the claim 6, characterized in that: the control section (4) is flat.
CN201910709282.5A 2019-08-02 2019-08-02 Movable tool for producing concrete prefabricated part Active CN110466050B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910709282.5A CN110466050B (en) 2019-08-02 2019-08-02 Movable tool for producing concrete prefabricated part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910709282.5A CN110466050B (en) 2019-08-02 2019-08-02 Movable tool for producing concrete prefabricated part

Publications (2)

Publication Number Publication Date
CN110466050A CN110466050A (en) 2019-11-19
CN110466050B true CN110466050B (en) 2020-09-11

Family

ID=68508519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910709282.5A Active CN110466050B (en) 2019-08-02 2019-08-02 Movable tool for producing concrete prefabricated part

Country Status (1)

Country Link
CN (1) CN110466050B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111923197A (en) * 2020-07-13 2020-11-13 亚泰集团沈阳现代建筑工业有限公司 Wallboard mold with prefabricated components and assembling method thereof
CN112643850B (en) * 2020-12-23 2022-03-11 台州东部建材科技有限公司 Preparation process of concrete prefabricated part
CN113787607B (en) * 2021-09-16 2024-08-09 广西中交建设发展有限公司 Mobilizable pc component built-in fitting is fixed frock

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001300929A (en) * 2000-04-20 2001-10-30 Ishikawajima Constr Materials Co Ltd Method for manufacturing segment
FI126477B (en) * 2013-01-14 2016-12-30 Concore Bv wire Control System
CN205552821U (en) * 2016-02-28 2016-09-07 张建军 High strength light weight wallboard production mould
CN206780641U (en) * 2017-05-16 2017-12-22 沈阳卫德住宅工业化科技有限公司 A kind of omnipotent machine frame for prefabricated component production and application
CN108943373B (en) * 2018-08-03 2020-10-20 上海住信住宅工业有限公司 A movable tooling for the production of concrete prefabricated components
CN108858698B (en) * 2018-08-09 2024-06-04 翁牛特旗双圆电力水泥制品有限公司 A mould for cement wire pole production usefulness

Also Published As

Publication number Publication date
CN110466050A (en) 2019-11-19

Similar Documents

Publication Publication Date Title
CN110466050A (en) A movable tooling for the production of concrete prefabricated components
CN213979903U (en) Novel building template
CN211201164U (en) A concrete construction fixing device
CN110125175B (en) Combined roller
CN201351362Y (en) Cast-in-place concrete ground planeness and elevation control device
CN210858016U (en) Building template connecting piece
CN212656230U (en) Film drum type vibrator for concrete curing
CN203129375U (en) Curtain wall T-shaped hanging piece installation device
CN109013936B (en) Die for realizing integral necking process of large-sized cylinder workpiece
CN216893035U (en) A kind of building decoration energy-saving curtain wall
CN204805318U (en) Can realize quick assembly disassembly's roller device
CN209409062U (en) An insert and its installation structure
CN221798853U (en) Wall connection structure of building curtain wall
CN220075010U (en) Assembled shear wall component combination side form
CN219973886U (en) A concrete placement bearing structure for construction is built in room
CN222207346U (en) Reinforcing apparatus of dysmorphism constructional column
CN215038749U (en) PC component groove activity frock
CN213888159U (en) Rotation preventing device for powder metallurgy core rod
CN213477643U (en) Detachable descending plate hanging mold supporting structure
CN110630006A (en) An aluminum formwork with high efficiency and material saving
CN222797053U (en) Frame square column template reinforced structure
CN219509187U (en) Formwork fixing device for building construction
CN221546353U (en) Toilet descending plate shaping quick-dismantling die
CN214561746U (en) Precast concrete component convenient to remove
CN202659236U (en) Circular vertical shaft sliding template convenient for detaching

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20260415

Address after: Room 2103, Room G001, Building 1, No. 213 Funing Road, Zumiao Street, Chancheng District, Foshan City, Guangdong Province, 528000 (Residence Declaration)

Patentee after: Foshan Runqianyu Intellectual Property Service Co.,Ltd.

Country or region after: China

Address before: 456581 Henan Province Anyang City Linzhou City Guilin Town Administrative Street No. 1

Patentee before: Tianyi Construction Development Co.,Ltd.

Country or region before: China